11-215-0039. THE NATURE OF THIS TYPE OF CONSTRUCTION POSES SPECIAL PROBLEMS CONDUIT AND BOXES COLOR CODE CHART
FOR THE DESIGN ENGINEERS AS WELL AS THE CONTRACTOR. EVERY EFFORT
HAS BEEN MADE BY THE ENGINEERS TO SHOW AND VERIFY WHERE POSSIBLE. ORANGE - CRITICAL BRANCH
THE LOCATION OF THE EXISTING ELECTRICAL SYSTEMS, THE MAJOR PORTION YELLOW -LIFE SAFETY BRANCH
OF THE ELECTRICAL SYSTEMS ARE AS SHOWN ON THE DRAWINGS. HOWEVER
MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO GREEN - EQUIPMENT BRANCH
ADVANTAGE IS TO BE TAKEN BY THE CONTRACTOR BECAUSE THESE MINOR
DIFFERENCES, RED - FIRE ALARM
10. ALL FLOORS, WALLS, AND ROOF PENETRATIONS SHALL BE PROPERLY
SEALED -OFF. IF FIRE RATED, AN APPROVED FIRE RETARDANT SEALANT
SHALL BE USED.
11. THESE DRAWINGS ARE A GUIDE FOR THE INSTALLATION OF THE RACEWAY
SYSTEM AND EQUIPMENT. THEY ARE INTENDED TO SHOW THE GENERAL
ARRANGEMENT, DESIGN AND EXTENT OF THE WORK AND PARTLY
DIAGRAMMATIC, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A NOTE
COMPLETE AND FUNCTIONAL INSTALLATION.
WIRING AND GROUNDING IN ALL PATIENT CARE AREAS SHALL BE INSTALLED
12. ANY DEVIATIONS FROM THESE DRAWINGS AND SPECIFICATIONS MUST BE IN COMPLIANCE WITH NEC ARTICLE 517.13
AUTHORIZED IN WRITING FROM THE ENGINEERS OFFICE. THE CONTRACTOR
SHOULD BE HELD LIABLE FOR ANY DEVIATIONS WITHOUT SUCH
AUTHORIZATION.
"• • Y • 7 ♦ Y
_ I
1.
SITE INVESTIGATION: PRIOR TO BIDDING THE CONTRACTOR SHALL VISIT THE
13.
ANY. WORK NOT SHOWN OR SPECIFICALLY MENTIONED ON THESE PLANS
_W
wM
too
0
AND /OR SPECIFICATIONS BUT CONSIDERED NECESSARY FOR COMPLETION OF
■�■ 1■■
WHICH WILL AFFECT HIS WORK. FAILURE TO DO SO WILL NOT BE ACCEPTED AS
THE WORK IN THE PROPER MANNER SHALL BE PROVIDED BY THE
A REASON FOR REQUESTING EXTRA PAY WHERE THE EXISTING CONDITION
`J
CONTRACTOR WITHOUT ADDITIONAL CHARGE.'
RESULTS IN EXTRA MATERIAL OR LABOR. THE CONTRACTOR SHALL SUBMIT IN
U Z
HIS BID AN AMOUNT THAT WOULD BE SET ASIDE FOR UNIDENTIFIED ITEMS.
14.
CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND DIMENSIONS AT JOB
c5
o
SITE PRIOR TO FABRICATION , AND INSTALLATION ' OF MATERIALS AND
2.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT
EQUIPMENT. ELECTRICAL CONTRACTOR TO COORDINATE HIS WORK WITH
NECESSARY FOR THE COMPLETE INSTALLATION OF THE ELECTRICAL SYSTEMS,
4
THE ARCHITECT BEFORE ROUGH INSTALLATION OF ALL OUTLETS, (LIGHTS,
ALL IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS, ALL WORK
RECEPTACLES, SWITCHES, PULL BOXES, ETC.) FOR EXACT LOCATION.
KEY PLAN
PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH THE FLORIDA
�> -- S.M.H.
BUILDING CODE 2007 EDITION WITH 2009 REVISIONS AND ALL THE STANDARDS
15.
ALL ELECTRICAL EQUIPMENT SUCH AS PANELS, PULL /J- BOXES, FEEDERS,
OF CONSTRUCTION ESTABLISHED BY THE BHSF HOSPITAL INCLUDING, BUT NOT
BREAKERS, ETC. SHALL BE PROPERLY IDENTIFIED WITH A PERMANENT LABEL
LIMITED TO THE FOLLOWING PUBLICATIONS: A) CHAPTER 59A -3 FLORIDA
AFFIXED TO THE EQUIPMENT. IDENTIFY BREAKERS IN PANELS BY MEANS OF A
ADMINISTRATIVE CODE 2002, B) NFPA 70 -2008, NFPA 72 -2002, NFPA 99 -2005,
TYPED, PLASTIC COVERED DIRECTORY. CONTRACTOR SHALL PROVIDE UPDATED
NFPA 110 -2005, NFPA 101 -2006, NFPA 780 -2004 AND C) AIA 2006 AND D) OSHA:
PANEL DIRECTORIES.
3.
MINIMUM STANDARDS: THE MATERIAL, EQUIPMENT, INSTALLATIONS, AND
16.
ALL SERVICE INTERRUPTIONS AND ALL REMOVAL AND DISPOSAL WORK SHALL
WORKMANSHIP FURNISHED UNDER THIS SECTION SHALL CONFORM AT LEAST TO
BE SCHEDULED AND COORDINATED WITH THE AUTHORIZED REPRESENTATIVE
THE REQUIREMENTS OF THE REGULATING AGENCIES AS LISTED IN ITEM (2)
9. THE NATURE OF THIS TYPE OF CONSTRUCTION POSES SPECIAL PROBLEMS CONDUIT AND BOXES COLOR CODE CHART
FOR THE DESIGN ENGINEERS AS WELL AS THE CONTRACTOR. EVERY EFFORT
HAS BEEN MADE BY THE ENGINEERS TO SHOW AND VERIFY WHERE POSSIBLE. ORANGE - CRITICAL BRANCH
THE LOCATION OF THE EXISTING ELECTRICAL SYSTEMS, THE MAJOR PORTION YELLOW -LIFE SAFETY BRANCH
OF THE ELECTRICAL SYSTEMS ARE AS SHOWN ON THE DRAWINGS. HOWEVER
MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO GREEN - EQUIPMENT BRANCH
ADVANTAGE IS TO BE TAKEN BY THE CONTRACTOR BECAUSE THESE MINOR
DIFFERENCES, RED - FIRE ALARM
10. ALL FLOORS, WALLS, AND ROOF PENETRATIONS SHALL BE PROPERLY
SEALED -OFF. IF FIRE RATED, AN APPROVED FIRE RETARDANT SEALANT
SHALL BE USED.
11. THESE DRAWINGS ARE A GUIDE FOR THE INSTALLATION OF THE RACEWAY
SYSTEM AND EQUIPMENT. THEY ARE INTENDED TO SHOW THE GENERAL
ARRANGEMENT, DESIGN AND EXTENT OF THE WORK AND PARTLY
DIAGRAMMATIC, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A NOTE
COMPLETE AND FUNCTIONAL INSTALLATION.
WIRING AND GROUNDING IN ALL PATIENT CARE AREAS SHALL BE INSTALLED
12. ANY DEVIATIONS FROM THESE DRAWINGS AND SPECIFICATIONS MUST BE IN COMPLIANCE WITH NEC ARTICLE 517.13
AUTHORIZED IN WRITING FROM THE ENGINEERS OFFICE. THE CONTRACTOR
SHOULD BE HELD LIABLE FOR ANY DEVIATIONS WITHOUT SUCH
AUTHORIZATION.
"• • Y • 7 ♦ Y
PROJECT SPECIFICATION
1.
SITE INVESTIGATION: PRIOR TO BIDDING THE CONTRACTOR SHALL VISIT THE
13.
ANY. WORK NOT SHOWN OR SPECIFICALLY MENTIONED ON THESE PLANS
_W
wM
JOBSITE AND BECOME ACQUAINTED WITH ALL OF THE EXISTING CONDITIONS
AND /OR SPECIFICATIONS BUT CONSIDERED NECESSARY FOR COMPLETION OF
■�■ 1■■
WHICH WILL AFFECT HIS WORK. FAILURE TO DO SO WILL NOT BE ACCEPTED AS
THE WORK IN THE PROPER MANNER SHALL BE PROVIDED BY THE
A REASON FOR REQUESTING EXTRA PAY WHERE THE EXISTING CONDITION
`J
CONTRACTOR WITHOUT ADDITIONAL CHARGE.'
RESULTS IN EXTRA MATERIAL OR LABOR. THE CONTRACTOR SHALL SUBMIT IN
U Z
HIS BID AN AMOUNT THAT WOULD BE SET ASIDE FOR UNIDENTIFIED ITEMS.
14.
CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND DIMENSIONS AT JOB
c5
o
SITE PRIOR TO FABRICATION , AND INSTALLATION ' OF MATERIALS AND
2.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT
EQUIPMENT. ELECTRICAL CONTRACTOR TO COORDINATE HIS WORK WITH
NECESSARY FOR THE COMPLETE INSTALLATION OF THE ELECTRICAL SYSTEMS,
4
THE ARCHITECT BEFORE ROUGH INSTALLATION OF ALL OUTLETS, (LIGHTS,
ALL IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS, ALL WORK
RECEPTACLES, SWITCHES, PULL BOXES, ETC.) FOR EXACT LOCATION.
KEY PLAN
PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH THE FLORIDA
�> -- S.M.H.
BUILDING CODE 2007 EDITION WITH 2009 REVISIONS AND ALL THE STANDARDS
15.
ALL ELECTRICAL EQUIPMENT SUCH AS PANELS, PULL /J- BOXES, FEEDERS,
OF CONSTRUCTION ESTABLISHED BY THE BHSF HOSPITAL INCLUDING, BUT NOT
BREAKERS, ETC. SHALL BE PROPERLY IDENTIFIED WITH A PERMANENT LABEL
LIMITED TO THE FOLLOWING PUBLICATIONS: A) CHAPTER 59A -3 FLORIDA
AFFIXED TO THE EQUIPMENT. IDENTIFY BREAKERS IN PANELS BY MEANS OF A
ADMINISTRATIVE CODE 2002, B) NFPA 70 -2008, NFPA 72 -2002, NFPA 99 -2005,
TYPED, PLASTIC COVERED DIRECTORY. CONTRACTOR SHALL PROVIDE UPDATED
NFPA 110 -2005, NFPA 101 -2006, NFPA 780 -2004 AND C) AIA 2006 AND D) OSHA:
PANEL DIRECTORIES.
3.
MINIMUM STANDARDS: THE MATERIAL, EQUIPMENT, INSTALLATIONS, AND
16.
ALL SERVICE INTERRUPTIONS AND ALL REMOVAL AND DISPOSAL WORK SHALL
WORKMANSHIP FURNISHED UNDER THIS SECTION SHALL CONFORM AT LEAST TO
BE SCHEDULED AND COORDINATED WITH THE AUTHORIZED REPRESENTATIVE
THE REQUIREMENTS OF THE REGULATING AGENCIES AS LISTED IN ITEM (2)
OF THE OWNER.
ABOVE. ALL MATERIALS AND EQUIPMENT USED SHALL BE LISTED OR BEAR THE
U.L. APPROVAL FOR THEIR INTENDED USE.
17.
CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, TAXES,'
INSPECTIONS, TESTS AND OTHER ITEMS AS REQUIRED FOR THE WORK AS
4.
RESPONSIBILITIES: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A
OUTLINED IN THE PLANS. PROVIDE ALL THE REQUIRED INSURANCE FOR
COMPLETE INSTALLATION OF THE RACEWAY SYSTEM, EQUIPMENT AND WIRING
PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
DURATION OF THE WORK.
5.
GUARANTEE: THE CONTRACTOR/SUB- CONTRACTOR SHALL FURNISH A
18.
UPON COMPLETION OF THE INSTALLATION, CONTRACTOR SHALL CONDUCT A
WRITTEN GUARANTEE THAT ALL WORK EXECUTED UNDER THIS CONTRACT
COMPLETE EQUIPOTENTIAL TEST AS DEFINED IN N.F.P.A. -99 (2002). SUBMIT
SHALL BE FREE FROM DEFECTS OF WORKMANSHIP AND MATERIALS FOR A
THE RESULTS OF THE TEST TO THE OWNER AND THE A/E. THE CONTRACTOR
PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE AND THAT HE
SHALL HAVE A TEST EQUIPMENT AVAILABLE FOR SPOT CHECKING AT FINAL
WILL AT HIS OWN EXPENSE, REPAIR OR REPLACE ALL WORK WHICH BECOMES
CONSTRUCTION SURVEY.
DEFECTIVE DURING THE TIME OF THE GUARANTEE.
19.
CONTRACTOR SHALL MAINTAIN 'A COMPLETE SET OF PRINTS FOR INDICATING
6,
ALL EQUIPMENT, SYSTEM AND SYSTEM COMPONENTS SHALL BE FROM THE
ALL CHANGES AS THE CONSTRUCTION PROGRESSES. AT THE COMPLETION OF
SAME MANUFACTURER AND SHALL BE INSTALLED IN ACCORDANCE WITH THE
THE WORK, THE CONTRACTOR SHALL DELIVER A SET OF "AS- BUILT" DRAWINGS ,
MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS.
TO THE OWNER IN REPRODUCIBLE MATERIAL. CONTRACTOR SHALL STAMP
"AS- BUILT" ON THE PLANS, (EACH SHEET), AND PRINT, DATE AND SIGN IN INK.
7.
RACEWAYS AND FITTINGS: CONDUIT RUNS SHALL BE CONCEALED IN CEILING
SPACES, AND WALL PARTITIONS; NO RACEWAY SHALL BE EXPOSED IN INTERIOR
20.
CONVENIENCE RECEPTACLE LIGHTING SWITCHES AND WIRING DEVICES
SPACES SUCH AS RESIDENT ROOMS, CONCEALED CONDUITS MAY BE EMT THE
SHALL BE ENGRAVED INDICATING PANEL AND CIRCUIT NUMBERS.
MINIMUM CONDUIT SIZE IS TO BE 3/4" FOR HOME RUN, ALL CONDUITS AND
RACEWAYS SHALL BE METAL.
21.
SEPARATE PERMIT APPLICATION ARE REQUIRED FOR FIRE ALARM. BURGLAR
ALARM, TELEPHONE, TV, CCTV, COMPUTER WIRING AND ANY OTHER LOW
8.
CONDUCTOR: ALL CONDUCTOR WIRE AND CABLE SHALL CONSIST OF 98 %
VOLTAGE SYSTEM. COPY OF CONTRACT MUST BE SUBMITTED WITH EACH
CONDUCTIVITY COPPER. ALL CABLES SHALL BE SINGLE CONDUCTOR, 600
APPLICATION.
VOLT, THERMOPLASTIC INSULATION. SUITABLE FOR CONTINUOUS OPERATION
AT 75 DEGREES C. CONDUCTOR TEMPERATURE IN BOTH WET AND DRY
22.
FIRE ALARM SHOP DRAWING AND PERMIT SHALL BE PROVIDED BY THE
LOCATIONS. THESE CABLES SHALL BE N.E.C. INSULATION CLASSIFICATION TYPE
CONTRACTOR
THWN/THHN. MINIMUM SIZE SHALL BE #12. ALL CONDUCTOR INSTALLATION
SHALL BE COLOR CODED MAINTAINING THE INTEGRITY OF THE EXISTING
INSTALLATION. COLORED INSULATION SHALL BE USED FOR AWG SIZES $10 AND
SMALLER AND APPROVED COLOR TAPES SHALL BE USED FOR AWG SIZES #8 AND
LARGER ALL POWER AND CONTROL CIRCUITS SHALL CARRY EQUIPMENT
GROUNDING CONDUCTOR SIZED PER NEC 250 -95.
9. THE NATURE OF THIS TYPE OF CONSTRUCTION POSES SPECIAL PROBLEMS CONDUIT AND BOXES COLOR CODE CHART
FOR THE DESIGN ENGINEERS AS WELL AS THE CONTRACTOR. EVERY EFFORT
HAS BEEN MADE BY THE ENGINEERS TO SHOW AND VERIFY WHERE POSSIBLE. ORANGE - CRITICAL BRANCH
THE LOCATION OF THE EXISTING ELECTRICAL SYSTEMS, THE MAJOR PORTION YELLOW -LIFE SAFETY BRANCH
OF THE ELECTRICAL SYSTEMS ARE AS SHOWN ON THE DRAWINGS. HOWEVER
MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO GREEN - EQUIPMENT BRANCH
ADVANTAGE IS TO BE TAKEN BY THE CONTRACTOR BECAUSE THESE MINOR
DIFFERENCES, RED - FIRE ALARM
10. ALL FLOORS, WALLS, AND ROOF PENETRATIONS SHALL BE PROPERLY
SEALED -OFF. IF FIRE RATED, AN APPROVED FIRE RETARDANT SEALANT
SHALL BE USED.
11. THESE DRAWINGS ARE A GUIDE FOR THE INSTALLATION OF THE RACEWAY
SYSTEM AND EQUIPMENT. THEY ARE INTENDED TO SHOW THE GENERAL
ARRANGEMENT, DESIGN AND EXTENT OF THE WORK AND PARTLY
DIAGRAMMATIC, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A NOTE
COMPLETE AND FUNCTIONAL INSTALLATION.
WIRING AND GROUNDING IN ALL PATIENT CARE AREAS SHALL BE INSTALLED
12. ANY DEVIATIONS FROM THESE DRAWINGS AND SPECIFICATIONS MUST BE IN COMPLIANCE WITH NEC ARTICLE 517.13
AUTHORIZED IN WRITING FROM THE ENGINEERS OFFICE. THE CONTRACTOR
SHOULD BE HELD LIABLE FOR ANY DEVIATIONS WITHOUT SUCH
AUTHORIZATION.
"• • Y • 7 ♦ Y
' LOCATION
OF WORK
r `
J, a
Seal
ty �LtrC_TRIC�,� �"�
HN ' r� P.Es.'
/�JCEN E 71 65!
:.
c y
Y
Sheet Title:
PROJECT NOTES
ELECTRICAL
Project No.: 20046
Date: 02.18.2011
Scale: AS NOTED
Drawn by: SI J.B.
Checked by: P. A, D. J.
Sheet Number:
E0n01
South Miami Hospital
B.H.SYF♦
6200 S.W. 73 RD. Street
Miami, FL. 33143
0 Z
o w
_W
wM
■�■ 1■■
�
■ ❑ Lij
`J
U Z
E
co Z J
z V ,� a
c5
o
H W
N
CD
y
4
KEY PLAN
�> -- S.M.H.
' LOCATION
OF WORK
r `
J, a
Seal
ty �LtrC_TRIC�,� �"�
HN ' r� P.Es.'
/�JCEN E 71 65!
:.
c y
Y
Sheet Title:
PROJECT NOTES
ELECTRICAL
Project No.: 20046
Date: 02.18.2011
Scale: AS NOTED
Drawn by: SI J.B.
Checked by: P. A, D. J.
Sheet Number:
E0n01