Loading...
11-173-004A/E PLUMBING LEGEND SYMBOL INSIDE DIAMETER DESCRIPTION AIR CONDITIONING IND SANITARY PIPE AR AREA DRAIN ACID RESISTANT WASTE PIPE GW AFC GREASY WASTE PIPE RWL ISOMETRIC RAIN WATER LEADER EO IW EMERGENCY OVERFLOW ---- - - - - -- ABOVE FINISHED GRADE VENT PIPE ---- AR - - -- AG ACID RESISTANT VENT PIPE — DOMESTIC COLD WATER PIPE -- KIT IT DOMESTIC HOT WATER PIPE - -- ACCESS PANEL DOMESTIC HOT WATER RETURN PIPE _IA APPROX INSTRUMENT AIR PIPE C KILOWATT CONDENSATE DRAIN PIPE 02 OXYGEN PIPE 02 ACID RESISTANT EXISTING OXYGEN PIPE N20 ASME NITROUS OXIDE PIPE A MEDICAL AIR PIPE A MECH EXISTING MEDICAL AIR PIPE V ACID VENT MEDICAL VACUUM PIPE V AW EXISTING MEDICAL VACUUM PIPE FOS MINIMUM /MINUTE FUEL OIL SUPPLY PIPE FOR MOD FUEL OIL RETURN PIPE G AMERICAN WATER WORKS ASSOCIATION GAS PIPE P &T BLDG PRESSURE TEMP RELIEF PIPE PD NOT APPLICABLE PAN DRAIN PIPE BOTTOM NC DIRECTION OF FLOW BT BATHTUB PITCH PIPE IN DIRECTION OF FLOW NORMALLY OPEN VALVE IN VERTICAL WCO -I I WCO 0--- f CA WALL CLEAN -OUT FCO —i$} NATIONAL PIPE STANDARD FLOOR CLEAN -OUT CATCH BASIN NTS GATE VALVE CHKV CHECK VALVE BALL VALVE CI CHECK VALVE — - -- OUTSIDE DIAMETER BALANCING VALVE (CIRCUIT SETTER) --�� -. OFD HOSE BIBB (HB) �-- CLEANOUT WATER HAMMER ARRESTOR —J I L VTR COND VENT THRU ROOF C MEDICAL GAS OUTLET CONNECTION pp PLANTER DRAIN CONT ® 0 PRESSURE & TEMPERATURE FLOOR DRAIN, AREA DRAIN OR FLOOR CHLORINATED POLYVINYL CHLORIDE pKp SINK WITH FULL GRATE ROOF DRAIN Uj COLD WATER FLOOR SINK WITH 1/2 GRATE PLUMBING PRESSURE AND TEMPERATURE RELIEF VALVE PRV PRESSURE REDUCING VALVE ANGLE VALE DETAIL PSIG CONNECT NEW TO EXISTING SYSTEMS A/E ARCHITECT/ENGINEER ID INSIDE DIAMETER AC AIR CONDITIONING IND INDIRECT AD AREA DRAIN INV INVERT AFC ABOVE FINISHED CEILING ISO ISOMETRIC AFF ABOVE FINISHED FLOOR IW INDIRECT WASTEIINDUSTRIAL WASTE AFG ABOVE FINISHED GRADE IWH INSTANTANEOUS WATER HEATER AG ABOVE GROUND AHU AIR HANDLING UNIT KIT IT KITCHEN AP ACCESS PANEL • KITCHEN AL APPROX APPROXIMATE KW KILOWATT APT APARTMENT 3 AR ACID RESISTANT LAV LAVATORY ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS MECH MECHANICAL AV ACID VENT MH MANHOLE AW ACID WASTE MIN MINIMUM /MINUTE AWS AMERICAN WELDING SOCIETY MOD MODEL AWWA AMERICAN WATER WORKS ASSOCIATION MTD MOUNTED BLDG BUILDING NA, N/A NOT APPLICABLE BOT BOTTOM NC NORMALLY CLOSED BT BATHTUB NO NORMALLY OPEN NIC NOT IN CONTRACT CA COMPRESSED AIR NPS NATIONAL PIPE STANDARD CB CATCH BASIN NTS NOT TO SCALE CHKV CHECK VALVE CI CAST IRON OD OUTSIDE DIAMETER ClP CAST IRON PIPE/CAST -IN -PLACE OFD OVERFLOW DRAIN CO CLEANOUT pS g� y OUTSIDE SCREW AND YOKE COND CONDENSATE CONK CONNECTION pp PLANTER DRAIN CONT CONTINUOUS /CONTINUATION P &T PRESSURE & TEMPERATURE CPVC CHLORINATED POLYVINYL CHLORIDE pKp PARKING DRAIN CW COLD WATER PLUM PLUMBING PRV PRESSURE REDUCING VALVE DET DETAIL PSIG POUNDS PER SQUARE INCH, GAGE DF DRINKING FOUNTAIN PVC POLYVINYL CHLORIDE DIA DIAMETER PVDF PQLYVINYLIDINE FLUORIDE DIM DIMENSION DN DOWN R RADIUS, RADII, RELIEF PIPE DOM DOMESTIC RD ROOF DRAIN DR DRAIN REINF REINFORCING, REINFORCED, REINFORCEMENT DS DOWNSPOUT REQ'D REQUIRED DW DISHWASHER RM ROOM DWG DRAWING RPM REVOLUTIONS PER MINUTE RWL RAIN WATER LEADER EA EACH EL ELEVATION SAN SANITARY ELEC ELECTRICAL SCH SCHEDULE EMER EMERGENCY SD STORM DRAIN EPDM ETHYLENE PROPYLENE DIENE MONOMER SECT SECTION EO EMERGENCY OVERFLOW SF SQUARE FEET EQUIP EQUIPMENT SHR SHOWER EWC ELECTRICAL WATER COOLER SHT SHEET EWH ELECTRICAL WATER HEATER SPECS SPECIFICATIONS EXIST EXISTING SS STAINLESS STEEUSANITARY SEWER SSK SERVICE SINK FCO FLOOR CLEANOUT FD FLOOR DRAIN TD TRENCH DRAIN FF FINISHED FLOOR TEMP TOTAL DYNAMIC HEAD FIN FINISH TEMPERATURE FLR FLOOR, FLOORING TOP TOP OF PIPE FM FACTORY MUTUAUFORCE MAIN TYP TYPICAL FO FUEL OIL FOR FUEL OIL RETURN UG UNDERGROUND FOS FUEL OIL SUPPLY UL UNDERWRITERS LABORATORIES FS FLOOR SINK URN UNLESS OTHERWISE NOTED FT FEET /FOOT UR URINAL FU FIXTURE UNIT FLIT FUTURE V VENT VAC VACUUM G GAS VB VACUUM BREAKER GA GAGE VIV VALVE IN VERTICAL GAL GALLON VTR VENT THRU ROOF GALV GALVANIZED VS VENT STACK GC GENERAL CONTRACTOR GPD GALLONS PER DAY W/ WITH GPH GALLONS PER HOUR WC WATER CLOSET ET GPM GALLONS PER MINUTE WCO WALL UT GV GATE VALVE W/O WITHOUT GW GREASY WASTE H&CW HOT AND COLD WATER HB HOSE BIBB HD HEAD HD HUB DRAIN HP HORSE POWER HR HOUR HW HOT WATER MEDICAL GAS SYSTEMS SPECIFICATIONS MEDICAL GAS SYSTEMS (AIR, OXYGEN, AND VACUUM} NOTE: ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH NFPA 99 (2005) SECTIONS 5.1 "LEVEL 1 DISTRIBUTION ", 5.1.9.3. "AREA ALARMS" IN THEIR ENTIRETY AND ALL OTHER APPLICABLE CODES AS REQUIRED. 1. PIPE AND FITTINGS: A. HARD -DRAWN SEAMLESS COPPER ASTMS - 819 MEDICAL GAS PIPE, TYPE "L ". B. WROUGHT COPPER ANSI B16.22 WITH WROUGHT COPPER BRAZED FITTINGS COMPLYING WITH ASME B16.50 C. SILVER BRAZING MATERIALS: 1. MELTING POINT: ABOVE 1100 DEGREES F. D. ALL PIPES SHALL BE CLEANED, CAPPED AND NITROGEN CHARGED. 2. STERILIZATION: A. CLEAN ALL TUBING, FITTINGS AND VALVES OF OIL, GREASE AND OTHER DEPOSITS BY WASHING A 180 DEGREES F. SOLUTION OF CARBONATE OR TRISODIUM PHOSPHATE MIXED: ONE POUND TO 3 GALLONS OF WATER. B. RINSE THOROUGHLY WITH CLEAN WATER. C. WHILE BEING BRAZED, JOINTS SHALL BE CONTINUOUSLY PURGED WITH OIL -FREE NITROGEN TO PREVENT THE FORMATION OF COPPER OXIDE ON THE INSIDE SURFACE OF THE JOINT, THE FLOW OF THE PURGE GAS SHALL BE MAINTAINED UNTIL THE JOINT IS COOL TO THE TOUCH. D. INTERNAL CLEANING OF SYSTEMS AFTER INSTALLATION NOT PERMITTED. E. SUBMIT CERTIFICATE TO A/E OF COMPLIANCE PRIOR TO INSTALLATION. F. PIPING MAY BE PURCHASED PRE - CLEANED FOR OXYGEN SERVICE. 3. TESTING A. TESTING COMPLETE BEFORE ANY WORK IS COVERED OR CONCEALED. B. PIPING MAY BE TESTED A SECTION AT A TIME TO FACILITATE CONSTRUCTION. C. MAINTAIN 150 PSI (1040 Kpa) OF OIL -FREE NITROGEN ON SYSTEM AND CHECK EACH JOINING WITH LIQUID SOAP OR THICK SOAPY WATER. D. AFTER COMPLETION OF 3.05C, PERFORM 2 -HOUR STANDING PRESSURE TEST WITH 150 PSI (1040 kPa) OF OIL -FREE NITROGEN OR AIR. NO PRESSURE DROP PERMITTED ON 4 -1/2 INCHES DIAMETER GAGE CALIBRATED TO 1/4 OF ONE PERCENT. E. AFTER COMPLETION OF SUBPARAGRAPH 3.05.D, REDUCE PRESSURE ON SYSTEM TO 50 PSI (350 kPa) AND PLACE "WARNING -DO NOT OPEN- PRESSURE SEALED ", TAGS ON ALL VALVES, OUTLETS AND CAPPED ENDS. F. LEAKS DEVELOPING AT THESE TEST REPAIRED AND RE- TESTED AT NO ADDITIONAL COST TO OWNER. G. AT COMPLETION OF WORK, OR WHEN SYSTEM OR SECTION IS MADE AVAILABLE, COMPLETELY FLUSH SYSTEMS WITH GAS TO BE USED IN THE PARTICULAR SYSTEM. H. TEST EACH DESIGNATED AND LABELED MEDICAL GAS OUTLET TO CONFIRM THE PRESENCE OF THE DESIRED CONCENTRATION OF MEDICAL GAS. 4. CERTIFICATION: A. THE CONTRACTOR SHALL PROVIDE THE SERVICES OF THE AUTHORIZED REPRESENTATIVE OF THE MANUFACTURER OF THE OXYGEN, MEDICAL AIR, AND VACUUM SYSTEM EQUIPMENT TO INSPECT THE COMPLETED INSTALLATION AND FURNISH CERTIFICATION ON THE MANUFACTURER'S LETTERHEAD THAT THESE SYSTEMS ARE WITHOUT CROSS CONNECTION, THAT THE EQUIPMENT IS INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, AND THAT ONLY OXYGEN IS AVAILABLE FROM OXYGEN OUTLETS AND EACH MEDICAL GAS IS ONLY AVAILABLE FROM THE CORRESPONDING OUTLETS. B. THE CONTRACTOR SHALL FURNISH A LETTER SIGNED BY A PRINCIPAL OF THE CONTRACTING FIRM ADDRESSED TO OWNER AND DELIVERED PRIOR TO FINAL INSPECTION WHICH CERTIFIES THAT 1. ALL MEDICAL GAS PIPING ARE LABELED CORRECTLY AND DIRECTION OF FLOW INDICATED, AND ALL MEDICAL GAS VALVES AND MANIFOLDS ARE LABELED CORRECTLY, AND THAT ALL ZONE VALVES AND ALARM PANEL INDICATE ITS CONTROLLING AREAS. 2. THERE ARE NO CROSS CONNECTIONS. 3. ALL MEDICAL GASES ARE AVAILABLE FROM THE CORRESPONDING OUTLETS, AND ALL VACUUM OPERATE AT A VACUUM. 4. SIGN TO BE POSTED ON EXTERIOR SIDE OF MEDICAL GAS STORAGE ROOM TO INDICATE "NO STORAGE OF COMBUSTIBLE MATERIALS ". C. COPIES OF THE CERTIFICATION LETTER SHALL ALSO BE FURNISHED TO THE ARCHITECT/ENGINEER AT TIME OF COMPLETION OF PROJECT. PLUMBING GENERAL NOTES 1. SITE INVESTIGATION: EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK: THE BIDDER IS REQUIRED, BEFORE SUBMITTING HIS PROPOSAL, TO VISIT THE SITE OF THE PROPOSED WORK AND FAMILIARIZE HIMSELF WITH THE NATURE, EXTENT OF THE WORK AND ANY LOCAL CONDITIONS THAT MAY IN ANY MANNER AFFECT THE WORK TO BE DONE AND EQUIPMENT, MATERIALS AND LABOR REQUIRED THEREFORE. SINCE THE WORK INVOLVES EXISTING BUILDING, SYSTEMS AND FACILITIES, SPECIAL CONSIDERATION SHALL BE GIVEN TO EXAMINATION OF WORKING CONDITIONS, EXISTING FACILITIES AND ALL BUILDING STRUCTURES. HE IS TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS SLIGHT VARIATION OF ROUTING AND /OR CONSTRUCTIONS SHOULD BE ANTICIPATED BY THIS CONTRACTOR TO AVOID CONFLICTS WITH OTHER TRADES. THESE ARE EXPRESSLY INCLUDED AS PART OF THE WORK WHENEVER REQUIRED AT NO ADDITIONAL COST TO OWNER. 2. THE NATURE OF THE REMODEL TYPE CONSTRUCTION POSES SPECIAL PROBLEMS FOR THE DESIGN ENGINEER AS WELL AS THE PLUMBING CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEER TO SHOW AND VERIFY, WHERE POSSIBLE, THE LOCATION OF THE EXISTING PLUMBING SYSTEMS. THE MAJOR PORTION OF THE PLUMBING SYSTEMS ARE AS SHOWN ON THE DRAWINGS. HOWEVER, MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO ADVANTAGE IS TO BE TAKEN BY THE PLUMBING CONTRACTOR BECAUSE THESE MINOR DIFFERENCES. PLUMBING CONTRACTOR SHALL PERFORM FIELD VERIFICATION BEFORE BIDDING THIS PROJECT. 3. ALL PIPING SHALL BE INSTALLED RECESSED IN WALLS, CHASES OR PARTITIONS. 4. EXISTING PIPES SERVING AREAS NOT COVER BY THIS CONTRACT BUT IN SERVICE AT THIS TIME SHALL NOT BE INTERRUPTED UNLESS IS A TEMPORARY INTERRUPTION COORDINATED WITH THE OWNER. 5. ALL WORK SHALL BE IN ACCORDANCE WITH THE STATE AND LOCAL CODES AND ORDINANCES. 6. CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION CHARGES REQUIRED. 7. CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT. 8. COORDINATE NEW WORK WITH ALL TRADES. 9. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR TO INSTALLATION. 10. CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCES. 11. WHEREVER DISSIMILAR METALS ARE TO BE JOINED. A DIELECTRIC FITTING SHALL BE PROVIDE TO CONNECT BOTH TYPES OF PIPES. 12. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL ROUGH INS WITH EQUIPMENT AND FIXTURES MANUFACTURER BEFORE MAKING ANY INSTALLATION. 13. CONTRACTOR SHALL PROTECT AND FIRE SEAL ALL OPENINGS AND PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS WITH ADEQUATE FIRESTOPPING MATERIALS TO MAINTAIN THE INDICATED FIRE RATINGS OF THE ASSEMBLIES BEING PENETRATED. 14. PROVIDE CEILING / WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO ACCESS PLUMBING EQUIPMENT. PANELS SHALL BE RECESSED TYPE, FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATIONS OF PANELS SHALL BE COORDINATED WITH ALL THE OTHER TRADES. 9150 South Dadeland •rr Miami * Florida 33156 * CA 924 Telephone 305.670.0141 Facsimile 305.670.0144 www,l-igopa.com Client South Miami Hospital B.H.S.F.'!I! 6200 S.W. 73 RD. Street Miami, FL. 33143 •OR AREA Seal Cn -Z:DUARDO A. S, P9Z,' P.E.' UC;ENSE # 64759 CL • • • 3 • i — i . — . • i r •OR AREA 1 1 1l Seal -Z:DUARDO A. S, P9Z,' P.E.' UC;ENSE # 64759 1 1 1l