11-122-008* * * * * * * * * * * * ** F
A U L T A N
----------------------------------------------------------------
A L Y S I S
S U M M A R Y * * * * * * * * * * * * * **
BUS NAME
-------------------------------------------------------------------
VOLTAGE
AVAILABLE FAULT CURRENT
CON
DUI
L -L
3 PHASE
X/R LINE /GRND X/R
200- --EX SBDNPSB
480.
21960.5
11.6
CH2S
480.
20026.1
8.0
MSN1 FPL XFMR
480.
31000.0
8.0
NT FPL XFSC
480.
22000.0
12.0
PNL 2CPL1
208.
1096.6
0.4
*
'
- L1
208.208.
108.
1
CD
PNL CDPA
480.
23596.4
3.7
PNL CL2N A
208.
2082.8
0.4
PNL (111-21NB
208.
1252.6
0.3
PNL CL2S
208.
5601.8
1.0
PNL CL2SA
208.
2661.5
0.5
PNL CL.2SB
208.
1707.4
0.4
SWDRD M SN 1
480.
30916.5
7.8
XFMR 2CPL1 PRI
480.
19256.7
1.5
XAvIR 2CPL1 SEC
208.
1876.9
0.6
XFMR CL2S PRI
480.
19459.7
5.5
XFMR CL2S SEC
208.
5819.8
1.0
* * * * * * * * * * * * * * * * * * * * ** FAULT ANALYSIS REPORT COMPLETED * * * * * * * * * * * * * * * * * * * * * **
* FAULT CURRENT ANALYSIS WAS TAKEN FROM ORIGINAL DRAWINGS DATED 03/09/05.
TYPE CUTLER HAMMER
VOLTAGE 120/208V, 3 PH, 4W
MOUNTING SURFACE FED
(EXISTING) MAIN BUS 100A MLO
PANEL "4CPL1 " AIC IOKAIC
FROM: CDPA LOCATION 4TH FL, ELEC. CLOSET
W
�
VOLT
AMP
POLE
TRIP
CON
DUI
WIRE
REMARKS
F.A.
CKT.
NO.
V
�
CKT.
N0.
REMARKS
WIRE
CON
DUI
TRIP
POLE
VOLT
AMP
w
Z
z <
Z ,Q
1
20
m
LAJ
VISICU RECEPTACLE 11 -12
1
2
VISICU RECEPTACLE 5 -6
Z
l<
20
1
0
10
1
1
2
2
1
20
VISICU RECEPTACLE 9 -10
3
4
VISICU RECEPTACLE 4 -4
CL,
20
1
O
1
20
VISICU RECEPTACLE 7 -8
5
6
VISICU RECEPTACLE 1 -2
20
1
1
20
CATH LAB RECEPT.
7
8
CATH LAB RECEPT.
20
1
1
20
CATH LAB RECEPT.
9
10
CATH LAB RECEPT.
20
1
1
20
CATH lA8 RECEPT.
11
12
VMW RECEPT RM. 42
1
1 2
20
1
600
1
20
PHILLIPS EQUIPMENT
13
14
CATH LAB RECEPT.
20
1
1
20
NICU
15
16
VGW RECEPT/MON. RY. 4
1211/2120
1
600
10
600
1
20
1/203012
VISICU RECEPT I" 424
17
18
RECEPT RY. 403J121/20
20
1 1
6001
1
20
PACS RECEPT.
19
20
VIM (M(;EpT R�, 4
121/20
20
1
600
1
20
1
1 PACS RECEPT.
21
22
VGW RECEPT RM. 4
1
1 2
20
1
SPACE
23
24
SPACE
20
1
SPACE
25
26
SPACE
20
1
SPACE
27
28
SPACE
20
1
SPACE
29
30
SPACE
20
1
SPACE
31
32
SPACE
20
1
SPACE
33
34
SPACE
20
1
SPACE
35
36
SPACE
20
1
SPACE
37
38
SPACE
20
1
SPACE
39
40
SPACE
20
1
SPACE
41
42 ISPACE
20
1
TOTAL DEMAND LOAD: 2.2KVAx 125%(READINGS) + 3.6KVA(LOAD BEING ADDED) = 6.35KVA
I = 6.35KVA = 18A 0 208V
0.360V
NOTES:
Q CONTRACTOR SHALL RE -USE EXISTING 1 -POLE, 20A CIRCUIT BREAKER.
2Q CONTRACTOR SHALL PROVIDE /INSTALL NEW 1 -POLE, 20A CIRCUIT BREAKER AND RUN NEW CONDUIT & WIRES AS
�7_ PER PANEL SCHEDULE.
I.I. lf,
A.) THE EQUIPMENT GROUNDING TERMINAL BARS OF THE NORMAL AND EMERGENCY ELECTRICAL SYSTEM
(CRITICAL & LIFE SAFETY) PANELBOARDS THAT SERVE THE SAME PATIENT AREA SHALL BE BONDED TOGETHER
WITH AN INSULATED CONTINUOUS COPPER CONDUCTOR NOT SMALLER THAN #8 AWG (N.E.C. ART. 517.14).
B.) SEE RISER DIAGRAM FOR FEEDER SIZES.
C.) CONTRACTOR SHALL FIELD VERIFY THAT ALL PANELBOARDS SERVING "CRITICAL CARE" AREAS ARE GROUNDED
IN ACCORDANCE WITH N.E.C. ART. 517- 19(d). METAL FEEDER RACEWAYS SHALL HAVE GROUNDING BUSHING AND
A CONTINUOUS COPPER BONDING JUMPER SIZED IN ACCORDANCE WITH N.E.C. TABLE 250 -95.
D.) REFER TO PANELBOARD SCHEDULES FOR REQUIRED PANELBOARD AIC RATINGS.
E.) FOR PANEL SHOWN IN THIS SHEET CONTRACTOR SHALL PROVIDE NEW UPDATED TYPE WRITTEN DIRECTORY.
F.) ALL CIRCUITS SHALL HAVE DEDICATED NEUTRAL IN ORDER TO COMPLY WITH NEC ART. 210.46.
PANEL SCHEDULE & FAULT CURRENT ANALYSIS
PwTO80"
C r
L) �T I
,
0
o °
i
0
U
Z
U
U
K
Z 0
LU
a
a
a
U
o
U: o
too
� y �Iltt
A
N
co 0
ate. c am
00 Q 'n q
0 14
vi
a
c.
0 �a
�w
I
w
J
W
�
D
Z
�
W
�zME
�
F.A.
V
�
�N
VN
W
w
Z
z <
Z ,Q
Q Z
_
m
LAJ
5
Q
Z
l<
0
J
CL,
cri
O
>►
I
W
J
�
D
Z
�
W
W
�
F.A.
V
�
�N
VN
W
w
Z
z <
Z ,Q
Q Z
a
FILE:
JOB NO.:
210 -840
DATE :
12 -01 -10
PLOT SIZE:
AS NOTED
DESIGNED /DRAWN BY:A.V,
CHECKED BY:
F.A.
SHEET No.:
E -7