11-1216-001r
q
PROJECT TEAM
A uSPIrF Af
SOUTH
CLIENT: BAPTIST HEALTH SOUTH FLORIDA
6200 SW 73'TH STREET
SOUTH MIAMI, FLORIDA 33143
TELEPHONE (786) 662 -4000
ARCHITECT: SALTZ MICHELSON ARCHITECTS, INC
3501 GRIFFIN ROAD
FT.LAUDERDALE, FL 33312
TELEPHONE (954) 266 -2700
FACSIMILE: (954) 266 -2701
ELECTRICAL
MECHANICAL ENGINEER: BARD, RAO& ATRAW C0NSULTNGENGWM-U
20 DOUGLAS RD., STE 301
CORAL ' (JABLES, FL 33134
TEL- 305 529 -1515
GENERAL DEMOLITION NOTES
I. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR HAULING
AND LEGALLY DISPOSING OF MATERIALS REMOVED IN DEMOLITION WORK.
2. THE PRO( EWRF5 PROPOSED FOR THE ACCOMPLISHMENT OF 5ALVA6E AND
DEMOLITION WORK SHALL BE SUBMITTED FOR REVIEW. THE PROCEDURES
SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL
AND DISPOSITION OF MATERIALS, PROTECTION OF PROPERTY,
COORDINATION WITH WORK OF OTHERS IN PROGRESS, AND TIMELY
015GONNECTION OF UTILITY 5ERVICE5, THE PROCEDURES SHALL
INCLUDE A DETAILED DESCRIPTION OF METH005 AMC) EQUIPMENT TO BE
USED FOR EACH OPERATION AND THE SEQUENCE OF OPERATION.
3. TITLE TO MATERIALS, TITLE TO ALL MATERIAL AND EQUIPMENT TO BE
DEMOLISHED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED
OVER TO THE OWNER IS VESTED IN THE CONTRACTOR AT START OF
PROJECT. ALL PLUMBING+ FIXTURES, LIGHTING FIXTURES, A/C
EQUIPMENT, APPLIANCES, TRAY5, SPECIALTY ITEM`,
ETC, SHALL BE EVALUATED BY A REPRESENTATIVE OF THE S.B.H.D.
AS TO THE STATUS OF THEIR REMOVAL.
THE OWNER WILL NOT BE RESPONSIBLE FOR THE CONPITION5,
LOSS OR DAMAGE OF SUCH PROPERTY AFTER NOTICE TO PROCEED.
4. THE GONTRAGTOR SHALL VI51T THE 51TE OF THE WORK AND EXAMINE
THE PLANS AND IT WILL BE ASSUMED THAT THE CONTRACTOR HAS
INVE5116ATED AND 15 FULLY INFORMED OF THE CONDITIONS AND
MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND
QUANTITIE5 OF WORK TO BE PERFORMED AND MATERIALS TO BE
FURNISHED AND AS TO THE REQUIREMENTS OF THE PLANS.
5. THE CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON
THESE pRANw -y5 AND AL50 REMOVE ANY OTHER ITEM5 OR CONSTRUCTION
A5 REQUIRED TO ACCOMPLISH ALL NEW WORK TO AREAS SHOWN
b. ALL DIMENSIONS SHOWN ARE TO BE VERIFIED IN THE FIELD AND ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT BEFORE PROCEEDING WITH THE WORK,
1. THE AMOUNT OF DUST RESULTING FROM DEMOLITION SHALL BE
CONTROLLED TO PREVENT THE SPREAD OF DUST TO AVOID CREATION OF
A NUISANCE IN THE 5URROUNDINO AREA, USE OF WATER WILL NOT BE
PERMITTED WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR
OBJECTIONABLE CONDITIONS 5" AS FLOODIN6 AND POLLUTION.
THE USE OF WATER WILL BE PERMITED FOR M15TIN6 AND WET FLOOR
MOPPING,
S. ALL EXISTING 5URFAGE5 5UCH A5 WALL5, FLOORS, CEILIN655, BA5E5, ETC.
THAT ARE AFFEGTED BY THESE ALTERATIONS AND WERE INTENDED TO REMAIN,
ARE TO HAVE NEW FIN15H TO MATCH ADJACENT EXISTING FINISHES.
q. GENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING OF
EXISTING CONCRETE 5LAB5, PARTITIONS, ETG..A5 MAY BE REQUIRED
FOR ALL TRADES TO ACCOMPLI5H ALL WORK REQUIRED BY THE5E
CONTRACT DOCUMENTS. CONT. SHALL DO ALL PATCHING AND
PROVIDE NEW FINISHES TO MATCH EXI5TIN6 50 AS TO MAKE THE
"PATCHED AREA" INP15CERNI13LE FROM THE EXIST, ADJACENT AREA.
10. UTILITY SERVICES, MAINTAIN EXISTING UTILITIES INDICATED
TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE
DURING DEMOLITION OPERATIONS.
A. DO NOT INTERUPT EXISTING UTILITIES SERVING OGCUPIEP
OR USE FACILITIES, EXCEPT WHEN AUTHORIZED IN
WRITING BY AUTHORITIES HAVING JURISDICTION.
II. PROTECTION, PROVIDE TEMPORARY BARRICADES AND OTHER FORMS
OF PROTECTION AS REQUIRED TO PROTECT 6ENERAL PUBLIC FROM
INJURY DUE TO SELECTIVE DEMOLITION WORK.
A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE
FREE AND SAFE PASSAGE OF OWNER'S PER50NAL AND
GENERAL PUBLIC TO AND FROM OCCUPIED PORTIONS OF BUILIDNG5.
12, GARBAGE REMOVAL SHOULD BE BY COVERED CART ONLY.
13, H05PITAL SHALL REMOVE ALL FURNITURE .CONTRACTOR
SHALL BE RE51PON5ABLE FOR GOVERING PROTECTING AND 5TORAGE OF
ALL REMAINING EQUIPMENT AND CABINETRY,
14, DEMOLITION SHALL BE LIMITED TO DAYTIME HOURS ONLY.
15. DO NOT P15TWB THE INTEGRITY OF THE EXI5TIN6 STRUCTURAL SYSTEM.
CONFIRM LOGATION OF EX15TING 5TRUGTURAL SUPPORTS AND MEMBERS PRIOR TO
GORE DRILLING AIV /OR GUTTING OPENINGS FOR NEW PLUMBING AND/OR MECHANICAL
LINES, AND NOTIFY AR( HITEGT IMMEDIATLY OF ANY COWLIGT5.
16. COORDINATE ALL PHASES OF THE WORK WITH THE OWNER PRIOR TO PROCEEDING.
11. IF NEGE%ARY, EXI5TIN65 WALLS MAY BE REMOVED TO RELIEVE NEW EQUIPMENT THAT
WILL NOT FIT THROUGH DOORS, CONTRACTOR TO PATCH AND REPAIR AFFECTED
WALLS TO MATCH ORIGINAL MATERIAL5 AND FIRE RATING AND INSTALL NEW FIN15HE5
A5 5CHEDULED AND /OR TO MATCH EXI5TIN5.
Iq, 5.M,H REP. SHALL APPROVE DISPOSAL OF ALL REMOVED ELEMENTS TO
VERIFY IF THEY SHALL BE DID 5ED OF OR STORE FOR OTHER U5E.
MIAMI,
I�1[17.a117e1
INDEX OF DRAWINGS
T1 COVER SHEET
ARCHITECTURAL
LS1 LIFE SAFETY PLAN 2ND FLOOR
LS2 LIFE SAFETY PLAN 4TH FLOOR
A1.0 PARTIAL 2ND FLOOR PLAN
A1.1 PARTIAL 4TH FLOOR PLAN, DETAILS
A2.0 DETAILS
A3.0 GENERAL NOTES AND SPECIFICATIONS
ELECTRICAL
EO.01 GENERAL ELECTRICAL NOTES
E2.01 PARTIAL 2ND FLOOR PLAN
E2.02 PARTIAL 4TH FLOOR PLAN
E5.01 RISER DIAGRAM
E7.01 ELECTRICAL PANELS
MECHANICAL
M1.01 ICRA GENERAL NOTES, VENTILATION PLAN, DETAIL
SCOPE OF WORK
THE SCOPE OF WORK IS TO INSTALL NEW IGU FLAT PANELS MONITORS:',
(8) IN THE 2ND FLOOR 51G.0 PATIENT ROOMS
(8) IN THE 2ND FLOOR 1.61) PATIENT ROOMS
(6) IN THE 2ND FLOOR PREP/ RECOVERY PATIENT ROOMS
(I2) IN THE 4TH FLOOR CRITICAL CARE UNIT PATIENT ROOM5
INFECTION CONTROL NOTES
I, EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. SEAL UNUSED DOORS WITH DUCT TAPE.
3. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA,
4. REMOVE OR 150LATE HVAG SYSTEM IN AREA WHERE WORK 15
BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
5. ,COMPLETE ALL CRITICAL BARRIERS I.E. 5HEET ROCK, PLYWOOD,
PLASTIC, TO 5EAL AREA FROM NON -WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (DART WITH PLASTIC COVERING AND
5EALED CONNECTION TO WORK 51TE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
6, MAINTAIN NEGATIVE AIR PRE55ME WITHIN WORK 517E UTILIZING
HEPA EGIAPPED AIR FILTRATION UNIT5 WITH ALARMS AND
RECORD READIN675 THREE TIMES A DAY.
1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
$. COVER TRANSPORT RECEPTACLES OR CART5. TAPE GOVERIN6
UNLE55 SOLID LID.
q. ALL PER50NNEL ENTERING WORK 51TE ARE REQUIRED TO WEAR
5HOE OVER5. SHOE COVER5 MU5T BE CHANGED EACH TIME
THE WORKER EXITS THE WORK AREA.
10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT 15 INSPECTED BY THE OWNERS SAFETY
DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND
THOROUGHLY GLEANED BY THE OWNERS ENVIRONMENTAL
5ERVICE5 DEPARTMENT.
LOCATION MAP
COUNTY LOCATION MAP
SOUTH MIAMI HOSPITAL _
ADDRESS:
6200 SOUTHWEST 73 STREET
SOUTH MIAMI, FL 33143
"
t�F r
r
r♦
r
SALTZ -MICHELSON,
A R C H I T E C T S
3501 Griffin Road
Ft. Lauderdale, FL 33312
(954) 266 -2700 Fx: (954) 266 -2701
sma@saltzmichelson.com
Charles Michelson
,IT �' O1 80U -'.H MIAMI Pro ectNo.:
BUILDING DEPT. 211 -166
STRUCi *uRAt. S CTION Drawn By-
NI-1
041RO`�?�:D �f.
Checked By:
Date:
09 -12 -11
LOCATION MAP
N
fi
G
TI
6
GENERAL NOTES:
I.
THE CONTRACTOR SHALL V151T THE 51TE OF THE WORK AND EXAMINE
11.
CONTRACTOR SHALL BE RE5PON51BLE FOR OBTAINING AND
THE PLANS AND IT WILL BE ASSUMED THAT THE CONTRACTOR HAS
PAYING FOR THE COST OF ALL INSPECTIONS AND TESTS
INVESTIGATED AND 15 FULLY INFORMED AS TO THE CONDITIONS
REQUIRED TO IMPLEMENT THE PLANS.
AND MATERIALS TO BE ENCOUNTERED A5 TO GHARA(TER, QUALITY
12,
FIRE SEAL ALL NEW OPENINGS AND PENETRATION5 ON FIRE
AND QUANTITIES OF WORK TO BE PERFORMED AND MATERIALS 70
RATED WALL5.
BE FURNISHED AND AS TO THE REQUIREMENTS OF THE PLANS.
13.
LAYOUT OF FLOORS AND CEILING SHALL FOLLOW EXACTLY
2.
CONTRACTOR SHALL VERIFY ALL DIMEN51ON5 ANp CONDITIONS
TH15 DOCUMENT5, IF ANY DISCREPANCIES CONTACT THE
IN THE FINAL PLANS AND ON THE JOB 51TE PRIOR TO EXECUTION
ARCHITECT BEFORE START INSTALLATION,
OF ANY WORK AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF
14.
AFTER APPROVAL OF THE FINAL PLANS, ALL REVISIONS MUST
ANY DISCREPANCIES. THE CONTRACTOR WILL BE RESPONSIBLE
PROCEED THROUGH THE ARGHITEGT FOR APPROVAL. ANY
FOR ALL 005% ARISING FROM A FAILURE TO PERFORM A
REMIT MADE WITHOUT THE WRITTEN APPROVAL OF THE
VERIFICATION AND 70 MAKE TIMELY NOTIFICATION OF
ARCHITECT MAY BE CONSIDERED INVALID AND, AT THE
EC
DISCREPANCIES, THE ARCHITECT WILL, IN AN EXPEDIENT
ARCHITECT,
SOLE DISCRETION OF THE ARGHITEGT, THE WORK
MANOR, PROVIDE THE OWNER WITH REVISED DRANNe5
THE O E
AND REQUIRED TO BE MODIFIED AT NO G05T 70 THE OWNER.
REFLECTING ANY OF THESE D15CREPANUE5 AND RELATED
MITIGATION FOR REVIEW AND APPROVAL.
15.
OWNER'S SUB- CONTRACTOR5 5HALL BE ALLOWED TO
3.
00 NOT SCALE DRAWINGS.
DO WORK PRIOR TO %U5TANTIAL COMPLETION SUBJECT
ONLY TO THE APPROPRIATE PROGRESS OF THE WORK AND A
4,
CONTRACTOR WILL GUARANTEE IN WRITING ALL MATERIALS AND
SEVEN (1) DAY PRIOR NOTICE OF INTENT BY OWNER TO THE
WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF
GONTRAGTOR.
FINAL ACCEPTANCE BY THE OWNER AND WILL, AT MI5 OWN COST,
REPAIR OR REPLACE ALL WORK OR DAMAGE GAU5ED BY WORK
16.
CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION AS
OF SUBCONTRACTOR5 WHICH BECOMES DEFECTIVE DURING THE
NECESSARY PER CITY AND LOCAL CODE REQUIREMENTS.
TERM OF THE GUARANTEE.
5.
CONTRACTOR SHALL COORDINATE AND SUPERVISE HI5 WORK
11,
ALL MATERIALS AND WORK TO CONFORM TO LATEST GOVERNING
AND WORK BY SUBCONTRACTORS.
BUILDIN6 CODES AND RE6U..ATION5. S 41T FOR REVIEW
6.
THESE PLANS ARE THE PROPERTY OF THE ARGHITEGT AND
NO LESS THAN (6) SETS OF SHOP DRAWN695 WHERE REQUIRED
SHALL NOT BE USED, REPRODUCED, OR GHAN6ED IN ANY WAY
AND /OR INDICATED.
WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ARCHITECT.
15,
CONTRACTOR SHALL PROVIDE ACCESS PANELS AS REQUIRED BY
1.
6ENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING
PLUMBING, AIR CONDITIONIN6 AND OTHER TRADES, AND AS
OF CONCRETE 5LAB5, ETC -A5 MAY BE REQUIRED FOR
REQUIRED BY CODES, LOCATIONS AND TYPE OF PANEL TO BE
ALL TRADES TO ACCOMPLISH ALL WORK REQUIRED BY
REVIEWED AND APPROVED BY THE ARGHITEGT.
THESE CONTRACT DOC.UMENT5. PATCH Q REPAIR AS REQ'D
Iq.
CONTRACTOR SHALL SUBMIT SHOP DRANNG5 AND PRODUCT
8.
CONTRACTORS INSTALLATION OF ALL UTILITIES
APPROVAL FOR ALL MANUFACTURED ITEM5
AND 5UB5E6IUENT HOOKUP SHALL BE AS NECE55ARY TO A55URE
20 CONTRACTOR SHALL LEAVE ACCESS TO ALL MEANS OF E6RE%
CONFORMANCE WITH UTILITY COMPANY REQUIREMENT5.
DURING CONSTRUCTION.
q.
IT 15 THE INTENT OF THE ARCHITECT THAT THI5 WORK BE IN
CONFORMANCE WITH BUILDING AUTHORITIES HAVING JURISDICTION
OVER THIS TYPE OF WORK AND OCCUPANCY. ALL CONTRA(TOR5
SHALL DO THEIR WORK IN COMPLIANCE WITH THE F.B.G.,
NATIONAL ELECTRIC GORE, NFPA, 05HA AND OTHER
APPLICABLE CODES AND REaLATION5,
10, IT 15 NOT THE INTENT OF THESE PLANS TO 5HOW EVERY MINOR
DETAIL OF CONSTRUCTION. THE CONTRACTOR 15 EXPECTED TO
FWNI5H AND INSTALL ALL CONSTRUCTION. THE CONTRACTOR
IS EXPECTED TO FURNI5H AND INSTALL ALL ITEMS REQUIRED
TO COMPLETE THE WORK NTH GOOD WORKMANSHIP AND ASSURE
PROPER WORKIN6 ORDER.
INDEX OF DRAWINGS
T1 COVER SHEET
ARCHITECTURAL
LS1 LIFE SAFETY PLAN 2ND FLOOR
LS2 LIFE SAFETY PLAN 4TH FLOOR
A1.0 PARTIAL 2ND FLOOR PLAN
A1.1 PARTIAL 4TH FLOOR PLAN, DETAILS
A2.0 DETAILS
A3.0 GENERAL NOTES AND SPECIFICATIONS
ELECTRICAL
EO.01 GENERAL ELECTRICAL NOTES
E2.01 PARTIAL 2ND FLOOR PLAN
E2.02 PARTIAL 4TH FLOOR PLAN
E5.01 RISER DIAGRAM
E7.01 ELECTRICAL PANELS
MECHANICAL
M1.01 ICRA GENERAL NOTES, VENTILATION PLAN, DETAIL
SCOPE OF WORK
THE SCOPE OF WORK IS TO INSTALL NEW IGU FLAT PANELS MONITORS:',
(8) IN THE 2ND FLOOR 51G.0 PATIENT ROOMS
(8) IN THE 2ND FLOOR 1.61) PATIENT ROOMS
(6) IN THE 2ND FLOOR PREP/ RECOVERY PATIENT ROOMS
(I2) IN THE 4TH FLOOR CRITICAL CARE UNIT PATIENT ROOM5
INFECTION CONTROL NOTES
I, EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. SEAL UNUSED DOORS WITH DUCT TAPE.
3. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA,
4. REMOVE OR 150LATE HVAG SYSTEM IN AREA WHERE WORK 15
BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
5. ,COMPLETE ALL CRITICAL BARRIERS I.E. 5HEET ROCK, PLYWOOD,
PLASTIC, TO 5EAL AREA FROM NON -WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (DART WITH PLASTIC COVERING AND
5EALED CONNECTION TO WORK 51TE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
6, MAINTAIN NEGATIVE AIR PRE55ME WITHIN WORK 517E UTILIZING
HEPA EGIAPPED AIR FILTRATION UNIT5 WITH ALARMS AND
RECORD READIN675 THREE TIMES A DAY.
1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
$. COVER TRANSPORT RECEPTACLES OR CART5. TAPE GOVERIN6
UNLE55 SOLID LID.
q. ALL PER50NNEL ENTERING WORK 51TE ARE REQUIRED TO WEAR
5HOE OVER5. SHOE COVER5 MU5T BE CHANGED EACH TIME
THE WORKER EXITS THE WORK AREA.
10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT 15 INSPECTED BY THE OWNERS SAFETY
DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND
THOROUGHLY GLEANED BY THE OWNERS ENVIRONMENTAL
5ERVICE5 DEPARTMENT.
LOCATION MAP
COUNTY LOCATION MAP
SOUTH MIAMI HOSPITAL _
ADDRESS:
6200 SOUTHWEST 73 STREET
SOUTH MIAMI, FL 33143
"
t�F r
r
r♦
r
SALTZ -MICHELSON,
A R C H I T E C T S
3501 Griffin Road
Ft. Lauderdale, FL 33312
(954) 266 -2700 Fx: (954) 266 -2701
sma@saltzmichelson.com
Charles Michelson
,IT �' O1 80U -'.H MIAMI Pro ectNo.:
BUILDING DEPT. 211 -166
STRUCi *uRAt. S CTION Drawn By-
NI-1
041RO`�?�:D �f.
Checked By:
Date:
09 -12 -11
LOCATION MAP
N
fi
G
TI
6