Loading...
11-1216-001r q PROJECT TEAM A uSPIrF Af SOUTH CLIENT: BAPTIST HEALTH SOUTH FLORIDA 6200 SW 73'TH STREET SOUTH MIAMI, FLORIDA 33143 TELEPHONE (786) 662 -4000 ARCHITECT: SALTZ MICHELSON ARCHITECTS, INC 3501 GRIFFIN ROAD FT.LAUDERDALE, FL 33312 TELEPHONE (954) 266 -2700 FACSIMILE: (954) 266 -2701 ELECTRICAL MECHANICAL ENGINEER: BARD, RAO& ATRAW C0NSULTNGENGWM-U 20 DOUGLAS RD., STE 301 CORAL ' (JABLES, FL 33134 TEL- 305 529 -1515 GENERAL DEMOLITION NOTES I. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR HAULING AND LEGALLY DISPOSING OF MATERIALS REMOVED IN DEMOLITION WORK. 2. THE PRO( EWRF5 PROPOSED FOR THE ACCOMPLISHMENT OF 5ALVA6E AND DEMOLITION WORK SHALL BE SUBMITTED FOR REVIEW. THE PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL AND DISPOSITION OF MATERIALS, PROTECTION OF PROPERTY, COORDINATION WITH WORK OF OTHERS IN PROGRESS, AND TIMELY 015GONNECTION OF UTILITY 5ERVICE5, THE PROCEDURES SHALL INCLUDE A DETAILED DESCRIPTION OF METH005 AMC) EQUIPMENT TO BE USED FOR EACH OPERATION AND THE SEQUENCE OF OPERATION. 3. TITLE TO MATERIALS, TITLE TO ALL MATERIAL AND EQUIPMENT TO BE DEMOLISHED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO THE OWNER IS VESTED IN THE CONTRACTOR AT START OF PROJECT. ALL PLUMBING+ FIXTURES, LIGHTING FIXTURES, A/C EQUIPMENT, APPLIANCES, TRAY5, SPECIALTY ITEM`, ETC, SHALL BE EVALUATED BY A REPRESENTATIVE OF THE S.B.H.D. AS TO THE STATUS OF THEIR REMOVAL. THE OWNER WILL NOT BE RESPONSIBLE FOR THE CONPITION5, LOSS OR DAMAGE OF SUCH PROPERTY AFTER NOTICE TO PROCEED. 4. THE GONTRAGTOR SHALL VI51T THE 51TE OF THE WORK AND EXAMINE THE PLANS AND IT WILL BE ASSUMED THAT THE CONTRACTOR HAS INVE5116ATED AND 15 FULLY INFORMED OF THE CONDITIONS AND MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND QUANTITIE5 OF WORK TO BE PERFORMED AND MATERIALS TO BE FURNISHED AND AS TO THE REQUIREMENTS OF THE PLANS. 5. THE CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE pRANw -y5 AND AL50 REMOVE ANY OTHER ITEM5 OR CONSTRUCTION A5 REQUIRED TO ACCOMPLISH ALL NEW WORK TO AREAS SHOWN b. ALL DIMENSIONS SHOWN ARE TO BE VERIFIED IN THE FIELD AND ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH THE WORK, 1. THE AMOUNT OF DUST RESULTING FROM DEMOLITION SHALL BE CONTROLLED TO PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE 5URROUNDINO AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS 5" AS FLOODIN6 AND POLLUTION. THE USE OF WATER WILL BE PERMITED FOR M15TIN6 AND WET FLOOR MOPPING, S. ALL EXISTING 5URFAGE5 5UCH A5 WALL5, FLOORS, CEILIN655, BA5E5, ETC. THAT ARE AFFEGTED BY THESE ALTERATIONS AND WERE INTENDED TO REMAIN, ARE TO HAVE NEW FIN15H TO MATCH ADJACENT EXISTING FINISHES. q. GENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING OF EXISTING CONCRETE 5LAB5, PARTITIONS, ETG..A5 MAY BE REQUIRED FOR ALL TRADES TO ACCOMPLI5H ALL WORK REQUIRED BY THE5E CONTRACT DOCUMENTS. CONT. SHALL DO ALL PATCHING AND PROVIDE NEW FINISHES TO MATCH EXI5TIN6 50 AS TO MAKE THE "PATCHED AREA" INP15CERNI13LE FROM THE EXIST, ADJACENT AREA. 10. UTILITY SERVICES, MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING DEMOLITION OPERATIONS. A. DO NOT INTERUPT EXISTING UTILITIES SERVING OGCUPIEP OR USE FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. II. PROTECTION, PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT 6ENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PER50NAL AND GENERAL PUBLIC TO AND FROM OCCUPIED PORTIONS OF BUILIDNG5. 12, GARBAGE REMOVAL SHOULD BE BY COVERED CART ONLY. 13, H05PITAL SHALL REMOVE ALL FURNITURE .CONTRACTOR SHALL BE RE51PON5ABLE FOR GOVERING PROTECTING AND 5TORAGE OF ALL REMAINING EQUIPMENT AND CABINETRY, 14, DEMOLITION SHALL BE LIMITED TO DAYTIME HOURS ONLY. 15. DO NOT P15TWB THE INTEGRITY OF THE EXI5TIN6 STRUCTURAL SYSTEM. CONFIRM LOGATION OF EX15TING 5TRUGTURAL SUPPORTS AND MEMBERS PRIOR TO GORE DRILLING AIV /OR GUTTING OPENINGS FOR NEW PLUMBING AND/OR MECHANICAL LINES, AND NOTIFY AR( HITEGT IMMEDIATLY OF ANY COWLIGT5. 16. COORDINATE ALL PHASES OF THE WORK WITH THE OWNER PRIOR TO PROCEEDING. 11. IF NEGE%ARY, EXI5TIN65 WALLS MAY BE REMOVED TO RELIEVE NEW EQUIPMENT THAT WILL NOT FIT THROUGH DOORS, CONTRACTOR TO PATCH AND REPAIR AFFECTED WALLS TO MATCH ORIGINAL MATERIAL5 AND FIRE RATING AND INSTALL NEW FIN15HE5 A5 5CHEDULED AND /OR TO MATCH EXI5TIN5. Iq, 5.M,H REP. SHALL APPROVE DISPOSAL OF ALL REMOVED ELEMENTS TO VERIFY IF THEY SHALL BE DID 5ED OF OR STORE FOR OTHER U5E. MIAMI, I�1[17.a117e1 INDEX OF DRAWINGS T1 COVER SHEET ARCHITECTURAL LS1 LIFE SAFETY PLAN 2ND FLOOR LS2 LIFE SAFETY PLAN 4TH FLOOR A1.0 PARTIAL 2ND FLOOR PLAN A1.1 PARTIAL 4TH FLOOR PLAN, DETAILS A2.0 DETAILS A3.0 GENERAL NOTES AND SPECIFICATIONS ELECTRICAL EO.01 GENERAL ELECTRICAL NOTES E2.01 PARTIAL 2ND FLOOR PLAN E2.02 PARTIAL 4TH FLOOR PLAN E5.01 RISER DIAGRAM E7.01 ELECTRICAL PANELS MECHANICAL M1.01 ICRA GENERAL NOTES, VENTILATION PLAN, DETAIL SCOPE OF WORK THE SCOPE OF WORK IS TO INSTALL NEW IGU FLAT PANELS MONITORS:', (8) IN THE 2ND FLOOR 51G.0 PATIENT ROOMS (8) IN THE 2ND FLOOR 1.61) PATIENT ROOMS (6) IN THE 2ND FLOOR PREP/ RECOVERY PATIENT ROOMS (I2) IN THE 4TH FLOOR CRITICAL CARE UNIT PATIENT ROOM5 INFECTION CONTROL NOTES I, EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 2. SEAL UNUSED DOORS WITH DUCT TAPE. 3. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA, 4. REMOVE OR 150LATE HVAG SYSTEM IN AREA WHERE WORK 15 BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 5. ,COMPLETE ALL CRITICAL BARRIERS I.E. 5HEET ROCK, PLYWOOD, PLASTIC, TO 5EAL AREA FROM NON -WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (DART WITH PLASTIC COVERING AND 5EALED CONNECTION TO WORK 51TE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. 6, MAINTAIN NEGATIVE AIR PRE55ME WITHIN WORK 517E UTILIZING HEPA EGIAPPED AIR FILTRATION UNIT5 WITH ALARMS AND RECORD READIN675 THREE TIMES A DAY. 1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. $. COVER TRANSPORT RECEPTACLES OR CART5. TAPE GOVERIN6 UNLE55 SOLID LID. q. ALL PER50NNEL ENTERING WORK 51TE ARE REQUIRED TO WEAR 5HOE OVER5. SHOE COVER5 MU5T BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA. 10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT 15 INSPECTED BY THE OWNERS SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY GLEANED BY THE OWNERS ENVIRONMENTAL 5ERVICE5 DEPARTMENT. LOCATION MAP COUNTY LOCATION MAP SOUTH MIAMI HOSPITAL _ ADDRESS: 6200 SOUTHWEST 73 STREET SOUTH MIAMI, FL 33143 " t�F r r r♦ r SALTZ -MICHELSON, A R C H I T E C T S 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma@saltzmichelson.com Charles Michelson ,IT �' O1 80U -'.H MIAMI Pro ectNo.: BUILDING DEPT. 211 -166 STRUCi *uRAt. S CTION Drawn By- NI-1 041RO`�?�:D �f. Checked By: Date: 09 -12 -11 LOCATION MAP N fi G TI 6 GENERAL NOTES: I. THE CONTRACTOR SHALL V151T THE 51TE OF THE WORK AND EXAMINE 11. CONTRACTOR SHALL BE RE5PON51BLE FOR OBTAINING AND THE PLANS AND IT WILL BE ASSUMED THAT THE CONTRACTOR HAS PAYING FOR THE COST OF ALL INSPECTIONS AND TESTS INVESTIGATED AND 15 FULLY INFORMED AS TO THE CONDITIONS REQUIRED TO IMPLEMENT THE PLANS. AND MATERIALS TO BE ENCOUNTERED A5 TO GHARA(TER, QUALITY 12, FIRE SEAL ALL NEW OPENINGS AND PENETRATION5 ON FIRE AND QUANTITIES OF WORK TO BE PERFORMED AND MATERIALS 70 RATED WALL5. BE FURNISHED AND AS TO THE REQUIREMENTS OF THE PLANS. 13. LAYOUT OF FLOORS AND CEILING SHALL FOLLOW EXACTLY 2. CONTRACTOR SHALL VERIFY ALL DIMEN51ON5 ANp CONDITIONS TH15 DOCUMENT5, IF ANY DISCREPANCIES CONTACT THE IN THE FINAL PLANS AND ON THE JOB 51TE PRIOR TO EXECUTION ARCHITECT BEFORE START INSTALLATION, OF ANY WORK AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF 14. AFTER APPROVAL OF THE FINAL PLANS, ALL REVISIONS MUST ANY DISCREPANCIES. THE CONTRACTOR WILL BE RESPONSIBLE PROCEED THROUGH THE ARGHITEGT FOR APPROVAL. ANY FOR ALL 005% ARISING FROM A FAILURE TO PERFORM A REMIT MADE WITHOUT THE WRITTEN APPROVAL OF THE VERIFICATION AND 70 MAKE TIMELY NOTIFICATION OF ARCHITECT MAY BE CONSIDERED INVALID AND, AT THE EC DISCREPANCIES, THE ARCHITECT WILL, IN AN EXPEDIENT ARCHITECT, SOLE DISCRETION OF THE ARGHITEGT, THE WORK MANOR, PROVIDE THE OWNER WITH REVISED DRANNe5 THE O E AND REQUIRED TO BE MODIFIED AT NO G05T 70 THE OWNER. REFLECTING ANY OF THESE D15CREPANUE5 AND RELATED MITIGATION FOR REVIEW AND APPROVAL. 15. OWNER'S SUB- CONTRACTOR5 5HALL BE ALLOWED TO 3. 00 NOT SCALE DRAWINGS. DO WORK PRIOR TO %U5TANTIAL COMPLETION SUBJECT ONLY TO THE APPROPRIATE PROGRESS OF THE WORK AND A 4, CONTRACTOR WILL GUARANTEE IN WRITING ALL MATERIALS AND SEVEN (1) DAY PRIOR NOTICE OF INTENT BY OWNER TO THE WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF GONTRAGTOR. FINAL ACCEPTANCE BY THE OWNER AND WILL, AT MI5 OWN COST, REPAIR OR REPLACE ALL WORK OR DAMAGE GAU5ED BY WORK 16. CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION AS OF SUBCONTRACTOR5 WHICH BECOMES DEFECTIVE DURING THE NECESSARY PER CITY AND LOCAL CODE REQUIREMENTS. TERM OF THE GUARANTEE. 5. CONTRACTOR SHALL COORDINATE AND SUPERVISE HI5 WORK 11, ALL MATERIALS AND WORK TO CONFORM TO LATEST GOVERNING AND WORK BY SUBCONTRACTORS. BUILDIN6 CODES AND RE6U..ATION5. S 41T FOR REVIEW 6. THESE PLANS ARE THE PROPERTY OF THE ARGHITEGT AND NO LESS THAN (6) SETS OF SHOP DRAWN695 WHERE REQUIRED SHALL NOT BE USED, REPRODUCED, OR GHAN6ED IN ANY WAY AND /OR INDICATED. WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ARCHITECT. 15, CONTRACTOR SHALL PROVIDE ACCESS PANELS AS REQUIRED BY 1. 6ENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING PLUMBING, AIR CONDITIONIN6 AND OTHER TRADES, AND AS OF CONCRETE 5LAB5, ETC -A5 MAY BE REQUIRED FOR REQUIRED BY CODES, LOCATIONS AND TYPE OF PANEL TO BE ALL TRADES TO ACCOMPLISH ALL WORK REQUIRED BY REVIEWED AND APPROVED BY THE ARGHITEGT. THESE CONTRACT DOC.UMENT5. PATCH Q REPAIR AS REQ'D Iq. CONTRACTOR SHALL SUBMIT SHOP DRANNG5 AND PRODUCT 8. CONTRACTORS INSTALLATION OF ALL UTILITIES APPROVAL FOR ALL MANUFACTURED ITEM5 AND 5UB5E6IUENT HOOKUP SHALL BE AS NECE55ARY TO A55URE 20 CONTRACTOR SHALL LEAVE ACCESS TO ALL MEANS OF E6RE% CONFORMANCE WITH UTILITY COMPANY REQUIREMENT5. DURING CONSTRUCTION. q. IT 15 THE INTENT OF THE ARCHITECT THAT THI5 WORK BE IN CONFORMANCE WITH BUILDING AUTHORITIES HAVING JURISDICTION OVER THIS TYPE OF WORK AND OCCUPANCY. ALL CONTRA(TOR5 SHALL DO THEIR WORK IN COMPLIANCE WITH THE F.B.G., NATIONAL ELECTRIC GORE, NFPA, 05HA AND OTHER APPLICABLE CODES AND REaLATION5, 10, IT 15 NOT THE INTENT OF THESE PLANS TO 5HOW EVERY MINOR DETAIL OF CONSTRUCTION. THE CONTRACTOR 15 EXPECTED TO FWNI5H AND INSTALL ALL CONSTRUCTION. THE CONTRACTOR IS EXPECTED TO FURNI5H AND INSTALL ALL ITEMS REQUIRED TO COMPLETE THE WORK NTH GOOD WORKMANSHIP AND ASSURE PROPER WORKIN6 ORDER. INDEX OF DRAWINGS T1 COVER SHEET ARCHITECTURAL LS1 LIFE SAFETY PLAN 2ND FLOOR LS2 LIFE SAFETY PLAN 4TH FLOOR A1.0 PARTIAL 2ND FLOOR PLAN A1.1 PARTIAL 4TH FLOOR PLAN, DETAILS A2.0 DETAILS A3.0 GENERAL NOTES AND SPECIFICATIONS ELECTRICAL EO.01 GENERAL ELECTRICAL NOTES E2.01 PARTIAL 2ND FLOOR PLAN E2.02 PARTIAL 4TH FLOOR PLAN E5.01 RISER DIAGRAM E7.01 ELECTRICAL PANELS MECHANICAL M1.01 ICRA GENERAL NOTES, VENTILATION PLAN, DETAIL SCOPE OF WORK THE SCOPE OF WORK IS TO INSTALL NEW IGU FLAT PANELS MONITORS:', (8) IN THE 2ND FLOOR 51G.0 PATIENT ROOMS (8) IN THE 2ND FLOOR 1.61) PATIENT ROOMS (6) IN THE 2ND FLOOR PREP/ RECOVERY PATIENT ROOMS (I2) IN THE 4TH FLOOR CRITICAL CARE UNIT PATIENT ROOM5 INFECTION CONTROL NOTES I, EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 2. SEAL UNUSED DOORS WITH DUCT TAPE. 3. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA, 4. REMOVE OR 150LATE HVAG SYSTEM IN AREA WHERE WORK 15 BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 5. ,COMPLETE ALL CRITICAL BARRIERS I.E. 5HEET ROCK, PLYWOOD, PLASTIC, TO 5EAL AREA FROM NON -WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (DART WITH PLASTIC COVERING AND 5EALED CONNECTION TO WORK 51TE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. 6, MAINTAIN NEGATIVE AIR PRE55ME WITHIN WORK 517E UTILIZING HEPA EGIAPPED AIR FILTRATION UNIT5 WITH ALARMS AND RECORD READIN675 THREE TIMES A DAY. 1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. $. COVER TRANSPORT RECEPTACLES OR CART5. TAPE GOVERIN6 UNLE55 SOLID LID. q. ALL PER50NNEL ENTERING WORK 51TE ARE REQUIRED TO WEAR 5HOE OVER5. SHOE COVER5 MU5T BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA. 10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT 15 INSPECTED BY THE OWNERS SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY GLEANED BY THE OWNERS ENVIRONMENTAL 5ERVICE5 DEPARTMENT. LOCATION MAP COUNTY LOCATION MAP SOUTH MIAMI HOSPITAL _ ADDRESS: 6200 SOUTHWEST 73 STREET SOUTH MIAMI, FL 33143 " t�F r r r♦ r SALTZ -MICHELSON, A R C H I T E C T S 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma@saltzmichelson.com Charles Michelson ,IT �' O1 80U -'.H MIAMI Pro ectNo.: BUILDING DEPT. 211 -166 STRUCi *uRAt. S CTION Drawn By- NI-1 041RO`�?�:D �f. Checked By: Date: 09 -12 -11 LOCATION MAP N fi G TI 6