11-1210-0010
U
0
0
a�
a�
0
A
11/14/20113:49:33 PM
PT -100
PT -201
PT -201A
PT -202
PT -202A
PT -203
PT -203A
PT -300
PT -301
PT -310
PT -311
PT-410
PT -900
RD -201
RD -201.E
RD -201.N
RD -201.S
RD -202
RD -202.E
RD -202.N
RD -202.S
RD -203
RD -204
RD -205
RD -206
RD -207
I d Z "AL Z LL%Jb I
• 1' ` It 1
CTS -630 Matrix ESP
o t M
u h ia • 1 i ta
DRAWING INDEX
Mechanical Riser Diagram
Overall 1st Floor
1st Floor Plan - Partial
Overall 2nd Floor
2nd Floor Plan - Partial
Overall 3rd Floor
3rd Floor Plan - Partial
Station Details - 6" System
Transmission Equipment Details - 6" System
Penetration & Support Details
Penetration & Support Details
Electrical Details
Equipment Schedule & 3d View
Level 01 Record Drawing
Level 01 East Tower Record Drawing
Level 01 North Tower Record Drawing
Level 01 South Tower Record Drawing
Level 02 Record Drawing
Level 02 East Tower Record Drawing
Level 02 North Tower Record Drawing
Level 02 South Tower Record Drawing
Level 03 Record Drawing
Level 04 Record Drawing
Level 05 Record Drawing
Level 06 Record Drawing
Level 07 Record Drawing
I -
FL
6200, SW 73rd Street 33143
C I I
lini cal Expans
0
ion
kp.
co
� OF
W m
m 19 .
p r
®F> ^.i.a Rxr r
a't��e
�'W o
¢ y
w
00
s
AM
� r *Q ti
n0a
n �
r
E-�
Special Feature
Nexus 0
Fri w
RFID z
Who Tube 0 rt
Hot Backup 0 Q
Alert Messaging 0 -" W
TL 2009 Upgrade 0
.o�
�j
.w
w �
Work Done Swisslog Others N/A
Receive Materials ("D 0 0
General Construction 0 7 0
Core Drilling E 0 0
Wall Penetration & Fire Stopping 0 0 0
General Demolition 0 0 0
Ceiling Removal / Replacement 0 0
Tube Installation 0 0
Station Rough-in 0 0
Power Wiring 0 0
Control Wiring 0 0 0
Ethernet Data Drops 0 0
Tune & Test / Startup 0 0
On -Site Training 0 0
Permits / Inspections Required 0 0
Dust Control QD 0 0
Night/Off Hours Work 0.. 0 0
Shutdown Required 0 0 0
Existing Tube Demolition 0 0, 0
Swisslog Healthcare Solutions
Phone: (800) 525 -1841
www.sv lsslog.com
■ APPROVED
Approval of drawings is for concept and
compliance with contract documents.
Owner has reviewed drawings and is
familiar with the project and scope of
work. Owner understands that conditions
may exist that may require changes in
routing and /or equipment locations and
those changes will be reflected in as -built
drawings. Approval by Owner does not
relieve TransLogic Corp. of its
responsibility to meet the requirements of
the specifications or contract.
Owners Rep
Date
J
E
0
C
N
0
E
0
cra
a
N
co
O
J