Loading...
11-1104-014MINIMUM STANDARDS: THE5E-CONSTRUCTION DOCUMENTS M16HT REQUIRE LARGER 51ZE5,, GREPfTER QUANTITIES, MORE PROTECTION AND REQUIREMENTS THAN THE GOVERNING BUILDING CODES. THE CONTRACTOR IS RESPONSIBLE FOR CARgYING OUT ALL OF THE PROVISIONS AND REQUIREMENTS INCLUDED IN THESE PLAN5,AND SPECIFICATIONS, SUBSTITUTIONS, ALTERNATES OR CHANGES*REQUE$T p-TO MATCH LOWER 5TIVARD5 PERMITTED BY THE BUILdIN6 CODE WILL NOT BE ACCEPTED. NFADDITIONAL PAYMENTS SHALL BE MADE TO THE CONTRACTOR TO CORRECT WORK THAT DOES NOT MEET ALL THE REQUIREMENTS SET FORTH IN THESE CONSTRUCTION DOCUMENTS. A.I.A. DOCUMENT A -201: THE LATEST EDITION OF THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION', AIA DOCUMENT A-201,15 HEREBY MADE A PART OF THESE PLANS AND SPEGIFIGATION5. COPIES ARE AVAILABLE FOR INSPECTION AT THE ARCHITECTS OFFICE. THESE GENERAL NOTES AND 5PECIFICATION5 SHALL NOT BE CONSTRUED TO VOID ANY PORTION OF AIA DOCUMENT A -201. CON5TRUCTION DOCUMENTS: THESE BOUND PLANS AND SPECIFICATIONS FORM A COMPLETE SET OF CON5TRUCTION DOCUMENTS AND SHOULD NOT BE SEPARATED FOR USE BY VARIOUS 5UB- TRADE5 EMPLOYED TO PROVIDE BID PROPOSALS OR EXECUTE THI5 PROJECT. A COMPLETE SET OF CON5TRUCTION DOGUMENT5 15 REQUIRED 50 THAT EACH TRADE CAN COORDINATE THEIR BIDS AND WORK WITH THE TOTAL PROJECT, GON5TRUGTION DOCUMENTS STAMPED 'NOT FOR CONSTRUCTION" SHALL NOT BE U5ED FOR BIDDING OR CONSTRUCTION AND ARE NOT PERMITTED ON THE JOB SITE. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL MAINTAIN A COMPLETE UP-TO DATE SET OF CONSTRUCTION DOCUMENTS AND SHOP ORAWING5 ON THE JOB 51TE AT ALL TIMES DURING THE CONSTRUCTION PERIOD THESE DOCUMENTS SHALL BE SECURED AGAINST ALL FORMS OF DAMAGE OR THEFT. CONSTRUCTION DOCUMENT REPRODUCTIONS: THESE PLANS ARE THE PROPERTY OF THE ARCHITECT. NO PORTION OF THESE CON5TRUCTION DOCUMENTS MAY BE REPRODUCED BY ANY MEANS OR METHODS WITHOUT THE EXPRE55 PRIOR AUTHORIZATION OF 5ALTZ MICHEL50N ARGHITEGT5. COPIES OF THE PLANS AND 5PEGIFICATION5 ARE AVAILABLE FROM THE,A 4HITEGT: - UNAUTHORIZED GOPIE5 OF THESE PLANS MAY NOT PROVTDE,'CURRENT�PROJEGT INFORMATION AND-MAY RESULT IN BID OR CONSTRUCTION DEFICIENCIES ?„ - 51TE V151T: PRIOR TO BIDDING OR SUBMITTING ANY PROPOSAL THE GENERAL GONTRAGTOR AND EACH SUBCONTRACTOR SHALL VI51T THE JOB 517E AND VERIFY ALL OF THE CONDITIONS UNDER WHICH TH15 WORK WILL BE PERFORMED. THE CONTRACTOR SHALL EXAMINE THE PLANS AND IT WILL BE A55UMED THAT THE CONTRACTOR HAS INVESTIGATED AND 15 FULLY INFORMED AS TO THE CONDITIONS AND MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND QUANTITIES OF WORK TO BE PERFORMED AND MATERIALS TO BE FURNISHED AND AS TO THE REQUIREMENTS OF THE IPLANS. qj AT , •. SUBSTITUTIONS OR, DEVIATIONS FROM; THE , PLM5,AND $PEGIFOATIONS DURIN6-13IDOIN6 OR CONSTRUCTION AE NOT PERMITTED WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE OWNER AND /OR ARCHITECT. FAILURE TO COMPLY WITH THIS PROV15ION WILL RESULT IN THE REJECTION OF THE WORK IN QUESTION. THE CONTRACTOR WILL NOT BE (OMPEN5ATED FOR UNAUTHORIZED SUBSTITUTIONS OR DEVIATION5 FROM THE PLANS AND WILL HAVE TO TAKE CORRECTIVE MEASURES AT HIS OWN EXPENSE. ALTERNATES: REQUESTS FOR PRODUCT ALTERNATES OR SUBSTITUTIONS WILL ONLY BE GON51PERED BY THE ARC HITEGT WHEN SUBMITTED WITH A LETTER OF EXPLANATION. WHEN APPLICABLE THE REQUEST SHALL INCLUDE; A C05T COMPARISON, AVAILABILITY, TIME 56HEOULE COMPARISON, DRAWIN65 AND /OR BROCHURE GUT 5HEET5 DEMONSTRATING THAT THE 5UB5TITUTION OR ALTERNATE MEETS THE INTENDED PERFORMANCE AND QUALITY OF THE ORIGINAL SPECIFICATION. CHANGE ORDERS: ALL CHANGE ORDERS SHALL BE SIGNED BY THE OWNER PRIOR TO COMMENCEMENT OF THE WORK TO BE CHANGED. REQUEST FOR PAYMENT: THE CONTRACTOR'S "REQUEST FOR PAYMENT" SHALL INCLUDE RELEASES OF LIEN FROM ALL MATERIAL SUPPLIERS AND 5UBCONTRAGTOR5 FOR SUPPLIES AND WORK RELATING TO THE REQUEST FOR PAYMENT. NOTICE OF COMMENCEMENT: THE GONTRAGTOR SHALL A5515T THE OWNER IN THE PREPARATION AND FILING 05 A NOTICE OF COMMENCEMENT. HE SHALL INSURE THAT SAID NOTICE 15 PROMINENTLY P05TED ON THE PROPERTY AND PROTECTED FROM ALL FORMS DAMAGE. ALL 5UBC.ONTRAGTOR5 AND MATERIAL SUPPLIERS SHALL BE MADE AWARE OF THE POSTING OF THIS DOCUMENT AND ARE REQUIRED TO SUBMIT A "NOTICE TO OWNER-" BY CERTIFIED MAIL. HIDDEN CONDITIONS: EXISTING UNOBSERVABLE COVERED, BURIED OR OTHERWISE HIDDEN GONDITION5 WHERE IN CONFLICT WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT AS SOON AS THEY ARE UNCOVERED. ADDITIONAL COSTS OR MODIFICATIONS OF THE WORK TO ACCOMMODATE THESE CONDITIONS SHALL BE APPROVED BY THE OWNER AND /OR ARCHITECT PRIOR TO PERFORMANCE OF THI5 WORK. WHEN HIDDEN CONDITION5 ARE FOUND TO BE IN VIOLATION OF ANY GOVERNING (ODE IN FORGE AT THE TIME OF CONSTRUCTION THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND /OR OWNER. CORREGTION OF EXISTING HIDDEN CODE VIOLATIONS SHALL BE APPROVED AND PAID FOR BY THE OWNER. D15GREPANGIE5: THE CONTRAGTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AND BE RESPONSIBLE FOR SAME. WHEN IN THE OPINION OF THE CONTRACTOR A 015GREPANGY EXISTS, HE SHALL PROMPTLY REPORT IT IN WRITIN6 TO THE ARGHITEGT PRIOR TO THE COMMENCEMENT OF THE WORK IN THE AREA OF QUESTION. NO ADDITIONAL PAYMENT SHALL BE MADE FOR THE CONTRACTORS FAILURE TO CORRECT CONFLICTING FIELD CONDITIONS. SAFETY AND SECURITY: THE CONTRACTOR SHALL TAKE ALL PRECAUTION5 TO ENSURE THE SAFETY OF THE WORK FORGE AND PUBLIC EXPOSED TO THE CONSTRUCTION PERFORMED UNDER THI5 CONTRACT. HE SHALL SECURE THE WORK 51TE AGAINST UNAUTHORIZED ENTRY AND MAINTAIN ALL SAFETY AND 5ECURITY MEASURES THROUGH OUT THE DURATION OF THE WORK. SAFEGUARDS: THE GENERAL CONTRACTOR SHALL PROVIDE GUARDRAILS, HANDRAILS, AND COVERS FOR ALL FLOOR, ROOF AND WALL OPENINGS, HE SHALL MAINTAIN AND RELOCATE ALL SAFEGUARDS AND PROTECTIVE FACILITIES AS REQUIRED BY SUBCONTRACTORS OR JOB. CONSTRUCTION MEANS AND METHODS: SALTZ MICHEL50N ARCHITECTS AND /OR ENGINEERS) SHALL NOT HAVE CHARGE, CONTROL OR BE RESPONSIBLE FOR CONSTRUCTION MEANS, METH005, 5EQUENGES, PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS. FINAL IN5PECTION: THE OWNER AND CONTRACTOR SHALL PERFORM A FINAL "WALK THROUGH" INSPECTION OF THE WORK PRIOR TO THE OWNERS FINAL ACCEPTANCE. THE GONTRAGTOR SHALL PREPARE AND SUBMIT A WRITTEN "PUNCH LIST" TO THE OWNER OF THE ITEMS OF THE WORK THAT REQUIRE ADJUSTMENT, CORRECTION OR REPLACEMENT. PUNCH LISTED EQUIPMENT, FEATURES OR FIN15HES SHALL BE REPAIRED TO THE OWNER'S SATISFACTION WITHIN FIVE WORKING DAYS. GENERAL NOTES &SPECIFICATIONS THESE ARE THE GENERAL REQUIREMENTS TO FOLLOW BY THE CONTRAGTOR5 OF THE PROJECT AT 'BAPTIST HEALTH SOUTH FLORIDA HOSPITAL'. NOT ALL OF THE ITEMS MAY APPLY TO THI5 SPECIFIC JOB. CONTACT THE ARCHITECT IF THERE ARE ANY QUESTIONS OR INDISGREPANGIES BETWEEN THE OUTLINE AND THE SPECIFIC NOTES THROUGHOUT THESE CONSTRUCTION DOCUMENTS. WORKMANSHIP: IT 15 UNDERSTOOD AND AGREED THAT THE ARCHITECT HAS NO ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMAN LIKE MANNER IN FIN15H HARDWARE CON5TRUGTIVE USE OF THE OWNER'S 51TE: HAS NO CONTROL OR ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, THE BUILDING (ODE AND THE A. MOUNT HARDWARE UNITS AT HEIGHTS INDICATED IN 'RECOMMENDED LOCATIONS FOR AUTHORITY OVER THE MEANS, METHODS, AND 5EQUENCE5 OF STATE ENERGY EFFICIENCY CODE. WORKMANSHIP QUALITY SHALL STRICTLY BUILDERS HARDWARE FOR STANDARD STEEL DOORS AND FRAMES" BY THE DOOR AND CONSTRUCTION; AND THEREFORE HAS NO ONGOING RESPONSIBILITY CONFORM TO THE INDUSTRY STANDARD AND APPLICABLE NATIONAL, STATE AND HARDWARE INSTITUTE, EXCEPT AS SPECIFICALLY INDICATED OR REQUIRED TO COMPLY WHAT50EVER FOR CONSTRUCTION 51TE SAFETY, A RESPONSIBILITY THAT LOCAL CODES, ORDINANCES AND RULES. WITH GOVERNING RE6ULATION5 IN COMPLIANCE WITH THE DOOR'S PRODUCT APPROVAL. HAS BEEN WHOLLY VESTED IN THE GENERAL CONTRACTOR. UTILITY GOMPANIE5 AND /OR GOVERNING A6ENGIE5 HAVING JURI50IGTION. B. VINYL WALL BASE: PROVIDE VINYL BASE WITH MAT(HIN6 END 5TOP5 AND NOTWITHSTANDING THE ABOVE, THE ARCHITECT HAS A DUTY TO PRESERVE AND MATERIALS: B. REQUIREMENTS FOR DESIGN, GRADE, FUNCTION, FINISH, 51ZE AND OTHER DISTINCTIVE PROTECT PUBLIC HEALTH, SAFETY, AND WELFARE. ACCORDINGLY, IT 15 SALTZ UNLE55 SPECIFIED OTHERWISE, ALL CONTRACTOR SUPPLIED MATERIALS, FIXTURES, QUALITIES OF EACH TYPE OF FINISH HARDWARE 15 INDICATED IN THE FINISH HARDWARE MICHEL50N ARCHITECTS PROFE55IONAL RESPONSIBILITY TO TAKE WHAT HE BELIEVE5 FITTINGS OR COMPONENTS SHALL BE NEW AND DELIVERED TO THE JOB 517E IN THE DATA SHEET AND HARDWARE SCHEDULE AT THE END OF THI5 SECTION. ARE PRUDENT MEASURES SHOULD THE ARCHITECT ENCOUNTER 51TUATION5 THAT HE MANUFACTURERS ORIGINAL SEALED CARTONS OR PACKAGING. 2. MIN. THICKNESS: .080' GAUGE BELIEVES CREATE A DANGER TO PUBLIC HEALTH, SAFETY, OR WELFARE. THE SHOP DRAWINGS• G. WHERE THE DOOR MANUFACTURER SPECIFIED FOR THE EXTERIOR DOORS ARE CLIENT /OWNER UNDERSTANDS THIS SITUATION AND AGREES TO DEFEND 5ALTZ SATISFACTION OF THE OWNER AND LANDLORD AT THE CONTRACTOR5 EXPENSE. CHANGED DUE TO THE CONTRA(TOR5 SUBSTITUTION OR APPROVED ALTERNATE, THE MICHEL50N ARCHITECTS AND HOLD THE ARCHITECT HARMLE55 FROM CLAIMS THE CONTRACTOR SHALL OBTAIN ARCHITECTS OR OWNER'S WRITTEN APPROVAL OF CONTRACTOR WILL COORDINATE AND PROVIDE AS NECESSARY THE SPECIFIED AR151N6 FROM THE ARCHITECT'S EXERCISE OF PROFESSIONAL RESPONSIBILITY IN tea' DRAWINGS PRIOR FABRICATION. SAMPLES SHALL BE SUBMITTED UPON HARDWARE SCHEDULED TO MEET BOTH THE NEW 00OR5S PRODUCT APPROVAL AND THIS REGARD. REQUEST. WHERE INSTALLATIONS REQUIRING SHOP DRAWINGS HAVE BEEN MADE OWNERS REQUIREMENTS FOR EACH DOOR LOCATION. THE CHANGING OF HARDWARE TO PERFORMANCE OF THE WORK UNDER THIS CONTRACT SHALL BE INCLUDED IN THE WITHOUT APPROVED DOCUMENTS THE OWNER AND /OR ARCHITECT MAY REJECT THE MEET THE REQUIREMENTS MENTIONED WILL NOT CONSTITUTE AN EXTRA MONETARY I IGEN5E5 AND PERMITS• WORK. REPLACEMENT ADDITIONS OR MODIFICATIONS TO ALL SUCH WORK SHALL BE CHARGE OR BURDEN TO THE OWNER OR PROJECT. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL SECURE THE MADE AT THE CONTRA( EXPENSE, THE CONTRACTOR SHALL SUBMIT SHOP REQUIRED CITY, COUNTY, STATE LICENSES OR PERMITS AND SPECIAL PERMITS, WHEN DRAWINGS FOR ALL PREFABRICATED ITEMS OF THE WORK. D. HARDWARE SCHEDULE= SEE DRAWING SHEET A5.0 REQUIRED, PRIOR TO COMMENCING ANY WORK ON THI5 PROJECT. PERMITS SHALL BE ACTIVE 5ERVIGES: PROTECTED AND DISPLAYED IN AGGORDANGE WITH THE LOCAL GOVERNING AGENCY EXISTING ACTIVE SERVICES: WATER, 6A5, 5EWER, ELECTRIC, ETC., WHEN REQUIREMENTS. ENCOUNTERED, SHALL BE PROTECTED AGAINST DAMAGE. DD NOT PREVENT OR EMPLOYEES, AGENTS AND PUBLIC FROM CLAIMS, DEMM05 OR EXPENSE ON ACCOUNT OF INJURY TO PERSON OR DAMAGE TO PROPERTY, ALLEGED OR REAL, ARISING FROM ANYTHING DONE OR NOR DONE UNDER THI5 AGREEMENT BY CONTRACTOR, SUBCONTRACTOR, OR ANYONE DIRECTLY EMPLOYED BY EITHER. GUARANTEE: THE CONTRACTOR SHALL GUARANTEE ALL WORK UNDER THI5 60NTRACT TO BE FREE FROM DEFECTS IN MATERIAL OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OR CERTIFICATE OF OCCUPANCY. HE SHALL REPLACE ANY WORK THAT FAILS TO CONFORM TO THE DRAWINGS OR DETAILS AS SHOWN IN THESE CONSTRUCTION 0OGUMENT5. HE SHALL DELIVER TO THE OWNER ALL WRITTEN WARRANTIES OR 6UARANTEE5 OFFERED BY THE MANUFACTURERS FOR ALL COMPONENTS, EQUIPMENT AND FIXTURES. COPIES OF INVOICES, BILLS OR PURCHASE ORDER5 SHALL BE GIVEN TO THE OWNER WHEN REQUIRED TO ENFORCE GUARANTEES AND WARRANTS. THESE PROVI51ON5 SHALL APPLY TO ALL VENDORS OR OTHERS WHO MAY BE EMPLOYED BY THE CONTRACTOR IN PRODUCING THI5 WORK. COORDINATION OF THE TRADES: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF EVERY ASPECT OF THE WORK AS DESCRIBED IN THE CONTRACT FOR CON5TRUCTION INCLUDING ALL OF THE REQUIREMENTS OF THE 'GENERAL CONDITIONS OF THE CONTRACT FOR GONSTRUGTION', AIA DOCUMENT A -201. HE SHALL VERIFY ALL DRAWINGS AND COORDINATE THE WORK OF ALL TRADES AT THE TIME THE WORK 15 PERFORMED ON THI5 STRUCTURE. NO ADDITIONAL PAYMENTS SHALL BE MADE FOR THE CONTRACTOR'S FAILURE TO COORDINATE THE WORK AND CORRECT CONFLICTING FIELD CONDITIONS. GENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING OF EXISTING CONCRETE SLABS, PARTITIONS, ETC. AS MAY BE REQUIRED FOR ALL TRADES TO ACCOMPLISH ALL WORK REQUIRED BY THESE CONTRACT DOCUMENTS. CONTRACTOR SHALL DO ALL PATCHING AND PROVIDE NEW FINISHES TO MATCH EXISTING 50 AS TO MAKE THE 'PATCHED AREA' INDISCERNIBLE TO THE EXISTING ADJACENT AREA. ALL EXISTING SURFACES SUCH AS WALL5, FLOORS, CEILINGS, BASES, ETC. THAT ARE AFFECTED BY THESE ALTERATIONS ARE TO HAVE NEW MATERIAL AND FIN15H AS REQUIRED TO MATCH ALL ADJACENT EX15TINO FINISHES. DEMOLITION: TITLE TO MATERIALS: TITLE TO ALL MATERIAL AND EQUIPMENT TO BE DEMOLISHED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO THE OWNER 15 VESTED IN THE CONTRACTOR AT START OF PROJECT. REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE DRAWINGS AND ALSO REMOVE ANY OTHER ITEMS OR CONSTRUCTION AS REQUIRED TO ACCOMPLISH ALL NEW WORK TO AREAS SHOWN. ALL REMOVED ITEMS SHALL BECOME THE PROPERTY OF THE CONTRACTOR WITH THE APPROVAL OF THE OWNER AND SHALL BE REMOVED FROM THE SITE. THE AMOUNT OF DUST RESULTING FROM DEMOLITION SHALL BE CONTROLLED TO PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE SURROUNDIN6 AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, LEAKING TO FLOOR BELOW AND POLLUTION. MANUFACTURER=S INSTRUCTIONS: MANUFACTURERS INSTRUCTIONS FOR INSTALLATION, APPLICATION, OR METHODS SHALL BE STRICTLY ADHERED TO AND BY REFERENCE ARE MADE A PART OF THESE PLANS AS IF FULLY WRITTEN HEREIN. FAILURE OF THE CONTRACTOR TO OBTAIN MANUFACTURER'S INSTRUGTION5 SHALL NOT RELIEVE HIM FROM PERFORMING ALL OF THE REQUIREMENTS OF THE WORK. CONTRACTOR SHALL CONFIRM ALL EQUIPMENT DIMENSIONS, ELECTRICAL REQUIREMENTS AND UTILITY CONNECTIONS PRIOR TO CONSTRUCTION WITH ACTUAL EQUIPMENT'S MAKE AND MODEL. FINAL ACCEPTANCE: THE CONTRACTOR SHALL DEMONSTRATE TO THE OWNER THE USE AND VERIFY THE PROPER FUNCTION OF ALL OPERATING FEATURES INCORPORATED INTO THE PROJECT. THE OWNER SHALL REVIEW, VERIFY AND APPROVE THE COMPLETENESS OF ALL 'PUNCH LIST" WORK. CERTIFICATE OF OCCUPANCY: UPON FINAL ACCEPTANCE AND COMPLETION THE CONTRACTOR SHALL OBTAIN AND DELIVER TO THE OWNER OR OWNER'S AGENT A "GERTIFIGATE OF OCCUPANCY" OR 'CERTIFICATE OF USE' FROM THE LOCAL GOVERNING AGENCY. PERMANENT ELEGTRIG SERVICE: IN THE EVENT A 'CERTIFICATE OF OCCUPANCY" OR 'CERTIFICATE OF COMPLETION' 15 A PREREQUISITE TO OBTAINING AN ELECTRIC METER AND /OR PERMANENT ELECTRIC SERVICE THE CONTRACTOR SHALL HAVE THE LOCAL ELECTRIC UTILITY INSTALL ALL THE REQUIRED COMPONENTS TO PROVIDE THE ELECTRIC SERVICE SPECIFIED IN THE PLANS. THEREAFTER HE SHALL TEST AND DEMONSTRATE TO THE OWNER THE USE AND VERIFY THE PROPER FUNCTION OF ALL COMPONENTS AND OPERATING FEATURES OF THE ELECTRICAL SYSTEM. TESTING: ALL REQUIRED TESTS SHALL BE PERFORMED BY AN APPROVED TESTING LABORATORY AT THE CONTRACTORS EXPENSE. TEST RESULTS SHALL BE SUBMITTED TO ARCHITECT, AND /OR ENGINEER. THE FOLLOWING GUIDELINES SPECIFICATIONS ARE INTENDED FOR GENERAL INFORMATION AND SUPPLEMENT THE REQUIREMENTS SHOWN ON THE DRAWING5. THESE SPECIFICATION5 ARE NOT A FULL COMPREHENSIVE CONSTRUCTION SPECIFICATIONS AND SHOULD NOT BE USED AS SUCH. THE GENERAL CONTRACTOR 15 RESPONSIBLE TO PROVIDE ALL MATERIALS AND LABOR REQUIRED TO ACHIEVE THE INTENT OF THESE SPECIFICATIONS AND DRAWINGS. JOINT SEALANTS: A. PROVIDE EXTERIOR AND INTERIOR JOINT SEALANTS AT ALL JOINTS IN VERTICAL SURFACES AND NONTRAFFIC HORIZONTAL SURFACES. B. PROVIDE JOINT SEALERS THAT HAVE BEEN PRODUCED AND INSTALLED TO ESTABL15H AND MAINTAIN WATERTIGHT AND AIRTIGHT CONTINUOUS 5EAL5. G. SUBMIT PRODUCT DATA AND COLOR SAMPLES FOR INITIAL SELECTION PURPOSES. D. PROVIDE SINGLE SOURCE RESPONSIBILITY FOR JOINT SEALER MATERIAL FROM DOW CORNING CORP. OR EQUAL. E. RAILINGS ALL WELDED GONSTRXTION. F. PROVIDE CLEAR ANODIZED FINISH. G. PROVIDE ESCUTCHEON PLATES 6 SLAB CONNECTIONS. HOLLOW METAL DOORS AND FRAMES: A. PROVIDE DOORS AND FRAMES COMPLYING WITH STEEL DOOR INSTITUTE "RECOMMENDED SPECIFICATIONS: STANDARD STEEL DOORS AND FRAMES' (501 -100). B. SUBMIT MANUFAGTURER5 TECHNICAL PRODUCT DATA BY A SINGLE SOURCE MANUFACTURER. G. ACCEPTABLE MANUFACTURERS: I. ANWELD/DIV. AMERICAN WELON6 d MFG. CO. 2. CE( O CORP. 3. FIREDOOR CORP. 4. CURRIES MFG. INC. 5.5TEELCRAFT/DIV. AMERICAN STANDARD CO. THINSET CERAMIC TILE AND DIMENSIONAL TILE 4. ANSI A IIS SERIES - SPECIFIGATIONS FOR CERAMIC TILE MORTARS AND GROUTS. 5. ANSI A 136.1 ORGANIC APHE51VB FOR INSTALLATION OF CERAMIC TILE, 6. AN51 A 131.1 SPECIFICATIONS FOR CERAMIC TILE. B. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM): I. A5TM (499 FACIAL DIMENSIONS AND THIGKNE95 OF FLAT, RECTANGULAR CERAMIC WALL AND FLOOR TILE. 2. ASTM 6501 RELATIVE RESISTANCE TO WEAR OF UNGLAZED CERAMIC TILE BY THE TAKER ABRA5ER 3. A5TM G 1028 TEST METHOD FOR DETERMINING THE STATIC COEFFICIENT OF FRICTION OF CERAMIC TILE AND OTHER TILE LIKE SURFACES BY THE HORIZONTAL DYNAMOMETER PULL METER METHOD. 1.03 SUBMITTALS A. GENERAL: SUBMIT LISTED SUBMITTALS IN ACCORDANCE WITH CONDITIONS OF THE CONTRACT AND DIVISION I SUBMITTAL PROCEDURES SECTION. B. PRODUCT DATA: SUBMIT PRODUCT DATA, INCLUDING MANUFACTURERS PRODUCT SHEET, FOR SPECIFIED PRODUCTS, G.5AMPLE5: SUBMIT SELECTION AND VERIFICATION 5AMPLE5 FOR FINISHES, COLORS AND TEXTURES, [).QUALITY ASSURANCE SUBMITTALS: SUBMIT THE FOLLOWING: I. TEST REPORTS: CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH SPECIFIED PERFORMANCE CHARACTERISTICS AND PHYSICAL PROPERTIES. 2. CERTIFICATES: PRODUCT GERTIFIGATES 516NED BY MANUFACTURER CERTIFYING MATERIALS COMPLY WITH SPECIFIED PERFORMANCE CHARACTER15TICS AND PHYSICAL REQUIREMENTS. 3. MASTER GRADE GERTIFIGATE: SUBMIT MATERIAL MASTER GRADE CERTIFICATION FOR QUARRY TILE PRODUCTS. 4. MANUFACTURERS INSTRUCTIONS: MANUFACTURER'S INSTALLATION INSTRUCTIONS. E. CLOSEOUT SUBMITTALS: SUBMIT THE FOLLOWING: I. MAINTENANCE DATA: MAINTENANCE DATA FOR INSTALLED PRODUCTS IN ACCORDANCE WITH DIVISION I CL05EOUT SUBMITTALS, MAINTENANCE DATA AND OPERATION DATA SECTION, INCLUDE METHODS FOR MAINTAINING INSTALLED PRODUCTS AND PRECAUTION5 AGAINST GLEANING MATERIALS AND METHODS DETRIMENTAL TO FINISHES AND PERFORMANCE. 2. WARRANTY: WARRANTY DOCUMENT5 5PEGIFIED HEREIN. 1.04 QUALITY A55URANGE A. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED, AS DETERMINED BY CONTRACTOR, IN PERFORMING WORK OF THIS SECTION WHO HAS SPECIALIZED IN THE INSTALLATION OF WORK 51MILAR TO THAT REQUIRED FOR THIS PROJECT AND WHO 15 ACCEPTABLE TO PRODUCT MANUFACTURER. B. MATERIAL CERTIFICATES: PROVIDE MASTER GRADE CERTIFICATES FOR EACH SHIPMENT OF QUARRY TILE SIGNED BY TILE MANUFACTURER AND INSTALLER. G. PRE INSTALLATION MEETINGS: CONDUCT PRE - INSTALLATION MEETING TO VERIFY PROJECT REQUIREMENTS, SUBSTRATE CONDITIONS, MANUFACTURERS INSTALLATION INSTRUCTIONS AND MANUFACTURER'S WARRANTY REQUIREMENTS, COMPLY WITH DIVISION I PROJECT MANAGEMENT AND COORDINATION, PROJECT MEETINGS SECTION. 1.05 DELIVERY, 5TORA6E, AND HANDLING A.ORDERI%, COMPLY WITH MANUFACTURERS ORDERING INSTRUCTIONS AND LEAD TIME REQUIREMENTS TO AVOID CONSTRUCTION DELAYS. B. DELIVERY: DELIVER MATERIALS IN MANUFACTURER'S ORIGINAL, UNOPENED, UNDAMAGED CONTAINERS WITH IDENTIFICATION LABELS INTACT. COMPLY WITH AN51 AI31.1 FOR LABELING SEALED TILE CONTAINERS. G. STORAGE AND PROTECTION: STORE MATERIALS PROTECTED FROM EXPOSURE TO HARMFUL WEATHER GONPITION5 AND AT TEMPERATURE CONDITIONS RECOMMENDED BY MANUFACTURER. 1.06 PROJECT CONDITIONS A TEMPERATURE REQUIREMENTS: MAINTAIN AMBIENT TEMPERATURE AND HUMIDITY CONDITIONS IN SPACES WHERE PRODUCTS WILL BE INSTALLED FOR TIME PERIOD BEFORE, DURING AND AFTER INSTALLATION AS RECOMMENDED BY MANUFACTURER. I. MINIMUM TEMPERATURE: MAINTAIN TEMPERATURE AT 50OF (1006) MINIMUM DURING INSTALLATION AND FOR SEVEN DAYS AFTER COMPLETION. 1.01 WARRANTY A. PROJECT WARRANTY: REFER TO CONDITIONS OF THE CONTRACT FOR PROJECT WARRANTY PROVISIONS. B. MANUFACTURER'S WARRANTY; SUBMIT, FOR OWNER'S ACCEPTANCE, MANUFACTURERS STANDARD WARRANTY DOCUMENT EXECUTED BY AUTHORIZED COMPANY OFFICIAL. MANUFACTURER'S WARRANTY 15 IN ADDITION TO, AND NOT A LIMITATION OF, OTHER RIGHTS OWNER MAY HAVE UNDER THE CONTRACT DOCUMENTS. A. WARRANTY PERIOD: ( 25 ) YEARS COMMENCING ON DATE OF SUBSTANTIAL COMPLETION. 1.08 MAINTENANCE A EXTRA MATERIALS: DELIVER TO OWNER EXTRA MATERIALS FROM SAME PRODUCTION RUN AS PRODUCTS INSTALLED, PACKAGE PRODUCTS WITH PROTECTIVE COVERING AND IDENTIFY WITH DESCRIPTIVE LABELS. COMPLY WITH DIVISION I CLOSEOUT SUBMITTALS, MAINTENANCE MATERIALS SECTION. I. QUANTITY. FURNISH QUANTITY OF FULL 51ZE UNITS EQUAL TO 2% OF AMOUNT INSTALLED FOR TILE AND TRIM UNITS. 2. DELIVERY, 5TORAGE AND PROTECTION: COMPLY WITH OWNERS REQUIREMENTS FOR DELIVERY, STORAGE AND PROTECTION OF EXTRA MATERIALS. PART 2 2.01 QUARRY TILE A. MANUFACTURER: METROPOLITAN CERAMICS, BY IRONROCK CAPITAL, INC. 1. CONTACT: DANNY W/ FLORIDA TILE, TEL: 305 - 513 -9600 2.03 SOURCE QUALITY A. SOURCE QUALITY: OBTAIN QUARRY TILE FROM A SINGLE MANUFACTURER. PART 3 EXECUTION 3.01 MANUFACTURERS INSTRUCTIONS A.(OMPLIANCE: COMPLY WITH MANUFACTURERS PRODUCT DATA, INCLUDING PRODUCT TECHNICAL BULLETINS, PRODUCT CATALOG INSTALLATION INSTRUCTIONS AND PRODUCT CARTON INSTRUCTIONS. 3.02 EXAMINATION A. 51TE VERIFICATION OF CONDITIONS: VERIFY SUBSTRATE GONDITION5, WHICH HAVE BEEN PREVIOUSLY INSTALLED UNDER OTHER SECTIONS, ARE ACCEPTABLE FOR PRODUCT INSTALLATION IN AGCORDANGE WITH MANUFAGTURER5 INSTRUCTIONS. 3.03 PREPARATION A.5URFACE PREPARATION: PREPARE 50135TRATE5 TO RECEIVE QUARRY TILE IN ACCORDANCE WITH INDUSTRY INSTALLATION REFERENCE STANDARDS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. 3.04 INSTALLATION A.REFERENCE5: I. AN51 TILE INSTALLATION STANDARD: COMPLY WITH AN51 AIOD SERIES. 2. TGA INSTALLATION REFERENCE: COMPLY WITH TGA HANDBOOK FOR CERAMIC TILE INSTALLATION. B. FIELD BLENDING: MIX AND BLEND TILE FROM SEVERAL CARTON5 TO ENSURE RANDOM DISTRIBUTION OF SHADE VARIATIONS. G. FLOOR TILE INSTALLATION= I. GENERAL: INSTALL QUARRY FLOOR TILE AND TRIM IN ACCORDANCE WITH INDUSTRY REFERENCE STANDARDS. 2. JOINT WIDTHS: ALLOW FOR JOINTS WIDTHS IN QUARRY FLOOR TILE : 1/4' D. WALL TILE INSTALLATION I. 6ENERAL: INSTALL QUARRY WALL TILE AND TRIM IN ACCORDANCE WITH INDUSTRY REFERENCE STANDARDS. 2. JOINT WIDTHS: ALLOW FOR JOINTS WIDTH IN QUARRY WALL TILE : 114" E. PATTERNS: INSTALL QUARRY TILE IN PATTERN INDICATED ON DRAWINGS. 3.05 GLEANING AND PROTECTION A. GLEANING: REMOVE TEMPORARY COVERING5 AND PROTECTION OF ADJACENT WORK AREAS. REPAIR OR REPLACE DAMAGED INSTALLED PRODUCTS, GLEAN INSTALLED PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS PRIOR TO OWNERS ACCEPTANCE. REMOVE CONSTRUCTION DEBRIS FROM PROJECT 51TE AND LEGALLY DISPOSE OF DEBRIS. B. PROTECTION: PROTECT INSTALLED PRODUCT'S FINISH SURFACES FROM DAMAGE DURING CONSTRUCTION. , (b a En 0 SALTZ MICHELSON ARCHITECTS�t 3501 Griffin Road e Ft. Lauderdale, FL 33312 l„�` (954) 266 -2700 Fx: (954) 266 -2701 ; sma @saltzmichelson.com AA- 0002897 Charles Michelson AR0009976 „ 0 Project No.: 2011 -117 Drawn By: JN Checked By: LS Date: 06 -30 -11 Revisions IA6901 4 .. t ,F t ,r DISTURB OPERATION OF ACTIVE SERVICES WHICH ARE TO REMAIN. IF ACTIVE VINYL FLOORING: PERMIT FEES: RELOCATION, MAKE REQUEST T T R MI CH REQUIRE RELOGA 0 E EQUES O SERVICES ARE ENGOUN E ED G QU � 5 F ASBESTOS, I A. PROVIDE VINYL PLANK FLOORING, PER FINISH LEGEND FREE 0 5BE5 05, /8 IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PAY FOR ALL BUILDING AUTHORITIES WITH JUR15016TION FOR DETERMINATION OF PROCEDURES. WHERE MINIMUM THICKNESS. ARCHITECT TO SELECT COLOR AND PATTERN FROM PERMITS REQUIRED BY LOCAL (ODE OR ORDINANCE. EXISTING 5ERVICE5 ARE TO BE ABANDONED, THEY SHALL BE TERMINATED ON MANUFACTURER'S PREMIUM SELECTION. CONFORMANCE WITH REQUIREMENTS OF THE LANDLORD, OWNER, SPECIFICATIONS, PERMANENT UTILITY FEES: UTILITY GOMPANIE5 AND /OR GOVERNING A6ENGIE5 HAVING JURI50IGTION. B. VINYL WALL BASE: PROVIDE VINYL BASE WITH MAT(HIN6 END 5TOP5 AND IMPACT FEES, WATER AND SEWER CONNECTION FEES AND DEPOSITS FOR PERMANENT PREFORMED OR MOLDED CORNER UNITS A5 FOLLOWS: UTILITY 5ERVICES SHALL BE PAID FOR BY THE OWNER. THE CONTRACTOR SHALL DAMAGE: NOTIFY THE ARCHITECT, AND /OR OWNER WHEN THESE FEES APPLY PRIOR TO THE THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTEGTIN6 ALL AREAS, INCLUDING I. HEIGHT: MIN. 4' START OF CONSTRUCTION. PUBLIC SPACES, IN AND AROUND THE 51TE AGAINST DAMAGE DURING THE 2. MIN. THICKNESS: .080' GAUGE CONSTRUCTION PROCESS. DAMAGE TO ANY AREA SHALL BE REPAIRED TO THE 3. STYLE= PER FINISH SCHEDULE. TEMPORARY UTILITY FEES: SATISFACTION OF THE OWNER AND LANDLORD AT THE CONTRACTOR5 EXPENSE. 4. FIN15H: PER FIN15H SCHEDULE. FEES FOR TEMPORARY CONSTRUCTION RELATED U5E OF UTILITY SERVICES SUCH AS WATER; ELECTRIC; TRASH DISPOSAL; PORTABLE TOILETS; JOB 51TE PHONES AND SANITATION FACILITIES: G. PREPARE SUBSTRATE SURFACES TO RECEIVE VINYL FLOORING AS PER OTHER SUCH 5ERVICE5 THAT ARE PRIMARILY UTILIZED BY THE CONTRACTOR IN THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE MANUFACTURER'S RECOMMENDATIONS. DETERMINE THAT FLOORING 15 SUITABLE FOR PERFORMANCE OF THE WORK UNDER THIS CONTRACT SHALL BE INCLUDED IN THE TEMPORARY TOILET FACILITIES ON THE JOB SITE. THE APPLICATION OF VINYL FLOORING BEFORE INSTALLATION. REPAIR ALL COST OF THE JOB AND PAID BY THE CONTRACTOR. CRAGK5, HOLE5, RIDGES OR DEFECTS FOR A SMOOTH AND LEVEL FLOOR. DRINKIN6 WATER: THE GENERAL CONTRACTOR SHALL PROVIDE PORTAE DRINKING WATER FOR THE D. WHERE EXISTING FLOOR REQUIRES REPAIR OR LEVELING, APPLY FLOOR INSURANCE: .E USE OF ALL TRADESMEN. THE WATER SUPPLY SHALL BE FREE OF CHARGE, LEVELING COMPOUND AS REQUIRED AND IN ACCORDANCE TO MANUFACTURER'S THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION CONVENIENTLY LOCATED AND MAINTAINED THROUGHOUT THE DURATION OF THE WORK. RECOMMENDATION5. AGAINST FUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE I. GYPSUM BASE PRODUCT 15 NOT ACCEPTABLE. WORK. PROOF OF IN5URANGE SHALL BE SUBMITTED TO THE OWNER PRIOR TO FIRE PROTECTION: 2. TEST EXISTING FLOORING FOR ANY 516N5 OF M015TURE INFILTRATION AND COMMENCEMENT OF WORK. THE CONTRACTOR AND HIS SUBCONTRACTORS ARE NOT THE CONTRACTOR SHALL PROVIDE GENERAL FIRE PROTECTION THROUGHOUT THE JOB REPAIR BEFORE APPLICATION OF LEVELING COMPOUND. TO COMMENCE WORK UNDER THI5 CONTRACT UNTIL REQUIRED IWARANCE 15 OBTAINED FOR THE DURATION OF THE WORK. EACH SUBCONTRACTOR SHALL BE RESPONSIBLE AND APPROVAL RECEIVED FROM THE OWNER. FOR PROVIDING FIRE PROTECTION FOR THEIR OWN SPECIALTY. E. INSTALL RE51LIENT FLOORING 051N6 METHOD AND MATERIALS IN 5TRIGT INSURANCE TYPE MINIMUM LIMITS OF LIABILITY OPERATING INSTRUCTIONS: ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. WORKMAN'S COMPENSATION STATUTORY THE OWNER SHALL BE FURNISHED WITH THE ORIGINAL OPERATING INSTRUCTIONS APPLY WALL BASE TO WALLS WHERE BASE 15 REQUIRED A5 INDICATED IN REPAIR AND MAINTENANCE MANUALS AS SUPPLIED BY THE MANUFACTURER FOR ALL FIN15H SCHEDULE. EQUIPMENT INSTALLED UNDER THE CONTRACTOR'S 5UPERYI510N. CONTRACTOR'S PUBLIC, LIABILITY: BODILY INJURY COO, 0 EACH PER50N FINAL GLEANING: 6. GLEAN AND PROTECT FLOORING AGAINST DAMAGES FROM CONSTRUCTION. $300,000 EACH ACCIDENT THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CONSTRUCTION GLEAN -UP REPLACE ALL TILES WHICH ARE FOUND DEFECTIVE. PROPERTY DAMAGES $10,000 EACH ACCIDENT INCLUDING THE REMOVAL OF ALL TEMPORARY CONSTRUCTION, SUPPORTS, LIGHTING, $25,000 AGGREGATE BARRIERS, BARRICADES, ETC. USING MANUFACTURERS RECOMMENDED GLEANING AGENTS THE CONTRACTOR SHALL GLEAN AND POLISH ALL CLASS SURFACES; FIN15H CONTRACTORS LIABILITY FOR SUBCONTRACTED WORK: HARDWARE; CERAMIC AND VINYL TILE FLOORING; MIRRORS, WOOPHORK; BODILY INJURY $100;000 EACH PER50N BASEBOARDS AND WALL SURFACES. REMOVE ALL FINGERPRINTS, STAINS, MARKINGS, AMY TILE $300,000 EACH ACCIDENT DUST, DIRT, PUTTY AND OVER PAINTING IN PREPARATION FOR USE AND OGCUPANGY. PROPERTY DAMAGE5 $10,000 EACH ACCIDENT PART I GENERAL $25,000 AGGREGATE 51TE CLEAN -UP: GARBAGE RECEPTACLES SHALL BE ON SITE AT ALL TIMES. THE JOB 51TE SHALL BE 1.02 REFERENCES AUTOMOBILE PUBLIC LIABILITY: KEPT FREE OF ACCUMULATED TRASH AND WASTE MATERIALS WHICH SHALL BE BODILY INJURY $100,000 EACH PERSON REMOVED WEEKLY. 'BROOM GLEANING" SHALL BE DONE ON AN AS NEEDED OR A. AMERICAN NATIONAL STANDARDS INSTITUTE (AN51): $300000 EACH ACCIDENT DAILY BA515 FOR THE DURATION OF CONSTRUCTION. THE CONTRAGTOR SHALL I. ANSI AI08 5ERIE5 - SPECIFICATIONS FOR INSTALLATION OF CERAMIC TILE AND PROPERTY DAMA6E5 $10,000 EACH ACCIDENT GLEAN ALL AREAS OF THE WORK AFTER CONSTRUCTION IS COMPLETED. ALL TRASH, DIMENSIONAL TILE. DEBRIS, IMPLEMENTS, AND SURPLUS MATERIALS SHALL BE REMOVED FROM THE JOB 2. AN51 A 105. 1 A - 5PECIFIGATION5 FOR INSTALLATION OF CERAMIC, TILE IN THE INDEMNITY: 51TE AT THE CONTRACTORS EXPENSE. ALL WASTE SHALL BE LEGALLY 015PO5E0 OF WET SET METHOD. GONTRAGTOR SHALL PROTECT, DEFEND, SAVE HARMLE55 AND INDEMNIFY OWNER; ITS AT PUBLIC OR PRIVATE DUMPING FACILITIES. 3. ANSI A 106. 10 - LOAD BEARING, BONDED, WATERPROOF MEMBRANES FOR EMPLOYEES, AGENTS AND PUBLIC FROM CLAIMS, DEMM05 OR EXPENSE ON ACCOUNT OF INJURY TO PERSON OR DAMAGE TO PROPERTY, ALLEGED OR REAL, ARISING FROM ANYTHING DONE OR NOR DONE UNDER THI5 AGREEMENT BY CONTRACTOR, SUBCONTRACTOR, OR ANYONE DIRECTLY EMPLOYED BY EITHER. GUARANTEE: THE CONTRACTOR SHALL GUARANTEE ALL WORK UNDER THI5 60NTRACT TO BE FREE FROM DEFECTS IN MATERIAL OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OR CERTIFICATE OF OCCUPANCY. HE SHALL REPLACE ANY WORK THAT FAILS TO CONFORM TO THE DRAWINGS OR DETAILS AS SHOWN IN THESE CONSTRUCTION 0OGUMENT5. HE SHALL DELIVER TO THE OWNER ALL WRITTEN WARRANTIES OR 6UARANTEE5 OFFERED BY THE MANUFACTURERS FOR ALL COMPONENTS, EQUIPMENT AND FIXTURES. COPIES OF INVOICES, BILLS OR PURCHASE ORDER5 SHALL BE GIVEN TO THE OWNER WHEN REQUIRED TO ENFORCE GUARANTEES AND WARRANTS. THESE PROVI51ON5 SHALL APPLY TO ALL VENDORS OR OTHERS WHO MAY BE EMPLOYED BY THE CONTRACTOR IN PRODUCING THI5 WORK. COORDINATION OF THE TRADES: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF EVERY ASPECT OF THE WORK AS DESCRIBED IN THE CONTRACT FOR CON5TRUCTION INCLUDING ALL OF THE REQUIREMENTS OF THE 'GENERAL CONDITIONS OF THE CONTRACT FOR GONSTRUGTION', AIA DOCUMENT A -201. HE SHALL VERIFY ALL DRAWINGS AND COORDINATE THE WORK OF ALL TRADES AT THE TIME THE WORK 15 PERFORMED ON THI5 STRUCTURE. NO ADDITIONAL PAYMENTS SHALL BE MADE FOR THE CONTRACTOR'S FAILURE TO COORDINATE THE WORK AND CORRECT CONFLICTING FIELD CONDITIONS. GENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING OF EXISTING CONCRETE SLABS, PARTITIONS, ETC. AS MAY BE REQUIRED FOR ALL TRADES TO ACCOMPLISH ALL WORK REQUIRED BY THESE CONTRACT DOCUMENTS. CONTRACTOR SHALL DO ALL PATCHING AND PROVIDE NEW FINISHES TO MATCH EXISTING 50 AS TO MAKE THE 'PATCHED AREA' INDISCERNIBLE TO THE EXISTING ADJACENT AREA. ALL EXISTING SURFACES SUCH AS WALL5, FLOORS, CEILINGS, BASES, ETC. THAT ARE AFFECTED BY THESE ALTERATIONS ARE TO HAVE NEW MATERIAL AND FIN15H AS REQUIRED TO MATCH ALL ADJACENT EX15TINO FINISHES. DEMOLITION: TITLE TO MATERIALS: TITLE TO ALL MATERIAL AND EQUIPMENT TO BE DEMOLISHED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO THE OWNER 15 VESTED IN THE CONTRACTOR AT START OF PROJECT. REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE DRAWINGS AND ALSO REMOVE ANY OTHER ITEMS OR CONSTRUCTION AS REQUIRED TO ACCOMPLISH ALL NEW WORK TO AREAS SHOWN. ALL REMOVED ITEMS SHALL BECOME THE PROPERTY OF THE CONTRACTOR WITH THE APPROVAL OF THE OWNER AND SHALL BE REMOVED FROM THE SITE. THE AMOUNT OF DUST RESULTING FROM DEMOLITION SHALL BE CONTROLLED TO PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE SURROUNDIN6 AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, LEAKING TO FLOOR BELOW AND POLLUTION. MANUFACTURER=S INSTRUCTIONS: MANUFACTURERS INSTRUCTIONS FOR INSTALLATION, APPLICATION, OR METHODS SHALL BE STRICTLY ADHERED TO AND BY REFERENCE ARE MADE A PART OF THESE PLANS AS IF FULLY WRITTEN HEREIN. FAILURE OF THE CONTRACTOR TO OBTAIN MANUFACTURER'S INSTRUGTION5 SHALL NOT RELIEVE HIM FROM PERFORMING ALL OF THE REQUIREMENTS OF THE WORK. CONTRACTOR SHALL CONFIRM ALL EQUIPMENT DIMENSIONS, ELECTRICAL REQUIREMENTS AND UTILITY CONNECTIONS PRIOR TO CONSTRUCTION WITH ACTUAL EQUIPMENT'S MAKE AND MODEL. FINAL ACCEPTANCE: THE CONTRACTOR SHALL DEMONSTRATE TO THE OWNER THE USE AND VERIFY THE PROPER FUNCTION OF ALL OPERATING FEATURES INCORPORATED INTO THE PROJECT. THE OWNER SHALL REVIEW, VERIFY AND APPROVE THE COMPLETENESS OF ALL 'PUNCH LIST" WORK. CERTIFICATE OF OCCUPANCY: UPON FINAL ACCEPTANCE AND COMPLETION THE CONTRACTOR SHALL OBTAIN AND DELIVER TO THE OWNER OR OWNER'S AGENT A "GERTIFIGATE OF OCCUPANCY" OR 'CERTIFICATE OF USE' FROM THE LOCAL GOVERNING AGENCY. PERMANENT ELEGTRIG SERVICE: IN THE EVENT A 'CERTIFICATE OF OCCUPANCY" OR 'CERTIFICATE OF COMPLETION' 15 A PREREQUISITE TO OBTAINING AN ELECTRIC METER AND /OR PERMANENT ELECTRIC SERVICE THE CONTRACTOR SHALL HAVE THE LOCAL ELECTRIC UTILITY INSTALL ALL THE REQUIRED COMPONENTS TO PROVIDE THE ELECTRIC SERVICE SPECIFIED IN THE PLANS. THEREAFTER HE SHALL TEST AND DEMONSTRATE TO THE OWNER THE USE AND VERIFY THE PROPER FUNCTION OF ALL COMPONENTS AND OPERATING FEATURES OF THE ELECTRICAL SYSTEM. TESTING: ALL REQUIRED TESTS SHALL BE PERFORMED BY AN APPROVED TESTING LABORATORY AT THE CONTRACTORS EXPENSE. TEST RESULTS SHALL BE SUBMITTED TO ARCHITECT, AND /OR ENGINEER. THE FOLLOWING GUIDELINES SPECIFICATIONS ARE INTENDED FOR GENERAL INFORMATION AND SUPPLEMENT THE REQUIREMENTS SHOWN ON THE DRAWING5. THESE SPECIFICATION5 ARE NOT A FULL COMPREHENSIVE CONSTRUCTION SPECIFICATIONS AND SHOULD NOT BE USED AS SUCH. THE GENERAL CONTRACTOR 15 RESPONSIBLE TO PROVIDE ALL MATERIALS AND LABOR REQUIRED TO ACHIEVE THE INTENT OF THESE SPECIFICATIONS AND DRAWINGS. JOINT SEALANTS: A. PROVIDE EXTERIOR AND INTERIOR JOINT SEALANTS AT ALL JOINTS IN VERTICAL SURFACES AND NONTRAFFIC HORIZONTAL SURFACES. B. PROVIDE JOINT SEALERS THAT HAVE BEEN PRODUCED AND INSTALLED TO ESTABL15H AND MAINTAIN WATERTIGHT AND AIRTIGHT CONTINUOUS 5EAL5. G. SUBMIT PRODUCT DATA AND COLOR SAMPLES FOR INITIAL SELECTION PURPOSES. D. PROVIDE SINGLE SOURCE RESPONSIBILITY FOR JOINT SEALER MATERIAL FROM DOW CORNING CORP. OR EQUAL. E. RAILINGS ALL WELDED GONSTRXTION. F. PROVIDE CLEAR ANODIZED FINISH. G. PROVIDE ESCUTCHEON PLATES 6 SLAB CONNECTIONS. HOLLOW METAL DOORS AND FRAMES: A. PROVIDE DOORS AND FRAMES COMPLYING WITH STEEL DOOR INSTITUTE "RECOMMENDED SPECIFICATIONS: STANDARD STEEL DOORS AND FRAMES' (501 -100). B. SUBMIT MANUFAGTURER5 TECHNICAL PRODUCT DATA BY A SINGLE SOURCE MANUFACTURER. G. ACCEPTABLE MANUFACTURERS: I. ANWELD/DIV. AMERICAN WELON6 d MFG. CO. 2. CE( O CORP. 3. FIREDOOR CORP. 4. CURRIES MFG. INC. 5.5TEELCRAFT/DIV. AMERICAN STANDARD CO. THINSET CERAMIC TILE AND DIMENSIONAL TILE 4. ANSI A IIS SERIES - SPECIFIGATIONS FOR CERAMIC TILE MORTARS AND GROUTS. 5. ANSI A 136.1 ORGANIC APHE51VB FOR INSTALLATION OF CERAMIC TILE, 6. AN51 A 131.1 SPECIFICATIONS FOR CERAMIC TILE. B. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM): I. A5TM (499 FACIAL DIMENSIONS AND THIGKNE95 OF FLAT, RECTANGULAR CERAMIC WALL AND FLOOR TILE. 2. ASTM 6501 RELATIVE RESISTANCE TO WEAR OF UNGLAZED CERAMIC TILE BY THE TAKER ABRA5ER 3. A5TM G 1028 TEST METHOD FOR DETERMINING THE STATIC COEFFICIENT OF FRICTION OF CERAMIC TILE AND OTHER TILE LIKE SURFACES BY THE HORIZONTAL DYNAMOMETER PULL METER METHOD. 1.03 SUBMITTALS A. GENERAL: SUBMIT LISTED SUBMITTALS IN ACCORDANCE WITH CONDITIONS OF THE CONTRACT AND DIVISION I SUBMITTAL PROCEDURES SECTION. B. PRODUCT DATA: SUBMIT PRODUCT DATA, INCLUDING MANUFACTURERS PRODUCT SHEET, FOR SPECIFIED PRODUCTS, G.5AMPLE5: SUBMIT SELECTION AND VERIFICATION 5AMPLE5 FOR FINISHES, COLORS AND TEXTURES, [).QUALITY ASSURANCE SUBMITTALS: SUBMIT THE FOLLOWING: I. TEST REPORTS: CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH SPECIFIED PERFORMANCE CHARACTERISTICS AND PHYSICAL PROPERTIES. 2. CERTIFICATES: PRODUCT GERTIFIGATES 516NED BY MANUFACTURER CERTIFYING MATERIALS COMPLY WITH SPECIFIED PERFORMANCE CHARACTER15TICS AND PHYSICAL REQUIREMENTS. 3. MASTER GRADE GERTIFIGATE: SUBMIT MATERIAL MASTER GRADE CERTIFICATION FOR QUARRY TILE PRODUCTS. 4. MANUFACTURERS INSTRUCTIONS: MANUFACTURER'S INSTALLATION INSTRUCTIONS. E. CLOSEOUT SUBMITTALS: SUBMIT THE FOLLOWING: I. MAINTENANCE DATA: MAINTENANCE DATA FOR INSTALLED PRODUCTS IN ACCORDANCE WITH DIVISION I CL05EOUT SUBMITTALS, MAINTENANCE DATA AND OPERATION DATA SECTION, INCLUDE METHODS FOR MAINTAINING INSTALLED PRODUCTS AND PRECAUTION5 AGAINST GLEANING MATERIALS AND METHODS DETRIMENTAL TO FINISHES AND PERFORMANCE. 2. WARRANTY: WARRANTY DOCUMENT5 5PEGIFIED HEREIN. 1.04 QUALITY A55URANGE A. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED, AS DETERMINED BY CONTRACTOR, IN PERFORMING WORK OF THIS SECTION WHO HAS SPECIALIZED IN THE INSTALLATION OF WORK 51MILAR TO THAT REQUIRED FOR THIS PROJECT AND WHO 15 ACCEPTABLE TO PRODUCT MANUFACTURER. B. MATERIAL CERTIFICATES: PROVIDE MASTER GRADE CERTIFICATES FOR EACH SHIPMENT OF QUARRY TILE SIGNED BY TILE MANUFACTURER AND INSTALLER. G. PRE INSTALLATION MEETINGS: CONDUCT PRE - INSTALLATION MEETING TO VERIFY PROJECT REQUIREMENTS, SUBSTRATE CONDITIONS, MANUFACTURERS INSTALLATION INSTRUCTIONS AND MANUFACTURER'S WARRANTY REQUIREMENTS, COMPLY WITH DIVISION I PROJECT MANAGEMENT AND COORDINATION, PROJECT MEETINGS SECTION. 1.05 DELIVERY, 5TORA6E, AND HANDLING A.ORDERI%, COMPLY WITH MANUFACTURERS ORDERING INSTRUCTIONS AND LEAD TIME REQUIREMENTS TO AVOID CONSTRUCTION DELAYS. B. DELIVERY: DELIVER MATERIALS IN MANUFACTURER'S ORIGINAL, UNOPENED, UNDAMAGED CONTAINERS WITH IDENTIFICATION LABELS INTACT. COMPLY WITH AN51 AI31.1 FOR LABELING SEALED TILE CONTAINERS. G. STORAGE AND PROTECTION: STORE MATERIALS PROTECTED FROM EXPOSURE TO HARMFUL WEATHER GONPITION5 AND AT TEMPERATURE CONDITIONS RECOMMENDED BY MANUFACTURER. 1.06 PROJECT CONDITIONS A TEMPERATURE REQUIREMENTS: MAINTAIN AMBIENT TEMPERATURE AND HUMIDITY CONDITIONS IN SPACES WHERE PRODUCTS WILL BE INSTALLED FOR TIME PERIOD BEFORE, DURING AND AFTER INSTALLATION AS RECOMMENDED BY MANUFACTURER. I. MINIMUM TEMPERATURE: MAINTAIN TEMPERATURE AT 50OF (1006) MINIMUM DURING INSTALLATION AND FOR SEVEN DAYS AFTER COMPLETION. 1.01 WARRANTY A. PROJECT WARRANTY: REFER TO CONDITIONS OF THE CONTRACT FOR PROJECT WARRANTY PROVISIONS. B. MANUFACTURER'S WARRANTY; SUBMIT, FOR OWNER'S ACCEPTANCE, MANUFACTURERS STANDARD WARRANTY DOCUMENT EXECUTED BY AUTHORIZED COMPANY OFFICIAL. MANUFACTURER'S WARRANTY 15 IN ADDITION TO, AND NOT A LIMITATION OF, OTHER RIGHTS OWNER MAY HAVE UNDER THE CONTRACT DOCUMENTS. A. WARRANTY PERIOD: ( 25 ) YEARS COMMENCING ON DATE OF SUBSTANTIAL COMPLETION. 1.08 MAINTENANCE A EXTRA MATERIALS: DELIVER TO OWNER EXTRA MATERIALS FROM SAME PRODUCTION RUN AS PRODUCTS INSTALLED, PACKAGE PRODUCTS WITH PROTECTIVE COVERING AND IDENTIFY WITH DESCRIPTIVE LABELS. COMPLY WITH DIVISION I CLOSEOUT SUBMITTALS, MAINTENANCE MATERIALS SECTION. I. QUANTITY. FURNISH QUANTITY OF FULL 51ZE UNITS EQUAL TO 2% OF AMOUNT INSTALLED FOR TILE AND TRIM UNITS. 2. DELIVERY, 5TORAGE AND PROTECTION: COMPLY WITH OWNERS REQUIREMENTS FOR DELIVERY, STORAGE AND PROTECTION OF EXTRA MATERIALS. PART 2 2.01 QUARRY TILE A. MANUFACTURER: METROPOLITAN CERAMICS, BY IRONROCK CAPITAL, INC. 1. CONTACT: DANNY W/ FLORIDA TILE, TEL: 305 - 513 -9600 2.03 SOURCE QUALITY A. SOURCE QUALITY: OBTAIN QUARRY TILE FROM A SINGLE MANUFACTURER. PART 3 EXECUTION 3.01 MANUFACTURERS INSTRUCTIONS A.(OMPLIANCE: COMPLY WITH MANUFACTURERS PRODUCT DATA, INCLUDING PRODUCT TECHNICAL BULLETINS, PRODUCT CATALOG INSTALLATION INSTRUCTIONS AND PRODUCT CARTON INSTRUCTIONS. 3.02 EXAMINATION A. 51TE VERIFICATION OF CONDITIONS: VERIFY SUBSTRATE GONDITION5, WHICH HAVE BEEN PREVIOUSLY INSTALLED UNDER OTHER SECTIONS, ARE ACCEPTABLE FOR PRODUCT INSTALLATION IN AGCORDANGE WITH MANUFAGTURER5 INSTRUCTIONS. 3.03 PREPARATION A.5URFACE PREPARATION: PREPARE 50135TRATE5 TO RECEIVE QUARRY TILE IN ACCORDANCE WITH INDUSTRY INSTALLATION REFERENCE STANDARDS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. 3.04 INSTALLATION A.REFERENCE5: I. AN51 TILE INSTALLATION STANDARD: COMPLY WITH AN51 AIOD SERIES. 2. TGA INSTALLATION REFERENCE: COMPLY WITH TGA HANDBOOK FOR CERAMIC TILE INSTALLATION. B. FIELD BLENDING: MIX AND BLEND TILE FROM SEVERAL CARTON5 TO ENSURE RANDOM DISTRIBUTION OF SHADE VARIATIONS. G. FLOOR TILE INSTALLATION= I. GENERAL: INSTALL QUARRY FLOOR TILE AND TRIM IN ACCORDANCE WITH INDUSTRY REFERENCE STANDARDS. 2. JOINT WIDTHS: ALLOW FOR JOINTS WIDTHS IN QUARRY FLOOR TILE : 1/4' D. WALL TILE INSTALLATION I. 6ENERAL: INSTALL QUARRY WALL TILE AND TRIM IN ACCORDANCE WITH INDUSTRY REFERENCE STANDARDS. 2. JOINT WIDTHS: ALLOW FOR JOINTS WIDTH IN QUARRY WALL TILE : 114" E. PATTERNS: INSTALL QUARRY TILE IN PATTERN INDICATED ON DRAWINGS. 3.05 GLEANING AND PROTECTION A. GLEANING: REMOVE TEMPORARY COVERING5 AND PROTECTION OF ADJACENT WORK AREAS. REPAIR OR REPLACE DAMAGED INSTALLED PRODUCTS, GLEAN INSTALLED PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS PRIOR TO OWNERS ACCEPTANCE. REMOVE CONSTRUCTION DEBRIS FROM PROJECT 51TE AND LEGALLY DISPOSE OF DEBRIS. B. PROTECTION: PROTECT INSTALLED PRODUCT'S FINISH SURFACES FROM DAMAGE DURING CONSTRUCTION. , (b a En 0 SALTZ MICHELSON ARCHITECTS�t 3501 Griffin Road e Ft. Lauderdale, FL 33312 l„�` (954) 266 -2700 Fx: (954) 266 -2701 ; sma @saltzmichelson.com AA- 0002897 Charles Michelson AR0009976 „ 0 Project No.: 2011 -117 Drawn By: JN Checked By: LS Date: 06 -30 -11 Revisions IA6901 4 .. t ,F t ,r