11-1104-004I
T D T�RL�
r- r ---------
.r.J M
s.J
EXIT J
REO. 20"
PROV. 60"
L.1. --------- 1... _, P
L L
- - .
NV-9TA
H.C. H.0
MALE MICE
TOIL TOIL
c
CONTROL
Roo,
c
ACCELERATOR
PUMP
TREATMENT
ROOM
PARTIAL FIRST FLOOR LIFE SAFETY PLAN.
SCALE: Ift" = 1' -0"
MOV
. ` •
\_ 12X12 LAY =1N GEILING DIFFUSER
ADJACENT SPACE
TRANSFER AIR BACK TO
CONSTRUCTION ARE
I
Np MANMD
T -°
I
P
P
1
I
P
P
d
►..0...0.1+
TYPE/FACTOR
WIDTH IN
INCHES
PROVIDED
CAPACITY
IN
PERSONS
d.�i✓'
EXT. DR./.2
4 &'
240
B
EXT. DR1.2
4 &'
ARCADE
G
EXT. DR1.2
&4'
450
D
EXT. DR.42
-{�-�
48,0
..
EXT. DR12
►.�►
480
4..
EXT. DR12
N.
_�
G
/
60'
300
H
EXT. DR1.2
4 &'
240
1
prim�
42'
210
J
EXT. DR1.2
W.
HOLDING
K
EXT. DR12
42'
210
L
EXT. DR12
&4'
4bO
M
EXT. DR1.2
10'
350
ROOM ENTRY FIOLDINGG
1,-M5
4,4gO
EXIT CAPACITY REQUIRED
1308
CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND
112,565
1,3Uq
4. CONTAIN CONSTRUCTION WASTE IN TI6HTLY COVERED CONTAINERS
BEFORE C06TFaJ-TION BEGINS.
BEFORE TRANSPORTING.
aw•d
3. MAINTAIN NE6ATIVE AIR PRESSURE HTMN WORK SITE UTILIZING
5. COVER TRANSPORT RECE11TACLE5 OR CARTS. TAPE COVERIN6
«
LMLE55 SOLID LID.
6. REMOVE ISOLATION OF WAG SYSTEM IN AREAS HERE WORK 15
C0NTAINER5 BEFORE TRANSPORTING.
BEING PERFORMED.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
..i��'
tKX'55 SOLID LID.
OF DIRT AND DEBRIS ASSOCIATED HTH CONSTRUCTION.
6. 5EAL HOLES, PIPES, CO WTS AND PtMTURES APPROPRIATELY.
& FINAL CLEANNG BY ENVIR0W1EHTAL SERVICES PRIOR TO
FEC
OCCUPANCY.
CONTROL RADIOLOGY
..
P
..
ELECTRICAL
■L
..
.
■
>!
.�
_
�,
OFFICE
7
ROOM
_...__
ARCADE
WATER
.
TAW
■(
►.../
�I��
11
ir.
..
r- r ---------
.r.J M
s.J
EXIT J
REO. 20"
PROV. 60"
L.1. --------- 1... _, P
L L
- - .
NV-9TA
H.C. H.0
MALE MICE
TOIL TOIL
c
CONTROL
Roo,
c
ACCELERATOR
PUMP
TREATMENT
ROOM
PARTIAL FIRST FLOOR LIFE SAFETY PLAN.
SCALE: Ift" = 1' -0"
MOV
. ` •
\_ 12X12 LAY =1N GEILING DIFFUSER
ADJACENT SPACE
TRANSFER AIR BACK TO
CONSTRUCTION ARE
I
Np MANMD
T -°
I
P
P
1
I
P
P
d
BUILDING INFORMATION
PROJECT NAME: BAPTIST HEALTH SOUTH MIAMI H05PITAL
LIFE SAFETY SURVEY
AOM55: 6200 5H 13 STREET SOUTH MIAMI, FLORIDA 33243
APPLICABLE CODES
FLORIDA BUILDING CODE: BUILDING CODE -2001 EDITION WITH 2O0q AMENDMENTS
THE 6UIDELINE5 OF DE516N AND CONSTRUGTION OF HEALTH CARE
FACILITIES 2006 EDITION
FIRE CODE: NFPA I, UNIFORM BUILDING GORE/ FLORIDA FIRE PREVENTION CODE 2001
LIFE SAFETY CODE: NFPA 101 - LIFE SAFETY CODE 2006
ACCESSIBILITY CODE: 2001 FLORIDA BUILDING CODE WITH 2O0q SUPPLEMENTS CHP. II
STATE FIRE MARSHALL RULE: NFPA 10 -2001, 5TANDARP FOR PORTABLE FIRE EXTIN6UI5HER
NFPA 13, 2002 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
NFPA 12, 2002 NATIONAL FIRE ALARM CODE
NFPA 80, Iggq, STANDARD FOR FIRE DOOR AND WINDOWS
NFPA qq, 2005 STANDARD FOR HEALTHCARE FACILITIES
NFPA 105, 2003 SMOKE CONTROL DOOR ASSEMBLY
NFPA 221, 2006 STANDARD OF FIRE WALLS AND FIRE BARRIER WALLS
BUILDING PLANNING
OCCUPANCY: INSTITUTIONAL GROUP I (FBG 2006)
MIXED OCCUPANCY: NO
REQUIRED FIRE 5EPARATION: IHR.
TYPE OF CONSTRUCTION
CONSTRUCTION TYPE: FBG TYPE IB - NFPA 220
ALTERATION LEVEL I- SECTION 403 FBC EXI5ITNG BUILDING CODE, 2001
CATEGORY OF REHABILITATION WORK
RENOVATION - NFPA 101, 2006 43.22.1.2 / IN THE 2001 FLORIDA FIRE PREVENTION (ODE
CENCUTOR ROOM
EXIT SUMMARY
►..0...0.1+
TYPE/FACTOR
WIDTH IN
INCHES
PROVIDED
CAPACITY
IN
PERSONS
d.�i✓'
EXT. DR./.2
4 &'
240
B
EXT. DR1.2
4 &'
240
G
EXT. DR1.2
&4'
450
D
EXT. DR.42
$4'
48,0
..
EXT. DR12
►.�►
480
4..
EXT. DR12
N.
_�
G
/
60'
300
H
EXT. DR1.2
4 &'
240
1
prim�
42'
210
J
EXT. DR1.2
W.
300
K
EXT. DR12
42'
210
L
EXT. DR12
&4'
4bO
M
EXT. DR1.2
10'
350
EXIT CAPACITY AVAILABLE
1,-M5
4,4gO
EXIT CAPACITY REQUIRED
1308
CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND
112,565
1,3Uq
4. CONTAIN CONSTRUCTION WASTE IN TI6HTLY COVERED CONTAINERS
BEFORE C06TFaJ-TION BEGINS.
BEFORE TRANSPORTING.
3. MAINTAIN NE6ATIVE AIR PRESSURE HTMN WORK SITE UTILIZING
5. COVER TRANSPORT RECE11TACLE5 OR CARTS. TAPE COVERIN6
HEPA EQUIPPED AIR FILTRATION LUTS.
4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED
LMLE55 SOLID LID.
6. REMOVE ISOLATION OF WAG SYSTEM IN AREAS HERE WORK 15
C0NTAINER5 BEFORE TRANSPORTING.
BEING PERFORMED.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
1 REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
tKX'55 SOLID LID.
OF DIRT AND DEBRIS ASSOCIATED HTH CONSTRUCTION.
6. 5EAL HOLES, PIPES, CO WTS AND PtMTURES APPROPRIATELY.
& FINAL CLEANNG BY ENVIR0W1EHTAL SERVICES PRIOR TO
OCCUPANCY.
BUILDING INFORMATION
PROJECT NAME: BAPTIST HEALTH SOUTH MIAMI H05PITAL
LIFE SAFETY SURVEY
AOM55: 6200 5H 13 STREET SOUTH MIAMI, FLORIDA 33243
APPLICABLE CODES
FLORIDA BUILDING CODE: BUILDING CODE -2001 EDITION WITH 2O0q AMENDMENTS
THE 6UIDELINE5 OF DE516N AND CONSTRUGTION OF HEALTH CARE
FACILITIES 2006 EDITION
FIRE CODE: NFPA I, UNIFORM BUILDING GORE/ FLORIDA FIRE PREVENTION CODE 2001
LIFE SAFETY CODE: NFPA 101 - LIFE SAFETY CODE 2006
ACCESSIBILITY CODE: 2001 FLORIDA BUILDING CODE WITH 2O0q SUPPLEMENTS CHP. II
STATE FIRE MARSHALL RULE: NFPA 10 -2001, 5TANDARP FOR PORTABLE FIRE EXTIN6UI5HER
NFPA 13, 2002 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
NFPA 12, 2002 NATIONAL FIRE ALARM CODE
NFPA 80, Iggq, STANDARD FOR FIRE DOOR AND WINDOWS
NFPA qq, 2005 STANDARD FOR HEALTHCARE FACILITIES
NFPA 105, 2003 SMOKE CONTROL DOOR ASSEMBLY
NFPA 221, 2006 STANDARD OF FIRE WALLS AND FIRE BARRIER WALLS
BUILDING PLANNING
OCCUPANCY: INSTITUTIONAL GROUP I (FBG 2006)
MIXED OCCUPANCY: NO
REQUIRED FIRE 5EPARATION: IHR.
TYPE OF CONSTRUCTION
CONSTRUCTION TYPE: FBG TYPE IB - NFPA 220
ALTERATION LEVEL I- SECTION 403 FBC EXI5ITNG BUILDING CODE, 2001
CATEGORY OF REHABILITATION WORK
RENOVATION - NFPA 101, 2006 43.22.1.2 / IN THE 2001 FLORIDA FIRE PREVENTION (ODE
CENCUTOR ROOM
EXIT SUMMARY
EXIT
TYPE/FACTOR
WIDTH IN
INCHES
PROVIDED
CAPACITY
IN
PERSONS
A
EXT. DR./.2
4 &'
240
B
EXT. DR1.2
4 &'
240
G
EXT. DR1.2
&4'
450
D
EXT. DR.42
$4'
48,0
E
EXT. DR12
8,4'
480
F
EXT. DR12
N.
4DO
G
EXT. DR1.2
60'
300
H
EXT. DR1.2
4 &'
240
1
EXT. DR1.2
42'
210
J
EXT. DR1.2
W.
300
K
EXT. DR12
42'
210
L
EXT. DR12
&4'
4bO
M
EXT. DR1.2
10'
350
EXIT CAPACITY AVAILABLE
1,-M5
4,4gO
EXIT CAPACITY REQUIRED
1308
CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND
FP. 8 L
VAULT ROOM
P -STAIR 4
REO. 15"
PROV. 44"
EXIT I
REO. 20"
PROV. 42'
CA"WAM
EXPANDED
TRANSFORMER
VAULT
SMOKE COMPARTMENT SUMMARY
SMOKE
COMPARTMENT
PRIMARY
L15E
AREA
S.F.
OCCUPANT
LOAD FACTOR
PER PERSON
OCCUPANT
LOAD
IA
TREATMENT
14,265
2405F
60
IB
TREATMENT
15,215
240 5F
&4
IG
ASSEMBLY
MINE55
SUB -TOTAL
3,15&
g20q
12961
15 5F
100 5F
250
q2
342
ID
TREATMENT
STORAGE
BUSINESS
SUB -TOTAL
1,995
3,343
q,340
14,61&
2405F
300 SF
100 SF
&
11
q3
112
IE
KITCHEN
DINNING
5UB -TOTAL
8,503
5,101
15,210
200 5F
115F
4&
515
566
IF
MECH. E0.
5,330
300 5F
I&
IG
TREATMENT
&,440
2405F
35
IH
TREATMENT
5805
2405F
25
11
TREATMENT
1,195
240 5F
30
Ii
TREATMENT
558,5
2405F
24
IK
TREATMENT
1,-M5
240 SF
33
TOTAL - FIRST LEVEL
CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND
112,565
1,3Uq
R
SCOPE OF WORK
THE SCOPE OF THI5 PROJECT 15 A FLOORING
RENOVATION WITH RELOCATED DOOR AND
TRAN51TION ADJUSTMENTS. THE CONFIGURATION OF
THE AREA 15 TO REMAIN AS 15. ALL LIFE SAFETY
DEVICES AND EC7RE55 COMPONENTS ARE EXI5TING
TO REMAIN. SEE SPECIFIC ENLARGED FLOOR FLAN
ZONES FOR CONSTRUCTION PHASE EXITING
REQUIREMENT5. THE FACILITY IGRA FOR TH15
PROJECT 15 TO 13E FULLY ADHERED TO. PER THE
ICRA THE PROJECT 15 TYPE 'C" HIGH RISK,
PROJECT TYPE III, WORK TO BE CONDUCTED
DURING RE6UL.AR WORK HOURS AND AFTER HOURS
AS REQUIRED.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
THE ICRA MATRIX 5HALL BE COMPLETED DURING PRE - CONSTRUCTION AND APPROVED BY THE
FIRE r
F
AS PART OF THE CONSW_,TION CONTRACT POCUMENTS. PRESCRIBED PRECAUTIONS MUST BE IN PLACE
u!
O
V
ICRA
III
INFECTION CONTROL RISK LEVELS
4 HR. FIRE BARRIER
CONSTRUCTION ACTIVITY TYPE
r PARTITION (N�r RATED) II
--------------------------------
HIGH R15K
TYPE C
H16H
CLA% IIUIV
EMER6ENCY ROOM EMER6ENGY ROOM
LABOR d DELIVERY LABOR t DELIVERY
LABORATORIES (SPECIMEN) LABORATORIES (5PECIMEN)
EAT 5IGN -HATCH INDICATES
EXIT TEXT AND ARROW INDICATES
rr •
Pi
FIRE DEPARTMENT ( ONNE CTION
OUTPATIENT 5U9,6ERY
1
1�11�
WORK THAT GENERATES MODERATE TO H16H LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY
FIXED BUILDING COMPONENTS OR A55EMBLIES. INGLUDE5, BUT 15 NOT LIMITED TO:
r•
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
r
r•r r ri
REMOVAL OF FLOOR COVERING, HALL COVERING, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
INFECTION CONTROL RISK ASSESSMENT (ICRA)
THE ICRA MATRIX 5HALL BE COMPLETED DURING PRE - CONSTRUCTION AND APPROVED BY THE
FACILITIE5 SAFETY, AND INFECTION CONTROL OFFICE. CONTRACTOR SHALL SIGN THE ICRA AGREEMENT
AS PART OF THE CONSW_,TION CONTRACT POCUMENTS. PRESCRIBED PRECAUTIONS MUST BE IN PLACE
PRIOR TO WORK START AND MUST BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT.
ICRA
MATRIX
INFECTION CONTROL RISK LEVELS
PATIENT
CONSTRUCTION ACTIVITY TYPE
6ROUP 3
R15K GROUP
HIGH R15K
TYPE C
H16H
CLA% IIUIV
EMER6ENCY ROOM EMER6ENGY ROOM
LABOR d DELIVERY LABOR t DELIVERY
LABORATORIES (SPECIMEN) LABORATORIES (5PECIMEN)
NEWBORN NURSERY NEWBORN NURSERY
OUTPATIENT 5U9,6ERY
CONSTRUCTION ACTIVIY TYPES
WORK THAT GENERATES MODERATE TO H16H LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY
FIXED BUILDING COMPONENTS OR A55EMBLIES. INGLUDE5, BUT 15 NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
TYPE G
REMOVAL OF FLOOR COVERING, HALL COVERING, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT HORK OR ELECTRICAL WORK ABOVE CEILIN66
• MAJOR CABLING A(TIVITIE5
• ANY ACTMTY WHICH CANNOT BE COMPLETED WITHIN A 5INGLE WORK SHIFT.
RA CLASSIFICATION
GLA55 ►I
1, REHM AND ��C wAG M HM 15
1. DO NOTnREMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
BEING DOPE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
PROJECT 15 THOROUGHLY INSPECTED BY OKER5 STAFF.
2. CONK ETE ALL CRITICAL BARRIER5 I.E. SHEET ROCK, PLYHXD,
2. VA(AW WORK HTH HEPA FILTERED VMAM5.
PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IhPLEME NT
3. MET MOPA IPE EXPOSED SURFACES HTH APPROPRIATELY
CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND
LABELED AND BHSF APPROVED HOSPITAL DISINFECTANT.
SEALED CO WORK 54TE HTH HEPA VACUUM PRIOR TO EXIT)
4. CONTAIN CONSTRUCTION WASTE IN TI6HTLY COVERED CONTAINERS
BEFORE C06TFaJ-TION BEGINS.
BEFORE TRANSPORTING.
3. MAINTAIN NE6ATIVE AIR PRESSURE HTMN WORK SITE UTILIZING
5. COVER TRANSPORT RECE11TACLE5 OR CARTS. TAPE COVERIN6
HEPA EQUIPPED AIR FILTRATION LUTS.
4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED
LMLE55 SOLID LID.
6. REMOVE ISOLATION OF WAG SYSTEM IN AREAS HERE WORK 15
C0NTAINER5 BEFORE TRANSPORTING.
BEING PERFORMED.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
1 REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
tKX'55 SOLID LID.
OF DIRT AND DEBRIS ASSOCIATED HTH CONSTRUCTION.
6. 5EAL HOLES, PIPES, CO WTS AND PtMTURES APPROPRIATELY.
& FINAL CLEANNG BY ENVIR0W1EHTAL SERVICES PRIOR TO
OCCUPANCY.
a
a
M
• isi -
a
•
��I[NPIV1IM1I)il
ARC H I T E C T S
3501 Griffm Road
Ft. Lauderdale, FL 33312
(954) 266 -2700 Fx: (954) 266 -2701
sma @saltzmichelson.com
AA- 0002897
Charles Michelson AR0009976
--
J
1
UK
R_
Project No.:
2011 -117
Drawn By:
By:
JIM
Checked By:
LS
Date:
06 -30 -11
Revisions
H