Loading...
11-1104-004I T D T�RL� r- r --------- .r.J M s.J EXIT J REO. 20" PROV. 60" L.1. --------- 1... _, P L L - - . NV-9TA H.C. H.0 MALE MICE TOIL TOIL c CONTROL Roo, c ACCELERATOR PUMP TREATMENT ROOM PARTIAL FIRST FLOOR LIFE SAFETY PLAN. SCALE: Ift" = 1' -0" MOV . ` • \_ 12X12 LAY =1N GEILING DIFFUSER ADJACENT SPACE TRANSFER AIR BACK TO CONSTRUCTION ARE I Np MANMD T -° I P P 1 I P P d ►..0...0.1+ TYPE/FACTOR WIDTH IN INCHES PROVIDED CAPACITY IN PERSONS d.�i✓' EXT. DR./.2 4 &' 240 B EXT. DR1.2 4 &' ARCADE G EXT. DR1.2 &4' 450 D EXT. DR.42 -{�-� 48,0 .. EXT. DR12 ►.�► 480 4.. EXT. DR12 N. _� G / 60' 300 H EXT. DR1.2 4 &' 240 1 prim� 42' 210 J EXT. DR1.2 W. HOLDING K EXT. DR12 42' 210 L EXT. DR12 &4' 4bO M EXT. DR1.2 10' 350 ROOM ENTRY FIOLDINGG 1,-M5 4,4gO EXIT CAPACITY REQUIRED 1308 CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND 112,565 1,3Uq 4. CONTAIN CONSTRUCTION WASTE IN TI6HTLY COVERED CONTAINERS BEFORE C06TFaJ-TION BEGINS. BEFORE TRANSPORTING. aw•d 3. MAINTAIN NE6ATIVE AIR PRESSURE HTMN WORK SITE UTILIZING 5. COVER TRANSPORT RECE11TACLE5 OR CARTS. TAPE COVERIN6 « LMLE55 SOLID LID. 6. REMOVE ISOLATION OF WAG SYSTEM IN AREAS HERE WORK 15 C0NTAINER5 BEFORE TRANSPORTING. BEING PERFORMED. 5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING ..i��' tKX'55 SOLID LID. OF DIRT AND DEBRIS ASSOCIATED HTH CONSTRUCTION. 6. 5EAL HOLES, PIPES, CO WTS AND PtMTURES APPROPRIATELY. & FINAL CLEANNG BY ENVIR0W1EHTAL SERVICES PRIOR TO FEC OCCUPANCY. CONTROL RADIOLOGY .. P .. ELECTRICAL ■L .. . ■ >! .� _ �, OFFICE 7 ROOM _...__ ARCADE WATER . TAW ■( ►.../ �I�� 11 ir. .. r- r --------- .r.J M s.J EXIT J REO. 20" PROV. 60" L.1. --------- 1... _, P L L - - . NV-9TA H.C. H.0 MALE MICE TOIL TOIL c CONTROL Roo, c ACCELERATOR PUMP TREATMENT ROOM PARTIAL FIRST FLOOR LIFE SAFETY PLAN. SCALE: Ift" = 1' -0" MOV . ` • \_ 12X12 LAY =1N GEILING DIFFUSER ADJACENT SPACE TRANSFER AIR BACK TO CONSTRUCTION ARE I Np MANMD T -° I P P 1 I P P d BUILDING INFORMATION PROJECT NAME: BAPTIST HEALTH SOUTH MIAMI H05PITAL LIFE SAFETY SURVEY AOM55: 6200 5H 13 STREET SOUTH MIAMI, FLORIDA 33243 APPLICABLE CODES FLORIDA BUILDING CODE: BUILDING CODE -2001 EDITION WITH 2O0q AMENDMENTS THE 6UIDELINE5 OF DE516N AND CONSTRUGTION OF HEALTH CARE FACILITIES 2006 EDITION FIRE CODE: NFPA I, UNIFORM BUILDING GORE/ FLORIDA FIRE PREVENTION CODE 2001 LIFE SAFETY CODE: NFPA 101 - LIFE SAFETY CODE 2006 ACCESSIBILITY CODE: 2001 FLORIDA BUILDING CODE WITH 2O0q SUPPLEMENTS CHP. II STATE FIRE MARSHALL RULE: NFPA 10 -2001, 5TANDARP FOR PORTABLE FIRE EXTIN6UI5HER NFPA 13, 2002 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS NFPA 12, 2002 NATIONAL FIRE ALARM CODE NFPA 80, Iggq, STANDARD FOR FIRE DOOR AND WINDOWS NFPA qq, 2005 STANDARD FOR HEALTHCARE FACILITIES NFPA 105, 2003 SMOKE CONTROL DOOR ASSEMBLY NFPA 221, 2006 STANDARD OF FIRE WALLS AND FIRE BARRIER WALLS BUILDING PLANNING OCCUPANCY: INSTITUTIONAL GROUP I (FBG 2006) MIXED OCCUPANCY: NO REQUIRED FIRE 5EPARATION: IHR. TYPE OF CONSTRUCTION CONSTRUCTION TYPE: FBG TYPE IB - NFPA 220 ALTERATION LEVEL I- SECTION 403 FBC EXI5ITNG BUILDING CODE, 2001 CATEGORY OF REHABILITATION WORK RENOVATION - NFPA 101, 2006 43.22.1.2 / IN THE 2001 FLORIDA FIRE PREVENTION (ODE CENCUTOR ROOM EXIT SUMMARY ►..0...0.1+ TYPE/FACTOR WIDTH IN INCHES PROVIDED CAPACITY IN PERSONS d.�i✓' EXT. DR./.2 4 &' 240 B EXT. DR1.2 4 &' 240 G EXT. DR1.2 &4' 450 D EXT. DR.42 $4' 48,0 .. EXT. DR12 ►.�► 480 4.. EXT. DR12 N. _� G / 60' 300 H EXT. DR1.2 4 &' 240 1 prim� 42' 210 J EXT. DR1.2 W. 300 K EXT. DR12 42' 210 L EXT. DR12 &4' 4bO M EXT. DR1.2 10' 350 EXIT CAPACITY AVAILABLE 1,-M5 4,4gO EXIT CAPACITY REQUIRED 1308 CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND 112,565 1,3Uq 4. CONTAIN CONSTRUCTION WASTE IN TI6HTLY COVERED CONTAINERS BEFORE C06TFaJ-TION BEGINS. BEFORE TRANSPORTING. 3. MAINTAIN NE6ATIVE AIR PRESSURE HTMN WORK SITE UTILIZING 5. COVER TRANSPORT RECE11TACLE5 OR CARTS. TAPE COVERIN6 HEPA EQUIPPED AIR FILTRATION LUTS. 4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED LMLE55 SOLID LID. 6. REMOVE ISOLATION OF WAG SYSTEM IN AREAS HERE WORK 15 C0NTAINER5 BEFORE TRANSPORTING. BEING PERFORMED. 5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING 1 REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING tKX'55 SOLID LID. OF DIRT AND DEBRIS ASSOCIATED HTH CONSTRUCTION. 6. 5EAL HOLES, PIPES, CO WTS AND PtMTURES APPROPRIATELY. & FINAL CLEANNG BY ENVIR0W1EHTAL SERVICES PRIOR TO OCCUPANCY. BUILDING INFORMATION PROJECT NAME: BAPTIST HEALTH SOUTH MIAMI H05PITAL LIFE SAFETY SURVEY AOM55: 6200 5H 13 STREET SOUTH MIAMI, FLORIDA 33243 APPLICABLE CODES FLORIDA BUILDING CODE: BUILDING CODE -2001 EDITION WITH 2O0q AMENDMENTS THE 6UIDELINE5 OF DE516N AND CONSTRUGTION OF HEALTH CARE FACILITIES 2006 EDITION FIRE CODE: NFPA I, UNIFORM BUILDING GORE/ FLORIDA FIRE PREVENTION CODE 2001 LIFE SAFETY CODE: NFPA 101 - LIFE SAFETY CODE 2006 ACCESSIBILITY CODE: 2001 FLORIDA BUILDING CODE WITH 2O0q SUPPLEMENTS CHP. II STATE FIRE MARSHALL RULE: NFPA 10 -2001, 5TANDARP FOR PORTABLE FIRE EXTIN6UI5HER NFPA 13, 2002 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS NFPA 12, 2002 NATIONAL FIRE ALARM CODE NFPA 80, Iggq, STANDARD FOR FIRE DOOR AND WINDOWS NFPA qq, 2005 STANDARD FOR HEALTHCARE FACILITIES NFPA 105, 2003 SMOKE CONTROL DOOR ASSEMBLY NFPA 221, 2006 STANDARD OF FIRE WALLS AND FIRE BARRIER WALLS BUILDING PLANNING OCCUPANCY: INSTITUTIONAL GROUP I (FBG 2006) MIXED OCCUPANCY: NO REQUIRED FIRE 5EPARATION: IHR. TYPE OF CONSTRUCTION CONSTRUCTION TYPE: FBG TYPE IB - NFPA 220 ALTERATION LEVEL I- SECTION 403 FBC EXI5ITNG BUILDING CODE, 2001 CATEGORY OF REHABILITATION WORK RENOVATION - NFPA 101, 2006 43.22.1.2 / IN THE 2001 FLORIDA FIRE PREVENTION (ODE CENCUTOR ROOM EXIT SUMMARY EXIT TYPE/FACTOR WIDTH IN INCHES PROVIDED CAPACITY IN PERSONS A EXT. DR./.2 4 &' 240 B EXT. DR1.2 4 &' 240 G EXT. DR1.2 &4' 450 D EXT. DR.42 $4' 48,0 E EXT. DR12 8,4' 480 F EXT. DR12 N. 4DO G EXT. DR1.2 60' 300 H EXT. DR1.2 4 &' 240 1 EXT. DR1.2 42' 210 J EXT. DR1.2 W. 300 K EXT. DR12 42' 210 L EXT. DR12 &4' 4bO M EXT. DR1.2 10' 350 EXIT CAPACITY AVAILABLE 1,-M5 4,4gO EXIT CAPACITY REQUIRED 1308 CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND FP. 8 L VAULT ROOM P -STAIR 4 REO. 15" PROV. 44" EXIT I REO. 20" PROV. 42' CA"WAM EXPANDED TRANSFORMER VAULT SMOKE COMPARTMENT SUMMARY SMOKE COMPARTMENT PRIMARY L15E AREA S.F. OCCUPANT LOAD FACTOR PER PERSON OCCUPANT LOAD IA TREATMENT 14,265 2405F 60 IB TREATMENT 15,215 240 5F &4 IG ASSEMBLY MINE55 SUB -TOTAL 3,15& g20q 12961 15 5F 100 5F 250 q2 342 ID TREATMENT STORAGE BUSINESS SUB -TOTAL 1,995 3,343 q,340 14,61& 2405F 300 SF 100 SF & 11 q3 112 IE KITCHEN DINNING 5UB -TOTAL 8,503 5,101 15,210 200 5F 115F 4& 515 566 IF MECH. E0. 5,330 300 5F I& IG TREATMENT &,440 2405F 35 IH TREATMENT 5805 2405F 25 11 TREATMENT 1,195 240 5F 30 Ii TREATMENT 558,5 2405F 24 IK TREATMENT 1,-M5 240 SF 33 TOTAL - FIRST LEVEL CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND 112,565 1,3Uq R SCOPE OF WORK THE SCOPE OF THI5 PROJECT 15 A FLOORING RENOVATION WITH RELOCATED DOOR AND TRAN51TION ADJUSTMENTS. THE CONFIGURATION OF THE AREA 15 TO REMAIN AS 15. ALL LIFE SAFETY DEVICES AND EC7RE55 COMPONENTS ARE EXI5TING TO REMAIN. SEE SPECIFIC ENLARGED FLOOR FLAN ZONES FOR CONSTRUCTION PHASE EXITING REQUIREMENT5. THE FACILITY IGRA FOR TH15 PROJECT 15 TO 13E FULLY ADHERED TO. PER THE ICRA THE PROJECT 15 TYPE 'C" HIGH RISK, PROJECT TYPE III, WORK TO BE CONDUCTED DURING RE6UL.AR WORK HOURS AND AFTER HOURS AS REQUIRED. INFECTION CONTROL RISK ASSESSMENT (ICRA) THE ICRA MATRIX 5HALL BE COMPLETED DURING PRE - CONSTRUCTION AND APPROVED BY THE FIRE r F AS PART OF THE CONSW_,TION CONTRACT POCUMENTS. PRESCRIBED PRECAUTIONS MUST BE IN PLACE u! O V ICRA III INFECTION CONTROL RISK LEVELS 4 HR. FIRE BARRIER CONSTRUCTION ACTIVITY TYPE r PARTITION (N�r RATED) II -------------------------------- HIGH R15K TYPE C H16H CLA% IIUIV EMER6ENCY ROOM EMER6ENGY ROOM LABOR d DELIVERY LABOR t DELIVERY LABORATORIES (SPECIMEN) LABORATORIES (5PECIMEN) EAT 5IGN -HATCH INDICATES EXIT TEXT AND ARROW INDICATES rr • Pi FIRE DEPARTMENT ( ONNE CTION OUTPATIENT 5U9,6ERY 1 1�11� WORK THAT GENERATES MODERATE TO H16H LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR A55EMBLIES. INGLUDE5, BUT 15 NOT LIMITED TO: r• • SANDING OF WALLS FOR PAINTING OR WALL COVERING r r•r r ri REMOVAL OF FLOOR COVERING, HALL COVERING, CEILING TILES AND CASEWORK • NEW WALL CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) THE ICRA MATRIX 5HALL BE COMPLETED DURING PRE - CONSTRUCTION AND APPROVED BY THE FACILITIE5 SAFETY, AND INFECTION CONTROL OFFICE. CONTRACTOR SHALL SIGN THE ICRA AGREEMENT AS PART OF THE CONSW_,TION CONTRACT POCUMENTS. PRESCRIBED PRECAUTIONS MUST BE IN PLACE PRIOR TO WORK START AND MUST BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. ICRA MATRIX INFECTION CONTROL RISK LEVELS PATIENT CONSTRUCTION ACTIVITY TYPE 6ROUP 3 R15K GROUP HIGH R15K TYPE C H16H CLA% IIUIV EMER6ENCY ROOM EMER6ENGY ROOM LABOR d DELIVERY LABOR t DELIVERY LABORATORIES (SPECIMEN) LABORATORIES (5PECIMEN) NEWBORN NURSERY NEWBORN NURSERY OUTPATIENT 5U9,6ERY CONSTRUCTION ACTIVIY TYPES WORK THAT GENERATES MODERATE TO H16H LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR A55EMBLIES. INGLUDE5, BUT 15 NOT LIMITED TO: • SANDING OF WALLS FOR PAINTING OR WALL COVERING TYPE G REMOVAL OF FLOOR COVERING, HALL COVERING, CEILING TILES AND CASEWORK • NEW WALL CONSTRUCTION • MINOR DUCT HORK OR ELECTRICAL WORK ABOVE CEILIN66 • MAJOR CABLING A(TIVITIE5 • ANY ACTMTY WHICH CANNOT BE COMPLETED WITHIN A 5INGLE WORK SHIFT. RA CLASSIFICATION GLA55 ►I 1, REHM AND ��C wAG M HM 15 1. DO NOTnREMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED BEING DOPE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. PROJECT 15 THOROUGHLY INSPECTED BY OKER5 STAFF. 2. CONK ETE ALL CRITICAL BARRIER5 I.E. SHEET ROCK, PLYHXD, 2. VA(AW WORK HTH HEPA FILTERED VMAM5. PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IhPLEME NT 3. MET MOPA IPE EXPOSED SURFACES HTH APPROPRIATELY CONTROL CUBE METHOD (CART HTH PLASTIC COVERING AND LABELED AND BHSF APPROVED HOSPITAL DISINFECTANT. SEALED CO WORK 54TE HTH HEPA VACUUM PRIOR TO EXIT) 4. CONTAIN CONSTRUCTION WASTE IN TI6HTLY COVERED CONTAINERS BEFORE C06TFaJ-TION BEGINS. BEFORE TRANSPORTING. 3. MAINTAIN NE6ATIVE AIR PRESSURE HTMN WORK SITE UTILIZING 5. COVER TRANSPORT RECE11TACLE5 OR CARTS. TAPE COVERIN6 HEPA EQUIPPED AIR FILTRATION LUTS. 4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED LMLE55 SOLID LID. 6. REMOVE ISOLATION OF WAG SYSTEM IN AREAS HERE WORK 15 C0NTAINER5 BEFORE TRANSPORTING. BEING PERFORMED. 5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING 1 REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING tKX'55 SOLID LID. OF DIRT AND DEBRIS ASSOCIATED HTH CONSTRUCTION. 6. 5EAL HOLES, PIPES, CO WTS AND PtMTURES APPROPRIATELY. & FINAL CLEANNG BY ENVIR0W1EHTAL SERVICES PRIOR TO OCCUPANCY. a a M • isi - a • ��I[NPIV1IM1I)il ARC H I T E C T S 3501 Griffm Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma @saltzmichelson.com AA- 0002897 Charles Michelson AR0009976 -- J 1 UK R_ Project No.: 2011 -117 Drawn By: By: JIM Checked By: LS Date: 06 -30 -11 Revisions H