11-1104-003ARCHITECT: SALTZ MICHELSON ARCHITECTS, INC 3_101 GRUTIN 'OA TELEPHOW- ' 2W2700 FAC!SffvffiX: 2W Z701 6200 - BAPTIST HEALTH SOUTH FLORIDA CLIENT.- SOUTH MIAN, FLORIDA TFIEPHON0 s 662-4M GENERAL NOTES: INFECTION CONTROL NOTES 1. THE CONTRACTOR SHALL V151T THE 51TE OF THE WORK AND EXAMINE 11. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE PLANS AND IT WILL BE ASSUMED THAT THE GONTRAGTOR HAS AND PAYING FOR THE COST OF ALL IN5PECTION5 AND TE5T5 INVESTIGATED AND 15 FULLY INFORMED AS TO THE CONDITIONS AND REQUIRED TO IMPLEMENT THE PLANS. MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND 12. FIRE SEAL ALL NEW OPENINGS AND PENETRATIONS ON QUANTITIES OF WORK TO BE PERFORMED AND MATERIALS TO BE FIRE RATED WALLS. FURNISHED AND AS TO THE REQUIREMENTS OF THE PLANS. PREVENT CONTAMINATION OF DUCT SYSTEM. 5. 13. LAYOUT OF FLOORS SHALL FOLLOW EXACTLY THIS 2. CONTRACTOR SHALL VERIFY ALL DIMEN51ON5 AND CONDITIONS IN DOCUMENTS. IF ANY DISCREPANCIES CONTACT THE ARCHITECT THE FINAL PLANS AND ON THE JOB SITE PRIOR TO EXECUTION OF ANY BEFORE START INSTALLATION. WORK AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF THE FOR VACUUMING PRIOR TO EXIT) BEFORE GON5TRUGTION BEGINS. CONTRACTOR WILL BE RESPONSIBLE ANY DISCREPANCIES. FOR ALL 14. AFTER APPROVAL OF THE FINAL PLANS, ALL REVISIONS 45T 005T5 ARISING FROM A FAILURE TO PERFORM A VERIFICATION AND TO PROCEED THROUGH THE ARCHITECT FOR APPROVAL. ANY MAKE TIMELY NOTIFICATION OF DISCREPANCIES. THE ARCHITECT WILL IN REV1510N5 MADE WITHOUT THE WRITTEN APPROVAL OF THE AN EXPEDIENT MANOR, PROVIDE THE OWNER WITH REVISED DRAWINGS ARCHITECT MAY BE CONSIDERED INVALID AND, AT THE SOLE REFLECTING ANY OF THESE D15GREPANGIE5 AND RELATED MITIGATION DISCRETION OF THE ARCHITECT, THE WORK REJECTED AND FOR REVIEW AND APPROVAL. REQUIREP TO BE MODIFIED AT NO COST TO THE OWNER. 15. OWNERS 5U5-GONTRAGTOR5 AND CONTRACTORS UNDER 3. DO NOT SCALE DRAWINGS. SEPARATE PERMIT SHALL BE ALLOWED TO DO WORK PRIOR TO SUBSTANTIAL COMPLETION SUBJECT ONLY TO THE APPROPRIATE 4. GONTRAGTOR WILL GUARANTEE IN WRITING ALL MATERIALS AND PR06RE55 OF THE WORK AND A SEVEN (1) DAY PRIOR NOTICE WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF OF INTENT BY OWNER TO THE CONTRACTOR. FINAL ACCEPTANCE BY THE OWNER AND WILL, AT HI5 OWN COST, REPAIR OR REPLACE ALL WORK OR DAMAGE CAUSED BY WORK OF Ib. CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION AS SUBGONTRAGTOR5 WHICH BE(OME5 DEFECTIVE DURING THE TERM OF NECESSARY PER CITY AND LOCAL (ODE REQUIREMENT5. THE GUARANTEE. 11. ALL MATERIALS AND WORK TO CONFORM TO LATEST GOVERNING 13UILPIN6 CODE5 AND REGULATIONS. SUBMIT FOR REVIEW NO LESS 5. CONTRACTOR SHALL COORDINATE AND 9JPERV15E HI5 WORK THAN (b) 5ET5 OF SHOP DRAWINGS WHERE REQUIRED AND /OR AND WORK BY SUBCONTRACTORS. INDICATED. b. THESE PLANS ARE THE PROPERTY OF THE ARCHITECT AND 16. (ONTRA(TOR SHALL PROVIDE ACCE55 PANELS AS REQUIRED BY SHALL NOT BE USED, REPRODUCED, OR CHANGED IN ANY WAY PLUMBING, AIR CONDITIONING AND OTHER TRADES, AND AS WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ARCHITECT. REQUIRED BY COPES, LOCATIONS AND TYPE OF PANEL TO 13E REVIEWED AND APPROVED BY THE ARCHITECT. 1. GENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING 0 CONCRETE F 5LAB5 ETC...A5 MAY BE REQUIRED FOR ALL Iq. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND PRODUCT TRADES TO ACCOMPLISH ALL WORK REQUIREP BY THESE APPROVAL FOR ALL MANUFACTURED ITEMS CONTRACT DOCUMENTS. PATCH I REPAIR AS REQ'D 20. CONTRACTOR SHALL LEAVE ACCESS TO ALL MEANS OF EGRESS 5. GONTRACTOR'5 INSTALLATION OF ALL UTILITIES AND 5UB6E0UENT DURING CONSTRUCTION. HOOKUP SHALL BE AS NEC ES5ARY TO ASSURE CONFORMANCE WITH 21. ALL NEW DOORS AND FRAMES TO MEET BH5F UTILITY COMPANY REQUIREMENT5. STANDARDS FOR MATERIALS, INSTALLATION, HARDWARE q. IT 15 THE INTENT OF THE ARCHITECT THAT THIS WORK BE IN AND FINISHES. CONFORMANCE WITH BUILPIN6 AUTHORITIE5 HAVING JLR15PICTION 22. CONTRACTOR TO COORDINATE AND IMPLEMENT OWNER OVER TH15 TYPE OF WORK AND OCCUPANCY. ALL CONTRACTORS PURCHASE ORDER TAX INCENTIVE PR06RAM. SHALL DO THEIR WORK IN COMPLIANCE WITH THE F.B.G., NATIONAL ELECTRIC, CODE, NFPA, 05HA AND OTHER APPLICABLE CODE5 AND REGULATIONS. 10. IT 15 NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. THE CONTRACTOR 15 EXPECTED TO FURNISH AND INSTALL ALL (ON5TRXTION. THE CONTRACTOR 15 EXPECTED TO FURNISH AND INSTALL ALL ITEMS REQUIRED TO COMPLETE THE WORK WITH GOOD WORKMANSHIP AND ASSURE PROPER WORKING ORDER. FL00R1,.,,\..;G UPGRAD--D MIAMI, FLORIDA WORK NOTES I. THE INTENT OF THIS PROJECT 15 TO RENOVATE THE EXI5TIN6 FLOORING FIN15HES THROUGHOUT THE ENTIRE KITCHEN AND A46E55ORY SPACES. 2. THE WORK OF TH15 PROJECT 15 TO BE PHASED AS NOTED HEREIN. THE INTENT 15 THAT THE PHASE BEING WORKED ON 15 100% COMPLETED AND TURN OVER TO THE OWNER FOR ITS INTENDED USE PRIOR TO COMMENCING THE NEXT PHASE WORK. CONTRACTOR TO SUBMIT A PHASING SCHEDULE PRIOR TO 5TARTING THE WORK. COORDINATE SPECIFIC LO( ATION5 OF TEMP. PARTITIONS WITH OWNER. 3. ALL FLOOR DRAINS ARE EXISTING TO REMAIN UNLE55 NOTED OTHERWISE. SEE PHASING AREA 213 FOR 56OPE OF WORK IN 015HROOM THAT WILL HAVE NEW DRAINS. 4. DOORS AFFECTED BY THE NEW RAISED FLOOR AREA ARE TO 13E REPLACED AS NOTED ON DOOR SCHEDULE 5. CONTRACTOR 15 RESPONSIBLE TO SURVEY THE LOCATION AND UTILITY CONNECTIONS TO ALL EQUIPMENT THAT 15 TO BE REMOVED TO ALLOW FOR NEW FLOORING INSTALLATION CONTRACTOR TO COORDINATE STORAGE OF ALL EQUIPMENT WITH OWNERS VENDOR AN REINSTALL IN ITS ORIGINAL LOCATION. MANUFACTURER'S INSTRUCTIONS: MANUFACTURERS INSTRUCTIONS FOR INSTALLATION, APPLICATION, OR METH005 SHALL BE STRICTLY ADHERED TO AND BY REFERENCE ARE MADE A PART OF THESE PLANS AS IF FULLY WRITTEN HEREIN. FAILURE OF THE CONTRACTOR TO OBTAIN MANUFACTURERS IN5TRUGTION5 SHALL NOT RELIEVE HIM FROM PERFORMING ALL OF THE REQUIREMENTS OF THE WORK. CONTRACTOR SHALL CONFIRM ALL EQUIPMENT DIMENSIONS ELECTRICAL REQUIREMENTS AND UTILITY CONNECTIONS PRIOR TO CONSTRUCTION WITH ACTUAL EQUIPMENT5 MAKE AND MODEL. GENERAL PHASING NOTES: 1. COORDINATE DEMOLITION WORK WITH PHASING 50 THAT AGTIVITIE5 ARE INTERRUPTED MINIMALLY. 2. TAKE ALL NECESSARY PRECAUTIONS DURING CONSTRUCTION TO ENSURE THE SAFETY OF THE STAFF + CLIENTS. 3. ALL EXITS AND CORRIDOR5 (BOTH PERMANENT AND TEMPORARY) THAT ARE NECESSARY TO ALLOW THE SAFE E6RE55 OF PATIENTS AND STAFF IN AN EMERGENCY ARE TO BE MAINTAINED FREE AND CLEAR OF ALL 0135TAGI..E5 AND DEBRIS. 4. THE CONTRACTOR 514ALL ERECT ALL NECESSARY BARRICADES, GUARD RAILS, TEMPORARY FENCING, WARNING LIGHTS, TEMPORARY LIGHTING, ETC., TO TOTALLY SEPARATE ALL CONSTRUCTION PHASING AND TO MAINTAIN THE SAFETY OF PATIENTS AND STAFF DURING THE WORK. 5. CONTRACTOR 15 TO DO ALL THAT 15 NECESSARY TO PREVENT EXGE551VE NOISE, DUST, MOISTURE, DEBRIS, ETC., FROM INTERFERING WITH THE FUNCTION OF ADJACENT NON - CONSTRUCTION AREAS. b. ADJACENT AREAS MUST CONTINUE TO FUNCTION DURING CONSTRUCTION. IF THE INTERRUPTION OF SERVICES 15 UNAVOIDABLE, THE CONTRACTOR SHALL NOTIFY THE OWNERS REPRESENTATIVE / ARCHITECT AT LEAST (14) FOURTEEN DAYS IN ADVANCE, TO SCHEDULE THE UTILITIES 5HUT -DOWN. 1. TH15 PROJEGT SHALL BE BUILT IN PHASES, HOWEVER, EVENTS SHALL BE CMRDINATEP WITH OWNER TO MINIMIZE DISRUPTION. D. CONTRACTOR TO COORDINATE THE PHASED C.ON5TRUCTION ZONES TO COMPLY WITH THE INTENT OF CONSTRUCTION ZONE VENTILATION PLAN. q. THE CONTRACTOR 15 TO COORDINATE THE PHASING PLANS SHOWN WITH THE A.H.J. THE INTENT 15 TO CONSTRUCT THE INDIVIDUAL PHASED LOCATION IN ORDER TO TURN OVER THE SPACE FOR USE BY THE FACILITY PRIOR TO MOVING ON TO THE NEXT PHASE OF CONSTRUCTION. 10. THE PHASE IA SCOPE OF WORK 15 TO COORDINATE WITH A SEPARATE HOOP REPLACEMENT PROJECT TO OCCUR WITHIN THE SAME TIME SCHEDULE. ALLOW 8 WEEKS FOR COMPLETION OF THIS PHASE FOR THE FLOORING REPLACEMENT PROJECTS. THE FLOORING RENOVATION WORK OCCUR IMMEDIATELY AFTER HOOD REPLACEMENT WORK. II. CONTRACTOR TO TEMPORARY REMOVE SINKS, DISHWASHER AND CONVEYOR. OWNER TO DISCONNECT ALL OTHER EQUIPMENT. CONTRACTOR TO COORDINATE WITH OWNER AS NECESSARY FOR REMOVAL OF EQUIPMENT. GENERAL DEMOLITION NOTES I. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQURED FOR HAULING AND LE6ALLY 015PO51N6 OF MATERIALS REMOVED IN DEMOLITION WORK. 2. THE PROCEDURES PROPOSED FOR THE ACCOMPLISHMENT OF SALVA6E AND DEMOLITION WORK SHALL BE 51,113MITTED FOR REVIEW. THE PRO(EDURE5 SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL . AND 015POSITION OF MATERIALS, PROTECTION OF PROPERTY, COORDINATION WITH WORK OF OTHERS IN PR06RE55, AND TIMELY DISCONNECTION OF UTILITY SERVICES. THE PROCEMIRE5 SHALL INCLUDE A DETAILED DESCRIPTION OF METHODS AND EQUIPMENT TO BE USED FOR EACH OPERATION AND THE SEQUENCE OF OPERATION. 3. TITLE TO MATERIALS: TITLE TO ALL MATERIAL AND EQUIPMENT TO BE DEMOL15HED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO THE OWNER 15 VESTED IN THE CONTRACTOR AT START OF PROJECT. ALL PLUMBING FIXTURES, LIGHTING FIXTURES, A/C EQUIPMENT, APPLIANCES, TRAYS, SPECIALTY ITEMS, ETC. SHALL BE EVALUATED BY A REPRESENTATIVE OF THE SB.H.O. AS TO 1 THE STATUS OF THEIR REMOVAL. THE OWNER WILL NOT BE RESPONSIBLE FOR THE CONDITIONS, L055 OR DAMAGE OF SUCH PROPERTY AFTER NOTICE TO PROCEED. 4. THE CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND EXAMINE THE PLANS AND IT WILL BE A55LHED THAT THE CONTRACTOR HAS INVESTIGATED AND 15 FULLY INFORMED OF THE CONDITIONS AND MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND GUANTITIES OF WORK TO BE PERFORMED AND MATERIALS TO BE FURNISHED AND AS TO THE RE61UIREMENT5 OF THE PLANS. 5. THE CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE DRAWINGS AND AL50 REMOVE ANY OTHER ITEMS OR CONSTRUCTION AS REQUIRED TO ALCAOMPL15H ALL NEW WORK TO AREAS SHOWN b. ALL DIMENSIONS SHOWN ARE TO BE VERIFIED IN THE FIELD AND ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. 1. THE AMOUNT OF DUST RESULTIN6 FROM DEMOLITION SHALL BE CONTROLLED TO PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE SURROUNDING AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING AND POLLUTION. THE USE OF WATER WILL BE PERMITED FOR MISTING AND WET FLOOR MOPPING. & ALL EX15TIN6 SURFACES 5" AS WALLS, FLOORS, CEILINGS, BASES, ETC. THAT ARE AFFECTED BY THESE ALTERATIONS AND WERE INTENDED TO REMAIN, ARE TO HAVE NEW FINISH TO MATCH ADJACENT EXISTING FINISHE5. q. 6ENERAL CONTRACTOR SHALL DO ALL CUTTING AND PATCHING OF EX6TIN6 CONCRETE SLABS, PARTITIONS, ETC ...A5 MAY BE REQUIRED FOR ALL TRADES TO ACCOMPLISH ALL WORK REQURED BY THESE CONTRACT DOCUMENTS. CONT. SHALL 00 ALL PATCHING AND PROVIDE NEW FINISHES TO MATCH EXI5TIN6 50 AS TO MAKE THE =PATCHED AREA' INDISCERNIBLE FROM THE EXIST. ADJACENT AREA, 10. UTILITY SERVICES: MAINTAIN EXI5TING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT A6AIN5T DAMA6E DURING DEMOLITION OPERATIONS. A. DO NOT INTERUPT EXISTING UTILITIES 5ERVIN67 OCCUPIED OR USE FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. 11. PROTECTION: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT 6ENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. A. PROVIDE PROTECTIVE MEASURES AS REGURED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PER50NAL AND GENERAL PUBLIC TO AND FROM OCCUPIED PORTIONS OF 13UILION65. 12. GARBAGE REMOVAL. SHOULD BE BY COVERED CART ONLY. 13. H05PITAL SHALL REMOVE ALL FURNITURE .CONTRACTOR SHALL BE RE5PON5ABLE FOR COVERING PROTECTING AND STORAGE OF ALL REMAINING EQUIPMENT AND CABINETRY. 14. DEMOLITION SHALL BE LIMITED TO DAYTIME HOURS ONLY. 15. DO NOT P15TWZ THE INTE6RITY OF THE EXISTING STRUCTURAL SYSTEM. CONFIRM LOCATION OF EXISTING STRUCTURAL SUPPORTS AND MEMBERS PRIOR TO GORE DRILLING AND /OR CUTTIN6 OPENIN65 FOR NEW PLUMBING AND /OR MECHANICAL LINES, AND NOTIFY ARCHITECT IMMEDIATLY OF ANY CONFLICTS. Ib. COORDINATE ALL PHASES OF THE WORK WITH THE OWNER PRIOR TO PROCEEDING. 11. IF NECESSARY, EXI5TIN6 WALLS MAY BE REMOVED TO RELIEVE NEW EQUIPMENT THAT WILL NOT FIT THROL16H DOORS. CONTRACTOR TO PATCH AND REPAIR AFFECTED WALLS TO MATCH ORIGINAL MATERIALS AND FIRE RATING AND INSTALL NEW FINISHES AS SCHEDULED AND /OR TO MATCH EXI5TIN6. 19. B.H.5F REP. SHALL APPROVE DISPOSAL OF ALL REMOVED ELEMENTS TO VERIFY IF THEY SHALL BE DISPOSED OF OR STORE FOR OTHER USE. H i INFECTION CONTROL NOTES I. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION SPACE NAME ROOM NO. OPERATIONS. 2. SEAL UNUSED DOOR5 WITH DUCT TAPE. 3. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA, 4. REMOVE OR ISOLATE HVAC 5Y5TEM IN AREA WHERE WORK 15 BEING DONE TO DOOR TAG PREVENT CONTAMINATION OF DUCT SYSTEM. 5. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC, TO SEAL WALLTA6 AREA FROM NON -WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE GON5TRUGTION BEGINS. b. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. UNITS TO BE DUCTED TO EXTERIOR. 1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 8. COVER TRANSPORT RECEPTACLE5 OR CARTS. TAPE COVERING UNLE55 5OLIP LID. q. ALL PER50NMEL ENTERING WORK 51TE ARE REQUIRED TO WEAR 5HOE COVERS. SHOE COVERS MUST BE CKM46ED EACH TIME THE WORKER EXIS5 THE WORK AREA, 10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT 15 INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY GLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT. GENERAL PHASING NOTES: 1. COORDINATE DEMOLITION WORK WITH PHASING 50 THAT AGTIVITIE5 ARE INTERRUPTED MINIMALLY. 2. TAKE ALL NECESSARY PRECAUTIONS DURING CONSTRUCTION TO ENSURE THE SAFETY OF THE STAFF + CLIENTS. 3. ALL EXITS AND CORRIDOR5 (BOTH PERMANENT AND TEMPORARY) THAT ARE NECESSARY TO ALLOW THE SAFE E6RE55 OF PATIENTS AND STAFF IN AN EMERGENCY ARE TO BE MAINTAINED FREE AND CLEAR OF ALL 0135TAGI..E5 AND DEBRIS. 4. THE CONTRACTOR 514ALL ERECT ALL NECESSARY BARRICADES, GUARD RAILS, TEMPORARY FENCING, WARNING LIGHTS, TEMPORARY LIGHTING, ETC., TO TOTALLY SEPARATE ALL CONSTRUCTION PHASING AND TO MAINTAIN THE SAFETY OF PATIENTS AND STAFF DURING THE WORK. 5. CONTRACTOR 15 TO DO ALL THAT 15 NECESSARY TO PREVENT EXGE551VE NOISE, DUST, MOISTURE, DEBRIS, ETC., FROM INTERFERING WITH THE FUNCTION OF ADJACENT NON - CONSTRUCTION AREAS. b. ADJACENT AREAS MUST CONTINUE TO FUNCTION DURING CONSTRUCTION. IF THE INTERRUPTION OF SERVICES 15 UNAVOIDABLE, THE CONTRACTOR SHALL NOTIFY THE OWNERS REPRESENTATIVE / ARCHITECT AT LEAST (14) FOURTEEN DAYS IN ADVANCE, TO SCHEDULE THE UTILITIES 5HUT -DOWN. 1. TH15 PROJEGT SHALL BE BUILT IN PHASES, HOWEVER, EVENTS SHALL BE CMRDINATEP WITH OWNER TO MINIMIZE DISRUPTION. D. CONTRACTOR TO COORDINATE THE PHASED C.ON5TRUCTION ZONES TO COMPLY WITH THE INTENT OF CONSTRUCTION ZONE VENTILATION PLAN. q. THE CONTRACTOR 15 TO COORDINATE THE PHASING PLANS SHOWN WITH THE A.H.J. THE INTENT 15 TO CONSTRUCT THE INDIVIDUAL PHASED LOCATION IN ORDER TO TURN OVER THE SPACE FOR USE BY THE FACILITY PRIOR TO MOVING ON TO THE NEXT PHASE OF CONSTRUCTION. 10. THE PHASE IA SCOPE OF WORK 15 TO COORDINATE WITH A SEPARATE HOOP REPLACEMENT PROJECT TO OCCUR WITHIN THE SAME TIME SCHEDULE. ALLOW 8 WEEKS FOR COMPLETION OF THIS PHASE FOR THE FLOORING REPLACEMENT PROJECTS. THE FLOORING RENOVATION WORK OCCUR IMMEDIATELY AFTER HOOD REPLACEMENT WORK. II. CONTRACTOR TO TEMPORARY REMOVE SINKS, DISHWASHER AND CONVEYOR. OWNER TO DISCONNECT ALL OTHER EQUIPMENT. CONTRACTOR TO COORDINATE WITH OWNER AS NECESSARY FOR REMOVAL OF EQUIPMENT. GENERAL DEMOLITION NOTES I. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQURED FOR HAULING AND LE6ALLY 015PO51N6 OF MATERIALS REMOVED IN DEMOLITION WORK. 2. THE PROCEDURES PROPOSED FOR THE ACCOMPLISHMENT OF SALVA6E AND DEMOLITION WORK SHALL BE 51,113MITTED FOR REVIEW. THE PRO(EDURE5 SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL . AND 015POSITION OF MATERIALS, PROTECTION OF PROPERTY, COORDINATION WITH WORK OF OTHERS IN PR06RE55, AND TIMELY DISCONNECTION OF UTILITY SERVICES. THE PROCEMIRE5 SHALL INCLUDE A DETAILED DESCRIPTION OF METHODS AND EQUIPMENT TO BE USED FOR EACH OPERATION AND THE SEQUENCE OF OPERATION. 3. TITLE TO MATERIALS: TITLE TO ALL MATERIAL AND EQUIPMENT TO BE DEMOL15HED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO THE OWNER 15 VESTED IN THE CONTRACTOR AT START OF PROJECT. ALL PLUMBING FIXTURES, LIGHTING FIXTURES, A/C EQUIPMENT, APPLIANCES, TRAYS, SPECIALTY ITEMS, ETC. SHALL BE EVALUATED BY A REPRESENTATIVE OF THE SB.H.O. AS TO 1 THE STATUS OF THEIR REMOVAL. THE OWNER WILL NOT BE RESPONSIBLE FOR THE CONDITIONS, L055 OR DAMAGE OF SUCH PROPERTY AFTER NOTICE TO PROCEED. 4. THE CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND EXAMINE THE PLANS AND IT WILL BE A55LHED THAT THE CONTRACTOR HAS INVESTIGATED AND 15 FULLY INFORMED OF THE CONDITIONS AND MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND GUANTITIES OF WORK TO BE PERFORMED AND MATERIALS TO BE FURNISHED AND AS TO THE RE61UIREMENT5 OF THE PLANS. 5. THE CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE DRAWINGS AND AL50 REMOVE ANY OTHER ITEMS OR CONSTRUCTION AS REQUIRED TO ALCAOMPL15H ALL NEW WORK TO AREAS SHOWN b. ALL DIMENSIONS SHOWN ARE TO BE VERIFIED IN THE FIELD AND ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. 1. THE AMOUNT OF DUST RESULTIN6 FROM DEMOLITION SHALL BE CONTROLLED TO PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE SURROUNDING AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN, OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING AND POLLUTION. THE USE OF WATER WILL BE PERMITED FOR MISTING AND WET FLOOR MOPPING. & ALL EX15TIN6 SURFACES 5" AS WALLS, FLOORS, CEILINGS, BASES, ETC. THAT ARE AFFECTED BY THESE ALTERATIONS AND WERE INTENDED TO REMAIN, ARE TO HAVE NEW FINISH TO MATCH ADJACENT EXISTING FINISHE5. q. 6ENERAL CONTRACTOR SHALL DO ALL CUTTING AND PATCHING OF EX6TIN6 CONCRETE SLABS, PARTITIONS, ETC ...A5 MAY BE REQUIRED FOR ALL TRADES TO ACCOMPLISH ALL WORK REQURED BY THESE CONTRACT DOCUMENTS. CONT. SHALL 00 ALL PATCHING AND PROVIDE NEW FINISHES TO MATCH EXI5TIN6 50 AS TO MAKE THE =PATCHED AREA' INDISCERNIBLE FROM THE EXIST. ADJACENT AREA, 10. UTILITY SERVICES: MAINTAIN EXI5TING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT A6AIN5T DAMA6E DURING DEMOLITION OPERATIONS. A. DO NOT INTERUPT EXISTING UTILITIES 5ERVIN67 OCCUPIED OR USE FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. 11. PROTECTION: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT 6ENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. A. PROVIDE PROTECTIVE MEASURES AS REGURED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PER50NAL AND GENERAL PUBLIC TO AND FROM OCCUPIED PORTIONS OF 13UILION65. 12. GARBAGE REMOVAL. SHOULD BE BY COVERED CART ONLY. 13. H05PITAL SHALL REMOVE ALL FURNITURE .CONTRACTOR SHALL BE RE5PON5ABLE FOR COVERING PROTECTING AND STORAGE OF ALL REMAINING EQUIPMENT AND CABINETRY. 14. DEMOLITION SHALL BE LIMITED TO DAYTIME HOURS ONLY. 15. DO NOT P15TWZ THE INTE6RITY OF THE EXISTING STRUCTURAL SYSTEM. CONFIRM LOCATION OF EXISTING STRUCTURAL SUPPORTS AND MEMBERS PRIOR TO GORE DRILLING AND /OR CUTTIN6 OPENIN65 FOR NEW PLUMBING AND /OR MECHANICAL LINES, AND NOTIFY ARCHITECT IMMEDIATLY OF ANY CONFLICTS. Ib. COORDINATE ALL PHASES OF THE WORK WITH THE OWNER PRIOR TO PROCEEDING. 11. IF NECESSARY, EXI5TIN6 WALLS MAY BE REMOVED TO RELIEVE NEW EQUIPMENT THAT WILL NOT FIT THROL16H DOORS. CONTRACTOR TO PATCH AND REPAIR AFFECTED WALLS TO MATCH ORIGINAL MATERIALS AND FIRE RATING AND INSTALL NEW FINISHES AS SCHEDULED AND /OR TO MATCH EXI5TIN6. 19. B.H.5F REP. SHALL APPROVE DISPOSAL OF ALL REMOVED ELEMENTS TO VERIFY IF THEY SHALL BE DISPOSED OF OR STORE FOR OTHER USE. H i a m e c TA - - - - -- IN; - -�T COUNTY LOCATION MAP -f SW- _ _ a _ I lSt` _ Sllyt loth St I SW ? ' ^� SAC ` wtl e, t p Ho'e t Villa L■a ^s RENO�iATION al; E Z C1 ?p,Ra Cycte � 1172nd St M $onset dt� Jesn s ' y �:a r•ti _ r. I ? j 1$ W7A�s Park GeritttemPra s SW'_ f x fluty ; s' I SW 74i ' `sw 741h St KEY PLAN N.T.S. ' i_. _.. _ - _ SW Toth ti fl - _ SW 78th V, BUILDING LOCATION MAP INDEX OF DRAWINGS T1 COVER SHEET ARCHITECTURAL LS1.0 LIFE SAFETY PLAN A1.0 FLOOR PLAN PHASE 1 /STAGE A A1.1 FLOOR PLAN PHASE 1 /STAGE B A1.2 FLOOR PLAN PHASE 2 /STAGE A A1.3 FLOOR PLAN PHASE 2 /STAGE B A1.4 FLOOR PLAN PHASE 3 /STAGE A A1.5 FLOOR PLAN PHASE 3 /STAGE B A1.6 FLOOR PLAN PHASE 4 A5.0 DOOR SCHEDULES & DETAILS A5.1 PARTIAL FLOOR PLAN - NEW WORK PLUMBING DISHWASHING AREA A6.0 GENERAL NOTES & SPECIFICATIONS LEGEND TYPE DESCRIPTION CORRIDOR 101 SPACE NAME ROOM NO. NEW WALL5 _- _- ___- -«__,_ EXISTING ELEMENTS TO REMAIN SPECIFIC DEMOLITION NOTES DOOR TAG O EQUIPMENT TAG WALLTA6 a� ��i■�� „-j Sl a m e c TA - - - - -- IN; - -�T COUNTY LOCATION MAP -f SW- _ _ a _ I lSt` _ Sllyt loth St I SW ? ' ^� SAC ` wtl e, t p Ho'e t Villa L■a ^s RENO�iATION al; E Z C1 ?p,Ra Cycte � 1172nd St M $onset dt� Jesn s ' y �:a r•ti _ r. I ? j 1$ W7A�s Park GeritttemPra s SW'_ f x fluty ; s' I SW 74i ' `sw 741h St KEY PLAN N.T.S. ' i_. _.. _ - _ SW Toth ti fl - _ SW 78th V, BUILDING LOCATION MAP INDEX OF DRAWINGS T1 COVER SHEET ARCHITECTURAL LS1.0 LIFE SAFETY PLAN A1.0 FLOOR PLAN PHASE 1 /STAGE A A1.1 FLOOR PLAN PHASE 1 /STAGE B A1.2 FLOOR PLAN PHASE 2 /STAGE A A1.3 FLOOR PLAN PHASE 2 /STAGE B A1.4 FLOOR PLAN PHASE 3 /STAGE A A1.5 FLOOR PLAN PHASE 3 /STAGE B A1.6 FLOOR PLAN PHASE 4 A5.0 DOOR SCHEDULES & DETAILS A5.1 PARTIAL FLOOR PLAN - NEW WORK PLUMBING DISHWASHING AREA A6.0 GENERAL NOTES & SPECIFICATIONS LEGEND TYPE DESCRIPTION CORRIDOR 101 SPACE NAME ROOM NO. NEW WALL5 _- _- ___- -«__,_ EXISTING ELEMENTS TO REMAIN SPECIFIC DEMOLITION NOTES DOOR TAG O EQUIPMENT TAG WALLTA6 EXISTING ELEMENTS TO BE REMOVED i a i f+ • i A R C H I T E C T S 3501 Griffin Road Ft. Lauderdale, FL 33312 (954) 266 -2700 Fx: (954) 266 -2701 sma @saltzmichelson.com AA- 0002897 ng 5 ' �k Charles Michelson AR0009976 1 a a Project No.: 2011 -117 Drawn By: JN Checked By: LS Date: 06 -30 -11 Revisions