GENERAL NOTES:
INFECTION CONTROL NOTES
1. THE CONTRACTOR SHALL V151T THE 51TE OF THE WORK AND EXAMINE
11. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
THE PLANS AND IT WILL BE ASSUMED THAT THE GONTRAGTOR HAS
AND PAYING FOR THE COST OF ALL IN5PECTION5 AND TE5T5
INVESTIGATED AND 15 FULLY INFORMED AS TO THE CONDITIONS AND
REQUIRED TO IMPLEMENT THE PLANS.
MATERIALS TO BE ENCOUNTERED AS TO CHARACTER, QUALITY AND
12. FIRE SEAL ALL NEW OPENINGS AND PENETRATIONS ON
QUANTITIES OF WORK TO BE PERFORMED AND MATERIALS TO BE
FIRE RATED WALLS.
FURNISHED AND AS TO THE REQUIREMENTS OF THE PLANS.
PREVENT CONTAMINATION OF DUCT SYSTEM.
5.
13. LAYOUT OF FLOORS SHALL FOLLOW EXACTLY THIS
2. CONTRACTOR SHALL VERIFY ALL DIMEN51ON5 AND CONDITIONS IN
DOCUMENTS. IF ANY DISCREPANCIES CONTACT THE ARCHITECT
THE FINAL PLANS AND ON THE JOB SITE PRIOR TO EXECUTION OF ANY
BEFORE START INSTALLATION.
WORK AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF THE
FOR VACUUMING PRIOR TO EXIT) BEFORE GON5TRUGTION BEGINS.
CONTRACTOR WILL BE RESPONSIBLE ANY DISCREPANCIES. FOR ALL
14. AFTER APPROVAL OF THE FINAL PLANS, ALL REVISIONS 45T
005T5 ARISING FROM A FAILURE TO PERFORM A VERIFICATION AND TO
PROCEED THROUGH THE ARCHITECT FOR APPROVAL. ANY
MAKE TIMELY NOTIFICATION OF DISCREPANCIES. THE ARCHITECT WILL IN
REV1510N5 MADE WITHOUT THE WRITTEN APPROVAL OF THE
AN EXPEDIENT MANOR, PROVIDE THE OWNER WITH REVISED DRAWINGS
ARCHITECT MAY BE CONSIDERED INVALID AND, AT THE SOLE
REFLECTING ANY OF THESE D15GREPANGIE5 AND RELATED MITIGATION
DISCRETION OF THE ARCHITECT, THE WORK REJECTED AND
FOR REVIEW AND APPROVAL.
REQUIREP TO BE MODIFIED AT NO COST TO THE OWNER.
15. OWNERS 5U5-GONTRAGTOR5 AND CONTRACTORS UNDER
3. DO NOT SCALE DRAWINGS.
SEPARATE PERMIT SHALL BE ALLOWED TO DO WORK PRIOR TO
SUBSTANTIAL COMPLETION SUBJECT ONLY TO THE APPROPRIATE
4. GONTRAGTOR WILL GUARANTEE IN WRITING ALL MATERIALS AND
PR06RE55 OF THE WORK AND A SEVEN (1) DAY PRIOR NOTICE
WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF
OF INTENT BY OWNER TO THE CONTRACTOR.
FINAL ACCEPTANCE BY THE OWNER AND WILL, AT HI5 OWN COST,
REPAIR OR REPLACE ALL WORK OR DAMAGE CAUSED BY WORK OF
Ib. CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION AS
SUBGONTRAGTOR5 WHICH BE(OME5 DEFECTIVE DURING THE TERM OF
NECESSARY PER CITY AND LOCAL (ODE REQUIREMENT5.
THE GUARANTEE.
11. ALL MATERIALS AND WORK TO CONFORM TO LATEST GOVERNING
13UILPIN6 CODE5 AND REGULATIONS. SUBMIT FOR REVIEW NO LESS
5. CONTRACTOR SHALL COORDINATE AND 9JPERV15E HI5 WORK
THAN (b) 5ET5 OF SHOP DRAWINGS WHERE REQUIRED AND /OR
AND WORK BY SUBCONTRACTORS.
INDICATED.
b. THESE PLANS ARE THE PROPERTY OF THE ARCHITECT AND
16. (ONTRA(TOR SHALL PROVIDE ACCE55 PANELS AS REQUIRED BY
SHALL NOT BE USED, REPRODUCED, OR CHANGED IN ANY WAY
PLUMBING, AIR CONDITIONING AND OTHER TRADES, AND AS
WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ARCHITECT.
REQUIRED BY COPES, LOCATIONS AND TYPE OF PANEL TO 13E
REVIEWED AND APPROVED BY THE ARCHITECT.
1. GENERAL CONTRACTOR SHALL DO ALL GUTTING AND PATCHING
0 CONCRETE F 5LAB5 ETC...A5 MAY BE REQUIRED FOR ALL
Iq. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND PRODUCT
TRADES TO ACCOMPLISH ALL WORK REQUIREP BY THESE
APPROVAL FOR ALL MANUFACTURED ITEMS
CONTRACT DOCUMENTS. PATCH I REPAIR AS REQ'D
20. CONTRACTOR SHALL LEAVE ACCESS TO ALL MEANS OF EGRESS
5. GONTRACTOR'5 INSTALLATION OF ALL UTILITIES AND 5UB6E0UENT
DURING CONSTRUCTION.
HOOKUP SHALL BE AS NEC ES5ARY TO ASSURE CONFORMANCE WITH
21. ALL NEW DOORS AND FRAMES TO MEET BH5F
UTILITY COMPANY REQUIREMENT5.
STANDARDS FOR MATERIALS, INSTALLATION, HARDWARE
q. IT 15 THE INTENT OF THE ARCHITECT THAT THIS WORK BE IN
AND FINISHES.
CONFORMANCE WITH BUILPIN6 AUTHORITIE5 HAVING JLR15PICTION
22. CONTRACTOR TO COORDINATE AND IMPLEMENT OWNER
OVER TH15 TYPE OF WORK AND OCCUPANCY. ALL CONTRACTORS
PURCHASE ORDER TAX INCENTIVE PR06RAM.
SHALL DO THEIR WORK IN COMPLIANCE WITH THE F.B.G., NATIONAL
ELECTRIC, CODE, NFPA, 05HA AND OTHER APPLICABLE CODE5 AND
REGULATIONS.
10. IT 15 NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR
DETAIL OF CONSTRUCTION. THE CONTRACTOR 15 EXPECTED TO
FURNISH AND INSTALL ALL (ON5TRXTION. THE CONTRACTOR 15
EXPECTED TO FURNISH AND INSTALL ALL ITEMS REQUIRED TO
COMPLETE THE WORK WITH GOOD WORKMANSHIP AND ASSURE
PROPER WORKING ORDER.
FL00R1,.,,\..;G UPGRAD--D
MIAMI, FLORIDA
WORK NOTES
I. THE INTENT OF THIS PROJECT 15 TO RENOVATE THE EXI5TIN6 FLOORING FIN15HES THROUGHOUT THE ENTIRE KITCHEN AND A46E55ORY SPACES.
2. THE WORK OF TH15 PROJECT 15 TO BE PHASED AS NOTED HEREIN. THE INTENT 15 THAT THE PHASE BEING WORKED ON 15 100% COMPLETED AND TURN OVER TO THE
OWNER FOR ITS INTENDED USE PRIOR TO COMMENCING THE NEXT PHASE WORK. CONTRACTOR TO SUBMIT A PHASING SCHEDULE PRIOR TO 5TARTING THE WORK.
COORDINATE SPECIFIC LO( ATION5 OF TEMP. PARTITIONS WITH OWNER.
3. ALL FLOOR DRAINS ARE EXISTING TO REMAIN UNLE55 NOTED OTHERWISE. SEE PHASING AREA 213 FOR 56OPE OF WORK IN 015HROOM THAT WILL HAVE NEW DRAINS.
4. DOORS AFFECTED BY THE NEW RAISED FLOOR AREA ARE TO 13E REPLACED AS NOTED ON DOOR SCHEDULE
5. CONTRACTOR 15 RESPONSIBLE TO SURVEY THE LOCATION AND UTILITY CONNECTIONS TO ALL EQUIPMENT THAT 15 TO BE REMOVED TO ALLOW FOR NEW FLOORING
INSTALLATION
CONTRACTOR TO COORDINATE STORAGE OF ALL EQUIPMENT WITH OWNERS VENDOR AN REINSTALL IN ITS ORIGINAL LOCATION.
MANUFACTURER'S INSTRUCTIONS:
MANUFACTURERS INSTRUCTIONS FOR INSTALLATION, APPLICATION, OR METH005 SHALL
BE STRICTLY ADHERED TO AND BY REFERENCE ARE MADE A PART OF THESE PLANS
AS IF FULLY WRITTEN HEREIN. FAILURE OF THE CONTRACTOR TO OBTAIN
MANUFACTURERS IN5TRUGTION5 SHALL NOT RELIEVE HIM FROM PERFORMING ALL OF
THE REQUIREMENTS OF THE WORK. CONTRACTOR SHALL CONFIRM ALL EQUIPMENT
DIMENSIONS ELECTRICAL REQUIREMENTS AND UTILITY CONNECTIONS PRIOR TO
CONSTRUCTION WITH ACTUAL EQUIPMENT5 MAKE AND MODEL.
GENERAL PHASING NOTES:
1. COORDINATE DEMOLITION WORK WITH PHASING 50 THAT AGTIVITIE5 ARE
INTERRUPTED MINIMALLY.
2. TAKE ALL NECESSARY PRECAUTIONS DURING CONSTRUCTION TO ENSURE THE SAFETY
OF THE STAFF + CLIENTS.
3. ALL EXITS AND CORRIDOR5 (BOTH PERMANENT AND TEMPORARY) THAT ARE
NECESSARY TO ALLOW THE SAFE E6RE55 OF PATIENTS AND STAFF IN AN EMERGENCY
ARE TO BE MAINTAINED FREE AND CLEAR OF ALL 0135TAGI..E5 AND DEBRIS.
4. THE CONTRACTOR 514ALL ERECT ALL NECESSARY BARRICADES, GUARD RAILS,
TEMPORARY FENCING, WARNING LIGHTS, TEMPORARY LIGHTING, ETC., TO TOTALLY
SEPARATE ALL CONSTRUCTION PHASING AND TO MAINTAIN THE SAFETY OF PATIENTS
AND STAFF DURING THE WORK.
5. CONTRACTOR 15 TO DO ALL THAT 15 NECESSARY TO PREVENT EXGE551VE NOISE,
DUST, MOISTURE, DEBRIS, ETC., FROM INTERFERING WITH THE FUNCTION OF ADJACENT
NON - CONSTRUCTION AREAS.
b. ADJACENT AREAS MUST CONTINUE TO FUNCTION DURING CONSTRUCTION. IF THE
INTERRUPTION OF SERVICES 15 UNAVOIDABLE, THE CONTRACTOR SHALL NOTIFY THE
OWNERS REPRESENTATIVE / ARCHITECT AT LEAST (14) FOURTEEN DAYS IN ADVANCE, TO
SCHEDULE THE UTILITIES 5HUT -DOWN.
1. TH15 PROJEGT SHALL BE BUILT IN PHASES, HOWEVER, EVENTS SHALL BE
CMRDINATEP WITH OWNER TO MINIMIZE DISRUPTION.
D. CONTRACTOR TO COORDINATE THE PHASED C.ON5TRUCTION ZONES TO COMPLY WITH
THE INTENT OF CONSTRUCTION ZONE VENTILATION PLAN.
q. THE CONTRACTOR 15 TO COORDINATE THE PHASING PLANS SHOWN WITH THE A.H.J.
THE INTENT 15 TO CONSTRUCT THE INDIVIDUAL PHASED LOCATION IN ORDER TO TURN
OVER THE SPACE FOR USE BY THE FACILITY PRIOR TO MOVING ON TO THE NEXT PHASE
OF CONSTRUCTION.
10. THE PHASE IA SCOPE OF WORK 15 TO COORDINATE WITH A SEPARATE HOOP
REPLACEMENT PROJECT TO OCCUR WITHIN THE SAME TIME SCHEDULE. ALLOW 8 WEEKS
FOR COMPLETION OF THIS PHASE FOR THE FLOORING REPLACEMENT PROJECTS. THE
FLOORING RENOVATION WORK OCCUR IMMEDIATELY AFTER HOOD REPLACEMENT WORK.
II. CONTRACTOR TO TEMPORARY REMOVE SINKS, DISHWASHER AND CONVEYOR.
OWNER TO DISCONNECT ALL OTHER EQUIPMENT. CONTRACTOR TO COORDINATE WITH
OWNER AS NECESSARY FOR REMOVAL OF EQUIPMENT.
GENERAL DEMOLITION NOTES
I. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQURED FOR HAULING AND LE6ALLY
015PO51N6 OF MATERIALS REMOVED IN DEMOLITION WORK.
2. THE PROCEDURES PROPOSED FOR THE ACCOMPLISHMENT OF SALVA6E AND
DEMOLITION WORK SHALL BE 51,113MITTED FOR REVIEW. THE PRO(EDURE5 SHALL
PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL . AND 015POSITION OF
MATERIALS, PROTECTION OF PROPERTY, COORDINATION WITH WORK OF OTHERS IN
PR06RE55, AND TIMELY DISCONNECTION OF UTILITY SERVICES. THE PROCEMIRE5 SHALL
INCLUDE A DETAILED DESCRIPTION OF METHODS AND EQUIPMENT TO BE USED FOR EACH
OPERATION AND THE SEQUENCE OF OPERATION.
3. TITLE TO MATERIALS: TITLE TO ALL MATERIAL AND EQUIPMENT TO BE
DEMOL15HED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO
THE OWNER 15 VESTED IN THE CONTRACTOR AT START OF PROJECT. ALL PLUMBING
FIXTURES, LIGHTING FIXTURES, A/C EQUIPMENT, APPLIANCES, TRAYS, SPECIALTY
ITEMS, ETC. SHALL BE EVALUATED BY A REPRESENTATIVE OF THE SB.H.O. AS TO
1 THE STATUS OF THEIR REMOVAL. THE OWNER WILL NOT BE RESPONSIBLE FOR THE
CONDITIONS, L055 OR DAMAGE OF SUCH PROPERTY AFTER NOTICE TO PROCEED.
4. THE CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND EXAMINE THE
PLANS AND IT WILL BE A55LHED THAT THE CONTRACTOR HAS INVESTIGATED
AND 15 FULLY INFORMED OF THE CONDITIONS AND MATERIALS TO BE
ENCOUNTERED AS TO CHARACTER, QUALITY AND GUANTITIES OF WORK TO BE
PERFORMED AND MATERIALS TO BE FURNISHED AND AS TO THE RE61UIREMENT5
OF THE PLANS.
5. THE CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE
DRAWINGS AND AL50 REMOVE ANY OTHER ITEMS OR CONSTRUCTION AS REQUIRED TO
ALCAOMPL15H ALL NEW WORK TO AREAS SHOWN
b. ALL DIMENSIONS SHOWN ARE TO BE VERIFIED IN THE FIELD AND ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK.
1. THE AMOUNT OF DUST RESULTIN6 FROM DEMOLITION SHALL BE CONTROLLED TO
PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE
SURROUNDING AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN,
OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING AND
POLLUTION. THE USE OF WATER WILL BE PERMITED FOR MISTING AND WET FLOOR
MOPPING.
& ALL EX15TIN6 SURFACES 5" AS WALLS, FLOORS, CEILINGS, BASES, ETC. THAT ARE
AFFECTED BY THESE ALTERATIONS AND WERE INTENDED TO REMAIN, ARE TO HAVE NEW
FINISH TO MATCH ADJACENT EXISTING FINISHE5.
q. 6ENERAL CONTRACTOR SHALL DO ALL CUTTING AND PATCHING OF
EX6TIN6 CONCRETE SLABS, PARTITIONS, ETC ...A5 MAY BE REQUIRED FOR ALL
TRADES TO ACCOMPLISH ALL WORK REQURED BY THESE CONTRACT
DOCUMENTS. CONT. SHALL 00 ALL PATCHING AND PROVIDE NEW FINISHES TO
MATCH EXI5TIN6 50 AS TO MAKE THE =PATCHED AREA' INDISCERNIBLE FROM
THE EXIST. ADJACENT AREA,
10. UTILITY SERVICES: MAINTAIN EXI5TING UTILITIES INDICATED TO REMAIN,
KEEP IN SERVICE, AND PROTECT A6AIN5T DAMA6E DURING DEMOLITION
OPERATIONS.
A. DO NOT INTERUPT EXISTING UTILITIES 5ERVIN67 OCCUPIED OR USE
FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES
HAVING JURISDICTION.
11. PROTECTION: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF
PROTECTION AS REQUIRED TO PROTECT 6ENERAL PUBLIC FROM INJURY DUE TO
SELECTIVE DEMOLITION WORK.
A. PROVIDE PROTECTIVE MEASURES AS REGURED TO PROVIDE FREE AND SAFE
PASSAGE OF OWNER'S PER50NAL AND GENERAL PUBLIC TO AND FROM OCCUPIED
PORTIONS OF 13UILION65.
12. GARBAGE REMOVAL. SHOULD BE BY COVERED CART ONLY.
13. H05PITAL SHALL REMOVE ALL FURNITURE .CONTRACTOR SHALL BE RE5PON5ABLE
FOR COVERING PROTECTING AND STORAGE OF ALL REMAINING EQUIPMENT AND
CABINETRY.
14. DEMOLITION SHALL BE LIMITED TO DAYTIME HOURS ONLY.
15. DO NOT P15TWZ THE INTE6RITY OF THE EXISTING STRUCTURAL SYSTEM.
CONFIRM LOCATION OF EXISTING STRUCTURAL SUPPORTS AND MEMBERS PRIOR TO
GORE DRILLING AND /OR CUTTIN6 OPENIN65 FOR NEW PLUMBING AND /OR MECHANICAL
LINES, AND NOTIFY ARCHITECT IMMEDIATLY OF ANY CONFLICTS.
Ib. COORDINATE ALL PHASES OF THE WORK WITH THE OWNER PRIOR TO PROCEEDING.
11. IF NECESSARY, EXI5TIN6 WALLS MAY BE REMOVED TO RELIEVE NEW EQUIPMENT
THAT WILL NOT FIT THROL16H DOORS. CONTRACTOR TO PATCH AND REPAIR
AFFECTED WALLS TO MATCH ORIGINAL MATERIALS AND FIRE RATING AND INSTALL
NEW FINISHES AS SCHEDULED AND /OR TO MATCH EXI5TIN6.
19. B.H.5F REP. SHALL APPROVE DISPOSAL OF ALL REMOVED ELEMENTS TO
VERIFY IF THEY SHALL BE DISPOSED OF OR STORE FOR OTHER USE.
H
i
INFECTION CONTROL NOTES
I.
EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
SPACE NAME
ROOM NO.
OPERATIONS.
2.
SEAL UNUSED DOOR5 WITH DUCT TAPE.
3.
PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA,
4.
REMOVE OR ISOLATE HVAC 5Y5TEM IN AREA WHERE WORK 15 BEING DONE TO
DOOR TAG
PREVENT CONTAMINATION OF DUCT SYSTEM.
5.
COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC, TO SEAL
WALLTA6
AREA FROM NON -WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM
FOR VACUUMING PRIOR TO EXIT) BEFORE GON5TRUGTION BEGINS.
b.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS. UNITS TO BE DUCTED TO EXTERIOR.
1.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
8.
COVER TRANSPORT RECEPTACLE5 OR CARTS. TAPE COVERING UNLE55 5OLIP LID.
q.
ALL PER50NMEL ENTERING WORK 51TE ARE REQUIRED TO WEAR 5HOE COVERS.
SHOE COVERS MUST BE CKM46ED EACH TIME THE WORKER EXIS5 THE WORK AREA,
10.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT 15
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY GLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
GENERAL PHASING NOTES:
1. COORDINATE DEMOLITION WORK WITH PHASING 50 THAT AGTIVITIE5 ARE
INTERRUPTED MINIMALLY.
2. TAKE ALL NECESSARY PRECAUTIONS DURING CONSTRUCTION TO ENSURE THE SAFETY
OF THE STAFF + CLIENTS.
3. ALL EXITS AND CORRIDOR5 (BOTH PERMANENT AND TEMPORARY) THAT ARE
NECESSARY TO ALLOW THE SAFE E6RE55 OF PATIENTS AND STAFF IN AN EMERGENCY
ARE TO BE MAINTAINED FREE AND CLEAR OF ALL 0135TAGI..E5 AND DEBRIS.
4. THE CONTRACTOR 514ALL ERECT ALL NECESSARY BARRICADES, GUARD RAILS,
TEMPORARY FENCING, WARNING LIGHTS, TEMPORARY LIGHTING, ETC., TO TOTALLY
SEPARATE ALL CONSTRUCTION PHASING AND TO MAINTAIN THE SAFETY OF PATIENTS
AND STAFF DURING THE WORK.
5. CONTRACTOR 15 TO DO ALL THAT 15 NECESSARY TO PREVENT EXGE551VE NOISE,
DUST, MOISTURE, DEBRIS, ETC., FROM INTERFERING WITH THE FUNCTION OF ADJACENT
NON - CONSTRUCTION AREAS.
b. ADJACENT AREAS MUST CONTINUE TO FUNCTION DURING CONSTRUCTION. IF THE
INTERRUPTION OF SERVICES 15 UNAVOIDABLE, THE CONTRACTOR SHALL NOTIFY THE
OWNERS REPRESENTATIVE / ARCHITECT AT LEAST (14) FOURTEEN DAYS IN ADVANCE, TO
SCHEDULE THE UTILITIES 5HUT -DOWN.
1. TH15 PROJEGT SHALL BE BUILT IN PHASES, HOWEVER, EVENTS SHALL BE
CMRDINATEP WITH OWNER TO MINIMIZE DISRUPTION.
D. CONTRACTOR TO COORDINATE THE PHASED C.ON5TRUCTION ZONES TO COMPLY WITH
THE INTENT OF CONSTRUCTION ZONE VENTILATION PLAN.
q. THE CONTRACTOR 15 TO COORDINATE THE PHASING PLANS SHOWN WITH THE A.H.J.
THE INTENT 15 TO CONSTRUCT THE INDIVIDUAL PHASED LOCATION IN ORDER TO TURN
OVER THE SPACE FOR USE BY THE FACILITY PRIOR TO MOVING ON TO THE NEXT PHASE
OF CONSTRUCTION.
10. THE PHASE IA SCOPE OF WORK 15 TO COORDINATE WITH A SEPARATE HOOP
REPLACEMENT PROJECT TO OCCUR WITHIN THE SAME TIME SCHEDULE. ALLOW 8 WEEKS
FOR COMPLETION OF THIS PHASE FOR THE FLOORING REPLACEMENT PROJECTS. THE
FLOORING RENOVATION WORK OCCUR IMMEDIATELY AFTER HOOD REPLACEMENT WORK.
II. CONTRACTOR TO TEMPORARY REMOVE SINKS, DISHWASHER AND CONVEYOR.
OWNER TO DISCONNECT ALL OTHER EQUIPMENT. CONTRACTOR TO COORDINATE WITH
OWNER AS NECESSARY FOR REMOVAL OF EQUIPMENT.
GENERAL DEMOLITION NOTES
I. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQURED FOR HAULING AND LE6ALLY
015PO51N6 OF MATERIALS REMOVED IN DEMOLITION WORK.
2. THE PROCEDURES PROPOSED FOR THE ACCOMPLISHMENT OF SALVA6E AND
DEMOLITION WORK SHALL BE 51,113MITTED FOR REVIEW. THE PRO(EDURE5 SHALL
PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL . AND 015POSITION OF
MATERIALS, PROTECTION OF PROPERTY, COORDINATION WITH WORK OF OTHERS IN
PR06RE55, AND TIMELY DISCONNECTION OF UTILITY SERVICES. THE PROCEMIRE5 SHALL
INCLUDE A DETAILED DESCRIPTION OF METHODS AND EQUIPMENT TO BE USED FOR EACH
OPERATION AND THE SEQUENCE OF OPERATION.
3. TITLE TO MATERIALS: TITLE TO ALL MATERIAL AND EQUIPMENT TO BE
DEMOL15HED AND REMOVED EXCEPTING ITEMS INDICATED TO BE TURNED OVER TO
THE OWNER 15 VESTED IN THE CONTRACTOR AT START OF PROJECT. ALL PLUMBING
FIXTURES, LIGHTING FIXTURES, A/C EQUIPMENT, APPLIANCES, TRAYS, SPECIALTY
ITEMS, ETC. SHALL BE EVALUATED BY A REPRESENTATIVE OF THE SB.H.O. AS TO
1 THE STATUS OF THEIR REMOVAL. THE OWNER WILL NOT BE RESPONSIBLE FOR THE
CONDITIONS, L055 OR DAMAGE OF SUCH PROPERTY AFTER NOTICE TO PROCEED.
4. THE CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND EXAMINE THE
PLANS AND IT WILL BE A55LHED THAT THE CONTRACTOR HAS INVESTIGATED
AND 15 FULLY INFORMED OF THE CONDITIONS AND MATERIALS TO BE
ENCOUNTERED AS TO CHARACTER, QUALITY AND GUANTITIES OF WORK TO BE
PERFORMED AND MATERIALS TO BE FURNISHED AND AS TO THE RE61UIREMENT5
OF THE PLANS.
5. THE CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON THESE
DRAWINGS AND AL50 REMOVE ANY OTHER ITEMS OR CONSTRUCTION AS REQUIRED TO
ALCAOMPL15H ALL NEW WORK TO AREAS SHOWN
b. ALL DIMENSIONS SHOWN ARE TO BE VERIFIED IN THE FIELD AND ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK.
1. THE AMOUNT OF DUST RESULTIN6 FROM DEMOLITION SHALL BE CONTROLLED TO
PREVENT THE SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN THE
SURROUNDING AREA, USE OF WATER WILL NOT BE PERMITTED WHEN IT WILL RESULT IN,
OR CREATE, HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING AND
POLLUTION. THE USE OF WATER WILL BE PERMITED FOR MISTING AND WET FLOOR
MOPPING.
& ALL EX15TIN6 SURFACES 5" AS WALLS, FLOORS, CEILINGS, BASES, ETC. THAT ARE
AFFECTED BY THESE ALTERATIONS AND WERE INTENDED TO REMAIN, ARE TO HAVE NEW
FINISH TO MATCH ADJACENT EXISTING FINISHE5.
q. 6ENERAL CONTRACTOR SHALL DO ALL CUTTING AND PATCHING OF
EX6TIN6 CONCRETE SLABS, PARTITIONS, ETC ...A5 MAY BE REQUIRED FOR ALL
TRADES TO ACCOMPLISH ALL WORK REQURED BY THESE CONTRACT
DOCUMENTS. CONT. SHALL 00 ALL PATCHING AND PROVIDE NEW FINISHES TO
MATCH EXI5TIN6 50 AS TO MAKE THE =PATCHED AREA' INDISCERNIBLE FROM
THE EXIST. ADJACENT AREA,
10. UTILITY SERVICES: MAINTAIN EXI5TING UTILITIES INDICATED TO REMAIN,
KEEP IN SERVICE, AND PROTECT A6AIN5T DAMA6E DURING DEMOLITION
OPERATIONS.
A. DO NOT INTERUPT EXISTING UTILITIES 5ERVIN67 OCCUPIED OR USE
FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES
HAVING JURISDICTION.
11. PROTECTION: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF
PROTECTION AS REQUIRED TO PROTECT 6ENERAL PUBLIC FROM INJURY DUE TO
SELECTIVE DEMOLITION WORK.
A. PROVIDE PROTECTIVE MEASURES AS REGURED TO PROVIDE FREE AND SAFE
PASSAGE OF OWNER'S PER50NAL AND GENERAL PUBLIC TO AND FROM OCCUPIED
PORTIONS OF 13UILION65.
12. GARBAGE REMOVAL. SHOULD BE BY COVERED CART ONLY.
13. H05PITAL SHALL REMOVE ALL FURNITURE .CONTRACTOR SHALL BE RE5PON5ABLE
FOR COVERING PROTECTING AND STORAGE OF ALL REMAINING EQUIPMENT AND
CABINETRY.
14. DEMOLITION SHALL BE LIMITED TO DAYTIME HOURS ONLY.
15. DO NOT P15TWZ THE INTE6RITY OF THE EXISTING STRUCTURAL SYSTEM.
CONFIRM LOCATION OF EXISTING STRUCTURAL SUPPORTS AND MEMBERS PRIOR TO
GORE DRILLING AND /OR CUTTIN6 OPENIN65 FOR NEW PLUMBING AND /OR MECHANICAL
LINES, AND NOTIFY ARCHITECT IMMEDIATLY OF ANY CONFLICTS.
Ib. COORDINATE ALL PHASES OF THE WORK WITH THE OWNER PRIOR TO PROCEEDING.
11. IF NECESSARY, EXI5TIN6 WALLS MAY BE REMOVED TO RELIEVE NEW EQUIPMENT
THAT WILL NOT FIT THROL16H DOORS. CONTRACTOR TO PATCH AND REPAIR
AFFECTED WALLS TO MATCH ORIGINAL MATERIALS AND FIRE RATING AND INSTALL
NEW FINISHES AS SCHEDULED AND /OR TO MATCH EXI5TIN6.
19. B.H.5F REP. SHALL APPROVE DISPOSAL OF ALL REMOVED ELEMENTS TO
VERIFY IF THEY SHALL BE DISPOSED OF OR STORE FOR OTHER USE.
H
i
a
m e c
TA
- - - - --
IN; - -�T COUNTY LOCATION MAP
-f SW-
_ _ a
_
I
lSt` _ Sllyt loth St I SW ?
' ^�
SAC ` wtl e, t p Ho'e t Villa L■a
^s RENO�iATION al;
E Z C1 ?p,Ra Cycte
�
1172nd St M $onset dt�
Jesn s '
y �:a r•ti _ r. I ? j 1$ W7A�s Park GeritttemPra s
SW'_ f x fluty ;
s' I
SW 74i
' `sw 741h St
KEY PLAN
N.T.S. ' i_. _.. _ - _ SW Toth
ti fl - _
SW 78th V,
BUILDING LOCATION MAP
INDEX OF DRAWINGS
T1 COVER SHEET
ARCHITECTURAL
LS1.0 LIFE SAFETY PLAN
A1.0 FLOOR PLAN PHASE 1 /STAGE A
A1.1 FLOOR PLAN PHASE 1 /STAGE B
A1.2 FLOOR PLAN PHASE 2 /STAGE A
A1.3 FLOOR PLAN PHASE 2 /STAGE B
A1.4 FLOOR PLAN PHASE 3 /STAGE A
A1.5 FLOOR PLAN PHASE 3 /STAGE B
A1.6 FLOOR PLAN PHASE 4
A5.0 DOOR SCHEDULES & DETAILS
A5.1 PARTIAL FLOOR PLAN - NEW WORK PLUMBING
DISHWASHING AREA
A6.0 GENERAL NOTES & SPECIFICATIONS
LEGEND
TYPE
DESCRIPTION
CORRIDOR
101
SPACE NAME
ROOM NO.
NEW WALL5
_- _- ___- -«__,_
EXISTING ELEMENTS TO REMAIN
SPECIFIC DEMOLITION NOTES
DOOR TAG
O
EQUIPMENT TAG
WALLTA6
a� ��i■�� „-j
Sl
a
m e c
TA
- - - - --
IN; - -�T COUNTY LOCATION MAP
-f SW-
_ _ a
_
I
lSt` _ Sllyt loth St I SW ?
' ^�
SAC ` wtl e, t p Ho'e t Villa L■a
^s RENO�iATION al;
E Z C1 ?p,Ra Cycte
�
1172nd St M $onset dt�
Jesn s '
y �:a r•ti _ r. I ? j 1$ W7A�s Park GeritttemPra s
SW'_ f x fluty ;
s' I
SW 74i
' `sw 741h St
KEY PLAN
N.T.S. ' i_. _.. _ - _ SW Toth
ti fl - _
SW 78th V,
BUILDING LOCATION MAP
INDEX OF DRAWINGS
T1 COVER SHEET
ARCHITECTURAL
LS1.0 LIFE SAFETY PLAN
A1.0 FLOOR PLAN PHASE 1 /STAGE A
A1.1 FLOOR PLAN PHASE 1 /STAGE B
A1.2 FLOOR PLAN PHASE 2 /STAGE A
A1.3 FLOOR PLAN PHASE 2 /STAGE B
A1.4 FLOOR PLAN PHASE 3 /STAGE A
A1.5 FLOOR PLAN PHASE 3 /STAGE B
A1.6 FLOOR PLAN PHASE 4
A5.0 DOOR SCHEDULES & DETAILS
A5.1 PARTIAL FLOOR PLAN - NEW WORK PLUMBING
DISHWASHING AREA
A6.0 GENERAL NOTES & SPECIFICATIONS
LEGEND
TYPE
DESCRIPTION
CORRIDOR
101
SPACE NAME
ROOM NO.
NEW WALL5
_- _- ___- -«__,_
EXISTING ELEMENTS TO REMAIN
SPECIFIC DEMOLITION NOTES
DOOR TAG
O
EQUIPMENT TAG
WALLTA6
EXISTING ELEMENTS TO BE REMOVED
i
a
i
f+
•
i
A R C H I T E C T S
3501 Griffin Road
Ft. Lauderdale, FL 33312
(954) 266 -2700 Fx: (954) 266 -2701
sma @saltzmichelson.com
AA- 0002897
ng
5
' �k
Charles Michelson AR0009976
1
a
a
Project No.:
2011 -117
Drawn By:
JN
Checked By:
LS
Date:
06 -30 -11
Revisions