Loading...
11-1067-004Louver Sill Detail 1 1/2" TT T E.NI C`IN G CONCRETE WALL E kS I €NNC, STUCCO CT TO E" DAMAGED AREAS, C `AFCE F Ut RE MOVIE' EXISTING; C.CN €.,VRE",,, AND RUNNS T AC E. BEFORE RE—STUCCO N G AND PAINT AFFECTT,CT AREAS TO MATC E k °IN G CONCRETE TEr WAt. L REMOVE CRACKED CCNNCC E,,Ew E AND STUCCO AT AREAS AROUND PIFIE PENETRATION, PATCH AND F IEC WITH H NEE N CONCRETE TE At C ^, AREAS WHERE I CTNNCTEETE, HAS BEEN FFE MOV EC AND APPLY CONTINUOUS SEALANT AI" PIPE. PENETRATION. CFCCAECTE. NEW STUCCO PATCH AND PAINT RNICF.E O MATCH EXISTING CNNFE E' AE.wF ROX, 24" OT CC,, C"CTNNIINCCtCCTUS BEAD MAXIMUM 8" OE CC, FOR F 'TO 17* AND 40 O. C. FOR B FNWE; 12* AD CANT STRIP ,— SET IN B11 IFS ,..APPFNCEN,, CCT" CT,CC, EASE FLASHING E^ FFTFEANNE 1 AEN INSULATION Roof STUCCO CORNER FEEACT FlNICFE "TO MATCH EXISTING ar Exterior NEW S TIJC,CCC TO ALK,' NN W'TFN EXISTING ETINNG E: WCICNTINNG STUCCO E NCITC TCNNC C ONNC REW "CE' WALL mmm FEE.'; 1 NCTTr,AE.t. CEEN ^I;.^ PLATE INC BED OF PCEE,.YURE.TH NFE' TOP LAYER OF ..'TOPCCCA ' MATRIX NACt`TECCCE:AE, E IC IT:NNCINNC A NEINNIFECI OF TT" PAST TOPCOAT FLASHING FABRIC IN ALL N.,.CTC,A`TIIETNNC SURFACE GRANULES APPIJE.TT TO TOP LAYER OF TOPCOAT MATRIX ATAxECNRS EAE 'FC'CF "ICCOAT E LA,5A INNG F" BRT C BASE;: EA)'F„ IA CF.. TOPCOAT MATRIX F AJOR S&E°,AE. GAF SBS ENCEix DIE D BITUMEN CAFE ETFWIE T,..CµP GRANULE- SHEET EFE I ,T`WNM BS TTTA IT„ ANTS NT F. C ,CN STRAINER C E ^A F INNC FNINEC °N Ad RUBE R010 FLASHING '•' ,.,. � "'„ „" a � N r:awm ANT FA TE EEC E AE A"FT T EXPANSION CCANT COVER, un;,m 13 FIELD ' „ > a F IE C CN F ABMCCATE C ',E AEC F°C ACAFIING ` E' T BNN E XPANi'.DONN JOINT COVERS EM ENT ARE NOT AE.E CNW E,,'D NA A F a LN SHE E ^TS, C off,, F ASTE,NIF,FA S MAXIMUM CTE'hA CLAMP 1/4" DENS DECK " NC „CC- „F AE"1NC;rAE ENNE;EETCWCNNTAE"WEN ITCWCTEm INNCF,TCAT10N TAPER INSULATION EXISTING CURB WALL AA* DOWN TO FTNNAINF a r�„ f *x DECK E.C.TF'°"FE THIS CACNFC TO DRAIN NOTE: N. MINIMUM 30” NEQUAECTEA A.. NCTE.,. LB, TO A... °C.ET" LEAD OR 16 CET> SOFT COPPER FE.,A`'SHiNNG, SET PRIMED FLANGE IN ROOF, CEMENT INI MOP ENEF, CAC MCA, CC6EN,"C" MEN OR BUR, SECT PRIMED FLANGE,' IN HEAT SOFTENED MEMBRANE ; ON .F ^CNRCH ACTS OR HW SHS SYSTEMS, PRIME TCNC :CURFA;CCE. BEFORE STRIPPING, ,MEMBRANE PLIES, , E EAN F �FFd � A C EEANNF�C tC� EXTEND CCEEC CLAMPING CC IG a N„ STRIPPING FE, TC.w.EATE,NWET * AND 8" BEYOND EDGE OF FLASHING NTFTE,ET, ETC`T' NN0,1' ETC.YONNC EDGE OF SkINNN. INSTALL STRIPPING BEFORE E INSTALLATION OF CAP SHEET, ' F a ,F. 9DE II BOX SIZED TO SCUPPER OPENING, REMOVE', DAMAGED SILK"ZO ON F: ARAPE ^C` WCCE.L AND F'EFkfCaOE`m NEW STUCCO AND PMNT RNISH, T() MATCH EkSDNG, SEE DETAIL 2/A-,,2 ALL EwNC €Ww 'NNNN(,C AEEA =NIT0NN(,.,,fd, RODS, SCREWS ANNO NAILS ON AREAS OF THE;' E T;.;R10,FC WALLS AND PARAPET AT ROOF' CAF "EF, A ARE TO BE REMOVED, REMOVE',, VE,, F.XISTINNG. STUCCO, PATCH H01 1" AT CCANNAGEC, AREAS, PITOCFFETE NEW E FU CCO 4NN A CLEAN SQUARE PAT TRNN AND PAENW I, F'CNNISE 4 TO NAATC1 d F.TAIS"TINCN REMOVE DAMAGED S FUCCO AT' AREAS INDICATED BY HATCH PROVIDE TNE.W1? STUCCO A "NI.) PA)NN k, FINNISH TO MATCH I'.AINNTTNCCC FASTEN N`CT DECK OR N AI E RS' AND TO AAL! rCTNTNNCI APPN°CTPMN EE C AS TE:&NE_N' Al A' CEW ^CC, MAXIMUM N °C" E: AND SET IN ROOF CEMENT OVf,, FW tINE F {'E i NN PLIES AND INSTALL iNSTALL FLASHING ASHINNA ANND S T"REPPINCCE FgJE S OVER R NNAIC E D FLANGES GE S ENN CNA GA N "AE h AETCIC ATE EI SCLIa�F�PER FLASHING ASHIN G T O CONFORM T O DO br`F TCPNCINNG AND *`A I' IN ROOF CEMENT` E NNE FCC,. GUAIFEN CANT TA IRW tSE� T ,NN & TCICE NN RUBE„ t (CO BASE F°EAS Ift, HW NON k «a FR, PLY SHEETS 1/4- DENS DECK E.NNEwR C „"`GUAFTI,,.0 ROOF INNCvF.CL INu,SfN DEER INN A F k ANN(';E E E SURROUNDING k _ � t�F�F�FNE kTFI..NNI� ALL 0N TS �4 NECTCT. EREC NNCTTE: T. BASE] F ASIIING ON ALL 15 & 0 YEAR GUARANIFE.PrD SYSTEMS MUST r„dC`C�o'E' rA BASE fIE„Y John, Roberts A # 4 CT sTE s�W ; V) E 1 czf r ” 0 2 CC . w REMOVE DAMAGED ,,IN PAFAF "ET WALL AND F ROWCS NF.N STUCCO AND PAINT =.,.lCar,C'H TO NA,," : ^ „II �k, �, kN NFrrvk � ^, A•k t, "fi r.,a E:;X FINNC; , SEE DETAIL, SAIL, , /A,,,.2 4 ,Nrr 8..ur, 3 4t" ., AREAS :s1, REMOVE,' aAM AG , STUCCO T ' e 3 0 6 � 04 4 � 8 4 .; INDICATED BY HA TCH. CAREFULLY ETF;VF', fax, 9a arN Near EXISIING I..,CTiCVRE, CLEAN, AN() RUNSTALL, 9`?. x7S kv , ��axir ',x3st 24'Y n v AA FOUX,iIIA TINE CWE „F C,TNF RE—STUCCOING AND PAINTING AF F I..C,TE. a AREAS TO FCA=C.'H E ^A €ST04 ,. SI C, DE„ AQ,,C'T T/A „ „CN AND 4/A--2 0 0 „ ^F(.;MOVE. DANCAC„ „E.F.I STUCCO AT AREA., INNDICaA E",D BY HAT I. PEEOV0E NEE,* STUCCO O ANND F'A NN ” FINISH TO NFA C..0 tE ENC1Nw TINC r1W T�i���dd REMOVE', DAMAGED SILK"ZO ON F: ARAPE ^C` WCCE.L AND F'EFkfCaOE`m NEW STUCCO AND PMNT RNISH, T() MATCH EkSDNG, SEE DETAIL 2/A-,,2 ALL EwNC €Ww 'NNNN(,C AEEA =NIT0NN(,.,,fd, RODS, SCREWS ANNO NAILS ON AREAS OF THE;' E T;.;R10,FC WALLS AND PARAPET AT ROOF' CAF "EF, A ARE TO BE REMOVED, REMOVE',, VE,, F.XISTINNG. STUCCO, PATCH H01 1" AT CCANNAGEC, AREAS, PITOCFFETE NEW E FU CCO 4NN A CLEAN SQUARE PAT TRNN AND PAENW I, F'CNNISE 4 TO NAATC1 d F.TAIS"TINCN REMOVE DAMAGED S FUCCO AT' AREAS INDICATED BY HATCH PROVIDE TNE.W1? STUCCO A "NI.) PA)NN k, FINNISH TO MATCH I'.AINNTTNCCC FASTEN N`CT DECK OR N AI E RS' AND TO AAL! rCTNTNNCI APPN°CTPMN EE C AS TE:&NE_N' Al A' CEW ^CC, MAXIMUM N °C" E: AND SET IN ROOF CEMENT OVf,, FW tINE F {'E i NN PLIES AND INSTALL iNSTALL FLASHING ASHINNA ANND S T"REPPINCCE FgJE S OVER R NNAIC E D FLANGES GE S ENN CNA GA N "AE h AETCIC ATE EI SCLIa�F�PER FLASHING ASHIN G T O CONFORM T O DO br`F TCPNCINNG AND *`A I' IN ROOF CEMENT` E NNE FCC,. GUAIFEN CANT TA IRW tSE� T ,NN & TCICE NN RUBE„ t (CO BASE F°EAS Ift, HW NON k «a FR, PLY SHEETS 1/4- DENS DECK E.NNEwR C „"`GUAFTI,,.0 ROOF INNCvF.CL INu,SfN DEER INN A F k ANN(';E E E SURROUNDING k _ � t�F�F�FNE kTFI..NNI� ALL 0N TS �4 NECTCT. EREC NNCTTE: T. BASE] F ASIIING ON ALL 15 & 0 YEAR GUARANIFE.PrD SYSTEMS MUST r„dC`C�o'E' rA BASE fIE„Y John, Roberts A # 4 CT sTE s�W ; V) E 1 czf r ” 0 2 CC