OSCRUBBER
OF 10 AIR CHANGES/HR IN THE CONTAINMENT AREA PER
THE HOSPITALS ICRA REQUIREMENTS. REFER TO HEPA
/—SCOPE OF
WORK
All
y'2
YR
F_
r'1
FLOOR
f
fi<
All
y'2
YR
W., ,"..f ....
CONSTRUCTION TRUCTION WORK ZONE
VENTILATION
PLAN TEST & BALANCE NOTES
1. PRE - DEMOLITION
PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK IN THE CONSTRUCTION AREA
AN INDEPENDENT AABC OR NEBB CERTIFIED TESTING, ADJUSTING AND BALANCING
(TAB) CONTRACTOR SHALL MEASURE AND DOCUMENT IN A TYPED REPORT THE
FOLLOWING INFORMATION:
A.) SPEED SETTING AND AIRFLOW OF ALL AIR SCRUBBER(S), RECIRCULATING AND
EXHAUST.
B.) DIFFERENTIAL PRESSURE READING OF ALL AIR SCRUBBER FILTER GAUGES.
C.) DIFFERENTIAL PRESSURE BETWEEN CONSTRUCTION ZONE AND ADJACENT AREAS AT
EACH DOORWAY ENTRANCE TO THE CONSTRUCTION ZONE.
D.) VERIFY ROOM PRESSURE DIFFERENTIAL MONITORS LOCATED NEAR DOORWAY
ENTRANCE TO CONSTRUCTION ZONE ARE READING WITHIN +/- 10% OF FIELD
READINGS OF ITEM 3 ABOVE.
E.) VERIFY THREE MINUTE ALARM DELAY IS FUNCTIONING ON ROOM PRESSURE
DIFFERENTIAL MONITORS AND THAT LOCAL AND REMOTE AUDIO /VISUAL ALARMS
FUNCTION WHEN CONSTRUCTION AREA NEGATIVE RELATIVE PRESSURE DROPS
BELOW MINIMUM SETPOINT.
F.) ANY DEFICIENCIES IN MEETING THE OWNER'S ICRA REQUIREMENTS FOR AIR.
CHANGES, RELATIVE NEGATIVE PRESSURE OR FAULTY EQUIPMENT SHALL BE
IDENTIFIED IN THE FINAL REPORT.
EQUIPMENT SPECIFICATIONS
1. ROOM PRESSURE MONITOR - ABATEMENT TECHNOLOGIES MODEL HCRPM -3N2
(800 -634 -9091) OR EQUIVALENT. PROVIDE WITH THE FOLLOWING FEATURES:
A.) WALL MOUNT, LCD DISPLAY, 12 TO 24 VAC, 400 MILLI AMPS. FURNISH WITH 120 /24VAC
PLUG -IN TRANSFORMER.
B.) ACCURACY +/- IX OF SCALE, ALARM ACCURACY +/- 1% OF SETPOINT.
C.) LOCAL /REMOTE AUDIO /VISUAL ALARM WITH SPOT RELAY FOR REMOTE. CONTACTS
RATED FOR 10 AMPS AT 250 VAC.
D.) ADJUSTABLE ALARM DELAY SET FOR THREE MINUTES, MAXIMUM FIVE MINUTES.
E.) AUTO CALIBRATION WITH DATE AND TIME MEMORY OF ALARMS.
F.) RANGE OF MEASUREMENT +/- 0.10 INCHES OF WATER COLUMN.
2.PORTABLE AIR SCRUBBERS - ABATEMENT TECHNOLOGIES MODEL HEPA - AIRE PAS
(800- 634 -9091) OR EQUIVALENT. PROVIDE WITH THE FOLLOWING FEATURES:
A.) U.L. OR E.T.L. LISTED.
B.) STAINLESS STEEL CABINET WITH INTEGRAL TRANSPORT DOLLY AND EXHAUST
COLLAR.
C.) UP TO FOUR STAGES OF FILTRATION WITH ZERO BYPASS CABINET CONSTRUCTION.
a.) FIRST STAGE 11 PARTICULATE FILTER.
b.) SECOND STAGE 2' PLEATED FILTER.
c.) OPTION CARBON FILTER TRACK.
d.) 99.97% EFFICIENT DOP HEPA FILTER.
D.) FILTER CHANGE INDICATOR LAMPS FOR PRE - FILTER AND FINAL FILTERS.
E.) POWER CORD FOR 120 VAC POWER CONNECTION, OPERATING HOUR METER, TWO
SPEED OR VARIABLE SPEED BLOWER.
9*"1,
ZIPWALL NEGATIVE AIR PRESSURE
MACHINE AND AIR SCRUBBER 1 t
I
TI W Z
CONSTRUCTION WORK NE o 0
VENTILATION NOTES
am
I. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL
RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW
THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH
THOSE REQUIREMENTS. CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS OF
THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO THE
PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA SHALL BE COORDINATED
WITH THE OWNER AND PERFORMED IN ACCORDANCE WITH THE ICRA REPORT, UNDER
THE SUPERVISION OF THE OWNER'S REPRESENTATIVE OR OTHER DESIGNATED ICRA
COMMITTEE OFFICER.
2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL
ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN AREAS
SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, AND ELSEWHERE
IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE
MEASURES TO THIS EFFECT INCLUDING ERECTION OF CONSTRUCTION ZONE BARRIERS
AND PROVISION OF NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE RELATIVE
TO OTHER AREAS OF THE FACILITY AS SHOWN ON PLANS.
3. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE
CONTRACTOR SHALL PROVIDE EQUIPMENT AND COMPONENTS AS SHOWN ON
CONSTRUCTION WORK ZONE VENTILATION PLAN TO CREATE A NEGATIVE PRESSURE IN
THE CONSTRUCTION WORK ZONE RELATIVE TO ADJACENT AREA. EXISTING HVAC
SYSTEMS AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS
SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER AND ONLY TO
THE EXTENT INDICATED ON THE CONSTRUCTION WORK ZONE VENTILATION PLAN. THE
CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH
THE ICRA REQUIREMENTS AND AT A MINIMUM AS FOLLOWS:
VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE
CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED
DURING THE CONSTRUCTION DURATION. COVER AND SEAL ALL DIFFUSERS,
REGISTERS AND GRILLES.
AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR
DISCHARGED AS INDICATED ON THE CONSTRUCTION WORK ZONE VENTILATION
PLAN.
MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN
ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTATION TO THE
OWNER AS REQUIRED.
4. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH THE OWNER,
AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR PRESSURE
RELATIONSHIPS WILL NOT BE ADVERSALY AFFECTED.
5. CONTRACTOR SHALL HAVE AIR SCRUBBER, PRESSURE MONITORS, ALARMS, DISCHARGE
AIR DUCTS AND ANY MODIFICATIONS TO EXISTING HVAC SYSTEMS READY PRIOR TO
DEMOLITION AND READY FOR TAB CONTRACTOR TO PERFORM CONSTRUCTION WORK
ZONE VENTILATION PLAN TESTING, ADJUSTING AND BALANCING.
6. DEMOLITION WORK SHALL NOT BEGIN UNTIL CONSTRUCTION WORK ZONE VENTILATION
PLAN TAB REPORT HAS BEEN REVIEWED AND APPROVED BY THE ARCHITECT /ENGINEER
AND THE OWNER'S INFECTION CONTROL COMMITTEE.
HEPA SCRUBBER
F_
FLOOR
f
CEILING
CEILING
•. FT.)
HEIGHT
HEIGHT
W., ,"..f ....
CONSTRUCTION TRUCTION WORK ZONE
VENTILATION
PLAN TEST & BALANCE NOTES
1. PRE - DEMOLITION
PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK IN THE CONSTRUCTION AREA
AN INDEPENDENT AABC OR NEBB CERTIFIED TESTING, ADJUSTING AND BALANCING
(TAB) CONTRACTOR SHALL MEASURE AND DOCUMENT IN A TYPED REPORT THE
FOLLOWING INFORMATION:
A.) SPEED SETTING AND AIRFLOW OF ALL AIR SCRUBBER(S), RECIRCULATING AND
EXHAUST.
B.) DIFFERENTIAL PRESSURE READING OF ALL AIR SCRUBBER FILTER GAUGES.
C.) DIFFERENTIAL PRESSURE BETWEEN CONSTRUCTION ZONE AND ADJACENT AREAS AT
EACH DOORWAY ENTRANCE TO THE CONSTRUCTION ZONE.
D.) VERIFY ROOM PRESSURE DIFFERENTIAL MONITORS LOCATED NEAR DOORWAY
ENTRANCE TO CONSTRUCTION ZONE ARE READING WITHIN +/- 10% OF FIELD
READINGS OF ITEM 3 ABOVE.
E.) VERIFY THREE MINUTE ALARM DELAY IS FUNCTIONING ON ROOM PRESSURE
DIFFERENTIAL MONITORS AND THAT LOCAL AND REMOTE AUDIO /VISUAL ALARMS
FUNCTION WHEN CONSTRUCTION AREA NEGATIVE RELATIVE PRESSURE DROPS
BELOW MINIMUM SETPOINT.
F.) ANY DEFICIENCIES IN MEETING THE OWNER'S ICRA REQUIREMENTS FOR AIR.
CHANGES, RELATIVE NEGATIVE PRESSURE OR FAULTY EQUIPMENT SHALL BE
IDENTIFIED IN THE FINAL REPORT.
EQUIPMENT SPECIFICATIONS
1. ROOM PRESSURE MONITOR - ABATEMENT TECHNOLOGIES MODEL HCRPM -3N2
(800 -634 -9091) OR EQUIVALENT. PROVIDE WITH THE FOLLOWING FEATURES:
A.) WALL MOUNT, LCD DISPLAY, 12 TO 24 VAC, 400 MILLI AMPS. FURNISH WITH 120 /24VAC
PLUG -IN TRANSFORMER.
B.) ACCURACY +/- IX OF SCALE, ALARM ACCURACY +/- 1% OF SETPOINT.
C.) LOCAL /REMOTE AUDIO /VISUAL ALARM WITH SPOT RELAY FOR REMOTE. CONTACTS
RATED FOR 10 AMPS AT 250 VAC.
D.) ADJUSTABLE ALARM DELAY SET FOR THREE MINUTES, MAXIMUM FIVE MINUTES.
E.) AUTO CALIBRATION WITH DATE AND TIME MEMORY OF ALARMS.
F.) RANGE OF MEASUREMENT +/- 0.10 INCHES OF WATER COLUMN.
2.PORTABLE AIR SCRUBBERS - ABATEMENT TECHNOLOGIES MODEL HEPA - AIRE PAS
(800- 634 -9091) OR EQUIVALENT. PROVIDE WITH THE FOLLOWING FEATURES:
A.) U.L. OR E.T.L. LISTED.
B.) STAINLESS STEEL CABINET WITH INTEGRAL TRANSPORT DOLLY AND EXHAUST
COLLAR.
C.) UP TO FOUR STAGES OF FILTRATION WITH ZERO BYPASS CABINET CONSTRUCTION.
a.) FIRST STAGE 11 PARTICULATE FILTER.
b.) SECOND STAGE 2' PLEATED FILTER.
c.) OPTION CARBON FILTER TRACK.
d.) 99.97% EFFICIENT DOP HEPA FILTER.
D.) FILTER CHANGE INDICATOR LAMPS FOR PRE - FILTER AND FINAL FILTERS.
E.) POWER CORD FOR 120 VAC POWER CONNECTION, OPERATING HOUR METER, TWO
SPEED OR VARIABLE SPEED BLOWER.
9*"1,
ZIPWALL NEGATIVE AIR PRESSURE
MACHINE AND AIR SCRUBBER 1 t
I
TI W Z
CONSTRUCTION WORK NE o 0
VENTILATION NOTES
am
I. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL
RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW
THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH
THOSE REQUIREMENTS. CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS OF
THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO THE
PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA SHALL BE COORDINATED
WITH THE OWNER AND PERFORMED IN ACCORDANCE WITH THE ICRA REPORT, UNDER
THE SUPERVISION OF THE OWNER'S REPRESENTATIVE OR OTHER DESIGNATED ICRA
COMMITTEE OFFICER.
2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL
ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN AREAS
SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, AND ELSEWHERE
IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE
MEASURES TO THIS EFFECT INCLUDING ERECTION OF CONSTRUCTION ZONE BARRIERS
AND PROVISION OF NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE RELATIVE
TO OTHER AREAS OF THE FACILITY AS SHOWN ON PLANS.
3. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE
CONTRACTOR SHALL PROVIDE EQUIPMENT AND COMPONENTS AS SHOWN ON
CONSTRUCTION WORK ZONE VENTILATION PLAN TO CREATE A NEGATIVE PRESSURE IN
THE CONSTRUCTION WORK ZONE RELATIVE TO ADJACENT AREA. EXISTING HVAC
SYSTEMS AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS
SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER AND ONLY TO
THE EXTENT INDICATED ON THE CONSTRUCTION WORK ZONE VENTILATION PLAN. THE
CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH
THE ICRA REQUIREMENTS AND AT A MINIMUM AS FOLLOWS:
VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE
CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED
DURING THE CONSTRUCTION DURATION. COVER AND SEAL ALL DIFFUSERS,
REGISTERS AND GRILLES.
AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR
DISCHARGED AS INDICATED ON THE CONSTRUCTION WORK ZONE VENTILATION
PLAN.
MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN
ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTATION TO THE
OWNER AS REQUIRED.
4. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH THE OWNER,
AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR PRESSURE
RELATIONSHIPS WILL NOT BE ADVERSALY AFFECTED.
5. CONTRACTOR SHALL HAVE AIR SCRUBBER, PRESSURE MONITORS, ALARMS, DISCHARGE
AIR DUCTS AND ANY MODIFICATIONS TO EXISTING HVAC SYSTEMS READY PRIOR TO
DEMOLITION AND READY FOR TAB CONTRACTOR TO PERFORM CONSTRUCTION WORK
ZONE VENTILATION PLAN TESTING, ADJUSTING AND BALANCING.
6. DEMOLITION WORK SHALL NOT BEGIN UNTIL CONSTRUCTION WORK ZONE VENTILATION
PLAN TAB REPORT HAS BEEN REVIEWED AND APPROVED BY THE ARCHITECT /ENGINEER
AND THE OWNER'S INFECTION CONTROL COMMITTEE.
HEPA SCRUBBER
F_
FLOOR
CEILING
CEILING
CEILING
•. FT.)
HEIGHT
HEIGHT
HEIGHT
W
`�
� .I
cc
Q
Q
W
°—oc
_
=
o
U)
LL
<.
a
_
F_
W
:3
_
—
•
Z
Q
W
OSCRUBBER
OF 10 AIR CHANGES/HR IN THE CONTAINMENT AREA PER
THE HOSPITALS ICRA REQUIREMENTS. REFER TO HEPA
SCRUBBER EQUIPMENT ' •
SCHEDULE
THIS SHEET FOR SCRUBBER INFORMATION r
OR EQUAL I1
KEY PLAN
N.T.S.
r�u t
Reid, Smith
600 Wcst : 0r
MII I
• • ■
' • s
Firm Certification - I 0
PE-33200
Michael A. Steward PE - M
SSR JOB # 1032079.0
I M]
F_
W
`�
� .I
cc
Q
Q
W
°—oc
_
=
o
U)
LL
<.
a
_
F_
W
:3
_
—
Z
Q
W
I M]