A. CODES
FLORIDA 1. STATE BUILDING !r r! !!: i
2. SMACNA
3. NFPA l 00
4. NFPA •r• !!
5.2006 GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE
SCOPE B. OF !•
1. PROVIDE ALL REQUIRED PERMITS, LABOR, MATERIAL AND EQUIPMENT REQUIRED TO
COMPLETE SCOPE OF -! JECT SHOWN ON DRAWINGS COMPLETE AND
READY 1. OCCUPANCY AND USE BY OWNER. 1` K SHALL INCLUDE BUT IS NOT
LIMITED !
a. REMOVAL, RELOCATION AND RE- INSTALLATION OF EXISTING EQUIPMENT AND
SYSTEM.
b. CONNECTIONS TO EXISTING OR NEW EQUIPMENT AND SYSTEMS.
c. MODIFICATION OF EXISTING DUCTWORK AND CONTROLS.
d. CUTTING AND PATCHING TO REMOVE EXISTING OR INSTALL NEW WORK.
e• CLEANING AND TESTING.
f. INSTRUCTION TO OWNER'S PERSONNEL.
2, PROVIDE ALL BUILDING PENETRATIONS REQUIRED TO COMPLETE PROJECT. ALL
PENETRATIONS SHALL BE PATCHED AND SEALED WATERTIGHT. MAINTAIN FIRE
RATINGS OF EXISTING STRUCTURE.
3. PROVIDE ALL NECESSARY DUCT, EQUIPMENT, PIPE SUPPORTS AND MATERIALS
REQUIRED FOR INSTALLATION PER THE REQUIREMENTS OF LOCAL, STATE OR FEDERAL
CODES.
C. MAINTENANCE MANUALS
I. PROVIDE MAINTENANCE MANUALS FOR ALL NEW EQUIPMENT CONTAINING ALL
OPERATING AND MAINTENANCE DATA, SUBMITTALS, WARRANTEES, DIAGRAMS,
INSPECTION REPORTS AND VALVE LISTS IN A 3 RING BINDER WITH POCKETS FOR
DRAWINGS, PROVIDE OWNER WITH MINIMUM OF 2 COPIES.
D. RECORD DRAWINGS
I. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE
TO THE CONTRACT DOCUMENTS.
2.THE CONTRACTOR SHALL PROVIDE THE ENGINEER 2 SETS OF COMPLETED RECORD
DRAWINGS.
3.THE PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ACCURATE RECORD
DRAWINGS ARE DELIVERED.
E. SUBSTITUTIONS
1. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND
WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS 'SPECIFIED STANDARD'
OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL
OF THE ENGINEER 10 DAYS PRIOR TO BID DATE.
2.ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL
REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND
EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING
BIDS.
F. WIND LOADS
I. ALL EQUIPMENT MOUNTED OUTSIDE SHALL BE FURNISHED WITH A NOA (NOTICE
OF ACCEPTANCE) FOR WINDSTORM OR BE FURNISHED WITH AN ENGINEERED DETAIL
DESIGNED FOR THE LOCAL WIND RATE.
A. LABELING
I. PROVIDE RIGID PLASTIC EMBOSSED EQUIPMENT NAME TAGS FOR ALL NEW EQUIPMENT
AND DISCONNECTS. SETON NAMEPLATE CORPORATION.
B. FLASHINGS AND COUNTER FLASHINGS
1. FURNISH MATERIALS AND COORDINATE INSTALLATION FOR ALL PENETRATIONS OF ROOF
BY ALL DUCT AND PIPE.
2. SHEET METAL - 24ga. ASTM A525 .
3. SHEET LEAD 6 Ibs PER SO. FT. (WHERE ALLOWED)
4. STAINLESS STEEL 20 go.
5, SHEET COPPER 24 oz PER SO. FT.
C. CLEANING TESTING AND ADJUSTING
I. THE MECHANICAL CONTRACTOR, AT HIS EXPENSE, SHALL CLEAN, REPAIR, ADJUST,
CHECK, BALANCE AND PLACE IN SERVICE THE VARIOUS SYSTEMS HEREIN SPECIFIED
WITH THEIR RESPECTIVE EQUIPMENT, ACCESSORIES AND PIPING. HE /SHE SHALL
FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND TOOLS REQUIRED TO PERFORM
TESTS REQUIRED BY THESE SPECIFICATIONS AND BY THE GOVERNING AUTHORITIES.
2.NO WORK SHALL BE COVERED OR CONCEALED UNTIL PROPERLY INSPECTED AND
TESTED.
D. HANGERS AND SUPPORTS
1. PROVIDE ALL NECESSARY DUCTWORK, HANGERS, RODS, CLAMPS AND 'ATTACHMENTS
TO PROPERLY INSTALL AND SUPPORT DUCTWORK AND EQUIPMENT FROM THE BUILDING
STRUCTURE.
2. PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS REQUIRED TO INSTALL
EQUIPMENT, PIPING AND DUCTWORK.
3. ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE CLEANED, PRIMED AND PAINTED TO
PREVENT RUSTING. FINISH COLOR AS SELECTED BY OWNER.
4. THE USE OF BAILING WIRE OR PERFORATED METAL STRAPPING IS NOT PERMITTED FOR
SUPPORTS.
G. WARRANTY /GUARANTEE
I. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF
WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE
PERIOD OF ONE YEAR.
2. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING
DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY
THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE
OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE
DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING' FROM THE
ORIGINAL DEFECT OR REPAIR THERETO.
15890 - SHEET METAL DUCTWORK
A. ALL DUCT TO BE INSTALLED ACCORDING TO 1990 EDITION OF SMACNA STANDARDS.
B. EXHAUST TO BE 0 -2' PRESSURE CLASS.
C. EXHAUST SYSTEM SHALL BE WELDED 316 STAINLESS STEEL. DUCTMATE GASKETED WATER
TIGHT JOINT MAY BE USED IF NECESSARY.
D. DUCTWORK ROUTED PARALLEL TO A WALL,RATED OR CORRIDOR SHALL BE INSTALLED
WITH MINIMUM 6' CLEARANCE TO ALLOW FOR INSPECTION OF WALL PENETRATIONS.
CONTRACTOR SHALL PROVIDE 12' CLEARANCE WHERE POSSIBLE, COORDINATE.
E. BALANCING DAMPERS (SHOP FABRICATED)
I. GENERAL - IN ALL DUCTWORK SYSTEMS, PROVIDE DAMPERS FOR PROPER CONTROL
AND BALANCING OF AIR QUANTITIES. CONCEALED DAMPERS SHALL HAVE CONCEALED
DAMPER REGULATOR. ALL COMPONENTS FOR PROPER OPERATION: (i.e. GEARS,
LINKAGES, CABLE, ETC.) SHALL BE INCLUDED.
2. TYPE:
3. MATERIAL: 316 STAINLESS STEEL.
4. SHAFT: %1 SQUARE ROD OPERATOR WITH END BEARINGS AND GASKET SEAL AT DUCT
PENETRATIONS. TERMINATE SHAFT IN DAMPER FRAME WITH BUSHINGS.
5. OPERATOR: LOCKING QUADRANT HANDLE WITH DAMPER POSITION INDICATOR.
.! r •1
A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN
ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC
(ASSOCIATED AIR BALANCE COUNCIL) STANDARDS.
B. TEST AND BALANCE FIRM SHALL BE:
I. EARL HAYGOOD, INC. - (305) 266 -7070.
C. CONTRACTOR SHALL:
1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT
AND DAMPERS WITH MECHANICAL CONTRACTOR.
2. AIR SYSTEMS:
a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN
DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES.
b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 107. OF DESIGN
WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND
ACTUAL TOTALS.
c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE
PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS.
DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR.
d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS.
e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS.
f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS
AS NOTED IN NEBB OR AABC PROCEDURES.
3. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES.
4. ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK
BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION
OF PROJECT.
5. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR
MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE
VFD TO RAMP UP IN RESPONSE TO FILTER LOADING.
•
Smith
Seckmaijn
Reid,
600 West H-illsbiaro, Suite 300
Deerfield beacli,_FL 33441
(954)T421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A. Steward PE - 65701
SSR JOB # 1032079.0
mm
.r
i
.1
mm