Loading...
10-818-036Q N O r� r� U RECEIVING ELEVATOR #II NEW WORK PLAN AT FIRST FLOOR - FIRE PROTECTION GENERAL NOTES: RECEIVING ELEVATOR #ll - NEW WORK PLAN „m AT SECOND FLOOR - FIRE PROTECTION 1. CONTRACTOR SHALL PHASE WORK AS DIRECTED BY ARCHITECTURAL DRAWINGS AND OWNER. 2. CONTRACTOR SHALL PATCH WALLS, FLOORS, ROOFING AND CEILINGS TO MATCH EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION SYSTEMS. COORDINATE WITH ARCHITECTURAL DRAWINGS. 3. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE AREAS. CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. WHERE FEASIBLE INSTALL NEW MAINS PRIOR TO DEMOLITION OF EXISTING. 4. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. 5. CONTRACTOR SHALL LOCATE ALL NEW VALVES AT ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS, AS REQUIRED, FOR VALVES LOCATED ABOVE HARD CEILINGS. 6. CONTRACTOR SHALL COORDINATE TIMING, DURATION AND AREAS AFFECTED BY SHUTDOWNS WITH HOSPITAL IN ORDER TO FACILITATE REQUIRED FIRE WATCH. 7. CONTRACTOR SHALL COORDINATE NEW SPRINKLER HEAD LOCATIONS WITH EXISTING CEILING GRID, CEILING MOUNTED DEVICES (LIGHTS, DIFFUSERS, SMOKE DETECTORS, ETC.) AND OBSTRUCTIONS TO SPRINKLER THROW (SOFFITS, PRIVACY CURTAINS, ETC.) PER NFPA 13. KEYED NOTES: OREMOVE AND REPLACE EXISTING SIDE WALL SPRINKLER HEAD AT BASE OF ELEVATOR SHAFT WITH NEW INTERMEDIATE TEMP SIDE WALL SPRINKLER AND RAISE OR LOWER PIPING AS NEEDED TO MEET NFPA. OREMOVE AND REPLACE EXISTING SPRINKLER HEAD AT TOP OF z ELEVATOR SHAFT WITH NEW INTERMEDIATE TEMP SPRINKLER. OREMOVE AND REPLACE EXISTING SPRINKLER HEAD IN ELEVATOR MACHINE ROOM AND REPLACE WITH NEW INTERMEDIATE TEMPERATURE SPRINKLER HEAD. REROUTE AS NEEDED TO ACCOMMODATE NEW EQUIPMENT. t