Loading...
10-818-035c Cl- N N / E 3 a / 0 Ln v- a N 0 0 0 N N E 0 Q) 4-- / c LL LL G L U a 0 i� U 0 0 (�j N cc PASSENGER SYMBOL ELEVATORS #9 & 10 - NEW WORK PLAN O NEW;. , CONSTRUCTION AT SEVENTH w FLOOR - FIRE PROTECTION 1' 2' 4' 8' 12' 0' 1' 2' 4' 8' 12' PIT ELEVATOR LL SYMBOL b1 =$dRIPTION EXISTING TO REMAIN �'�`��•� EXISTING TO BE REMOVED O NEW;. , CONSTRUCTION CONNECT TO EXIST. AT THIS POINT w 0' 1' 2' 4' 8' 12' FLOOR PLAN -FIRE PROTECTIO GENERAL NOTES-. IMP-1 PASSENGER ELEVATORS #9 & NEW WORK PLAN 111111111 1 w 1. CONTRACTOR SHALL PHASE WORK AS DIRECTED BY ARCHITECTURAL DRAWINGS AND OWNER. 2. CONTRACTOR SHALL PATCH WALLS, FLOORS, ROOFING AND CEILINGS TO MATCH EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION SYSTEMS. COORDINATE WITH ARCHITECTURAL DRAWINGS. 3, THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE AREAS. CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. WHERE FEASIBLE INSTALL NEW MAINS PRIOR TO DEMOLITION OF EXISTING. 4. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. 5. CONTRACTOR SHALL LOCATE ALL NEW VALVES AT ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS, AS REQUIRED, FOR VALVES LOCATED ABOVE HARD CEILINGS. 6, CONTRACTOR SHALL COORDINATE TIMING, DURATION AND AREAS AFFECTED BY SHUTDOWNS WITH HOSPITAL IN ORDER TO FACILITATE REQUIRED FIRE WATCH. 7, CONTRACTOR SHALL COORDINATE NEW SPRINKLER HEAD LOCATIONS WITH EXISTING CEILING GRID, CEILING MOUNTED DEVICES (LIGHTS, DIFFUSERS, SMOKE DETECTORS, ETC.) AND OBSTRUCTIONS TO SPRINKLER THROW (SOFFITS, PRIVACY CURTAINS, ETC.) PER NFPA 13. IN N� 10 AT ROOF LEVEL - FIRE PROTE, C7 10 N N i W(uT 1j, aI� . I * y r f s ( 2 T %11UA Tv! r q p;t t�l'd3�isl - 11 r •._ fr3� 11� 1 P ,��11. 1 9 y } KEYED NOTES-. TREMOVE AND REPLACE EXISTING SIDE WALL SPRINKLER HEAD AT BASE OF ELEVATOR SHAFT WITH NEW INTERMEDIATE TEMP SIDE WALL SPRINKLER AND RAISE OR LOWER PIPING AS NEEDED TO MEET NFPA. OREMOVE SPRINKLER HEAD AT TOP OF ELEVATOR SHAFT AND ASSOCIATED BRANCH PIPING BACK TO LIMITS SHOWN AND CAP. TCONNECT TO EXISTING 21/' LINE WITH 2" A/S LINE WITH CONTROL VALVE 3 WITH F.S AND T.S. RUN 1' DRAIN TO EXTERIOR AND SPILL OVER ROOF. PROVIDE WITH SPLASH BLOCK. SEE DETAIL. NEW CON;STR,UCTION LEGEND SYMBOL b1 =$dRIPTION EXISTING TO REMAIN �'�`��•� EXISTING TO BE REMOVED NEW;. , CONSTRUCTION CONNECT TO EXIST. AT THIS POINT PASSENGER V. 910 NORTH TOWER MAIN BUILDING Q PAVILION VISITOR'S BUILDING PARKING GARAGE LOCAT10N PLAN ROOF LEVEL;' ' NaRTH REVISIONS= ;A 0 A A 0 Ln Ln M' N M ll7 M 1 t� CO 0 a co o01 �Q °M aLL LL 0 Z w= ' ^V I Q M LL — 0 x W I � CO Ih � W� a't � I O N O O M pm" ISM o � � x O w O 4 a � A 0 U <c) �W v- 9 g e _ i o a 0 Q Smith SS3L Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE-65701 Dennie Davin PE - 68688 SSR JOB # 1032045.0 O O 17— dS w n I- # Z O Q rn I__L cj:� 0 W O O <r I � I— LL_ �> I W = W ~ � r 10 a0 W � 0 � C�0OW V) LL _ ()Z-- I___U QLdV)< WZ.—� DRAWN: CHECKED: DATE: 06 -30 -10 SCALE: t G E N ��0 +77- / OF w C t IgolvAl �< She9'f' O. FP2.2 OF I JOB U 201013 1