10-818-024C
U)
v
i
0
n
E
o.
i
O
U-)
Q-
O
N
(D
O
0
cv
N
Y)
F
LL
LL
z
U
C
a.
O
N
N
U
O
O
N
N
co
�z
0
PLUMBING NEW CONSTRUCTION NOTES
1. PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT, AND PIPING
SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE
WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES
REQUIREMENTS.
2. CONTRACTOR SHALL FIELD VERIFY EXISTING INVERT ELEVATIONS, SIZES AND
LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE
FOOND, THEY ARE TO NOTIFY ENGINEER.
3. ALL PLUMBING FIXTURES TO COMPLY WITH TABLE 604.3 OF THE FLORIDA
BUILDING CODE - 2007
4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING
HEIGHTS WITH KITCHEN EQUIPMENT, EQUIPMENT AND ARCHITECTURAL DRAWINGS
AND SUPPLIER. INSTALL EQUIPMENT AND MAKE FINAL
CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS,
P.R.V.'S, AND PIPING AS REQUIRED. CONTRACTOR SHALL OBTAIN
A SET OF THE EQUIPMENT DRAWINGS PRIOR TO BIDDING IN ORDER
TO DETERMINE ALL REQUIRED CONNECTIONS.
5. ALL NEW VALVES INSTALLED IN DOMESTIC WATER SYSTEMS SHALL BE NSF -61
CERIFIED.
6. PROVIDE 12'X12' ACCESS PANELS FOR ALL VALVES LOCATED
ABOVE HARD CEILINGS. INSTALL VALVES SO AS TO BE WITHIN
REACH OF ACCESS DOOR.
7. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS
FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION,
INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES,
VACUUM BREAKERS, REDUCING VALVES. SPECIAL FITTINGS, THERMOMETERS,
GLOBE SOLENOID VALVES, INSULATION, AND ALL NECESSARY DEVICES
FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED
PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS.
8. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED
ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE
IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES.
IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR
ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF
DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS, RISER DIAGRAMS AND FOR
THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING
JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME
REQUIRED AND SCHEDULE FOR PERFORMING WORK.
9. PAINT ALL EXPOSED PIPING AT EXTERIOR TO MATCH BUILDING COLOR.
10. EXISTING UTILITIES, WHICH ARE NOT SHOWN, THAT ARE DISCOVERED
DURING DEMOLITION SHALL BE BROUGHT TO THE ATTENTION OF THE
OWNER'S REPRESENTATIVE BY THE CONTRACTOR FOR PROPER CO-
ORDINATION. CONTRACTOR SHALL REMOVE, REWORK AND /OR REROUTE
THE EXISTING UTILITIES AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
11. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT
CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS.
12. WITH PENETRATIONS FIR EISTANCERINDEX FOR THROUGH PENETRATION FIRE STOP
SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND
SPECIFICATIONS.
13. CONTRACTOR SHALL TEST WATER FROM DOMESTIC COLD AND HOT WATER SYSTEMS
WHICH HAVE BEEN MODIFIED BY THE RENOVATION AFTER MODIFICATIONS ARE
COMPLETE FOR CONTAMINANTS. PROVIDE COPY OF TEST REPORT ONE WEEK PRIOR
TO FINAL AHCA INSPECTION.
14. CLEANOUT COVERS SHALL NOT BE INSTALLED ON THE CORRIDOR SIDE OF
ANY WALL OR IN ANY CORRIDOR FLOORS. IF DISCREPANCIES ARE FOUND ON
PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION.
15. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND PHONE
PANELS.
16. ALL NON PRESSURIZED CONDENSATE PIPING SHALL BE SLOPED AT 1 141 FT
UNLESS OTHERWISE NOTED.
17. ALL EXP SEDTEDIPE AND FITTINGS IN FINISHED AREAS SHALL BE
18. THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS
AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING
DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED
FOR APPROVAL.
19, ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE
CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY
DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF
THE WORK.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING
AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING
WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER.
21. CONTRACTOR SHALL COORDINATE WITH ALL
DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE
ROUTING PROBLEMS.
22. PROVIDE OFFSETS AND FITTINGS AS REQUIRED.
23. ALL VENTS SHALL BE A MINIMUM OF 25'-0" AWAY FROM
A/C INTAKES, AND OPERABLE WINDOWS.
24. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUIT FOR
OIL INTERCEPTOR ALARM PANELS AND SHALL
COORDINATE WITH DIVISION 16. CONTRACTOR SHALL HOLD A LOW VOLTAGE
WIRING LICENSE.
25. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS
AND TESTS.
26. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL CASEWORK.
CONTRACTOR SHALL OBTAIN ARCHITECTURAL DRAWINGS AND REVIEW
PRIOR TO INSTALLATION.
?7. ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS
WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY
OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING
AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER.
28. ALL UNDERGROUND CLEANOUTS SHALL BE HEAVY DUTY TYPE. WITH REINFORCED
CONCRETE BASE.
29. CONTRACTOR SHALL GIVE 24 HOURS NOTICE TO APPLICABLE UTILITY COMPANY
PRIOR TO PERFORMING WORK INVOLVING UTILITIES.
30. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO
ACTUAL CONDITION AND SPACE REQUIREMENTS.
31. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS
SCHEDULED OR SPECIFIED, USING THE MANUFACTURERS AND MODEL NUMBERS
AS CALLED FOR IN THE SPECIFICATIONS AND SCHEDULED ON
THE DRAWINGS. IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS
SPECIFIED ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN
THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR
WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST, AT THE TIME OF BIDDING,
SUBMIT SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER THE
EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED bR TO BE
DEDUCTED FROM HIS PROPOSAL.
32. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME
TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES
WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF
SUBSTITUTE MATERIALS.
33. WARRANTY /GUARANTEE
A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY
OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION
FOR THE PERIOD OF ONE YEAR.
B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING
DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY
THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE
OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE
DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
ORIGINAL DEFECT OR REPAIR THERETO.
34.
Y
ES,
HEDULED
1. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR
WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE
OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT
(48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION
OF EXISTING SERVICE.
2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME
CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND
WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE
OF THE CONTRACT.
35. CONTRACTOR SHALL PROVIDE DRY CONTACTS AND RELAYS ON ALL EQUIPMENT,
INTERFACES, MODBUS, SIGNAL WIRING AND CONDUIT FOR CONNECTION INTO BMS
(BUILDING MANAGMENT SYSTEM). COORDINATE WITH HOSPITALS CONTROLS VENDOR
AND PROVIDE SHOP DRAWINGS OF COMPLETE SYSTEM FOR REVIEW AND APPROVAL.
36. ALL STORM PIPING AND CONDENSATE PIPING SHALL BE INSULATED
THROUGHOUT ENTIRE SYSTEM.
37. PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE
TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES
SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO
OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
38. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A
MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING
OF 50.
39. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES.
PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF
CONSTRUCTION.
40. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL
RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW
THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH
THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF
VENTILATION REQUIREMENTS REQUIRED BY ICRA.
PLUMBING DEMOLITION NOTES
I. EXISTING SERVICES INDICATED ON THESE DRAWINGS
WERE DERIVED FROM EXISTING DRAWINGS AND
LIMITED FIELD OBSERVATIONS. THESE DRAWINGS
MAY NOT BE ALL INCLUSIVE OF SERVICES THAT
EXIST IN THE PROJECT AREA. CONTRACTOR SHALL
VERIFY SERVICES, LOCATION, TYPE, AND SIZE
PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS
IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL
BE REPORTED TO THE ARCHITECT FOR COORDINATION
PRIOR TO CONSTRUCTION.
2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES, TO
REMAIN OR TO BE RELOCATED, SHALL BE REPAIRED
TO ORIGINAL OPERATION OR REPLACED, SHOULD THEY
BE DAMAGED DURING CONSTRUCTION.
3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS
(UNLESS NOTED OTHERWISE) SHALL REMAIN AS IS.
4. ALL PENETRATIONS OR OPENINGS FROM REMOVED
PIPES THROUGH EXISTING BUILDING
WALLS AND FLOORS SHALL BE SLEEVED AND /OR
PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL
DRAWINGS FOR FINAL FINISHES.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
TO EXISTING PIPING , FIXTURES, IVIED GAS OUTLETS OR EQUIPMENT
DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING
WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE
OWNER.
6. CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN
USE DURING CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION
OF AN EXISTING SERVICE IS NECESSARY, CONTRACTOR SHALL
COORDINATE WITH AUTHORIZED HOSPITAL PERSONNEL BEFORE
MAKING THE NECESSARY INTERRUPTION.
7. CONTRACTOR TO FIELD VERIFY THAT ALL EXISTING PLUMBING
TO BE REMOVED DOES NOT AFFECT OTHER AREA'S OF THE HOSPITAL THAT
ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF
DISCREPENCIES ARE FOUND THE CONTRACTOR IS TO NOTIFY THE
ENGINEER.
8, CONTRACTOR SHALL REMOVE EXISTING PLUMBING TO FIXTURES,
AND EQUIPMENT TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED.
CONTRACTOR SHALL CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS,
WALLS OR BELOW FLOOR. CONTRACTOR SHALL REROUTE ALL ACTIVE PLUMBING
SERVICES IN CHASES OR WALLS TO BE REMOVED, TO NEW
CHASE AREAS OR NEW WALLS AS REQUIRED.
9, CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF PLUMBING
FIXTURES AND /OR EQUIPMENT THAT ARE TO BE REMOVED
TO THE LOCAL OWNER'S REPRESENTATIVE. ALL ITEMS THAT THE
LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE
TURNED OVER TO THE OWNER AND THE REMAINDER SHALL BE REMOVED
FROM THE SITE AND LEGALLY DISPOSED.
PLUMBING LEGEND
C.W
SYMBOL DESCRIPTION
SYMBOL DESCkiPTl4M
- --
COLD WATER
HOT WATER
BALL VALVE
- - --
HOT WATER O10•F)
HOT WATER RECIRC
CHECK VALVE
- - - --
HOT WATER RECIRCULATION
P -1,ETC
FIXTURE WENTF'CATION
-SS-
SANITARY SEWER (UNDERGROUND)
WASTE (INTERIOR)
CONNECTION TO GY1S_ INS
CAP ON LINE --
-W-
WASTE LINE
3
--V--
VENT PIPE (ABOVE OR BELOW GROUND)
S.W.
PIPE TURNED UP
-RWL-
RAIN WATER LEADER
9
PIPE TURNED DOWN
- SW-
STORM WATER (UNDERGROUND)
'5- -GI-
BALANCING Vt LYF 1RCUIT SETTER W /CHE( ti
VALVE SET RT 0.5G "M
C.D.
CLEANOUT (ABOVE CEILING)
-D-
DRIP TROUGH DRAIN LINE
---CD-
CONDENSATE DRAIN LINL
R.D.
PRESSURE REDUCING VALVE
.
UNDERGROUND COLD WATER
F.D.
FLOOR DRAIN
- _PCD-
PUMPED CONDENSATE
F.F.EL
FINISHED FLOOR ELEVATION
PLUMBING ABBREVIATIONS
C.W
COLD WATER
P.R.V.
PRESSURE REDUCING VALVE
H.W.
HOT WATER
R.P.B.P.
REDUCED PRESSURE BACKFLOW PREVENTER
H.W.R.
HOT WATER RECIRC
A.F.F.
ABOVE FINISHED FLOOR
V.T.R.
VENT THRU ROOF
A.F.G.
ABOVE FINISHED GRADE
W.
WASTE (INTERIOR)
A.P.
ACCESS PANEL
R.W.L.
RAIN WATER LEADER
W.C.O.
WALL CLEANOUT
S.W.
STORM WATER
S.S.
SANITARY SEWER
I.E.
INVERT ELEVATION
V.I.V.
VALVE IN VERTICAL
C.O.
CLEANOUT
C.D.
CONDESATE
OFCI
OWNER FURNISHED CONTRACTOR INSTALLED
LE
INVERT ELEVATION
R.D.
ROOF DRAIN
F.C.U.
FAN COIL UNIT
F.D.
FLOOR DRAIN
F.F.EL
FINISHED FLOOR ELEVATION
PUMP SCHE _ L
SYSTEM TYPE MFGR MODEL G.P.M. HEAD PUMP H.P. VOLTAGE REMARKS
No. FTR BOOST
SUMP PUMP P -1 SIMPLEX GOULDS 50 EACH I PROVIDE W/ HEAVY DUTY
(ELEVATOR PIT) SUBMER. WS0511B 20 I NA /2 HP 115 - IPH FLOAT SWITCH. NOTE *1
NOTES:
1. CSI CONTROLS MODEL: RKSF115CB -X. SIMPLEX CONTROL PANEL, IPH, 25AMPS MAX W /FLOAT SWITCHES CONTACTORS, H.O.A. AND RUN
LIGHTS AUDIO- VISUAL HIGH WATER ALARM W /SILENCE, NEMA 4X ENCLOSURE.
2. COORDINATE FINAL LOCATION OF CONTROL PANEL WITH OWNER PRIOR TO INSTALLATION.
3. PROVIDE W /DRY CONTACTS FOR REMOTE MONITORING OF EQUIPMENT TO BMS -- BUILDING MANAGEMENT
SYSTEM, COORDINATE FINAL LOCATION OF PANEL WITH OWNER, AND COORDINATE WITH BMS CONTRACTOR.
4. PROVIDE HEAVY DUTY FLOAT SWITCHES AND STAINLESS STEEL MOUNTING BRACKET.
5. PROVIDE CHECK VALVES MOUNTED IN THE HORIZONTAL DISCHARGE. SEE DETAILS P5.1.
6. REFER TO DETAILS ON P5.1 FOR TYPICAL INSTALLATION DETAILS.
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
PO.1
PLUMBING LEGENDS, SCHEDULES AND DRAWING INDEX
P2.1
SERVICE ELEVATOR #8 MACHINE ROOM = NEW WORK - PLUMBING
P2.2
PASSENGER ELEVATOR #9 & 10 MACHINE ROOM - NEW WORK -
PLUMBING
P2.3
RECEIVING ELEVATOR #11 - DEMOLITION
& NEW WORK AT UNDERGROUND LEVEL - PLUMBING
P2.4
RECEIVING ELEVATOR #11 SECOND FLOOR PLAN - NEW WORK -
PLUMBING
P2.5
EMPLOYEE ELEVATOR #3 GROUND LEVEL - DEMOLITION &
NEW WORK - PLUMBING
P2,6
EMPLOYEE ELEVATORS #1 & 2 GROUND LEVEL - DEMOLITION &
NEW WORK - PLUMBING
P2.7
PASSENGER ELEVATORS CHILDRENS CENTER GROUND LEVEL -
DEMOLITION & NEW WORK - PLUMBING
P5.1
PLUMBING DETAILS
♦
♦
b
REVISIONS,
0
A
z
0-1
I- Q
0�
z0
W=
U Q
0
Q
W
0
WV)
Ln Ln
v m
M u'
co
m
Ln
CD fnn
J
U^
�a
< w
r�
v
v
f-
x
w
N
� N
r-to
r_ to
31: Ln
V)
o�
N W
W F-
E
0 (n
c�
�W
ry
r
0 A§
SRSmith
Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421-1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John L. Moulder PLC - 33200
IIE6 -1 A. SLe d PE - 65701
De .it D-i. r>; - 68se8
SSR JOB # 1032046 -0
V)
W
� X
° W
W°
Uz
V)
aU
r z
z�
wQ
CD
LLJ
zz
m
r2
DRAWN:
CHECKED: -
DATE: 06 -30 -10
SCAL 111
i
No. 00 .
s
1,091ey No.
ON
I JOB n 201013 I