Loading...
10-732-035E D C A ,A -'': 67- . j �jt N 314 314 oti 4/& A 2 AREA OF WORK VAC 2) 1 " OXYGEN G) I" AIR UP rvA w. ........... ................. ........... .............. ................ - ................ ........... ..................... ............ ............... ....... . .. zt, 314 V U .... .... ... rr 02 V i r s. ................................. ........ 511 ------------ .......... % 3 V, rr fr ................ .............. ........................ ........................ ... .......... .......... .............. - ................... . ....... % . . . . . . . . . . . . . . . . . . . . . . . . — 0 . . . . . . . . . . . . . . . . . . . . . . k ry r. t --- ------------- — . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iz -7 I .. ....... .. . .... ... .... .. .. ....................... . . . ................... rp .............. ....... ........... ........... . .......... • .................... ....................... ................... . .................... ........................ --------------------- . .......... -------- ----- PARTIAL FIRST FLOOR PLAN DEMOLITION MEDICAL GAS NE) 0' 1' T 4$ 8) 12' GENERAL NOTES: KEYED NOTES: I CONTRACTOR SHALL PATCH WALLS AND CEILINGS TO MATCH EXISTING FINISHES FOR DEMOLITION 3. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, VIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK E PIPING, CONDUIT, ETC.). PRO. REMOVE EXISTING VACUUM AND OXYGEN PIPING AND ASSOCIATED AND INSTALLATION OF PIPING, ZONE VALVE BOXES, ALARM PANELS, ETC. UNLESS NOTED 0 HANGERS. COORDINATE WITH OWNER. OTHERWISE ON ARCH. DRAWINGS. 4. CONTRACTOR SHALL LOCATE ALL NEW VALVES AT ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS, AS REQUIRED, FOR VALVES LOCATED ABOVE HARD CEILINGS. EXISTING ZONE VALVE BOX BEING CONVERTED TO MAINTENANCE 2. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE VALVES. LABEL TO SHOW AREAS SERVED. TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL: WORK MAY NOT BE LIMITED 10 SCOPE OF WORK 0 R PHASING AREAS INDICATED, tU, IJU I AL,-)U MAY A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. INCLUDE WORK OUTSIDE OF THE SCOPE OF WORK OR PHASING AREAS AS INDICATED BY CONTRACT DOCUMENTS. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. Z S T/5-1, I R4, DEMOLITION LEGEND SYMBOL SYMBOL DESCRIPTION EXISTING TO REMAIN EXISTING TO BE REMOVED REMOVE EXISTING TO THIS POINT -ArchitkLUre Engineering Planning 'interior Desig7n Landscape Architecture -e-eoi 'soj"'h-Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859-2050 Fax (305) 860-3700 MEP ENGINEER: Smith Seckman 2R Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421-1260 FAX: (954) 421-1466 www.ssr-inc.com Firm Certification - EB-0000857 John E. Moulder PE - 33200 Michael A. Steward PE - 65701 SSR JOB # 1032062.0 #A MO 0 b 3 C ♦v cc A R AL PERMI SUBMITTAL CD PHASE REVISIONS: A PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER B PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN N3 COMM. NO. 40062.100 SCALE: DATE: JUNE 30.2010 DRAWN: A CHECKED: CADD FILE: DRAWING TITLE: PARTIAL FIRST FLOOR DEMOLITION MEDICAL GAS SHEET NO. P1.3