Loading...
10-732-032t rn C d. A M 0 0 2 I 3 J 4 REGULATORY REQUIREMENTS A. NFPA 101: Life Safety Code (2006). B. NFPA 99: Standard for Health Care Facilities (2005). C. ANSI Handicapped Code- A117.1. D. Florida Fire Marshall's Rules 69A -3.012 F.A.C. - (2007). E. Florida Building Code - 2007 with 2009 ammendments. E. Guidelines for Design and Construction of Hospital and Health Care Facilities - (2006). 5 i t i PLUMBING MATERIALS PLUMBING SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH FLORIDA BUILDING CODE - PLUMBING 2007 AND ADA REQUIREMENTS. WASTE AND VENT: NO HUB SERVICE WEIGHT CAST IRON, BY CHARLOTTE OR TYLER, ABOVE FLOOR WITH 'HUSKY' HEAVY DUTY #SD4000 COUPLINGS AND BELL AND SPIGOT WITH NEOPRENE GASKETS BELOW SLAB FOR PIPING 2' AND LARGER AND COPPER TYPE !'.'M' HARD DRAWN COPPER WITH WROUGHT FITTINGS, WITH 95/5 LEAD FREE SOLDER FOR PIPING UP TO 1 -1/2. WATER: DOMESTIC COLD AND HOT WATER PIPING SHALL BE TYPE 'L' HARD DRAWN COPPER WITH WROUGHT FITTINGS, WITH 95/5 LEAD FREE SOLDERED JOINTS PER FBC 2007. INSULATE HOT WATER AND HOT WATER RETURN PIPING USING 1' THICK FIBERGLASS INSULATION HAVING A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPMENT OF 50 OR LESS iN ACCORDANCE WITH ASTM E- 84,NPFA 225 AND UL 723. ACCEPTABLE INSULATION MFGR'S: KNAUF, JOHNS - MANVILLE AND CERTAINTEED. FOAMGLASS INSULATION SHALL BE USED WHERE PIPING PENETRATES RATED WALLS. LABEL PIPING BY ADHESIVE LABELS (TO DENOTE CONTENTS AND DIRECTION OF FLOW) ON PIPING AT NO MORE THAN 25 FOOT INTERVALS, AT EACH VALVE, AND AT EACH CHANGE IN DIRECTION. PROVIDE ARROWS AT EACH LOCATION WHERE LABELED INDICATING DIRECTION OF FLOW. LABELING TO BE MINIMUM OF 2' HIGH LETTERS. COPPER PROPRESS FITTINGS BY VIEGA, CONFORMING TO MATERIAL AND SIZING REQUIREMENT OF ASME 88.16 OR ASME B16.22. 0 -RINGS FOR COPPER PRESS FITTINGS SHALL BE EPDM. TYPE 'L' FOR PIPING UP TO 4' IN SIZE. CONTRACTOR SHALL ONLY USE TOOLS BY VIEGA AND RIDGE TOOL COMPANY. TEST WATER AND WASTE PIPING AS PER LOCAL CODES. PLUMBING FIXTURES: KOHLER, AMERICAN STANDARD, ZURN PLUMBING TRIM: CHICAGO FAUCETS, ZURN SHOCK ARRESTORS: SIOUX CHIEF OR PRECISION PLUMBING PRODUCTS. FLOOR DRAINS : ZURN, WADE, J.R SMITH MIXING VALVES: SYMMONS FLUSH VALVES: SLOAN ROYAL, ZURN FIXTURE CARRIER: ZURN, WADE, J.R SMITH SUPPLY STOPS: MCGUIRE, ZURN HEAVY DUTY, WHEEL HANDLE CONTRACTOR SHALL PROVIDE PLUMBING FIXTURE AND MATERIAL SUBMITTALS TO THE ENGINEER FOR APPROVAL PRIOR TO INSTALLATION AND PURCHASING. PLUMBING FIXTURES PROVIDE PLUMBING FIXTURES, TRIM AND RELATED ITEMS SUCH AS HEAVY DUTY SUPPLIES, TRAPS, DRAINS, CLEANOUTS AND FIXTURE SUPPORTS AND OTHER ACCESSORY ITEMS. COORDINATE FIXTURE REQUIREMENTS BY REVIEWING ARCHITECTURAL AND EQUIPMENT DRAWINGS. INSTALL FIXTURES IN ACCORDANCE WITH CONTRACT DRAWINGS AND MANUFACTURER'S ROUGH -IN DRAWINGS. WALL HUNG LAVATORIES SHALL BE PROVIDED WITH FLOOR MOUNTED CARRIERS. MATERIALS HANGERS - GRINNELL BY ANVIL, B -LINE, FEE AND MASON, PHD, VIKING AND RELIABLE. 1. GRINNELL FIGURE #260 MSS TYPE 1, CLEViS HANGER FOR: NON- INSULATED STEEL AND GALVANIZED PIPING 2' THROUGH 241. NON - INSULATED CAST IRON PIPE - 3' AND LARGER. 2. GRINNELL FIGURE #CT -69, MSS TYPE 10 WITH ADJUSTABLE WROUGHT TUBING RING HANGER, COPPER PLATED FOR: NON - INSULATED COPPER TUBING WiTH NO LONGITUDINAL MOVEMENT; NON- INSULATED CAST IRON PIPING 2' AND LESS. EXPANSION ANCHORS: HILTI KWIK -BOLT, ZINC PLATED, METAL EXPANSION ANCHOR TO BE USED ON EXISTING CONSTRUCTION. ANCHOR TO MEET U.L., ICBO -4627 AND FM LISTINGS. POWDER INSERTS ARE NOT ACCEPTABLE VALVES - NIBCO, KITZ OR MILWAUKEE 1. BALL VALVES (DOMESTIC WATER): A. 2' AND LESS: NIBCO FIGURE T585 -70 OR S- 585 -70, 2- PIECE, FULL PORT, 600 PSI, WOG, TFE SEATS. B. ALL VALVES SHALL BE NSF -61 RATED. C. PROVIDE BALL VALVES WITH LOCKING HANDLES. '�l dal[ �+ 1�IU7 ��►: i��li• hI���A�hl� :a�il:�h�•'�flAni��hL��I:i�II 2. LOCATE VALVES SO AS TO BE ACCESSIBLE BY MAINTENANCE PERSONNEL. �t MEDICAL GAS MEDICAL GAS PIPING SYSTEM 1.9 FURNISH, INSTALL, AND TEST COMPLETE PIPING SYSTEM FOR OXYGEN, AIR AND VACUUM. SYSTEM SHALL BE PRESSURE TESTED WITH OIL FREE NITROGEN (NF) AND ANALYZED IN ACCORDANCE WITH NFPA 99. PROVIDE BRAZER PERFORMANCE QUALIFICATION TEST RECORDS TO ENGINEER FOR EACH BRAZER USED ON INSTALLATION PRIOR TO INSTALLATION. GRAZERS SHALL BE QUALIFIED PER PIPE, MGMC, OR AMGI WITH 37 MINIMUM HOURS TRAINING. MEDICAL GAS PIPING: SEAMLESS TYPE 'L' HARD DRAWN COPPER WITH WROUGHT COPPER FITTINGS FOR BRAZED CONNECTIONS. ALL PIPING PRECLEANED FOR OXYGEN SERVICE (PRECLEANED FOR OXYGEN SERVICE iS NOT REQUIRED FOR VACUUM PIPING). SILVER BRAZING MATERIAL: STAY- SILV -15, SILVALOY -15, AIRCOSIL #15, OR PROS- SILVER -15. SILVER BRAZING ALLOY COMPOSITION: 15% SILVER, 80% COPPER AND 5% PHOSPHORUS, NO CADMIUM. FLUX: DO NOT USE FOR COPPER -TO- COPPER JOINTS. USE FLUX FOR JOINING COPPER TO BRASS OR BRONZE. EXERCISE CARE IN APPLYING THE FLUX TO AVOID LEAVING ANY EXCESS FLUX INSIDE THE COMPLETED JOINTS. UTILIZE UNISTRUT SUPPORTS WITH PHD MANUFACTURING MODEL #2501 - 2514 UNISTRUT CUSHIONED CLAMPS OR PHD MODEL #153 PVC COATED TEAR DROP HANGERS. TAPE IS NOT ACCEPTABLE. EXPANSION ANCHORS: HILTI KWIK -BOLT, ZINC PLATED, METAL EXPANSION ANCHOR TO BE USED ON EXISTING CONSTRUCTION. ANCHOR TO MEET U.L., ICBO -4627 AND FM LISTINGS. CONTRACTOR SHALL PROVIDE MEDICAL GAS CERTIFICATION REPORT TO OWNER & ENGINEER PRIOR TO FINAL AHCA INSPECTION. CONTRACTOR SHALL CERTIFY EXISTING SYSTEM PRIOR TO CUTTING INTO EXISTING SYSTEM AND SHALL SUBMIT MEDICAL GAS CERTIFICATION TO ENGINEER FOR REVIEW PRIOR TO ANY NEW INSTALLATION. CONTRACTOR SHALL ALSO PROVIDE COPY OF TESTS FOR ALL STEPS AS OUTLINED IN NFPA 99 IN ADDITION TO MEDICAL GAS CERTIFICATION. LABEL PIPING WITH ADHESIVE LABELS. COLOR CODED PER NFPA 99. LABEL PIPING AT INTERVALS OF NOT MORE THAN 20 FEET, AT LEAST ONCE IN EACH ROOM, AT EACH STORY TRAVERSED BY THE PIPING SYSTEM, AT EACH WALL AND FLOOR SLAB PENETRATION, AT EACH VALVE AND AT EACH CHANGE IN DIRECTION. PROVIDE ARROWS AT EACH LOCATION WHERE LABELED INDICATING DIRECTION OF FLOW. SYSTEM SHALL BE INSTALLED PER NFPA 99. ALL PIPING SHALL BE PRECLEANED AND PLUGGED PRIOR TO SHIPMENT TO THE JOB SITE. JOINTS TO BE MADE WITH 1000 DEGREES F MELTING POINT MINIMUM WITH 15% SILVER BRAZING ALLOY. SYSTEM SHALL BE PURGED CONTINUOUSLY WITH DRY NITROGEN (NF) WHILE BEING ASSEMBLED AND BRAZED. USE OF FLUX IS NOT ALLOWED EXCEPT ON DISSIMILAR METALS. USE SHALL BE KEPT TO A MINIMUM. PROVIDE HANGERS ON PIPING PER NFPA 99 AND IN EACH ROOM. CROSS CONNECTION TESTING AND CERTIFICATION OF THE NEW AND EXISTING MEDICAL GAS SYSTEM MUST BE PERFORMED BY FACTORY TRAINED TECHNICIANS FROM THE MEDICAL GAS PIPELINE EQUIPMENT SUPPLIER. MEDICAL GAS VALVE BOXES, VALVES, ALARMS AND OUTLETS SHALL BE BY ONE MANUFACTURER. MEDICAL GAS OUTLETS SHALL BE BEACON MEDAES OHMEDA COMPATIBLE - DIAMOND 3, QUICK CONNECT. CONTRACTOR SHALL VERIFY THAT OUTLETS MATCH EXISTING HOSPITAL STANDARD PRIOR TO PURCHASING AND INSTALLATION. MEDICAL GAS AREA ALARM PANEL SHALL BE BEACON MEDEAS MEDPLUS TOTALALERT THREE MODULE ALARM PANEL #6819A3 WITH GAS SPECIFIC MODULES AS REQUIRED BY MED GAS SCHEDULE. PROVIDE OPTIONAL NETWORK COMMUNICATIONS BOARD CAPABLE OF INTERFACING WITH FACILITY'S ETHERNET AND CAT -5 ETHERNET CABLE. MEDICAL GAS ZONE VALVE BOXIF SHALL BE BEACON MEDEES, AMICO OR OHIO MEDICAL. VALVE BOXES SHALL INCLUDE 1 �' PRESSURE GAUGES READING 0 -100 PSIG FOR OXYGEN & AIR,& 0-30' HG FOR VACUUM. GAUGES SHALL BE LOCATED DOWNSTREAM OF VALVES. PROVIDE PERMENANTLY ENGRAVED LABELS ON ALL MEDICAL GAS ZONE VALVES AND ALARM PANELS TO INDICATE AREA SERVED PER NFPA -99. COORDINATE WITH HOSPITAL STANDARDS. PLUMBING CONTRACTOR SHALL PROVIDE AND COORDINATE ALL LOW VOLTAGE WIRING WITH DIVISION 16 AND PROVIDE ALL REQUIRED CONDUITS AND WIRING. CONTRACTOR SHALL HOLD A LOW VOLTAGE WIRING LICENSE. PIPELINE PRODUCTS (INCLUDING ALARM PANEL, ZONE VALVE BOX AND OUTLETS) SHALL BE BY BEACON MEDAES, AMICO OR OHIO MEDICAL. ALL PIPELINE PRODUCTS SHALL BE BY THE SAME MANUFACTURER. �r �r•��t a'r CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS IN AUTOCAD FORMAT AT COMPLETION OF PROJECT. ALL MATERIAL SHALL BE MANUFACTURED WITHIN THE UNITED STATES. i I s - - Architecture Engineering Planning Interior Gesign Landscape Architecture 2601 So Vvbayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 'CEP ENGINEER: Smith Seckman Reid, inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE - 65701 SSR JOB # 1032062.0 ��111111y� M •, N - S F r bi q D PHASE REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER flm PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 COMM. NO. 40062.100 SCALE: DATE: JUNE 30.2010 DRAWN: CHECKED: CADD FILE: DRAWING TITLE: SHEET NO. A • WIN ION