Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
10-732-031
r F ■M 1 7 11 A 5 6 FOR APPROVAL RING ONLESS'lT HAS BEEN COORDINATED, DRAWN AND SUBMITTED 19. ALL NEW VALVES INSTALLED IN DOMESTIC WATER SYSTEMS SHALL BE NSF -61 CERIFIED. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS AND TESTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING 21. AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. 22. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE ROUTING PROBLEMS. 23. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. 24. ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF THE WORK. 25. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUIT FOR SENSOR OPERATED FIXTURES AND MEDICAL GAS ALARM PANELS AND SHALL COORDINATE WITH DIVISION 16. CONTRACTOR SHALL HOLD A LOW VOLTAGE WIRING LICENSE. SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 38, ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER. 39. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES. PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF CONSTRUCTION. 40. ALL FLUSH VALVES, FIXTURE STOPS, VALVES, ETC., ALL PIPING SHALL BE RIGIDLY SECURED (NO MOVEMENT WHEN OPERATED). INSTALL PERMANENT STAMPED BRASS VALVE TAG ON EACH VALVE, COORDINATE WITH OWNER'S IDENTIFICATION SYSTEM. PLUMBING DRAIN SCHEDULE PLUMBING NEW CONSTRUCTION NOTES 1. PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT, AND PIPING 26. GENERAL NOTE: TEMPERATURE OF HOT WATER TO PUBLIC REST ROOMS SHALL NOT MANUFACTURER SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE TYPE EXCEED 110 F, PER FLORIDA ENERGY CODE 412.1.ABCD.2.3.2. CONTRACTOR ZURN FLOOR DRAIN WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES POLISHED NICKEL BRONZE TOP SHALL VERIFY TEMPERATURE OF HOT WATER SYSTEM WITH OWNER. INSTALL /, DIA. STRAINER AND INECTION IMER REQUIREMENTS. EXAM ROOMS TEMPERING VALVES AS REQUIRED, FOR A MAXIMUM TEMPERATURE OF 110 F 2. CONTRACTOR SHALL FIELD VERIFY EXISTING INVERT ELEVATIONS, SIZES AND SYMBOL SUBJECT TO REVIEW BY ENGINEER. P2.2 LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE 27. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL CASEWORK. PARTIAL FOUND, THEY ARE TO NOTIFY ENGINEER. T MODEL CONTRACTOR SHALL OBTAIN ARCHITECTURAL DRAWINGS AND REVIEW SIZE MANUFACTURER TYPE PRIOR TO INSTALLATION. 3, ALL PLUMBING FIXTURES TO COMPLY WITH TABLE 604.3 OF THE FLORIDA BUILDING CODE - 2007 28. CHANGES IN THE DIRECTION OF SANITARY PIPING SHALL NOT BE MADE WITH © 1 7• r• 1 1 1 � y. FITTINGS WHICH WILL CAUSE EXCESSIVE REDUCTION IN THE VELOCITY OF FLOW 4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING OR CREATE ANY OTHER ADVERSE EFFECT UNLESS PHYSICALLY IMPOSSIBLE HEIGHTS WITH KITCHEN EQUIPMENT EQUIPMENT AND ARCHITECTURAL DRAWINGS (IE: USE OF SANITARY TEE IN A HORIZONTAL CONNECTION USE OF A DOUBLE AND SUPPLIER. INSTALL EQUIPMENT AND MAKE FINAL SANITARY IN AHVTRT OUSSTACK OR ENE K,CS E TI SHORT-RADIUS CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS P.R.V: S, AND PIPING AS REQUIRED. CONTRACTOR SHALL OBTAIN ORE INI ZURN A SET OF THE EQUIPMENT DRAWINGS PRIOR TO BIDDING IN ORDER 29. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO TO DETERMINE ALL REQUIRED CONNECTIONS. P -7 ACTUAL CONDITION AND SPACE REQUIREMENTS. 5. CONTRACTOR SHALL PROVIDE TRAP PRIMERS ON ALL FLOOR 30. CONTRACTOR SHALL TEST WATER FROM DOMESTIC COLD AND HOT WATER SYSTEMS NA DRAINS AS REQUIRED BY STATE AND LOCAL CODES. NA WHICH HAVE BEEN MODIFIED BY THE RENOVATION AFTER MODIFICATIONS ARE COMPLETE FOR CONTAMINANTS. PROVIDE COPY OF TEST REPORT ONE WEEK PRIOR 6. PROVIDE 12'XI2' ACCESS PANELS FOR ALL VALVES LOCATED t' TO FINAL AHCA INSPECTION. 4' ABOVE HARD CEILINGS. INSTALL VALVES SO AS TO BE WITHIN 31. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS #K -6676 REACH OF ACCESS DOOR. SCHEDULED OR SPECIFIED USING THE MANUFACTURERS AND MODEL NUMBERS 7. CONTRACTOR SHALL PROVIDE ROUGH-INS AND MAKE FINAL CONNECTIONS THECDRAWINGS FOR IN THANFONE (MANUFACTURER SCHEDULED EQUIPMENT IS FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION, SPECIFIED ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN THIS CONTRACTOR INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES, THIS CONTRACTOR'S PROPOSAL. IF VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, THERMOMETERS, WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST, AT THE TIME OF BIDDING, GLOBE SOLENOID VALVES, INSULATION. AND ALL NECESSARY DEVICES SUBMIT SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER THE EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED bR TO BE FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED DEDUCTED FROM HIS PROPOSAL. PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS. P -20A JUST - (STAFF) #SL -ADA- SINGLE COMP. (S S.) 18 GAUGE 32. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME 8. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED P OWRAP #PW2150 1 % P -TRAP OFFSET TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES NA ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE I/ WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF tl /� IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. SUBSTITUTE MATERIALS. 2019 -A -GR IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR OFFSET STRAINER ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF 33. WARRANTY /GUARANTEE DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS. RISER DIAGRAMS AND FOR A, THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME FOR THE PERIOD OF ONE YEAR. REQUIRED AND SCHEDULE FOR PERFORMING WORK. B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING 9. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A ' DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE JUST (2 COMP.) OF 50. DOUBLE COMP. DOUBLE STAINLESS STEEL OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE McGUIRE (2) #151 DRAINS H -2165 DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE 10. EXISTING UTILITIES, WHICH ARE NOT SHOWN, THAT ARE DISCOVERED __ ORIGINAL DEFECT OR REPAIR THERETO. y� DURING DEMOLITION SHALL BE BROUGHT TO THE ATTENTION OF THE NA SINK OWNER'S REPRESENTATIVE BY THE CONTRACTOR FOR PROPER CO- 34. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES ORDINATION. CONTRACTOR SHALL REMOVE, REWORK AND /OR REROUTE OR FACILITIES SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR COORDINATE FLOW CONTROL THE EXISTING UTILITIES AS DIRECTED BY THE OWNER'S REPRESENTATIVE. REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY 11. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT EX MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED 12. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP COORDINATED TARQUGfi THCONNECTIONS AND7TMANAGSR ALL BE DEVICE WITH MFGR. SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. 1. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE 13. CONTRACTOR SHALL FURNISH AND INSTALL SHOCK ABSORBERS ON FLUSH OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT VALVE FIXTURES AND ALL LINES SERVING QUICK CLOSING VALVES AND AS (4 ) HOU S NSA VI ACE OF EACH REQUIRED INTERRUPTION INDICATED ON PLUMBING PLANS AND RECOMMENDED BY THE MANUFACTURER. 2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME 14, CLEANOUT COVERS SHALL NOT BE INSTALLED ON THE CORRIDOR SIDE OF CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND ANY WALL OR IN ANY CORRIDOR FLOORS. IF DISCREPANCIES ARE FOUND ON WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION. OF THE CONTRACT. 15. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND PHONE 35. CONTRACTOR SHALL SAW CUT CONCRETE FIRST FLOOR SLAB AS REQUIRED TO PANELS. ACCOMMODATE DEMOLITION AND NEW WORK SHOWN. PATCH WITH SIMILAR MATERIALS TO MATCH EXISTING. SEE ARCH. DRAWINGS. 16. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS AND MOUNTING HEIGHTS. 36. ALL STORM PIPING OVERFLOW STORM AND CONDENSATE PIPING SHALL BE INSULATED 17, ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE THROUGHOUT ENTRE SYSTEM. CHROME PLATED. 37. PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE 18. THE PLUMBING CONTRACTOR SHALL KEEP_ A_ SE_T. OF MARKED UP _DRAWINGS._ TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES FOR APPROVAL RING ONLESS'lT HAS BEEN COORDINATED, DRAWN AND SUBMITTED 19. ALL NEW VALVES INSTALLED IN DOMESTIC WATER SYSTEMS SHALL BE NSF -61 CERIFIED. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS AND TESTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING 21. AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. 22. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE ROUTING PROBLEMS. 23. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. 24. ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF THE WORK. 25. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUIT FOR SENSOR OPERATED FIXTURES AND MEDICAL GAS ALARM PANELS AND SHALL COORDINATE WITH DIVISION 16. CONTRACTOR SHALL HOLD A LOW VOLTAGE WIRING LICENSE. SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 38, ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER. 39. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES. PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF CONSTRUCTION. 40. ALL FLUSH VALVES, FIXTURE STOPS, VALVES, ETC., ALL PIPING SHALL BE RIGIDLY SECURED (NO MOVEMENT WHEN OPERATED). INSTALL PERMANENT STAMPED BRASS VALVE TAG ON EACH VALVE, COORDINATE WITH OWNER'S IDENTIFICATION SYSTEM. PLUMBING DRAIN SCHEDULE GAS LEGEND SYMBOL SCHEDULE WASTE REMARKS - MANUFACTURER MODEL TYPE FD -1 ZURN FLOOR DRAIN #ZN- 415 -6B -P POLISHED NICKEL BRONZE TOP AS SHOWN IN PLAN /, DIA. STRAINER AND INECTION IMER i 1 I. EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE, AND SIZE PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR COORDINATION PRIOR TO CONSTRUCTION. 2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES, TO REMAIN OR TO BE RELOCATED, SHALL BE REPAIRED TO ORIGINAL OPERATION OR REPLACED, SHOULD THEY BE DAMAGED DURING CONSTRUCTION. 3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS (UNLESS NOTED OTHERWISE) SHALL REMAIN AS IS. 4. ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PIPING , FIXTURES, MED GAS OUTLETS OR EQUIPMENT DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE OWNER. 6• CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN USE DURING CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION OF AN EXISTING SERVICE IS NECESSARY, CONTRACTOR SHALL COORDINATE WITH AUTHORIZED HOSPITAL PERSONNEL BEFORE MAKING THE NECESSARY INTERRUPTION. 7. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN EXISTING WALLS TO BE DEMOLISHED AND PROVIDE NEW OFFSETS AT CEILING ABOVE AND CEILING BELOW TO NEW STACK OR RISER LOCATION COORDINATED WITH FLOOR PLAN LAYOUT AND EXISTING CONDITIONS. CONTRACTOR TO FIELD VERIFY THAT ALL EXISTING PLUMBING AND MEDICAL GAS $' TO BE REMOVED DOES NOT AFFECT OTHER AREA'S OF THE HOSPITAL THAT ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF DISCREPENCIES ARE FOUND THE CONTRACTOR IS TO NOTIFY THE ENGINEER. 9. CONTRACTOR SHALL REMOVE EXISTING PLUMBING AND MEDICAL GAS TO FIXTURES, MEDICAL GAS OUTLETS, ZONE VALVE BOXES, ALARM PANELS AND EQUIPMENT TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED. CONTRACTOR SHALL CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS, WALLS OR BELOW FLOOR. CONTRACTOR SHALL REROUTE ALL ACTIVE PLUMBING SERVICES IN CHASES OR WALLS TO BE REMOVED, TO NEW CHASE AREAS OR NEW WALLS AS REQUIRED. 10. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF PLUMBING FIXTURES, MED GAS OUTLETS AND /OR EQUIPMENT THAT ARE TO BE REMOVED TO THE LOCAL OWNER'S REPRESENTATIVE. ALL ITEMS THAT THE LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE TURNED OVER TO THE OWNER AND THE REMAINDER SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED. NOTES: 1. CONTRACTOR SHALL PROVIDE PERMANENTLY ENGRAVED LABELS AT ALL NEW ZONE VALVE BOXES AND ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE TO INDICATE SPECIFIC ROOMS SERVED. COORDINATE LABELING WITH FINAL ROOM NAMES AND NUMBERS, AND AREA SERVED WITH HOSPITAL. WHERE AN ALARM PANEL HAS MULTIPLE ALARM POINTS OF EACH MEDICAL GAS, EACH ALARM POINT SHALL BE CLEARLY LABELED TO INDICATE THE AREA SERVED. 2. PROVIDE PERMANENT ENGRAVED LABELS AT ALL NEW ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE, INDICATING ELECTRICAL LIFE SAFETY CIRCUIT FEEDING ALARM PANEL. PLUMBING FIXTURE SCHEDULE GAS LEGEND MEDICAL GAS SCHEDULE FITTING EQUIPPED WITH REMARKS VSYMBOLZDESCRIPTION E VALVE BOX 1/ 02, 3/4 V 1 7• •. 771 EXAM ROOMS SL L OUTLETS (1) -02, (1) -V, (D -SL P.W. EXAM ROOMS H.W. E PRESSURE ALARM PANEL (1) -02, (1) -V, (1) -SPARE SYMBOL EXAM ROOMS P2.2 -1 FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P3.1 PARTIAL NOTES: 1. CONTRACTOR SHALL PROVIDE PERMANENTLY ENGRAVED LABELS AT ALL NEW ZONE VALVE BOXES AND ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE TO INDICATE SPECIFIC ROOMS SERVED. COORDINATE LABELING WITH FINAL ROOM NAMES AND NUMBERS, AND AREA SERVED WITH HOSPITAL. WHERE AN ALARM PANEL HAS MULTIPLE ALARM POINTS OF EACH MEDICAL GAS, EACH ALARM POINT SHALL BE CLEARLY LABELED TO INDICATE THE AREA SERVED. 2. PROVIDE PERMANENT ENGRAVED LABELS AT ALL NEW ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE, INDICATING ELECTRICAL LIFE SAFETY CIRCUIT FEEDING ALARM PANEL. PLUMBING FIXTURE SCHEDULE GAS LEGEND SYMBOL FIXTURE FITTING FLOOR 1 7" Ill •i71 Y71 ' •7.11 ': :. } . ... 7 7, OXYGEN 1 7• •. 771 MEDICAL GAS OUTLET (SEE MED. GAS SCHEDULE) SL SLIDE MOUNTED P.W. C.W H.W. WASTE REMARKS SYMBOL CARRIER P2.2 -1 FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P3.1 PARTIAL MANUFACTURER T MODEL TYPE SIZE MANUFACTURER TYPE SUPPLY TRAP FAUCET • •�s.z I•. •ar «I © 1 7• r• 1 1 1 � y. SLOAN #117BH, CHI. ZURN #13864 LOOSE P -7 KOHLER- (STAFF) TYRRELL FLOOR MOUNTED 20' X 27' NA NA NA NA FAUCET #814 AND Z1 217_B __ t' �/� 4' STRAINER & K -8935 CLINICAL SINK #K -6676 VITREOUS CHINA #91OG- 777 -19K S.S. RIM GARD. CHICAGO FAUCET P -20A JUST - (STAFF) #SL -ADA- SINGLE COMP. (S S.) 18 GAUGE 1 14 X 16 X 6 /¢ McGUIRE PROWRAP #PW1151 WC H -2165 P OWRAP #PW2150 1 % P -TRAP OFFSET 786 GN2FCCP 1.6 GPM WRISTBLADE HANDLE. NA -- I/ �/� tl /� NA S.S. SINK 2019 -A -GR SELF- RIMMING OFFSET STRAINER FOR WHEEL CHAIR USE COORDINATE FLOW CONTROL DEVICE WITH MFGR. P_22B JUST (2 COMP.) DOUBLE COMP. DOUBLE STAINLESS STEEL 16' X 16' X 101 /1 McGUIRE (2) #151 DRAINS H -2165 ( I i #8912 1 /¢ P -TRAPS CHICAGO FAUCET WRI GN2FCCP 1.6 GPM WRISTBLADE HANDLE. NA __ I/� y� t' /�' NA SINK 18 GAUGE COORDINATE FLOW CONTROL DEVICE WITH MFGR. NOTES: 1. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUITS FROM TRANSFORMERS ABOVE CEILING TO PLUMBING FIXTURES FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE WITH DIVISION 16. 2. INSTALLATION OF FIXTURES SHALL BE FULLY COORDINATED WITH GRAB BARS. 3. PROVIDE SYMMONS THERMOSTATIC MIXING VALVE *5- 210 -CK 1/2 GPM MIN, 2 GPM MAX ON FAUCETS SET AT 110"F (P -13, P20A, P -22B & P -22B). SEE DETAILS. 4. COORDINATE LAVATORY MOUNTING HEIGHT WITH ARCHITECTURAL DRAWINGS. REPORT ANY DISCREPANCIES WITH ARCH /ENGR. 5. PROVIDE BOX MOUNT TRANSFORMER. MOUNT ABOVE CEILING. 6. CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL FOR A COMPLETE INSTALLATION OF THE PLUMBING FIXTURES INCLUDING ANY GROUT AS REQUIRED AT WALL HUNG FIXTURES. COORDINATE WITH ARCHITECT FOR SPECIFIC GROUT REQUIREMENTS. INFECTION CONTROL MEASURES 1. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH THOSE REQUIREMENTS. CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS OF THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO THE PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA SHALL BE COORDINATED WITH THE OWNER AND PERFORMED IN ACCORDANCE WITH THE ICRA REPORT, UNDER THE SUPERVISION OF THE OWNER'S REPRESENTATIVE OR OTHER DESIGNATED ICRA COMMITTEE OFFICER. 2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN AREAS SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, AND ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE MEASURES TO THIS EFFECT INCLUDING ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE RELATIVE TO OTHER AREAS OF THE FACILITY. 3.IN ADDITION TO THE MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE CONTRACTOR AT A MINIMUM SHALL PROVIDE EQUIPMENTAND COMPONENTS NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION WORK ZONE RELATIVE TO ADJACENT AREA. EXISTING HVAC SYSTEMS AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AT A MINIMUM AS FOLLOWS: VERIFY ALL EXISTING PLUMBING WHICH PASSES THROUGH THE CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED DURING THE CONSTRUCTION DURATION. AIR REMOVED FROM THE CONSTUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL COMMITTEE. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTATION TO THE OWNER AS REQUIRED. 4. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH THE OWNER, AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR PRESSURE RELATIONSHIPS WILL NOT BE ADVERSALY AFFECTED. PLUMBING LEGEND GAS LEGEND SYMBOL DESCRIPTION A 11117 7' 1 7" Ill •i71 Y71 ' •7.11 ': :. } . ... 7 7, OXYGEN 1 7• •. 771 MEDICAL GAS OUTLET (SEE MED. GAS SCHEDULE) SL SLIDE .711 •' FIRST FLOOR - DEMOLITION - PLUMBING P1.3 PARTIAL FIRST FLOOR - DEMOLITION - MEDICAL GAS P2.1 PARTIAL UNDERGROUND - NEW CONSTRUCTION - PLUMBING P2.2 -1 FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P3.1 PARTIAL FIRST FLOOR - NEW CONSTRUCTION - MEDICAL GAS P5.1 • T 1T kill 14, 1 • •�s.z I•. •ar «I © 1 7• r• 1 1 1 � y. I PLUMBING ABBREVIATIONS GAS LEGEND SYMBOL DESCRIPTION A MEDICAL COMPRESSED AIR 1 7" Ill •i71 Y71 ' •7.11 ': :. } . ... 7 7, OXYGEN 1 7• •. 771 MEDICAL GAS OUTLET (SEE MED. GAS SCHEDULE) SL SLIDE .711 •' FIRST FLOOR - DEMOLITION - PLUMBING P1.3 PARTIAL FIRST FLOOR - DEMOLITION - MEDICAL GAS P2.1 PARTIAL UNDERGROUND - NEW CONSTRUCTION - PLUMBING P2.2 PARTIAL FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P3.1 PARTIAL FIRST FLOOR - NEW CONSTRUCTION - MEDICAL GAS P5.1 PLUMBING DETAILS AND ISOMETRIC RISERS MEDICAL GAS LEGEND SYMBOL DESCRIPTION A MEDICAL COMPRESSED AIR V VACUUM 02 OXYGEN Q MEDICAL GAS OUTLET (SEE MED. GAS SCHEDULE) SL SLIDE n A r, d %v, Td Architecture Engineering Planning Interior Design Landscapq Architecture 2601. South- Bayahora Dr.ve 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 El MEP ENGINEER: M3�.Smith Seckman Reid, Inc. I 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm. Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. steward PE-65701 SSR JOB # 1032062.0 �%% E. M ,• Z;••iG N ,r i� OF or e, s 1 R .1 •�� PERM( SUBMITTAL CD PHASE REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER B PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40062.100 SCALE: DATE: RUNE 30.2010 DRAWN: A CHECKED: CADD FILE: DRAWING TITLE: PLUMBING LEGENDS, SCHEDULES, NOTES AND DRAWING INDEX SHEET NO. °11 DRAWING INDEX SHEET NUMBER SHEET TITLE PO.O PLUMBING LEGENDS, SCHEDULES, NOTES AND DRAWING INDEX PO.1 PLUMBING SPECIFICATIONS P1.1 PARTIAL UNDERGROUND - DEMOLITION - PLUMBING P1.2 PARTIAL FIRST FLOOR - DEMOLITION - PLUMBING P1.3 PARTIAL FIRST FLOOR - DEMOLITION - MEDICAL GAS P2.1 PARTIAL UNDERGROUND - NEW CONSTRUCTION - PLUMBING P2.2 PARTIAL FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P3.1 PARTIAL FIRST FLOOR - NEW CONSTRUCTION - MEDICAL GAS P5.1 PLUMBING DETAILS AND ISOMETRIC RISERS n A r, d %v, Td Architecture Engineering Planning Interior Design Landscapq Architecture 2601. South- Bayahora Dr.ve 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 El MEP ENGINEER: M3�.Smith Seckman Reid, Inc. I 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm. Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. steward PE-65701 SSR JOB # 1032062.0 �%% E. M ,• Z;••iG N ,r i� OF or e, s 1 R .1 •�� PERM( SUBMITTAL CD PHASE REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER B PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40062.100 SCALE: DATE: RUNE 30.2010 DRAWN: A CHECKED: CADD FILE: DRAWING TITLE: PLUMBING LEGENDS, SCHEDULES, NOTES AND DRAWING INDEX SHEET NO. °11