Loading...
10-732-028p IIIIIIIIIIIIIAII MEAN IIIIIIIIIIIIIA! . swi, A 1 7 4 A A 6 PARTIAL FIRST FLOOR PLAN - DEMOLITION -FIRE PROTECTION ICI I � KEYED NOTES: DEMOLITION LEGEND REMOVE DESCRIPTION HEAD AND In BRANCH PIPING BACK TO LIMITS SHOWN AND EXISTING TO REMAIN PREPARE PIPING TO EXTEND XISTING TO BE REMOVED (D REMOVE TO THIS POINT 21/1 A/S CONTROL 1. CONTRACTOR SHALL PHASE WORK AS DIRECTED BY ARCHITECTURAL DRAWINGS AND OWNER. 2. CONTRACTOR SHALL PATCH WALLS, FLOORS, ROOFING AND CEILINGS TO MATCH EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION SYSTEMS. COORDINATE WITH ARCHITECTURAL DRAWINGS. 3. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. WHERE FEASIBLE INSTALL NEW MAINS PRIOR TO DEMOLITION OF EXISTING. 4. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. 5. PIPING SHOWN TO BE REMOVED IS NOT TO BE CAPPED AND ABANDONED. 6. CONTRACTOR SHALL RAISE EXISTING PIPING AS REQUIRED IN ORDER TO FACILITATE THE INSTALLATION OF THE SYSTEMS ABOVE CEILINGS. PROVIDE WITH NEW FITTINGS. 7. CONTRACTOR SHALL COORDINATE TIMING, DURATION AND AREAS AFFECTED BY SHUTDOWNS WITH HOSPITAL IN ORDER TO FACILITATE REQUIRED FIRE WATCH. e A 1 � " r, N -f. . J; end 0 d u \.'�Po..t, i YA w`9 ..�w r x, n x`t ."... ... t✓ x.� r b) C j 9`6 C� & "} .* �? � �' .� 3u °.u�k t ..a.F a a..,... II ,�aIIi°I ! b+ ^m, fx ?.—E, r b,PCYUw re NY �,.wc ...R'xt au.?�r c..l ,'^I~xr. +i Cil....I., l....a Architecture Enginoo:ing Planning Intericir Design Land3cap-e Architecture 2E61 South Ray"sho�e -Driv4 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 EP ENGINEER: Smith M3�. Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE-65701 SSR JOB # 1032062.0 i %I ...a FIJI �%% S ........ , -, E No. 33 C 4* F ;Je //i 01 AL St.,% PERMIT SUBMITTAL CD PHASE REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER B PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 6j KEY PLAN COMM. NO. 40062.100 SCALE: DATE: JUNE 30.2010 DRAWN: A CHECKED: CADD FILE: DRAWING TITLE: PARTIAL FIRST FLOOR DEMOLITION FIRE PROTECTION SHEET NO. FP1. 1 REMOVE EXISTING SPRINKLER HEAD AND In BRANCH PIPING BACK TO LIMITS SHOWN AND 0 PREPARE PIPING TO EXTEND TO NEW SPRINKLER HEAD. SEE FP2.1 FOR CONTINUATION. (D EXISTING 21/1 A/S CONTROL VALVE WITH F.S AND T.S. r, N -f. . J; end 0 d u \.'�Po..t, i YA w`9 ..�w r x, n x`t ."... ... t✓ x.� r b) C j 9`6 C� & "} .* �? � �' .� 3u °.u�k t ..a.F a a..,... II ,�aIIi°I ! b+ ^m, fx ?.—E, r b,PCYUw re NY �,.wc ...R'xt au.?�r c..l ,'^I~xr. +i Cil....I., l....a Architecture Enginoo:ing Planning Intericir Design Land3cap-e Architecture 2E61 South Ray"sho�e -Driv4 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 EP ENGINEER: Smith M3�. Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE-65701 SSR JOB # 1032062.0 i %I ...a FIJI �%% S ........ , -, E No. 33 C 4* F ;Je //i 01 AL St.,% PERMIT SUBMITTAL CD PHASE REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER B PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 6j KEY PLAN COMM. NO. 40062.100 SCALE: DATE: JUNE 30.2010 DRAWN: A CHECKED: CADD FILE: DRAWING TITLE: PARTIAL FIRST FLOOR DEMOLITION FIRE PROTECTION SHEET NO. FP1. 1