10-732-028p
IIIIIIIIIIIIIAII
MEAN
IIIIIIIIIIIIIA!
.
swi,
A
1 7 4 A A 6
PARTIAL FIRST FLOOR PLAN - DEMOLITION -FIRE PROTECTION
ICI I �
KEYED NOTES:
DEMOLITION LEGEND
REMOVE
DESCRIPTION
HEAD AND In BRANCH PIPING BACK TO LIMITS SHOWN AND
EXISTING TO REMAIN
PREPARE
PIPING TO EXTEND
XISTING TO BE REMOVED
(D
REMOVE TO THIS POINT
21/1 A/S CONTROL
1. CONTRACTOR SHALL PHASE WORK AS DIRECTED BY ARCHITECTURAL DRAWINGS AND OWNER.
2. CONTRACTOR SHALL PATCH WALLS, FLOORS, ROOFING AND CEILINGS TO MATCH EXISTING
FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION SYSTEMS. COORDINATE
WITH ARCHITECTURAL DRAWINGS.
3. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE
TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL:
A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER.
B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCIBED BY OWNER.
C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT
BY THE OWNER.
D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF
SHUTDOWNS REQUIRED. WHERE FEASIBLE INSTALL NEW MAINS PRIOR TO DEMOLITION OF EXISTING.
4. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK,
PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK.
5. PIPING SHOWN TO BE REMOVED IS NOT TO BE CAPPED AND ABANDONED.
6. CONTRACTOR SHALL RAISE EXISTING PIPING AS REQUIRED IN ORDER TO FACILITATE THE INSTALLATION
OF THE SYSTEMS ABOVE CEILINGS. PROVIDE WITH NEW FITTINGS.
7. CONTRACTOR SHALL COORDINATE TIMING, DURATION AND AREAS AFFECTED BY SHUTDOWNS WITH
HOSPITAL IN ORDER TO FACILITATE REQUIRED FIRE WATCH.
e A
1 � "
r,
N -f.
. J;
end 0 d u \.'�Po..t, i YA w`9 ..�w r x, n x`t ."... ... t✓ x.� r
b) C j
9`6 C� & "} .* �? � �' .� 3u °.u�k t ..a.F a a..,...
II ,�aIIi°I ! b+ ^m, fx ?.—E, r b,PCYUw
re
NY �,.wc ...R'xt au.?�r c..l ,'^I~xr. +i Cil....I., l....a
Architecture Enginoo:ing Planning
Intericir Design Land3cap-e Architecture
2E61 South Ray"sho�e -Driv4 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
EP ENGINEER:
Smith
M3�. Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A. Steward PE-65701
SSR JOB # 1032062.0
i
%I ...a FIJI
�%% S ........ , -,
E
No. 33
C 4* F
;Je //i 01 AL St.,%
PERMIT SUBMITTAL
CD PHASE
REVISIONS:
PROJECT NAME:
SOUTH MIAMI HOSPITAL
EAST TOWER FIBROID CENTER
B
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
6j
KEY PLAN
COMM. NO. 40062.100
SCALE:
DATE: JUNE 30.2010
DRAWN:
A CHECKED:
CADD FILE:
DRAWING TITLE:
PARTIAL FIRST FLOOR
DEMOLITION
FIRE PROTECTION
SHEET NO.
FP1. 1
REMOVE
EXISTING SPRINKLER
HEAD AND In BRANCH PIPING BACK TO LIMITS SHOWN AND
0
PREPARE
PIPING TO EXTEND
TO NEW SPRINKLER HEAD. SEE FP2.1 FOR CONTINUATION.
(D
EXISTING
21/1 A/S CONTROL
VALVE WITH F.S AND T.S.
r,
N -f.
. J;
end 0 d u \.'�Po..t, i YA w`9 ..�w r x, n x`t ."... ... t✓ x.� r
b) C j
9`6 C� & "} .* �? � �' .� 3u °.u�k t ..a.F a a..,...
II ,�aIIi°I ! b+ ^m, fx ?.—E, r b,PCYUw
re
NY �,.wc ...R'xt au.?�r c..l ,'^I~xr. +i Cil....I., l....a
Architecture Enginoo:ing Planning
Intericir Design Land3cap-e Architecture
2E61 South Ray"sho�e -Driv4 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
EP ENGINEER:
Smith
M3�. Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A. Steward PE-65701
SSR JOB # 1032062.0
i
%I ...a FIJI
�%% S ........ , -,
E
No. 33
C 4* F
;Je //i 01 AL St.,%
PERMIT SUBMITTAL
CD PHASE
REVISIONS:
PROJECT NAME:
SOUTH MIAMI HOSPITAL
EAST TOWER FIBROID CENTER
B
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
6j
KEY PLAN
COMM. NO. 40062.100
SCALE:
DATE: JUNE 30.2010
DRAWN:
A CHECKED:
CADD FILE:
DRAWING TITLE:
PARTIAL FIRST FLOOR
DEMOLITION
FIRE PROTECTION
SHEET NO.
FP1. 1