Loading...
10-732-012IIIIIIIIIIIIAII IIIIIIIIIIIAN I" A 1 7 3 4 5 SUPPLY DUCTWORK HVAC GENERAL NOTES 1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT 10. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS. FLOOR PLANS. INSTALLATION REQUIREMENTS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL 11. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND 3. CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES. PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS. ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER 2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND X WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF. REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED PROPER MANNER BY CONTRACTOR. MAXIMUM USING 45 DEGREE OR LONG RADIUS ELBOWS. MAIN RUNOUT SQUARE TO 6. 12. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK 3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS ROUND ADAPTER NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION MAXIMUM AS REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES, DATA FOR ACTUAL DUCTWORK CONNECTIONS SIZES, INCLUDING, BUT NOT 8. OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE LIMITED TO THOSE SHOWN. DIFFUSER REPAIRED AND FINISHED TO MATCH EXISTING. 4. PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH 13. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE MARK DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES. PROVIDE DAMPERS AS CFM RANGE REQUIREMENTS OF THE OWNER. NECK SIZE CLOSE AS POSSIBLE TO MAIN IN BRANCH CONNECTION. SEE DIFFUSER THROW AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 14. PROVIDE TEMPORARY FILTERS ON ALL RETURN AIR GRILLES AND MODULE SIZE TRANSFER OPENINGS IN THE WORK AREA. 5. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN ADVANCE. 15. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON 0 - 100 12x12 / 12x12 6'0 AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY 6. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE TITUS TMS -AA INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO 24x24 / 24x24 SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 10x6 / 810 SUBMITTING THE BID. 7. NO DUCTWORK, OR CONDUIT SHALL BE INSTALLED UNTIL IT IS 16. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE C COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL 201- 325 USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE. 1010 OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES; 17. PROVIDE CLEAR ACCESS TO FIRE DAMPERS AND VALVES. EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT D TITUS TMS -AA LIMITED TO, THOSE SHOWN. 24x24 / 24x24 1214 8. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE 18. ALL DUCTWORK MATERIALS SHALL BE PROTECTED WHILE BEING SHIPPED TO SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE. THE SITE, STORED ON SITE AND AS INSTALLATION PROGRESSES. DUCTWORK STORED ON SITE PRIOR TO INSTALLATION SHALL BE OFF THE FLOOR. COVER 9. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL ALL DIFFUSERS AND GRILLES AFTER INSTALLATION PRIOR TO EQUIPMENT BE INSTALLED WITH MINIMUM 6' CLEARANCE TO ALLOW FOR INSPECTION TITUS 50F START UP AND TEST AND BALANCE. 8x8 / l0x1O OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12' CLEARANCE 10x6 / 810 - WHERE POSSIBLE, COORDINATE. SUPPLY DUCTWORK RETURN OR EXHAUST DUCTWORK AIR DEVICE SCHEDULE }� 340 �-- SUPPLY DIFFUSER & AIR QUANTITY 1. AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS. O 2. BRANCH & OPTIONAL BRANCH DUCT SIZES ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS. HVAC DETAILS 3. ALL AIR DEVICES INSTALLED IN INACCESSIBLE AND /OR DRYWALL CEILINGS SHALL BE PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS. X 4• ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND /OR LAY -IN CEILINGS SHALL HAVE A X SMOKE CONTROL X MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF. BRANCH 5. MAXIMUM PRESSURE DROP FOR ALL AIR DEVICES SHALL NOT EXCEED 0.10 IN. W.G. MAIN RUNOUT SQUARE TO 6. ALL AIR DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED. I I_MVD ROUND ADAPTER 7. MAXIMUM INC RATING FOR ALL AIR DEVICES SHALL NOT EXCEED 25. 8. ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED. DIFFUSER 9. THROW VALUES ARE GIVEN FOR TERMINAL VELOCITIES OF 150, 100 & 50 FPM RESPECTIVELY. OR GRILLE MARK MFGR & MODEL CFM RANGE FACE SIZE / NECK SIZE BRANCH DUCT SIZE THROW REMARKS MODULE SIZE A TITUS TMS -AA 0 - 100 12x12 / 12x12 6'0 8x6 / 610 2 -3 -6 B TITUS TMS -AA 101 - 200 24x24 / 24x24 810 10x6 / 810 3 -5 -9 C TITUS TMS -AA 201- 325 24x24 / 24x24 1010 12x8 / 1010 4 -6 -13 D TITUS TMS -AA 326 - 525 24x24 / 24x24 1214 14x10 / 12'(D 5 -8 -16 1 TITUS 50F 0 - 180 8x8 / l0x1O 8x8 10x6 / 810 - 2 TITUS 50F 181 - 300 10x10 / 24x24 10x10 12x8 / 1010 - 3 TITUS 50F 301- 450 12x12 ! 24x24 12x12 14x1O / 120 - 4 TITUS 50F 451- 650 14x14 / 24x24 14x14 16x10 / 14'0 1 - SUPPLY DUCTWORK RETURN OR EXHAUST DUCTWORK FD FIRE DAMPER }� 340 �-- SUPPLY DIFFUSER & AIR QUANTITY 120 R. RETURN GRILLE &AIR QUANTITY 160 E. pUANTITY GRILLE &AIR O � THERMOSTAT (ADJUST.) X REHEAT COIL L 1 R. RISE IN DUCTWORK 1� --�-� CROP IN DUCTWORK CONICAL TEE CONN. BELLMOUTH CONN. �- 450 THROAT TAP BRANCH CONNECTION PR RADIUS ELBOW R /W =1.5 TURNING VANES IN ELBOW �- DIVIDED FLOW FITTINGS M.V.D. MANUAL VOL. DAMPER MECHANICAL DEMOLITION NOTES 1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF EXISTING DUCT ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK. 2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS DIRECTED BY THE OWNER). 3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM DUCTWORK THAT WILL REMAIN. 4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE WALL WHERE AIR DEVICES, DUCTS, ETC. HAVE BEEN REMOVED. (MAINTAIN THE EXISTING RATINGS). 5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. 6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. iill� o w r. � UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA SERVED' BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL EQUIPMENT AND ASSOCIATED FSD'S SHALL DE- ENERGIZE. FANS IDENTIFIED AS EXHAUSTING HAZARDOUS MATERIAL SHALL RUN CONTINUOUSLY. DUCT AND PIPE INSULATION DUCTWORK 1.INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE (WITH ROOF INSULATION >R12): 2' THICK, R -6.0 MIN, FIBERGLASS. HVAC DESIGN REQUIRES SHEET NUMBER YES NO DUCT SMOKE DETECTOR(S) MO.1 X FIRE DAMPER(S) X M1.1 SMOKE DAMPER(S) M2.1 X FIRE RATED ENCLOSURE HVAC DETAILS X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING (SEE ARCH. X SMOKE CONTROL X 1 6 TEST &BALANCE NOTES 1. PRECONSTRUCTION: PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW. THE FOLLOWING INFORMATION IS REQUIRED: - AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S). - AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S). - AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S). - SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S). - MEASURED FAN RPM, MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED AREA(S). - PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE. - WATERFLOW TO COILS AS APPLICABLE. 2. FINAL CONSTRUCTION: UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS, ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTORS PROPOSAL. 3. FINAL REPORT: SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. 1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL (ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF HAZARDOUS MATERIALS. 2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED AS SUCH. 3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED. AHU OPERATION DURING CONSTRUCTION THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY. 1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE CONSTRUCTION WORK. 2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION. THE ENDS OF DUCTWORK SHALL BE CLOSED DURING CONSTRUCTION. 3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERAL WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE COVERED WITH ROLL -UP FILTER MATERIAL. 4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS. 5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED. DRAWING INDEX SHEET NUMBER SHEET TITLE M0.0 HVAC LEGEND, NOTES, SCHEDULES AND DRAWING INDEX MO.1 HVAC SPECIFICATIONS MO.2 CONSTRUCTION ZONE VENTILATION PLAN M1.1 PARTIAL FIRST FLOOR - DEMOLITION - HVAC M2.1 PARTIAL FIRST FLOOR - NEW CONSTRUCTION - HVAC M3.1 HVAC DETAILS I ry Architecture Engineering Planning w Intarior Design `andscape Architecture 2601 Sndth Ba,4shore DKive � 0th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 7 VIEP ENGINEER: Smith M3�. Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE -33200 Michael A. Steward PE - 65701 SSR JOB # 1032062.0 �rrrrt MOVEis Is too `` • `G N S ,: v 'Y : cc r rof AAl PERMIT UBMITfAL CD PHASE REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER B PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 13 COMM. NO. 40062.100 SCALE: DATE: JUNE 30.2010 DRAWN: A CHECKED: CADD FILE: DRAWING TITLE: HVAC LEGEND, NOTE SCHEDULES AND DRAWING INDEX SHEET NO. 1 1 F`