10-732-012IIIIIIIIIIIIAII
IIIIIIIIIIIAN
I"
A
1 7 3 4 5
SUPPLY DUCTWORK
HVAC GENERAL
NOTES
1.
HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT
10.
REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL
AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE
EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS.
FLOOR PLANS.
INSTALLATION REQUIREMENTS.
2.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL
11.
CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND
3.
CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES.
PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS.
ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER
2.
DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND
X
WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE
DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE
MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF.
REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED
PROPER MANNER BY CONTRACTOR.
MAXIMUM
USING 45 DEGREE OR LONG RADIUS ELBOWS.
MAIN RUNOUT
SQUARE TO
6.
12.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK
3.
PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS
ROUND ADAPTER
NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION
MAXIMUM
AS REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S
AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES,
DATA FOR ACTUAL DUCTWORK CONNECTIONS SIZES, INCLUDING, BUT NOT
8.
OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE
LIMITED TO THOSE SHOWN.
DIFFUSER
REPAIRED AND FINISHED TO MATCH EXISTING.
4.
PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH
13.
ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE
MARK
DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES. PROVIDE DAMPERS AS
CFM RANGE
REQUIREMENTS OF THE OWNER.
NECK SIZE
CLOSE AS POSSIBLE TO MAIN IN BRANCH CONNECTION. SEE DIFFUSER
THROW
AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
14.
PROVIDE TEMPORARY FILTERS ON ALL RETURN AIR GRILLES AND
MODULE SIZE
TRANSFER OPENINGS IN THE WORK AREA.
5.
SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN
ADVANCE.
15.
EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON
0 - 100
12x12 / 12x12
6'0
AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY
6.
ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING
VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND
CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE
TITUS TMS -AA
INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO
24x24 / 24x24
SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER.
10x6 / 810
SUBMITTING THE BID.
7.
NO DUCTWORK, OR CONDUIT SHALL BE INSTALLED UNTIL IT IS
16.
ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE
C
COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL
201- 325
USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE.
1010
OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES;
17.
PROVIDE CLEAR ACCESS TO FIRE DAMPERS AND VALVES.
EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT
D
TITUS TMS -AA
LIMITED TO, THOSE SHOWN.
24x24 / 24x24
1214
8.
IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE
18.
ALL DUCTWORK MATERIALS SHALL BE PROTECTED WHILE BEING SHIPPED TO
SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE.
THE SITE, STORED ON SITE AND AS INSTALLATION PROGRESSES. DUCTWORK
STORED ON SITE PRIOR TO INSTALLATION SHALL BE OFF THE FLOOR. COVER
9.
DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL
ALL DIFFUSERS AND GRILLES AFTER INSTALLATION PRIOR TO EQUIPMENT
BE INSTALLED WITH MINIMUM 6' CLEARANCE TO ALLOW FOR INSPECTION
TITUS 50F
START UP AND TEST AND BALANCE.
8x8 / l0x1O
OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12' CLEARANCE
10x6 / 810
-
WHERE POSSIBLE, COORDINATE.
SUPPLY DUCTWORK
RETURN OR EXHAUST
DUCTWORK
AIR DEVICE
SCHEDULE
}� 340
�-- SUPPLY DIFFUSER &
AIR QUANTITY
1.
AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE
NOTED ON HVAC
FLOOR PLANS.
O
2.
BRANCH & OPTIONAL BRANCH DUCT SIZES ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC
FLOOR PLANS.
HVAC DETAILS
3.
ALL AIR DEVICES INSTALLED IN INACCESSIBLE AND /OR DRYWALL CEILINGS SHALL BE
PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS.
X
4•
ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND /OR LAY -IN CEILINGS SHALL HAVE A
X
SMOKE CONTROL
X
MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF.
BRANCH
5.
MAXIMUM
PRESSURE DROP FOR ALL AIR DEVICES SHALL NOT EXCEED 0.10 IN. W.G.
MAIN RUNOUT
SQUARE TO
6.
ALL AIR DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED.
I I_MVD
ROUND ADAPTER
7.
MAXIMUM
INC RATING FOR ALL AIR DEVICES SHALL NOT EXCEED 25.
8.
ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED.
DIFFUSER
9.
THROW
VALUES ARE GIVEN FOR TERMINAL VELOCITIES OF 150, 100 & 50 FPM RESPECTIVELY.
OR GRILLE
MARK
MFGR & MODEL
CFM RANGE
FACE SIZE /
NECK SIZE
BRANCH DUCT SIZE
THROW
REMARKS
MODULE SIZE
A
TITUS TMS -AA
0 - 100
12x12 / 12x12
6'0
8x6 / 610
2 -3 -6
B
TITUS TMS -AA
101 - 200
24x24 / 24x24
810
10x6 / 810
3 -5 -9
C
TITUS TMS -AA
201- 325
24x24 / 24x24
1010
12x8 / 1010
4 -6 -13
D
TITUS TMS -AA
326 - 525
24x24 / 24x24
1214
14x10 / 12'(D
5 -8 -16
1
TITUS 50F
0 - 180
8x8 / l0x1O
8x8
10x6 / 810
-
2
TITUS 50F
181 - 300
10x10 / 24x24
10x10
12x8 / 1010
-
3
TITUS 50F
301- 450
12x12 ! 24x24
12x12
14x1O / 120
-
4
TITUS 50F
451- 650
14x14 / 24x24
14x14
16x10 / 14'0
1 -
SUPPLY DUCTWORK
RETURN OR EXHAUST
DUCTWORK
FD
FIRE DAMPER
}� 340
�-- SUPPLY DIFFUSER &
AIR QUANTITY
120
R. RETURN GRILLE &AIR
QUANTITY
160
E. pUANTITY GRILLE &AIR
O
� THERMOSTAT (ADJUST.)
X
REHEAT COIL
L
1
R. RISE IN DUCTWORK
1� --�-� CROP IN DUCTWORK
CONICAL TEE CONN.
BELLMOUTH CONN.
�- 450 THROAT TAP
BRANCH CONNECTION
PR RADIUS ELBOW R /W =1.5
TURNING VANES IN
ELBOW
�- DIVIDED FLOW
FITTINGS
M.V.D. MANUAL VOL. DAMPER
MECHANICAL DEMOLITION NOTES
1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF
EXISTING DUCT ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT
ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE
OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK.
2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL
HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL
SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS
DIRECTED BY THE OWNER).
3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM
DUCTWORK THAT WILL REMAIN.
4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE
WALL WHERE AIR DEVICES, DUCTS, ETC. HAVE BEEN REMOVED.
(MAINTAIN THE EXISTING RATINGS).
5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE
ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND
DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS.
6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS
OF THE OWNER.
iill�
o w r. �
UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA SERVED'
BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL EQUIPMENT AND
ASSOCIATED FSD'S SHALL DE- ENERGIZE. FANS IDENTIFIED AS EXHAUSTING
HAZARDOUS MATERIAL SHALL RUN CONTINUOUSLY.
DUCT AND PIPE INSULATION
DUCTWORK
1.INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE
(WITH ROOF INSULATION >R12): 2' THICK, R -6.0 MIN, FIBERGLASS.
HVAC DESIGN REQUIRES
SHEET
NUMBER
YES
NO
DUCT SMOKE DETECTOR(S)
MO.1
X
FIRE DAMPER(S)
X
M1.1
SMOKE DAMPER(S)
M2.1
X
FIRE RATED ENCLOSURE
HVAC DETAILS
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY
X
FIRE STOPPING (SEE ARCH.
X
SMOKE CONTROL
X
1
6
TEST &BALANCE NOTES
1. PRECONSTRUCTION:
PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB
CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT
THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING
EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE
RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW.
THE FOLLOWING INFORMATION IS REQUIRED:
- AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S).
- AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED
AREA(S).
- AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE
RENOVATED AREA(S).
- SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S).
- MEASURED FAN RPM, MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED
AREA(S).
- PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE.
- WATERFLOW TO COILS AS APPLICABLE.
2. FINAL CONSTRUCTION:
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL
REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED
AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS,
ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL
BE INCLUDED IN THIS CONTRACTORS PROPOSAL.
3. FINAL REPORT:
SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE
ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL (ASBESTOS).
COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF
HAZARDOUS MATERIALS.
2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND DISPOSAL OF
HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS PART OF THE WORK OF THIS
CONTRACT UNLESS SPECIFICALLY IDENTIFIED AS SUCH.
3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY
IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW
TO PROCEED.
AHU OPERATION DURING CONSTRUCTION
THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS
APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY.
1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE
ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE
CONSTRUCTION WORK.
2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY
CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION. THE ENDS OF DUCTWORK SHALL BE CLOSED DURING
CONSTRUCTION.
3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERAL
WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE
COVERED WITH ROLL -UP FILTER MATERIAL.
4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED
DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS.
5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED.
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
M0.0
HVAC LEGEND, NOTES, SCHEDULES AND DRAWING INDEX
MO.1
HVAC SPECIFICATIONS
MO.2
CONSTRUCTION ZONE VENTILATION PLAN
M1.1
PARTIAL FIRST FLOOR - DEMOLITION - HVAC
M2.1
PARTIAL FIRST FLOOR - NEW CONSTRUCTION - HVAC
M3.1
HVAC DETAILS
I
ry
Architecture Engineering Planning
w Intarior Design `andscape Architecture
2601 Sndth Ba,4shore DKive � 0th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
7
VIEP ENGINEER:
Smith
M3�. Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE -33200
Michael A. Steward PE - 65701
SSR JOB # 1032062.0
�rrrrt
MOVEis Is too
`` • `G N S
,: v 'Y
: cc
r
rof AAl
PERMIT UBMITfAL
CD PHASE
REVISIONS:
PROJECT NAME:
SOUTH MIAMI HOSPITAL
EAST TOWER FIBROID CENTER
B
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
13
COMM. NO. 40062.100
SCALE:
DATE: JUNE 30.2010
DRAWN:
A CHECKED:
CADD FILE:
DRAWING TITLE:
HVAC LEGEND, NOTE
SCHEDULES AND
DRAWING INDEX
SHEET NO.
1 1
F`