10-732-004GENERAL NOTESi
A._ CONTRACTOR SHALL BE RESPONSIBLE FOR
PERFORMING A WALK -THRU OF THE PROJECT
PRIOR TO SUBMITTING A BID TO THE OWNER FO
IDENTIFYING POSSIBLE CRITICAL ITEMS. NOT ALL
ITEMS TO BE DEMOLISHED ARE SHOWN ON THE
PLAN.
B._ OPENINGS LEFT THROUGH RATED AND SMOKE
PARTITIONS DUE TO REMOVAL OF DUCTWORK
AND /OR CONDUITS SHALL BE CLOSED BOTH
SIDES AS PER APPLICABLE CODES.
C._ SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL
AND PLUMBING DRAWINGS
FOR ADDITIONAL REMOVAL WORK OF LIGHTING,
PLUMBING FIXTURES, EQUIPMENT, ETC.
D._ THE CONTRACTOR SHALL COORDINATE ALL
TEMPORARY WALL PARTITIONS.
E._ THE CONTRACTOR SHALL COORDINATE WITH
OWNER OR OWNER REPRESENTATIVE TEMPORARY
STORAGE OF ANY TYPE OF EQUIPMENT,
FURNITURE, ETC., TO BE RELOCATED PRIOR TO
ANY WORK.
F._ THE CONTRACTOR SHALL FIELD VERIFY ALL
CONDITIONS AND DIMENSIONS PRIOR TO ANY
WORK.
EXISTING DOOR, HARDWARE AND FRAME TO BE
REMOVED.
REMOVE ALL EXISTING METAL/VINYL CORNER
GUARDS, HANDRAIL /BUMPER GUARDS, ETC.
PATCH AND REPAIR SURROUNDING WALLS TO
REMAIN.
REMOVE ALL OR PORTION OF METAL STUD
PARTITIONS, r••- AND METAL
FRAME; HEADER TO REMAIN.
(5) REMOVE ALL OR PORTION OF METAL STUD
�--/� PARTITIONS.
(6 } CONTRACTOR TO WORK IN ROOM AND KEEP
DOOR CLOSED WHILE WORKING.
PROVIDE TEMPORARY SIGN TO READ:
"CONSTRUCTION r• NOT ENTER" ON t *
SIDE AND • ON
CONSTRUCTION SIDE •
TEMPORARY PARTITION. SEE WALL TYPE T
OTEMPORARY DOOR TO BE 3' -0" x 6' -8"
® EXISTING COLUMN TO REMAIN
EXISTING WALL OR PARTITION TO REMAIN
WALL /PARTITION WITH EXISTING DOOR TO
REMAIN
WALL OR PARTITION WITH EXISTING DOOR
TO BE
REMOVED
REFERRED TO DEMOLITION NOTE ACTION
TO BE
APPLIED
TEMPORARY PARTITION
•r► TEMPORARY
HATCH •r • • r
THE
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seck man, Reid, Inc.
CO LTL'TING
ENGINEER
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Faz(954)421 -1466
REVISIONS:
PROJECT
SOUTH MIAMI HOSPITAL
• ' . ' t ii r1 1' y_
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
COMM. • 40062.100
SCALE: AS SHOWN
•A 0
DRAWN:
CHECKED: B.H.
.DD ..,
DRAWING
FLOOR FIRST
DEMOLITION
PHASE 1
SHEET •