Loading...
10-732-002MEP ENGINEER: MEPENGINEER INFORMATION Smith, Seckman, Reid, Inc. CGINSLTLTING- EN G-IN EERE3 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421 -1260 Faz(954)421 -1466 HOR0 Co N � .4 6574 �:7: kyj 61yIs] 1 PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 COMM. NO. SCALE: DATE: DRAWN: CHECKED: CADD FILE: DRAWING TITLE: 71 0 40062.100 1l8' = V -0" JULY 21, 2010 ARIAZIFG B.H. H:PROJECTS 1 1 ABBREVIATIONS GENERAL NOTES GENERAL DEMOLITION NOTES DRAWING INDEX A ACOUS. ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE 01• CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ARCHITECTURE ADA AMERICANS WITH DISABILITIES ACT LAM LAMINATED FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE ADJ ADJUSTABLE LT LIGHT NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. do ALL OTHER APPLICABLE CODES, RULES AND COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETiHER WITH DETAILS COVER AFF ABOVE FINISH FLOOR LTWT UGHT WEIGHT REGULATIONS. FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND AGG AGGREGATE LF OR UN FT LINEAR FEET DAYS OF WEEK TO BE WORKED. AO.O INDEX A.C. AIR CONDITIONING 02. THE CONTRACTOR SHAU_ FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE LS -1.0 FIRST FLOOR LIFE SAFETY PLAN ALUM ALUMINUM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED D -1.1 FIRST FLOOR DEMOLITION PLAN B BM BEAM ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PROGRESS OF OWNER'S ON SITE OPERATIONS. A -1.1 FIRST FLOOR PLAN BLK BLOCK MAX MAXIMUM PRIOR TO SUBMISSION OF BID. A -2.0 REFLECTED CEILING PLAN BLKG BLOCKING MECH MECHANICAL - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND A -3.0 MILLWORK BOT BOTTOM MET OR MTL METAL 03. THE CONTRACTOR SHAM. BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. A -3.1 INTERIOR ELEVATION AND DETAILS BLDG BUILDING MIN MINIMUM THE WORK DESCRIBED iN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE A -4.0 WALL TYPES BLKHD BULKHEAD MISC MACH MISCELLANEOUS MACHINE COMMENCEMENT OF WORK. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, A -5.0 WALL PENETRATION DETAILS MANUF MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL A -6.0 DOOR SCHEDULE C CAB CABINET DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND CARP CARPET N NFPA NATIONAL FIRE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOUTiON WORK. FILE CLG CEILING WITH ARCHITECT PRIOR TO START OF WORK. CEM CA CEMENT CENTER LINE NIC NOM NOT IN CONTRACT NOMINAL 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, • 03. OCCUPANCY. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE MECHANICAL CER CERAMIC NIS NOT TO SCALE SURFACE/RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF C.T. CERAMIC TiLE INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES HEAT /SMOKE DETECTORS CONCEALED/ EXPOSED FIRE OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES MO.O HVAC LEGEND, NOTES, SCHEDULES AND DRAWING INDEX CO CLEAN OUT O OC ON CENTER SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH MOA HVAC SPECIFICATIONS CL OR CLOS CLOSET OH OR OPP.HD. OPPOSITE HAND SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND STRONG ODORS. M0.2 CONSTRUCTION ZONE VENTILATION PLAN COL COLUMN OD OUTSIDE DIAMETER NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE M1.1 PARTIAL FIRST FLOOR - DEMOLITION -HVAC CONC CONCRETE OFF OFFICE RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER TO MATCH ORIGINAL ( 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES M2.1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION -HVAC CMU CONCRETE MASONRY UNiT OPNG OPENING INSTALLATION) UPON COMPLETION OF REPAIR WORK. TO BE DEMOLISHED. CONDITIONS EXISTING AT TiME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY M3.1 HVAC DETAILS CONST CONSTRUCTION OSHA OCCUPATIONAL MINA ADMINISTRATION 06• ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. CENT CG CONTINUOUS CORNER GUARD CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WiTH THE WORK. 05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. CR CU CRASH RAIL CUBIC P PR PASS PAIR PASSENGER 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE 06• PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS PROTECTION TO PROTECT OWNER'S ELECTRICAL - - PENT PENTHOUSE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. EM D DEPT DEPARTMENT PC PRECAST STARTING WORK. EO.0 ELECTRICAL LEGEND, NOTES, SCHEDULES AND DRAWING INDEX DET./DTL DETAIL Pi PLAS PANEL JOINT PLASTER 08• CONTRACTOR SHAD. PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL E1.1 PARTIAL FIRST FLOOR- DEMOUTiON- ELECTRICAL DIA DIM DIAMETER DIMENSION POL POUSHED THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. E1.2 PARTIAL FIRST FLOOR- REFERENCE PLAN - ELECTRICAL DN DOWN PMLD PREMOULDED THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING E2.1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION- UGHTiNG DS DOWN SPOUT PNL PANEL DEMOLITION OPERATIONS. E3.1 PARTIAL FIRST FLOOR- REFERENCE PLAN -POWER &SYSTEMS DWG DRAWING 09• ALL WALL /(]LING SURFACES WIiNIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH E4.1 PARTIAL ELECTRICAL RISER DIAGRAM & PANEL SCHEDULES DF DRINKING FOUNTAIN O QT QUARRY TiLE EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. E5.1 ELECTRICAL STUDIES QTM QUARRY TiLE MINIATURES CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. E6.1 ELECTRICAL SPECIFICATIONS E E.A. EXPOSED AGGREGATE D. CONSTRUCT TEMPORARY INSULAiTED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE EA EACH R RAID RADIUS 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED iN ADVANCE OF PAINT FINISH. NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND EL ELEVATION GRADE) R RISER SECURITY LOCKS. ALL TEMP' PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. ELE ELEVATION FACADE} REINF REINFORCED 11, THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT FIRE PROTECTION ELEV ElEELEVATOR REQb REQUIRED AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE E SPREAD RATINGS OR MEANS OF EGRESS E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE. SCREWS NAILS, ETC. WILL NOT BE EP ELECTRICAL PANEL RF ROOF WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. PERMITTED. (SEE DRAWING #13 ON SHEET A -6.0) EQ EQUIP EQUAL EQUIPMENT RD ROOF DRAIN 12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND F. REMOVE PROTECTIONS AT COMPLETION OF WORK. FPO.O FIRE PROTECTION LEGENDS. SCHEDULES AND DRAWING INDEX FP0.1 FIRE PROTECTION SPECIFICATIONS EXIST EXISTING RM RO ROOM ROUGH OPENING ACCESSIBLE AT ALL TIMES. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 100% NEGATIVE PRESSURE BY USE OF SUITABLE FANS FP1.1 PARTIAL FIRST FLOOR - DEMOLITION -FIRE PROTECTION EXP.JT. OR EJ EXPANSION JOINT REFL OR REF REFLECTED 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. FP2,1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION -FIRE PROTECTION EXP EXPOSED RWL RAIN WATER LEADER FP5.1 FIRE PROTECTION DETAILS EXT EXTERIOR 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT ELEC ELECTRICAL CONTAMINATION OF DUCT SYSTEM. EWC ELECTRIC WATER COILER 8 SECT SECTION 15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK SST SHEET WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPUSHED AT THE TIMES OTHER 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. PLUMBING F FT FEET SHT MET OR SM SHEET METAL THAN NORMAL WEEKDAY WORKING HOURS FIN FINISH SIM SIMILAR 08. MAINTAIN EXISTING BUILDING SYSTEMS/UTiLITiES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST P0.0 PLUMBING LEGENDS, SCHEDULES AND DRAWING INDEX FE FIRE EXTINGUISHER SQ SQUARE 16. CONTRACTOR SHAM PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FlREWATCIH. POA PLUMBING SPECIFICATIONS FEC FIRE EXTINGUISHER CABINET STD STANDARD ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. P1.1 PARTIAL UNDERGROUND- DEMOUTiONI- PLUMBING FC FL FIRE CABINET FLOOR SS STL STAINLESS STEEL. STEEL 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 - DO NOT INTERRUPT BUILDING SYSTEMS,/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING P1,2 PARTIAL FIRST FLOOR- DEMOUTiON- PLUMBING FD FLOOR DRAIN STOR STORAGE AM AND SATURDAY do SUNDAY 24 HOURS, BUILDING SYSTEMS/UTiUTiES AS ACCEPTABLE TO GOVERNING AUTHORITIES. P1.3 PARTIAL FIRST FLOOR - DEMOLITION- MEDICAL GAS FLUOR FLUORESCENT STRUCT STRUCTURAL P2.1 PARTIAL UNDERGROUND -NEW CONSTRUCTION- PLUMBING F.R. FIRE RATING SUSP SUSPENDED 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOUTiON OPERATIONS. P2.2 PARTIAL FIRST FLOOR -NEW CONSTRUCTION - PLUMBING FS FV FULL SIZE FIELD VERIFY SPECS SPECIFICATIONS 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE O9. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL P3.1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION- MEDICAL GAS P5.1 PLUMBING DETAILS AND ISOMETRIC RISERS FVC FIRE VALVE CABINET RESPONSIBLE FOR THOR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND /OR. REPLACED AT NO OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE T TEL TELEPHONE ADDTiONAL COST TO OWNER. PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 0 GALV GALVANIZED TEMP TEMPERED GA GAUGE TLT. OR TOI. TOILET 10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUS GC GENERAL CONTRACTOR T TREADS 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. GL GB GLASS GRAB BAR TYP TR TYPICAL TELEPHONE RECEPTACLE 21. PROVIDE WALK -OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR - DO NOT USE WATER WHEN iT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, THK THICK CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. POLLUTION AND DAMAGE TO EXISTING FINISHES. GGRR GGRRADDEM GYP BD GYPSUM WALLBOARD 22• CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR U UL UNDERWRITER MECHANICAL, ELECTRICAL AND PLUMBING WiTH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WAIL DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT H HC HANDICAPPED LABORATORIES SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -6.2, A -10.0 AND A -10.1 FOR SEALING TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S HRDW HARDWARE FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBUES SHALL HAVE FIRE DAMPERS TO MATCH THE REPRESENTATIVE, REARRANGE SELECTIVE DEMOUTiON SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS HT HEIGHT Y VERT VERTICAL RATING OF THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. WITHOUT UNDUE DELAY. HM HOLLOW METAL HORIZ HORIZONTAL VB VT VINYL L.E VAPOR BARRIER 23. IT SMALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM I IN INCH VWC VINYL WALL COVERING SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE DEBRIS REMOVAL TO BE DONE AFTER INCAND INCANDESCENT CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING REGULAR WORKING HOURS. ID INSIDE DIAMETER W VWC -GYP WAIL COVERING - GYPSUM BOARD INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE 'OWNER TO SURVEY AND REMOVE AND PROVIDE TO GENERAL HAZARDOUS INSUL INT INSULATION INTERIOR VWC -PLAS WC WALL COVERING - PLASTER WET COLUMN GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS OPERATIONS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERAliONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND APPLICABLE RE U INV INVERT WP WATERPROOFING FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. WD WOOD ON THE DRAWINGS. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE J JT JOINT W/ WITH JST JOIST W/0 WITHOUT 13. UPON COMPLETION OF DEMOUTiON WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE JC JANITOR'S CLOSET WC WATER CLOSET PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. Y YD YARD - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EQSTiNG PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS DOOR SYMBOL :_ WALL CONSTRUCTION A WALL TYPE DOOR NUMBER 1--- °ELEVATION NSIX ATION CONCRETE Blanket PRECAST GRAVEL or CRUSHED STONE CEMENT MORTAR PLASTER CONCRETE NUMBER ROOM NAME OFFICE ROOM NAME EXTERIOR do INTERIOR 4 X- 0 2 Cl � D3`A ELEVATION SYMBOL ��}'' ROOM NUMBER SHEET NUMBER FINISH SCHEDULE XX 3 P'T`O IV EARTH TOE Ceramic or Structurd SOLID CONC• MAS. UNIT UNEMMONSMINOWANWO CONCRETE MASONRY UNIT MARBLE CONSTRUCTION DETAIL -DETAIL NUMBER BUILDING, PARTIAL DETAIL NUMBER -,. 1 Alp �.- SHEET NUMBER L SECTION � MR � DETAIL - SHEET NUMBER A 1 .... SYMBOL SHEET WOOD METAL Finished WOOD Rod* WOOD Bloddng BRICi( Large WINDOW TYPES ® WINDOW TYPE COLUMN REFERENCE -- NUMBER OR LETTER Continuous intermittent Soda GENERAL NOTES ABCDEFG -- -NOTE G AM GLASS NSUTATiON TOP OF CONCRETE ELEVATION 0.00 SLAB ELEVATION Sman Large Rigid DETAIL NUMBER Sede Scde .__.u.DRAWING DRAWING TITLES REVISIONS REVISION NUMBER [ClABCDEF ') E: STEED. STEEL Smai Scale Large Scde PLYWOOD SHEET NUMBER DEMOLITION NOTE NOTE THIS DRAWING X NOTE (� -... MEP ENGINEER: MEPENGINEER INFORMATION Smith, Seckman, Reid, Inc. CGINSLTLTING- EN G-IN EERE3 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421 -1260 Faz(954)421 -1466 HOR0 Co N � .4 6574 �:7: kyj 61yIs] 1 PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER FIBROID CENTER PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 COMM. NO. SCALE: DATE: DRAWN: CHECKED: CADD FILE: DRAWING TITLE: 71 0 40062.100 1l8' = V -0" JULY 21, 2010 ARIAZIFG B.H. H:PROJECTS 1 1