10-732-002MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
CGINSLTLTING-
EN G-IN EERE3
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Faz(954)421 -1466
HOR0
Co
N
�
.4
6574
�:7: kyj 61yIs] 1
PROJECT NAME:
SOUTH MIAMI HOSPITAL
EAST TOWER FIBROID CENTER
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
COMM. NO.
SCALE:
DATE:
DRAWN:
CHECKED:
CADD FILE:
DRAWING TITLE:
71
0
40062.100
1l8' = V -0"
JULY 21, 2010
ARIAZIFG
B.H.
H:PROJECTS
1 1
ABBREVIATIONS
GENERAL NOTES
GENERAL DEMOLITION NOTES
DRAWING INDEX
A
ACOUS.
ACOUSTICAL
L
LAV
LAVATORY
01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE
01• CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION
ARCHITECTURE
ADA
AMERICANS WITH DISABILITIES ACT
LAM
LAMINATED
FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES,
WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE
ADJ
ADJUSTABLE
LT
LIGHT
NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. do ALL OTHER APPLICABLE CODES, RULES AND
COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETiHER WITH DETAILS
COVER
AFF
ABOVE FINISH FLOOR
LTWT
UGHT WEIGHT
REGULATIONS.
FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND
AGG
AGGREGATE
LF OR UN FT
LINEAR FEET
DAYS OF WEEK TO BE WORKED.
AO.O INDEX
A.C.
AIR CONDITIONING
02. THE CONTRACTOR SHAU_ FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE
LS -1.0 FIRST FLOOR LIFE SAFETY PLAN
ALUM
ALUMINUM
M
MAT
MATERIAL
DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY
- PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED
D -1.1 FIRST FLOOR DEMOLITION PLAN
B
BM
BEAM
ML
MATCH LINE
AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING
PROGRESS OF OWNER'S ON SITE OPERATIONS.
A -1.1 FIRST FLOOR PLAN
BLK
BLOCK
MAX
MAXIMUM
PRIOR TO SUBMISSION OF BID.
A -2.0 REFLECTED CEILING PLAN
BLKG
BLOCKING
MECH
MECHANICAL
- COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND
A -3.0 MILLWORK
BOT
BOTTOM
MET OR MTL
METAL
03. THE CONTRACTOR SHAM. BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT
WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA.
A -3.1 INTERIOR ELEVATION AND DETAILS
BLDG
BUILDING
MIN
MINIMUM
THE WORK DESCRIBED iN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE
A -4.0 WALL TYPES
BLKHD
BULKHEAD
MISC
MACH
MISCELLANEOUS
MACHINE
COMMENCEMENT OF WORK.
02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES,
A -5.0 WALL PENETRATION DETAILS
MANUF
MANUFACTURER
04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE
EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL
A -6.0 DOOR SCHEDULE
C
CAB
CABINET
DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE
OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND
CARP
CARPET
N
NFPA
NATIONAL FIRE
SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION.
ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOUTiON WORK. FILE
CLG
CEILING
WITH ARCHITECT PRIOR TO START OF WORK.
CEM
CA
CEMENT
CENTER LINE
NIC
NOM
NOT IN CONTRACT
NOMINAL
05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO,
•
03. OCCUPANCY. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE
MECHANICAL
CER
CERAMIC
NIS
NOT TO SCALE
SURFACE/RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS,
DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF
C.T.
CERAMIC TiLE
INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES HEAT /SMOKE DETECTORS CONCEALED/ EXPOSED FIRE
OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES
MO.O HVAC LEGEND, NOTES, SCHEDULES AND DRAWING INDEX
CO
CLEAN OUT
O
OC
ON CENTER
SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR
THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH
MOA HVAC SPECIFICATIONS
CL OR CLOS CLOSET
OH OR OPP.HD.
OPPOSITE HAND
SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND
STRONG ODORS.
M0.2 CONSTRUCTION ZONE VENTILATION PLAN
COL
COLUMN
OD
OUTSIDE DIAMETER
NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE
M1.1 PARTIAL FIRST FLOOR - DEMOLITION -HVAC
CONC
CONCRETE
OFF
OFFICE
RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER TO MATCH ORIGINAL
(
04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES
M2.1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION -HVAC
CMU
CONCRETE MASONRY UNiT
OPNG
OPENING
INSTALLATION) UPON COMPLETION OF REPAIR WORK.
TO BE DEMOLISHED. CONDITIONS EXISTING AT TiME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY
M3.1 HVAC DETAILS
CONST
CONSTRUCTION
OSHA
OCCUPATIONAL MINA ADMINISTRATION
06• ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD
OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR.
CENT
CG
CONTINUOUS
CORNER GUARD
CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WiTH THE WORK.
05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED.
CR
CU
CRASH RAIL
CUBIC
P
PR
PASS
PAIR
PASSENGER
07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE
06• PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS PROTECTION TO PROTECT OWNER'S
ELECTRICAL
- -
PENT
PENTHOUSE
OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO
PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK.
EM
D
DEPT
DEPARTMENT
PC
PRECAST
STARTING WORK.
EO.0 ELECTRICAL LEGEND, NOTES, SCHEDULES AND DRAWING INDEX
DET./DTL DETAIL
Pi
PLAS
PANEL JOINT
PLASTER
08• CONTRACTOR SHAD. PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF
A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL
E1.1 PARTIAL FIRST FLOOR- DEMOUTiON- ELECTRICAL
DIA
DIM
DIAMETER
DIMENSION
POL
POUSHED
THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND
AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING.
E1.2 PARTIAL FIRST FLOOR- REFERENCE PLAN - ELECTRICAL
DN
DOWN
PMLD
PREMOULDED
THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS.
B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING
E2.1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION- UGHTiNG
DS
DOWN SPOUT
PNL
PANEL
DEMOLITION OPERATIONS.
E3.1 PARTIAL FIRST FLOOR- REFERENCE PLAN -POWER &SYSTEMS
DWG
DRAWING
09• ALL WALL /(]LING SURFACES WIiNIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH
E4.1 PARTIAL ELECTRICAL RISER DIAGRAM & PANEL SCHEDULES
DF
DRINKING FOUNTAIN
O
QT
QUARRY TiLE
EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE,
C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY.
E5.1 ELECTRICAL STUDIES
QTM
QUARRY TiLE MINIATURES
CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED.
E6.1 ELECTRICAL SPECIFICATIONS
E
E.A.
EXPOSED AGGREGATE
D. CONSTRUCT TEMPORARY INSULAiTED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE
EA
EACH
R
RAID
RADIUS
10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED iN ADVANCE OF PAINT FINISH.
NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND
EL
ELEVATION GRADE)
R
RISER
SECURITY LOCKS. ALL TEMP' PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT.
ELE
ELEVATION FACADE}
REINF
REINFORCED
11, THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT
FIRE PROTECTION
ELEV
ElEELEVATOR
REQb
REQUIRED
AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE E SPREAD RATINGS OR MEANS OF EGRESS
E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE. SCREWS NAILS, ETC. WILL NOT BE
EP
ELECTRICAL PANEL
RF
ROOF
WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES.
PERMITTED. (SEE DRAWING #13 ON SHEET A -6.0)
EQ
EQUIP
EQUAL
EQUIPMENT
RD
ROOF DRAIN
12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND
F. REMOVE PROTECTIONS AT COMPLETION OF WORK.
FPO.O FIRE PROTECTION LEGENDS. SCHEDULES AND DRAWING INDEX
FP0.1 FIRE PROTECTION SPECIFICATIONS
EXIST
EXISTING
RM
RO
ROOM
ROUGH OPENING
ACCESSIBLE AT ALL TIMES.
G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 100% NEGATIVE PRESSURE BY USE OF SUITABLE FANS
FP1.1 PARTIAL FIRST FLOOR - DEMOLITION -FIRE PROTECTION
EXP.JT.
OR EJ EXPANSION JOINT
REFL OR REF
REFLECTED
13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES.
EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING..
FP2,1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION -FIRE PROTECTION
EXP
EXPOSED
RWL
RAIN WATER LEADER
FP5.1 FIRE PROTECTION DETAILS
EXT
EXTERIOR
14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION.
H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
ELEC
ELECTRICAL
CONTAMINATION OF DUCT SYSTEM.
EWC
ELECTRIC WATER COILER
8
SECT
SECTION
15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK
SST
SHEET
WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPUSHED AT THE TIMES OTHER
07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK.
PLUMBING
F
FT
FEET
SHT MET OR SM
SHEET METAL
THAN NORMAL WEEKDAY WORKING HOURS
FIN
FINISH
SIM
SIMILAR
08. MAINTAIN EXISTING BUILDING SYSTEMS/UTiLITiES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST
P0.0 PLUMBING LEGENDS, SCHEDULES AND DRAWING INDEX
FE
FIRE EXTINGUISHER
SQ
SQUARE
16. CONTRACTOR SHAM PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES
DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FlREWATCIH.
POA PLUMBING SPECIFICATIONS
FEC
FIRE EXTINGUISHER CABINET
STD
STANDARD
ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY.
P1.1 PARTIAL UNDERGROUND- DEMOUTiONI- PLUMBING
FC
FL
FIRE CABINET
FLOOR
SS
STL
STAINLESS STEEL.
STEEL
17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00
- DO NOT INTERRUPT BUILDING SYSTEMS,/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED
IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING
P1,2 PARTIAL FIRST FLOOR- DEMOUTiON- PLUMBING
FD
FLOOR DRAIN
STOR
STORAGE
AM AND SATURDAY do SUNDAY 24 HOURS,
BUILDING SYSTEMS/UTiUTiES AS ACCEPTABLE TO GOVERNING AUTHORITIES.
P1.3 PARTIAL FIRST FLOOR - DEMOLITION- MEDICAL GAS
FLUOR
FLUORESCENT
STRUCT
STRUCTURAL
P2.1 PARTIAL UNDERGROUND -NEW CONSTRUCTION- PLUMBING
F.R.
FIRE RATING
SUSP
SUSPENDED
18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS.
- MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOUTiON OPERATIONS.
P2.2 PARTIAL FIRST FLOOR -NEW CONSTRUCTION - PLUMBING
FS
FV
FULL SIZE
FIELD VERIFY
SPECS
SPECIFICATIONS
19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE
O9. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL
P3.1 PARTIAL FIRST FLOOR -NEW CONSTRUCTION- MEDICAL GAS
P5.1 PLUMBING DETAILS AND ISOMETRIC RISERS
FVC
FIRE VALVE CABINET
RESPONSIBLE FOR THOR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND /OR. REPLACED AT NO
OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE
T
TEL
TELEPHONE
ADDTiONAL COST TO OWNER.
PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER.
0
GALV
GALVANIZED
TEMP
TEMPERED
GA
GAUGE
TLT. OR TOI.
TOILET
10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUS
GC
GENERAL CONTRACTOR
T
TREADS
20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS.
AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
GL
GB
GLASS
GRAB BAR
TYP
TR
TYPICAL
TELEPHONE RECEPTACLE
21. PROVIDE WALK -OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR
- DO NOT USE WATER WHEN iT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING,
THK
THICK
CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA.
POLLUTION AND DAMAGE TO EXISTING FINISHES.
GGRR
GGRRADDEM
GYP BD
GYPSUM WALLBOARD
22• CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF
11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR
U
UL
UNDERWRITER
MECHANICAL, ELECTRICAL AND PLUMBING WiTH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WAIL
DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT
H
HC
HANDICAPPED
LABORATORIES
SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -6.2, A -10.0 AND A -10.1 FOR SEALING
TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S
HRDW
HARDWARE
FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBUES SHALL HAVE FIRE DAMPERS TO MATCH THE
REPRESENTATIVE, REARRANGE SELECTIVE DEMOUTiON SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS
HT
HEIGHT
Y
VERT
VERTICAL
RATING OF THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED.
WITHOUT UNDUE DELAY.
HM
HOLLOW METAL
HORIZ
HORIZONTAL
VB VT
VINYL L.E
VAPOR BARRIER
23. IT SMALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE
12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM
I
IN
INCH
VWC
VINYL WALL COVERING
SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK
DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE DEBRIS REMOVAL TO BE DONE AFTER
INCAND
INCANDESCENT
CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING
REGULAR WORKING HOURS.
ID
INSIDE DIAMETER
W
VWC -GYP
WAIL COVERING - GYPSUM BOARD
INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS
PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE
'OWNER TO SURVEY AND REMOVE AND PROVIDE TO GENERAL HAZARDOUS
INSUL
INT
INSULATION
INTERIOR
VWC -PLAS
WC
WALL COVERING - PLASTER
WET COLUMN
GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS
OPERATIONS
MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERAliONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND
APPLICABLE RE U
INV
INVERT
WP
WATERPROOFING
FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED
ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION.
WD
WOOD
ON THE DRAWINGS.
- BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE
J
JT
JOINT
W/
WITH
JST
JOIST
W/0
WITHOUT
13. UPON COMPLETION OF DEMOUTiON WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE
JC
JANITOR'S CLOSET
WC
WATER CLOSET
PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO.
Y
YD
YARD
- REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND
SURFACES TO REMAIN TO CONDITION EQSTiNG PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION
OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK.
ARCHITECTURAL SYMBOLS
REFERENCE SYMBOLS
DOOR SYMBOL :_ WALL CONSTRUCTION A WALL TYPE
DOOR NUMBER
1--- °ELEVATION
NSIX ATION CONCRETE
Blanket PRECAST
GRAVEL or
CRUSHED
STONE
CEMENT
MORTAR
PLASTER
CONCRETE
NUMBER
ROOM NAME OFFICE ROOM NAME EXTERIOR do INTERIOR 4 X- 0 2
Cl
� D3`A
ELEVATION SYMBOL
��}'' ROOM NUMBER SHEET NUMBER FINISH SCHEDULE XX
3
P'T`O IV
EARTH TOE
Ceramic or
Structurd
SOLID CONC•
MAS. UNIT
UNEMMONSMINOWANWO
CONCRETE
MASONRY
UNIT
MARBLE
CONSTRUCTION DETAIL -DETAIL NUMBER
BUILDING, PARTIAL DETAIL NUMBER -,. 1
Alp
�.- SHEET NUMBER
L SECTION � MR
� DETAIL - SHEET NUMBER
A 1
....
SYMBOL
SHEET WOOD
METAL Finished
WOOD
Rod*
WOOD
Bloddng
BRICi(
Large
WINDOW TYPES ® WINDOW TYPE COLUMN REFERENCE -- NUMBER OR LETTER
Continuous
intermittent
Soda
GENERAL NOTES ABCDEFG -- -NOTE
G AM GLASS
NSUTATiON
TOP OF CONCRETE ELEVATION 0.00
SLAB ELEVATION
Sman Large
Rigid
DETAIL NUMBER
Sede Scde
.__.u.DRAWING
DRAWING TITLES
REVISIONS REVISION NUMBER
[ClABCDEF
')
E:
STEED. STEEL
Smai Scale Large Scde
PLYWOOD
SHEET NUMBER
DEMOLITION NOTE NOTE THIS DRAWING X NOTE
(� -...
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
CGINSLTLTING-
EN G-IN EERE3
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Faz(954)421 -1466
HOR0
Co
N
�
.4
6574
�:7: kyj 61yIs] 1
PROJECT NAME:
SOUTH MIAMI HOSPITAL
EAST TOWER FIBROID CENTER
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
COMM. NO.
SCALE:
DATE:
DRAWN:
CHECKED:
CADD FILE:
DRAWING TITLE:
71
0
40062.100
1l8' = V -0"
JULY 21, 2010
ARIAZIFG
B.H.
H:PROJECTS
1 1