Loading...
10-559-003� � | --- --- - -~--- 10. REROUTE OR CAP, AS REQUIRED, ALL CONCEALED WIRING, PIPING, OR OTHER 1. THE CONTRACTOR SHALL VERIFY THAT CONSTRUCTION OF EXISTING WALLS UTILITIES WITHIN EXISTING AREAS TO BE DEMOLISHED AS PER TRADE STANDARDS MEETS THE FIRE PROTECTION RATINGS DESIGNATED ON THESE DRAWINGS. HE AND APPLICABLE CODES. SHALL ALSO MAKE ANY REPAIRS OR MODIFICATIONS NECESSARY TO BRING EXISTING WALLS, DOORS, DUCTS, ETC. UP TO THE PROPER INDICATED FIRE ------- 11. REFER TO ARCHITECTURAL AND ENGINEERING DRAWINGS AND SPECIFICATIONS DEMOLIrION NOTES U | FJRO|LGUON RATING. DOORS AN FRAMES NOT MEETING RATING REQUIREMENTS FOR REPLACEMENT OR REPAIR AND REFINISHING OF EXISTING BUILDING SYSTEMS OR BEARING PROPER LABELS SHALL BE REPLACED. OR COMPONENTS TO REMAIN THAT ARE DISTURBED OR OTHERWISE LEFT UNFINISHED BY THE DEMOLITION WORK ' 2. THE CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURES AND ALL r STRUCTURAL ELEMENTS AS NECESSARY TO PRESERVE STRUCTURAL INTEGRITY 12. REVIEW AND IMPLEMENT ALL LC.R.A. REQUIREMENTS AS PROVIDED BY THE DURING DEMOLITION. THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A OWNER. LIMIT THE AMOUNT OF NOISE AND DUST POLLUTION WITHIN THE | MANNER RESULTING IN A REDUCTION OF LOAD CARRYING CAPACITY DR CONSTR(1C�nm ARFA Rv |mnTA|||mr rFMpnP4nYFmr|nn|/RFn Amn nAPP|req | � | | Risk Group Office WIDO CCU Above High Risk Ati Parturn Highest Echocardography - � ~ - U U Low XXIXIXXX Imaging Services N Lateral Echo Stress Roams Medium Nuclear Medicine Newborn Nursery KJ Construction Infection Control Risk Assessment (HCRA) PT/OT Outpatient Surgery | LOAD/DEFLECTION RATIO. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL SPECIFIED AS REQUIRED BY HOSPITAL'S I.C.R.A. POLICY TO MAINTAIN OCCUPANCY � STRUCTURAL CUTS PRIOR TO EXECUTION SO THAT APPROVAL CAN BE OBTAINED AND USE OF SPACES IN EXISTING AREAS OF THE BUILDING 24 HOURS PER DAY. FROM THE ARCHITECT AND STRUCTURAL ENGINEER. THE EXACT LOCATION ANC QUANTITY OF TEMPORARY PARTITIONS REQUIRED IS TO BE DETERMINED BY HOSPITAL'S I.C.R.A. POLICY. ALL TEMPORARY PARTITIONS 3. THE CONTRACTOR SHALL VERIFY THAT EXIT EGRESS IS MAINTAINED FOR ALL SEPARATING OCCUPIED AREAS FROM CONSTRUCTION ACTIVITY SHALL BE 1—HOUR X///, OCCUPIED AREAS OF THE BUILDING THROUGHOUT ALL PHASES OF CONSTRUCTION. FIRE RATED. MERE POLYETHYLENE MEMBRANE IS USED IT SHAH BE U.L. RATED, 1—HOUR FIRE RATED. 4. REMOVE EXISTING CONSTRUCTION AS INDICATED. TYPICAL WAIT REMOVAL /Z Z/' INCLUDES MECHANICAL, PLUMBING, COMMUNICATIONS, INFORMATION SYSTEMS, AND 13. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING ELECTRICAL SYSTEMS CONTAINED THEREIN. REMOVE DOORS, CASEWORK, WINDOWS, EXITS AND EXIT LIGHTING ARE TO REMAIN. FIRE PROTECTIVE DEVICES AND FIRE FRAMES, FINISHES AND OTHER FIXTURES AS REQUIRED. ALARMS SHALL BE MAINTAINED. AFTER REMOVAL OF PIPE CHASES, PATCH HOLES IN EXISTING FLOORS OR WALLS TO REMAIN TO MEET ORIGINAL FIRE PROTECTION AND STRUCTURAL REQUIREMENTS. 14. ALL EXISTING AREAS TO REMAIN AND EXISTING AREAS AFFECTED BY PATCH ADJOINING WALLS, FLOOR, AND DECK. PREPARE SURFACES TO RECEIVE NEW DEMOLITION OR NEW CONSTRUCTION WORK AS SHOWN ON DRAWINGS SHALL BE FINISH PER FINISH SCHEDULE (WHERE NEW FINISHES ARE CALLED FOR ON EXISTING PATCHED AS REQUIRED TO MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, SURFACES, REMOVE THE EXISTING FINISH AND PREPARE SURFACE TO RECEIVE THE MATERIAL, FIRE RATING, FINISH AND COLOR, UNLESS OTHERWISE NOTED. WORK TO DEMO FLOOR PLAN LEGEND CRASH RAIL TO BE NEW FINISH) BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED. REMOVED AND PORTION OF WALL TO BE F2113� REPLACED AFTER -ELECTRI _PEMO. N CAL AND FIRE ALARM EXISTING 5. COORDINATE DEMOLIT10N AND LOCATION OF G.C. DUMPSTER WITH HOSPITAL P.M. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR PATCHING ANY X// EW DOOR G.C. SHALL NOT USE HOSPITAL'S DUMPSTERS NOR USE ANY OF THE HOSPITAL'S DAMAGE WHICH MAY OCCUR DURING DEMOUT10N ACTIVITIES. THE CONTRACTOR NOT SCOPE OF WORK X/ INSTALLATION DEVICES TO BE REMOVED AND WASTE DISPOSAL CONTAINERS OR SYSTEMS FOR DISPOSAL OF CONSTRUCTION SHALL REPLACE OR REPAIR ANY EXISTING TO REMAIN FINISHES, ETC., WHICH ARE DO NOT DISTURB "Zit " RELOCATED. SEE ELECTRICAL PLANS MATERIALS AND DEBRIS. DEBRIS SHALL NOT ACCUMULATE AT THE PROJECT SITE DAMAGED DURING DEMOLITION (I.E. — CEILING GRID, CEILING TILE, WALL COVERINGS, LOCATION AND SHALL BE CARTED OFF FOLLOWING DAILY WORK IN ACCORD WITH FLOOR COVERINGS, CORNER GUARDS, WALL GUARDS, HANDRAILS, CHAIR RAIL, R OVE DOOR AND ALL FURNITURE/STATIONS OWNER'S I.C.R.A. POLICY. MOLDINGS, ETC.) REPAIRS TO BE DONE TO LOGICAL EDGES OF SURFACES EXISTING 8~ CWU TO RBW/VN -FRAM�. PREPARE WALL TO BE REMOVED BY BHE. 6. IN ACCORD WITH MEP DRAWINGS REMOVE ALL DESIGNATED ELECTRICAL FIXTURES TO RE�EIVE NEW 48" PM TO COORDINATE WITH AND ALL ELECTRICAL DROPS IN EXISTING PARTITIONS AND AREAS OF DEMOLITION. 16. IF ANY EXISTING FIRE PROOFING OR FIRE ASSEMBLIES WHICH ARE SUPPOSED EXISTING DEMISING WALL TO VENDOR TO REMAIN ARE DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO REMAIN CONFORM TO ORIGINAL FIRE PROTECTION REQUIREMENTS. CONTACT ARCHITECT TO EXISTING DOOR TO EXISTING DEMISING WALL TO 7. ALL ITEMS INDICATED TO BE STORED FOR REUSE ARE TO BE STORED AS VERIFY U.L. ASSEMBLIES TO BE USED FOR REPAIRS. BE DEMO 7/11,11" 'T, REMAIN. PROTECT DIRECTED BY DURING CONSTRUCTION THE OWNER'S P.M. 17. THE DEMOLITION CONTRACTOR SHALL ADHERE TO ANY/ALL REQUIREMENTS AS EXISTING PARTITION TO CEILING AND FLOOR PROVIDED BY BAPTIST HEALTH, ET. AL. CONCERNING BUT NOT LIMITED TO DEBRIS 8. THE DEMOLITION CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS REMAIN /DISCOVERED, THE ARCHITECT MUST BE N011FIED PRIOR TO BID OR DEMOLITION 1X TION c� EXISTING l COMMENCEMENT. IF DISCOVERED AFTER DEMOL11ION HAS COMMENCED, WORK WILL NON—CONSTRUCTION AREAS, MITIGATION OF AIRBORN DUST AND PARTICULATES DEMO STOP IN THE CONFLICT AREA UNTIL THE ARCHITECT HAS REVIEWED THE CONFLICT. (I.C.R.A.), AND ANY/ALL WORK PROCEDURES REQUIRED BY THE HOSPITALS' 61. _J CONSTRUCTION SERVICE DEPARTMENT. IT IS THE RESPONSIBILITY OF THE GENERAL ---------- DEMOLITION /-EXISTING WALLS TO CONTRACTOR TO LEARN OF, COORDINATE, AND IMPLEMENT THESE PROCEDURES / /,/ / - , ///", //,' / / ,, / ' " / ' "'It' /, / REMAIN. PROTECT OF 9. THE DEMOLITION DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE PRIOR TO AND THROUGHOUT CONSTRUCT10N. X/X BEEN PREPARED USING DESIGN DOCUMENTS PROVIDED BY THE OWNER. ACTUAL r7 `~ |/ \ EXISTING DOOR TO BE DEMO 18. WHERE EXISTING CONSTRUCTION IS FOUND TO CONTAIN ASBESTOS, NOTIFY THE COND11IONS AT THE SITE MAY VARY. THE DEMOL171ON WORK IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION WORK AND IN NO WAY RELIEVES THE OWNER AND THE ARCHITECT IN WRITING. REMOVAL, DISPOSAL AND REPLACEMENT /RELOCATED (REFER TO CONTRACTOR FROM PROVIDING ANY AND ALL DEMOL11ION REQUIRED TO COMPLETE ~� L- PLAN) DEMO FLOOR " ~ -----yr/ OF THE ASBESTOS MATERIAL SHALL BE IN ACCORDANCE WITH FEDERAL, STATE THE NEW WORK. AND LOCAL REGULATIONS. DEMO NO"F'E DENOTES DEMOLITION OF EXISTING DRYWALL �T SCALE: NTS EXTERIOR WALLS AREAS SURROUNDING THE PROJECT ���� ������ � ��r Pm�ectName and Non�be�&Aed�3os E8GV���ssRomm Project Manager: Lui�Rommudp pn�o mnmc�nmuu�uvom o�� Architect: Edward Lewis Architects Date Prepared: 6-01-10 SPECIFIC m|TEor ACTIVITIES (ag patient mvmymumn�ivnmvms.�u�: Location: 2NYmlnBuilding 2 Mamo,xmno.m.scu,n�Room ' ISSUES RELATED Tp VENTILATION, PLUMBING, AND eLEozR/C4Lin terms mrme occurrence m probable outages: NOTE: The |cnA Matrix sxuo be completed during preoonstmnnun and approved by SM* pocmties, auoyv. and Mvu Gas Shut Down will uvrequired Infection Control, Contractor shall sign the |cmA Agreement ay part ofme construction contract documents. Prescribed precautions must u*in place prior to%york start and must uv maintained throughout the duration m the project. cOwTmmmEmrmEAnunEo using the prior assessments: TYPE orCONSTRUCTION PROJECT ACTIVITY Required barriers: Plastic m n xenxnnnauun,:wu/red: vos, avmuup, Small scale, short duration activities which create minimal dust Includes, but is not limited tor. Note: Ronovalmn/constmctmo shall uuIsolated from the occupied areas during construction and shall b, TYPE B 0 Installation of telephone and computer cabling negative (*uuzmm)vwtx,uspeottu surrounding areas. • Access to chase spaces • Cutting of walls or ceiling where dust migration can be m|mKpFvwuTEnDAmxGE:mnoo Risk due to compromising structural barriers (eu.roof, exterior walls, etc) NO This project has been identified os CONSTRUCTION PROJECT ACTIVITY TYPE B. WORK HOURS-Will the work be done during non-patent care hovs? NO NOTE: INFECTION CONTROL RISK GROUP (uow/v*/oxest)uamou*nmp/oumomaouhvpofverxoetm*vAnueaffected. U | �or|omoopncmnxoxomuvuo|m* |oo�xno�msoxnx�mm��o�enomanmm | | U | | | THE G.C. SHALL CONSTRUCT SEALED | U Low No Hospital A Part m Baptist Health y)stms Adjacent Service Area Risk Group Office Cardiology CCU Above High Risk Ati Parturn Highest Echocardography Emergency Room Below Offices Low Imaging Services N Lateral Echo Stress Roams Medium Nuclear Medicine Newborn Nursery Intensive Care Units Construction Infection Control Risk Assessment (HCRA) PT/OT Outpatient Surgery Isolation Rooms Respiratory Therapy U | Matrix ofPrecautions W Lateral Heart Non Invasive Medium Pharmacy | \.�/ I S Lateral NIA NIA Oncclogy ���� ������ � ��r Pm�ectName and Non�be�&Aed�3os E8GV���ssRomm Project Manager: Lui�Rommudp pn�o mnmc�nmuu�uvom o�� Architect: Edward Lewis Architects Date Prepared: 6-01-10 SPECIFIC m|TEor ACTIVITIES (ag patient mvmymumn�ivnmvms.�u�: Location: 2NYmlnBuilding 2 Mamo,xmno.m.scu,n�Room ' ISSUES RELATED Tp VENTILATION, PLUMBING, AND eLEozR/C4Lin terms mrme occurrence m probable outages: NOTE: The |cnA Matrix sxuo be completed during preoonstmnnun and approved by SM* pocmties, auoyv. and Mvu Gas Shut Down will uvrequired Infection Control, Contractor shall sign the |cmA Agreement ay part ofme construction contract documents. Prescribed precautions must u*in place prior to%york start and must uv maintained throughout the duration m the project. cOwTmmmEmrmEAnunEo using the prior assessments: TYPE orCONSTRUCTION PROJECT ACTIVITY Required barriers: Plastic m n xenxnnnauun,:wu/red: vos, avmuup, Small scale, short duration activities which create minimal dust Includes, but is not limited tor. Note: Ronovalmn/constmctmo shall uuIsolated from the occupied areas during construction and shall b, TYPE B 0 Installation of telephone and computer cabling negative (*uuzmm)vwtx,uspeottu surrounding areas. • Access to chase spaces • Cutting of walls or ceiling where dust migration can be m|mKpFvwuTEnDAmxGE:mnoo Risk due to compromising structural barriers (eu.roof, exterior walls, etc) NO This project has been identified os CONSTRUCTION PROJECT ACTIVITY TYPE B. WORK HOURS-Will the work be done during non-patent care hovs? NO NOTE: INFECTION CONTROL RISK GROUP (uow/v*/oxest)uamou*nmp/oumomaouhvpofverxoetm*vAnueaffected. U | �or|omoopncmnxoxomuvuo|m* |oo�xno�msoxnx�mm��o�enomanmm | | U | | | THE G.C. SHALL CONSTRUCT SEALED | U Low Medium H* Office Cardiology CCU Immuno-compromised Pts Echocardography Emergency Room Bum Unit Imaging Services Laboratories Central Sterile Supply Nuclear Medicine Newborn Nursery Intensive Care Units PT/OT Outpatient Surgery Isolation Rooms Respiratory Therapy Pediatrics Medical /Surgical Units Cardiac Rehab Pharmacy NICU Oncclogy Radiation Oncology C-section Rooms HAND WASHING SINKS? YES m*/ExmOM OR cH*wuEm FROM umRIuux autbzi PRIOR TO ENTRY INTO ROOM. CHAMBER SHALL BE INFECTION CONTROL STAFF AGREE with theminimumnumhrrnf sinks for this pr�ectYES CONSTRUCTED IN ACCORD WITH |CRA POLICY AND SUBJECT TO AHCA REVIEW. t� USE PRE—CONSTRUCTED DECONTAMINATION oomTmmmsmT|oausou�pussedxm^�epm]ec,�um (comment asto how meyewn»eouu��e� UNIT OR BUILD SUITABLE FRAMING AND LINE WITH Traffic xow: Trough Main cnrxoors DOUBLE LAYER OF FIRE— RETARDANT POLYETHYLENE SHEATHING WITH TAPE AT ALL Housekeeping: Controcto,"dn clean and SMHen"|ronmental will disinfect LAP JOINTS IN THE FIRE—RETARDANT POLYETHYLENE SHEATHING FOR THE ANTEROOMS Debris Removal: |nvnw:md�ur�s � IN ACCORD WITH |CRA REQUIREMENTS. / rl 7 ICRA Matrix of Precautions -Appendix | | 2.) INSTALL HEPA — FILTERED EXHAUST UNIT | U '~`� '� misF��h���n�mn�nn|m���owoom�o�m�cmoup�smu� �.nequin��psommoom���e�*m��oyc�� �TH |�� RB�|RBWENTS. REPLACE ROE� A5 PER |CRA REQUIREMENTS. � - - »wvnno�^msnu�«p»nr�=n^v�mn �nnn�pmn"o�n�o»'mu�;«pnn« cvide active means to prevent airborne dust tom J.} THE G.C. SHALL ESTABLISH AND ENFORCE 1. CONSTRUCTION PROJECTAC71MTY TYPE Pr | | POLICY FOR DUST/DEBRIS REMOVAL FROM 777f n U 9024SW152 STREET VILLAGE OF PALMETTO BAY, FL 33157 3US.234.0S76 FAX 78$�72.4183 EDWARD LEWIS AFKCH|TECTS'lNC' AACO81678 C' EDWARD LEW|S AR 0009567 M/E/P Engineer �tmm��mxw �m0�wwn Im LU 0 LL ROO to Seal %moMOM1111111111111 Edward Lewis, '111A GOD to Revision Project Number Date MAY» 2010 Sheet Title ��N����� �����N��0��" PLAN Drawn by, Ll[E C8eokedbyv ELEWUS Sheet Number