10-559-003�
�
| --- --- - -~--- 10. REROUTE OR CAP, AS REQUIRED, ALL CONCEALED WIRING, PIPING, OR OTHER
1. THE CONTRACTOR SHALL VERIFY THAT CONSTRUCTION OF EXISTING WALLS UTILITIES WITHIN EXISTING AREAS TO BE DEMOLISHED AS PER TRADE STANDARDS
MEETS THE FIRE PROTECTION RATINGS DESIGNATED ON THESE DRAWINGS. HE AND APPLICABLE CODES.
SHALL ALSO MAKE ANY REPAIRS OR MODIFICATIONS NECESSARY TO BRING
EXISTING WALLS, DOORS, DUCTS, ETC. UP TO THE PROPER INDICATED FIRE -------
11. REFER TO ARCHITECTURAL AND ENGINEERING DRAWINGS AND SPECIFICATIONS
DEMOLIrION NOTES
U |
FJRO|LGUON RATING. DOORS AN FRAMES NOT MEETING RATING REQUIREMENTS FOR REPLACEMENT OR REPAIR AND REFINISHING OF EXISTING BUILDING SYSTEMS
OR BEARING PROPER LABELS SHALL BE REPLACED. OR COMPONENTS TO REMAIN THAT ARE DISTURBED OR OTHERWISE LEFT
UNFINISHED BY THE DEMOLITION WORK
'
2. THE CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURES AND ALL r
STRUCTURAL ELEMENTS AS NECESSARY TO PRESERVE STRUCTURAL INTEGRITY 12. REVIEW AND IMPLEMENT ALL LC.R.A. REQUIREMENTS AS PROVIDED BY THE
DURING DEMOLITION. THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A OWNER. LIMIT THE AMOUNT OF NOISE AND DUST POLLUTION WITHIN THE |
MANNER RESULTING IN A REDUCTION OF LOAD CARRYING CAPACITY DR CONSTR(1C�nm ARFA Rv |mnTA|||mr rFMpnP4nYFmr|nn|/RFn Amn nAPP|req |
�
|
|
Risk Group
Office
WIDO
CCU
Above High Risk Ati Parturn
Highest
Echocardography
- � ~
-
U
U
Low
XXIXIXXX
Imaging Services
N Lateral Echo Stress Roams
Medium
Nuclear Medicine
Newborn Nursery
KJ
Construction Infection Control Risk Assessment (HCRA)
PT/OT
Outpatient Surgery
|
LOAD/DEFLECTION RATIO. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL SPECIFIED AS REQUIRED BY HOSPITAL'S I.C.R.A. POLICY TO MAINTAIN OCCUPANCY
�
STRUCTURAL CUTS PRIOR TO EXECUTION SO THAT APPROVAL CAN BE OBTAINED AND USE OF SPACES IN EXISTING AREAS OF THE BUILDING 24 HOURS PER DAY.
FROM THE ARCHITECT AND STRUCTURAL ENGINEER. THE EXACT LOCATION ANC QUANTITY OF TEMPORARY PARTITIONS REQUIRED IS TO
BE DETERMINED BY HOSPITAL'S I.C.R.A. POLICY. ALL TEMPORARY PARTITIONS
3. THE CONTRACTOR SHALL VERIFY THAT EXIT EGRESS IS MAINTAINED FOR ALL SEPARATING OCCUPIED AREAS FROM CONSTRUCTION ACTIVITY SHALL BE 1—HOUR X///,
OCCUPIED AREAS OF THE BUILDING THROUGHOUT ALL PHASES OF CONSTRUCTION.
FIRE RATED. MERE POLYETHYLENE MEMBRANE IS USED IT SHAH BE U.L. RATED,
1—HOUR FIRE RATED.
4. REMOVE EXISTING CONSTRUCTION AS INDICATED. TYPICAL WAIT REMOVAL /Z Z/'
INCLUDES MECHANICAL, PLUMBING, COMMUNICATIONS, INFORMATION SYSTEMS, AND 13. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING
ELECTRICAL SYSTEMS CONTAINED THEREIN. REMOVE DOORS, CASEWORK, WINDOWS,
EXITS AND EXIT LIGHTING ARE TO REMAIN. FIRE PROTECTIVE DEVICES AND FIRE
FRAMES, FINISHES AND OTHER FIXTURES AS REQUIRED.
ALARMS SHALL BE MAINTAINED.
AFTER REMOVAL OF PIPE CHASES, PATCH HOLES IN EXISTING FLOORS OR WALLS
TO REMAIN TO MEET ORIGINAL FIRE PROTECTION AND STRUCTURAL REQUIREMENTS. 14. ALL EXISTING AREAS TO REMAIN AND EXISTING AREAS AFFECTED BY
PATCH ADJOINING WALLS, FLOOR, AND DECK. PREPARE SURFACES TO RECEIVE NEW DEMOLITION OR NEW CONSTRUCTION WORK AS SHOWN ON DRAWINGS SHALL BE
FINISH PER FINISH SCHEDULE (WHERE NEW FINISHES ARE CALLED FOR ON EXISTING PATCHED AS REQUIRED TO MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION,
SURFACES, REMOVE THE EXISTING FINISH AND PREPARE SURFACE TO RECEIVE THE MATERIAL, FIRE RATING, FINISH AND COLOR, UNLESS OTHERWISE NOTED. WORK TO
DEMO FLOOR PLAN LEGEND CRASH RAIL TO BE
NEW FINISH) BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED.
REMOVED AND
PORTION OF WALL TO BE F2113�
REPLACED AFTER -ELECTRI _PEMO.
N CAL AND FIRE ALARM EXISTING
5. COORDINATE DEMOLIT10N AND LOCATION OF G.C. DUMPSTER WITH HOSPITAL P.M. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR PATCHING ANY X//
EW DOOR
G.C. SHALL NOT USE HOSPITAL'S DUMPSTERS NOR USE ANY OF THE HOSPITAL'S DAMAGE WHICH MAY OCCUR DURING DEMOUT10N ACTIVITIES. THE CONTRACTOR NOT SCOPE OF WORK X/ INSTALLATION DEVICES TO BE REMOVED AND
WASTE DISPOSAL CONTAINERS OR SYSTEMS FOR DISPOSAL OF CONSTRUCTION SHALL REPLACE OR REPAIR ANY EXISTING TO REMAIN FINISHES, ETC., WHICH ARE DO NOT DISTURB
"Zit " RELOCATED. SEE ELECTRICAL PLANS
MATERIALS AND DEBRIS. DEBRIS SHALL NOT ACCUMULATE AT THE PROJECT SITE DAMAGED DURING DEMOLITION (I.E. — CEILING GRID, CEILING TILE, WALL COVERINGS,
LOCATION AND SHALL BE CARTED OFF FOLLOWING DAILY WORK IN ACCORD WITH FLOOR COVERINGS, CORNER GUARDS, WALL GUARDS, HANDRAILS, CHAIR RAIL,
R OVE DOOR AND ALL FURNITURE/STATIONS
OWNER'S I.C.R.A. POLICY. MOLDINGS, ETC.) REPAIRS TO BE DONE TO LOGICAL EDGES OF SURFACES
EXISTING 8~ CWU TO RBW/VN -FRAM�. PREPARE WALL TO BE REMOVED BY BHE.
6. IN ACCORD WITH MEP DRAWINGS REMOVE ALL DESIGNATED ELECTRICAL FIXTURES TO RE�EIVE NEW 48" PM TO COORDINATE WITH
AND ALL ELECTRICAL DROPS IN EXISTING PARTITIONS AND AREAS OF DEMOLITION. 16. IF ANY EXISTING FIRE PROOFING OR FIRE ASSEMBLIES WHICH ARE SUPPOSED
EXISTING DEMISING WALL TO VENDOR
TO REMAIN ARE DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO REMAIN
CONFORM TO ORIGINAL FIRE PROTECTION REQUIREMENTS. CONTACT ARCHITECT TO EXISTING DOOR TO
EXISTING DEMISING WALL TO
7. ALL ITEMS INDICATED TO BE STORED FOR REUSE ARE TO BE STORED AS VERIFY U.L. ASSEMBLIES TO BE USED FOR REPAIRS.
BE DEMO 7/11,11" 'T, REMAIN. PROTECT
DIRECTED BY DURING CONSTRUCTION
THE OWNER'S P.M.
17. THE DEMOLITION CONTRACTOR SHALL ADHERE TO ANY/ALL REQUIREMENTS AS
EXISTING PARTITION TO CEILING AND FLOOR
PROVIDED BY BAPTIST HEALTH, ET. AL. CONCERNING BUT NOT LIMITED TO DEBRIS
8. THE DEMOLITION CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS
REMAIN /DISCOVERED, THE ARCHITECT MUST BE N011FIED PRIOR TO BID OR DEMOLITION 1X TION
c� EXISTING l
COMMENCEMENT. IF DISCOVERED AFTER DEMOL11ION HAS COMMENCED, WORK WILL NON—CONSTRUCTION AREAS, MITIGATION OF AIRBORN DUST AND PARTICULATES
DEMO
STOP IN THE CONFLICT AREA UNTIL THE ARCHITECT HAS REVIEWED THE CONFLICT. (I.C.R.A.), AND ANY/ALL WORK PROCEDURES REQUIRED BY THE HOSPITALS' 61. _J
CONSTRUCTION SERVICE DEPARTMENT. IT IS THE RESPONSIBILITY OF THE GENERAL ---------- DEMOLITION /-EXISTING WALLS TO
CONTRACTOR TO LEARN OF, COORDINATE, AND IMPLEMENT THESE PROCEDURES / /,/ / - , ///", //,' / / ,, / ' " / ' "'It' /, / REMAIN. PROTECT
OF
9. THE DEMOLITION DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE PRIOR TO AND THROUGHOUT CONSTRUCT10N. X/X
BEEN PREPARED USING DESIGN DOCUMENTS PROVIDED BY THE OWNER. ACTUAL r7 `~
|/ \
EXISTING DOOR TO BE DEMO
18. WHERE EXISTING CONSTRUCTION IS FOUND TO CONTAIN ASBESTOS, NOTIFY THE COND11IONS AT THE SITE MAY VARY. THE DEMOL171ON WORK IS INTENDED TO
SHOW THE GENERAL SCOPE OF DEMOLITION WORK AND IN NO WAY RELIEVES THE OWNER AND THE ARCHITECT IN WRITING. REMOVAL, DISPOSAL AND REPLACEMENT /RELOCATED (REFER TO
CONTRACTOR FROM PROVIDING ANY AND ALL DEMOL11ION REQUIRED TO COMPLETE ~� L- PLAN)
DEMO FLOOR
" ~
-----yr/
OF THE ASBESTOS MATERIAL SHALL BE IN ACCORDANCE WITH FEDERAL, STATE
THE NEW WORK. AND LOCAL REGULATIONS.
DEMO NO"F'E DENOTES DEMOLITION OF
EXISTING DRYWALL �T
SCALE: NTS EXTERIOR WALLS
AREAS SURROUNDING THE PROJECT
���� ������ � ��r
Pm�ectName and Non�be�&Aed�3os E8GV���ssRomm Project Manager: Lui�Rommudp pn�o mnmc�nmuu�uvom o��
Architect: Edward Lewis Architects Date Prepared: 6-01-10 SPECIFIC m|TEor ACTIVITIES (ag patient mvmymumn�ivnmvms.�u�:
Location: 2NYmlnBuilding 2 Mamo,xmno.m.scu,n�Room
'
ISSUES RELATED Tp VENTILATION, PLUMBING, AND eLEozR/C4Lin terms mrme occurrence m probable outages:
NOTE: The |cnA Matrix sxuo be completed during preoonstmnnun and approved by SM* pocmties, auoyv. and Mvu Gas Shut Down will uvrequired
Infection Control, Contractor shall sign the |cmA Agreement ay part ofme construction contract documents. Prescribed
precautions must u*in place prior to%york start and must uv maintained throughout the duration m the project. cOwTmmmEmrmEAnunEo using the prior assessments:
TYPE orCONSTRUCTION PROJECT ACTIVITY Required barriers: Plastic m n
xenxnnnauun,:wu/red: vos, avmuup,
Small scale, short duration activities which create minimal dust
Includes, but is not limited tor. Note: Ronovalmn/constmctmo shall uuIsolated from the occupied areas during construction and shall b,
TYPE B 0 Installation of telephone and computer cabling negative (*uuzmm)vwtx,uspeottu surrounding areas.
• Access to chase spaces
• Cutting of walls or ceiling where dust migration can be m|mKpFvwuTEnDAmxGE:mnoo
Risk due to compromising structural barriers (eu.roof, exterior walls, etc) NO
This project has been identified os CONSTRUCTION PROJECT ACTIVITY TYPE B.
WORK HOURS-Will the work be done during non-patent care hovs? NO NOTE:
INFECTION CONTROL RISK GROUP (uow/v*/oxest)uamou*nmp/oumomaouhvpofverxoetm*vAnueaffected.
U | �or|omoopncmnxoxomuvuo|m* |oo�xno�msoxnx�mm��o�enomanmm | |
U | | | THE G.C. SHALL CONSTRUCT SEALED | U
Low
No Hospital
A Part m Baptist Health y)stms
Adjacent Service Area
Risk Group
Office
Cardiology
CCU
Above High Risk Ati Parturn
Highest
Echocardography
Emergency Room
Below Offices
Low
Imaging Services
N Lateral Echo Stress Roams
Medium
Nuclear Medicine
Newborn Nursery
Intensive Care Units
Construction Infection Control Risk Assessment (HCRA)
PT/OT
Outpatient Surgery
Isolation Rooms
Respiratory Therapy
U |
Matrix ofPrecautions
W Lateral Heart Non Invasive
Medium
Pharmacy
| \.�/
I S Lateral NIA
NIA
Oncclogy
���� ������ � ��r
Pm�ectName and Non�be�&Aed�3os E8GV���ssRomm Project Manager: Lui�Rommudp pn�o mnmc�nmuu�uvom o��
Architect: Edward Lewis Architects Date Prepared: 6-01-10 SPECIFIC m|TEor ACTIVITIES (ag patient mvmymumn�ivnmvms.�u�:
Location: 2NYmlnBuilding 2 Mamo,xmno.m.scu,n�Room
'
ISSUES RELATED Tp VENTILATION, PLUMBING, AND eLEozR/C4Lin terms mrme occurrence m probable outages:
NOTE: The |cnA Matrix sxuo be completed during preoonstmnnun and approved by SM* pocmties, auoyv. and Mvu Gas Shut Down will uvrequired
Infection Control, Contractor shall sign the |cmA Agreement ay part ofme construction contract documents. Prescribed
precautions must u*in place prior to%york start and must uv maintained throughout the duration m the project. cOwTmmmEmrmEAnunEo using the prior assessments:
TYPE orCONSTRUCTION PROJECT ACTIVITY Required barriers: Plastic m n
xenxnnnauun,:wu/red: vos, avmuup,
Small scale, short duration activities which create minimal dust
Includes, but is not limited tor. Note: Ronovalmn/constmctmo shall uuIsolated from the occupied areas during construction and shall b,
TYPE B 0 Installation of telephone and computer cabling negative (*uuzmm)vwtx,uspeottu surrounding areas.
• Access to chase spaces
• Cutting of walls or ceiling where dust migration can be m|mKpFvwuTEnDAmxGE:mnoo
Risk due to compromising structural barriers (eu.roof, exterior walls, etc) NO
This project has been identified os CONSTRUCTION PROJECT ACTIVITY TYPE B.
WORK HOURS-Will the work be done during non-patent care hovs? NO NOTE:
INFECTION CONTROL RISK GROUP (uow/v*/oxest)uamou*nmp/oumomaouhvpofverxoetm*vAnueaffected.
U | �or|omoopncmnxoxomuvuo|m* |oo�xno�msoxnx�mm��o�enomanmm | |
U | | | THE G.C. SHALL CONSTRUCT SEALED | U
Low
Medium
H*
Office
Cardiology
CCU
Immuno-compromised Pts
Echocardography
Emergency Room
Bum Unit
Imaging Services
Laboratories
Central Sterile Supply
Nuclear Medicine
Newborn Nursery
Intensive Care Units
PT/OT
Outpatient Surgery
Isolation Rooms
Respiratory Therapy
Pediatrics
Medical /Surgical Units
Cardiac Rehab
Pharmacy
NICU
Oncclogy
Radiation Oncology
C-section Rooms
HAND WASHING SINKS? YES m*/ExmOM OR cH*wuEm FROM umRIuux autbzi
PRIOR TO ENTRY INTO ROOM. CHAMBER SHALL BE
INFECTION CONTROL STAFF AGREE with theminimumnumhrrnf sinks for this pr�ectYES CONSTRUCTED IN ACCORD WITH |CRA POLICY AND
SUBJECT TO AHCA REVIEW.
t� USE PRE—CONSTRUCTED DECONTAMINATION
oomTmmmsmT|oausou�pussedxm^�epm]ec,�um (comment asto how meyewn»eouu��e�
UNIT OR BUILD SUITABLE FRAMING AND LINE WITH
Traffic xow: Trough Main cnrxoors DOUBLE LAYER OF FIRE— RETARDANT
POLYETHYLENE SHEATHING WITH TAPE AT ALL
Housekeeping: Controcto,"dn clean and SMHen"|ronmental will disinfect LAP JOINTS IN THE FIRE—RETARDANT
POLYETHYLENE SHEATHING FOR THE ANTEROOMS
Debris Removal: |nvnw:md�ur�s
� IN ACCORD WITH |CRA REQUIREMENTS.
/ rl 7
ICRA Matrix of Precautions -Appendix
| | 2.) INSTALL HEPA — FILTERED EXHAUST UNIT | U
'~`� '�
misF��h���n�mn�nn|m���owoom�o�m�cmoup�smu� �.nequin��psommoom���e�*m��oyc�� �TH |�� RB�|RBWENTS. REPLACE ROE� A5
PER |CRA REQUIREMENTS.
� - - »wvnno�^msnu�«p»nr�=n^v�mn �nnn�pmn"o�n�o»'mu�;«pnn«
cvide active means to prevent airborne dust tom J.} THE G.C. SHALL ESTABLISH AND ENFORCE
1.
CONSTRUCTION PROJECTAC71MTY TYPE
Pr
| | POLICY FOR DUST/DEBRIS REMOVAL FROM 777f
n U
9024SW152 STREET
VILLAGE OF PALMETTO BAY, FL 33157
3US.234.0S76 FAX 78$�72.4183
EDWARD LEWIS AFKCH|TECTS'lNC'
AACO81678
C' EDWARD LEW|S AR 0009567
M/E/P Engineer
�tmm��mxw �m0�wwn
Im
LU
0
LL
ROO
to
Seal %moMOM1111111111111
Edward Lewis, '111A
GOD
to
Revision
Project Number
Date
MAY» 2010
Sheet Title
��N�����
�����N��0��"
PLAN
Drawn by, Ll[E
C8eokedbyv ELEWUS
Sheet Number