1. ALL WORK SHALL BE IN ACCORDANCE WITH A.H.C.A. (STATE) AND F.B.C.
18. PRIOR TO STARTING ANY WORK THE CONTRACTOR IS TO TAKE PRECAUTIONS TO
REQUIREMENTS OF HOSPITAL FACILITIES, ZONING REQUIREMENTS, AND ALL OTHER
SECURE ALL PERMITS, LICENSES, UTILITY CONNECTION CONFIRMATIONS,
APPLICABLE FEDERAL, MUNICIPAL, AND COUNTY CODE REQUIREMENTS.
GOVERNMENTAL APPROVALS, ETC., NECESSARY FOR FULL COMPLETION OF THE
PROJECT.
2. BEFORE PERFORMING ANY WORK OR ORDERING ANY MATERIALS THE CONTRACTOR
SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF ANY EXISTING AND NEW WORK
19. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS OF ALL SHOP
AND SHALL BE RESPONSIBLE FOR ITS ACCURACY, ANY DIFFERENCES FOUND SHALL BE
FABRICATED ITEMS.
SUBMITTED TO THE ARCHITECT OR ENGINEER FOR VERIFICATION BEFORE PROCEEDING
WITH THE WORK.
20. THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL SIGNAGE, BARRIO —
CADDIES, FENCING, LIGHTING, ETC., AS REQUIRED FOR THE PREVENTION OF THE
3. THE CONSTRUCTION PROCEDURES AND REQUIREMENTS OF BAPTIST HEALTH, ET. AL.
PERSONAL INJURIES TO THE OWNERS, ITS EMPLOYEES, REPRESENTATIVES, CLIENTELE,
SHALL BE CONSIDERED AN INCLUSIVE PART OF THESE SPECIFICATIONS AND /OR
OR OTHERS WITHIN THE AREAS OF CONSTRUCTION.
DRAWINGS.
21. PROTECTIVE DEVICES TO BE INSTALLED SHALL COMPLY WITH THE RE-
4. ALL SUBCONTRACTORS AS WELL AS THE GENERAL CONTRACTOR, SHALL BE
REQUIREMENTS OF ALL LOCAL, STATE, AND NATIONAL GOVERNING CODES, THE
GOVERNED BY ALL APPLICABLE SECTIONS OF THESE DOCUMENTS WITH REFERENCE TO
BUILDING OWNER GUIDELINES, AND OTHER GOVERNING FORMS OF AUTHORITY. THE
THEIR RESPECTIVE AREAS OF WORK.
GENERAL CONTRACTOR SHALL TAKE ORDINARY PRECAUTIONS TO PREVENT THEIR
DISRUPTION DURING THE COURSE OF WORK.
5. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ADVISE HIS
SUBCONTRACTORS AND SUPPLIERS OF THESE REQUIREMENTS HEREIN AND FURNISH
22 THE GENERAL CONTRACTOR SHALL TAKE ORDINARY PRECAUTIONS TO SECURE
THEM WITH THEIR RESPECTIVE SPECIFICATION SECTIONS.
AND PROTECT MATERIALS TO BE RELOCATED OR WAREHOUSE AS DETERMINED BY THE
OWNER OR ARCHITECT.
6. DIVISIONS OF THE WORK FOR SUBCONTRACTING PURPOSES SHALL BE BY SPEC.
SECTION. ALL WORK SHALL PERFORMED BY QUALIFIED CONTRACTORS IN STRICT
23. PRIOR TO START TAKE ORDINARY PRECAUTIONS TO SECURE ALL PERMITS,
TU
ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.
LICENSES,
LICENSES, UTILITY CONNEC1ON CONFIRMATIONS, GOVERNMENTAL APPROVAL, ETC.,
FOR FULL COMPLETION OF THE PROJECT.
7. THIS DRAWING PACKAGE IS BASE UPON DOCUMENTS, SPECIFICATIONS AND RELATED
INFORMATION PROVIDED BY THE OWNER AND /OR OWNER AGENT — NOTIFY THE
24. THE GENERAL CONTRACTOR SHALL LOCATE ALL GENERAL REFERENCE POINTS AND
ARCHITECT IMMEDIATELY IF THERE ARE DISCREPANCIES.
TAKE ORDINARY PRECAUTIONS TO PREVENT THEIR DISRUPTION.
8. THE DESIGN INFORMATION INDICATED ON THE PLANS IS INTENDED TO BE A
25. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS OF ALL SHOP
COMPLETE AND WORKABLE SYSTEM IN ACCORDANCE WITH ALL PRODUCT
FABRICATED ITEMS.
MANUFACTURERS SPECIFICATIONS, EXISTING AND /OR PROPOSED, BUILDING DESIGN,
26. THE GENERAL CONTRACTOR SHALL BE HELD TO HAVE EXAMINED THE SITE WITH
FIELD CONDITIONS, ETC. ALL MISCELLANEOUS MATERIALS, PARTS, DESIGN DIMENSIONS,
RESPECT TO ALL EXISTING FIELD CONDITIONS AND TO HAVE FULLY EXAMINED THE
WHETHER INDICATED ON PLANS OR NOT, SHALL BE INCLUDED AS PART OF THIS
COMPLETE SET OF ARCHITECTURAL DRAWINGS AND SHALL BE RESPONSIBLE FOR THE
DRAWING PACKAGE.
COORDINATION AND INSERTION OF ALL DRAWING SETS (ARCHITECTURAL, MEP, FIRE
9. THE ARCHITECT SHALL BE NOTIFIED PRIOR TO START OF CONSTRUCTION, SHOULD
SAFETY do FIRE PROTECTION) INCLUDED AS PART OF THE ORIGINAL DRAWING
EXISTING FIELD CONDITIONS VARY FROM DRAWINGS BY GREATER THAN 1"
PACKAGE AS PART OF THE CONTRACT DOCUMENTS. IT IS THE RESPONSIBILITY OF
THE G.C. TO IMPLEMENT IN THE FIELD ONLY THE WORK SHOWN AND INDICATED ON
10, THE GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE REMOVAL AND
THE OFFICIAL APPROVED PERMIT SET OF DRAWINGS AND APPROVED CONTRACT
STORAGE OF MATERIALS AND ITEMS REFERRED TO AS "f0 BE REMOVED AND STORED"
MODIFICATIONS. IT IS THE RESPONSIBILITY OF THE G.C. TO COMMENCE WORK ONLY
AS DETERMINED BY THE HOSPITAL'S CONSTRUCTION SERVICES REPRESENTATIVE.
WHEN IN HAND OF ALL GOVERNING AUTHORITIES' REQUIRED CONSTRUCTION PERMITS.
11. THE GENERAL CONTRACTOR SHALL ALLOW FOR ALL REQUIRED PROVISIONS FOR
27° THE CONTRACTORS SHALL SUBMIT A CONSTRUCTION SCHEDULE AND SCHEDULE
THE REMOVAL OF TRASH FROM THE SITE, INCLUDING ENVIRONMENTAL CHARGES,
OF VALUES PRIOR TO COMMENCEMENT OF WORK FOR THE OWNERS (P.M.) APPROVAL.
DUMPING FEES, ETC. IN HIS ORIGINAL BID SUBMISSION.
28, THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER (P.M.) WITH A SET OF
12. THE GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING IN
AS —BUILT PLANS UPON COMPLE11ON OF THE JOB, SHOWING RUNS OF MEP LINES AND
EXISTING FLOORS, WALLS AND CEILINGS AS REQUIRED FOR ALL TRADES, EXCLUDING
SERVICES AND ANY SIGNIFICANT CHANGES MADE TO BUILDING, AS —BUILT DRAWINGS
REMOVAL AND RELOCATED ITEMS SHOWN.
SHALL BE SUBMITTED ON CD IN .DWG FORMAT.
13, THE GENERAL CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON
DRAWINGS, ALSO REMOVE ANY OTHER ITEM OR CONSTRUCTION AS REQUIRED TO
ACCOMPLISH ALL NEW WORK AND /OR REVISION WORK TO, AND /OR REVISION TO
EXISTING AREAS AS SHOWN OR DESCRIBED ELSEWHERE IN THE CONTRACT
DOCUMENTS.
14. THE GENERAL CONTRACTOR SHALL GRIND AND /OR FILL ALL PROJECTIONS AND
VOIDS IN EXISTING FLOORS AS REQUIRED FOR ALL NEW FINISHES: PATCH AND REPAIR
AS REQUIRED.
15. THE GENERAL CONTRACTOR OF SUBCONTRACTORS SHALL BE HELD RESPONSIBLE
FOR THE REMOVAL AND DISPOSAL OF MATERIALS AND ITEMS REFERRED TO AS
"DEBRIS" OR DETERMINED BY THE ARCHITECT TO BE REFUSE.
16. THE GENERAL CONTRACTOR SHALL HAVE MADE ALL REQUIRED PROVISIONS FOR
THE REMOVAL OF DEBRIS FROM SITE, HAVING CHARGES, DUMPING FEES, ETC., IN HIS
ORIGINAL BID SUBMISSION. THE GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING
AND PATCHING
17. IN EXISTING FLOORS, WALLS AND CEILINGS AS REQUIRED FOR ALL TRADES,
EXCLUDING REMOVAL AND RELOCATED ITEMS AS SHOWN.
ARCHITECTURE p • .
I:jr � L
Architect IE[IJA
edward fewis
architects
9024 SW 152 STREET
VILLAGE OF PALMETTO BAY, FLORIDA 33157
(305) 234 -0576 FAX (786) 472.4193
EDWARD LEWIS ARCHITECTS, INC. AAC001678
C. EDWARD LEWIS AR 0009567
M /E /P Engineer
JGP ENGINEERING GROUP P.A.
- _ -- MIAMI. FLORIDA RBs 0000778$
9300 N.W. 25TH STREET SUITE 207
—_ -- MINA, FLORIDA, 33172
(305) 436 -9292 FAX (305) 438-9272
E —MAIL: JGPMANIOBELLSOUTH.NET
JOSE G. PUG SR. FLORIDA P.E. / 47817
JOSE G. PUG JR. FLORIDA P.E. / 49148
HECTOR M. MASCO FLORIDA P.E. # 56115
Owners Rep:
Baptist Health of South Florida
8900 N. Kendall Dr.,
Miami, Florida 33176
Ph. 305.786.1960
END USERS REVIEW AND APPROVAL
ANNETTE MOORE
CONI KAVANAGH
ENGINEERING
ELECTRICAL
MECHANICAL
PLUMBING
•
CS COVER SHEET
ARCHITECTURE
LS 1.0 LIFE AND SAFETY PLAN
A 2.0 DEMO PLAN
A 3.0 FLOOR PLANS
A 7.0 ELEVATIONS, DETAILS & SCHEDULES
MECHANICAL / PLUMBING
MP -01 PLUMBING AND MECHANICAL
14-11 9�1[46�1111
E -01 ELECTRICAL LAYOUT
E -02 ELECTRICAL LAYOUT
FDWARD LEWIS ARCHITECTS, INC,,
n
Client Code/Fi le- Project- Sub.
ZN,
® 9024 SW 152 STREET
o VILLAGE OF PALMETTO BAY, FL. 33157
CIT'i W- SOUTH MIAMI
BUILDING DEPT,
STRUCTURAL SECTION
W_
kl� ( )M
�O�F •
1 i
FAX 786. 472 4193
E-MAIL design@elamiami.com
p
O
N
00
O
c
v
0
a_
Co
O
1
0)
O
a
L1J
♦LrLN 1�� �
W =
F O
r
a�
44
r
W C
2 9) u
r,