10-525-011L
I
12
I
irl
ire
RE
SCREWS MAY BE
OMITTED IF HANGER
24' DIA.
50' DUI. MAX.
MAX.
ZD OF SAME SIZE
AS HANGER STRAP
HANGERS MUST NOT DEFORM DUCT SHAPE
SUPPORT FROM
UNDERSIDE OF
STRUCTURE (TYP)
HARD ELBOW
w
ROD
SIZE BOLT(S) FOR
LOAD
a.
a •�
a; •r
REINFORCEMENT MAY BE USED FOR ATTACHMENT
a. • 1WA SITIM
DO NOT EXCEED AUJDWABLE MAD LIMITS.
DUCT A i
•
TRANSITION 11 SINGLE RUN OUT '
AS REQ'D. Li
HAND DAMPER
CEILING
CEILING MOUNTED BRANCH DUCTS
15
M]
13
im
11 1 10 1 9 1 8 1 7
AIR DISTRIBUTION DEVICE SCHEDULE
UNIT
SERVICE
AIR
NECK
SELECTION
NO.
FIRE DAMPERS
PATTERN
SIZE
BASED ON
A
CEILING
SUPPLY
ONE WAY
SEE
PLANS
TITUS TDC -AA
B
SUPPLY
TWO WAY - 90'
PLANS
TITUS TDC -AA
C
SUPPLY
TWO WAY - 180'
P
PLANS
TITUS TDC -AA
D
CEILING
SUPPLY
THREE WAY
SEE
PLANS
TITUS TDC -AA
E
SUZY
FouP. WAY
PSIS
TITUS TDC -AA
F
RETURN
-
SEE
TITUS 5OF
DUCT SMOKE DETECTOR
INSULATION: NONE UNLESS SPECIFIED OTHERWISE.
FIRE DAMPER
PLANS
RETURN GRILLE
G
EXHAUST
-
SEE
PLANS
TITUS 5OF
NOTES:
1. ALL DEVICES SHALL MATCH . CEILING TYPES.
2. FOR TYPES A -E, ALL DIFFUSERS SHALL BE SIZE 18X18 TO KEEP
UNIFORM APPEARANCE WITH NECK SIZE AS SPECIFIED ON DRAWINGS.
3. TYPE F,G - PROVIDE PLENUM BOX FOR DUCT CONNECTION AS REQUIRED
BOX SHALL BE 4" WIDER AND HIGHER THEN DUCT CONNECTION.
- -10" ROUND NECK SIZE
�,.
4. NOMENCLATURE 10 "0 4 -WAY SUPPLY DIFFUSER
E -200 200 CFM
ARE TO BE DETERMINED IN THE FIELD AND BY THE ACTUAL BUILDING
CONDITIONS. EQUIPMENT, DUCTS OR PIPES INTERFERING WHTH THE
INSTALLATION SHALL BE RELOCATED AS REQUIRED AT NO ADDITIONAL
COST TO THE OWNER. COORDINATE WITH ALL TRADES TO AVOID
INTERFERENCE OF EQUIPMENT.
13. INSTALLATION METHODS SHALL PERMIT ACCESSIBILITY FOR
SERVICE AND /OR REPLACEMENT OF EQUIPMENT PROVIDED.
14. ALL MECHANICAL EQUIPMENT SHALL BE ISOLATED FROM THE
BUILDING STRUCTURE BY MEANS OF NOISE AND VIBRATION
ISOLATORS. DUCTWORK PENETRATIONS THROUGH WALLS SHALL NOT
BE RIGIDLY CONNECTED TO THE BUILDING STRUCTURE. SLEEVES
SHALL BE PROVIDED WITH CLEARANCES AROUND THE OUTSIDE ALL
SUCH PENETRATIONS SHALL BE SMOKE AND FIRESTOPPED.
15. ALL DEBRIS TO BE REMOVED DAILY.
B. SCOPE OF WORK
1. INSTALL ALL DUCTWORK, PIPING. EQUIPMENT, ETC. AS INDICATED IN
THE CONSTRUCTION DOCUMENTS OR SPECIFICATIONS.
2. PROVIDE ALL NEW DISCONNECTS AND CAPPING TO FACILITATE
CONSTRUCTION. ALL REMOVAL AND DISPOSAL SHALL BE
ACCOMPLISHED BY THE GENERAL CONTRACTOR.
3. TEST AND BALANCE AS SHOWN ON PLANS BY MECHANICAL CONTRACTOR.
T&B REPORT WILL BE REQUIRED TO BE SUBMITTED TO ENGINEER FOR
APPROVAL
4. THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED
WITH THE ELECTRICAL SYSTEMS. IF THE CONTRACTOR ELECTS TO USE
ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL
COORDINATION WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY
EXPENSE TO THE ELECTRICAL CONTRACTOR RESULTING FROM SUCH
ALTERNATE SELECTIONS.
5. CONTRACTOR SHALL NOT DEVIATE FROM THESE DESIGN DOCUMENTS
WITHOUT PRIOR APPROVAL FROM ENGINEER. CONTRACTOR IS
RESPONSIBLE-FOR-ALL-AS-BUILT DRAWINGS AND SHALL BEAR ALL
COSTS REQUIRED TO DOCUMENT AS -BUILT DRAWINGS, CONTRACTOR
SHALL MAINTAIN REDLINE MARKUP DRAWINGS OF AS -BUILT CONDITIONS
is
IN
9 1 8 1 7
0
0
5 1 4
HVAC DESIGN REQUIRES
MECHANICAL
SPECIFICATIONS
QTY
A. .GENERAL REQUIREMENTS
C.
MATERIALS
FIRE DAMPERS
1. SCOPE OF WORK SHALL INCLUDE ALL LABOR, MATERIALS, TOOLS,
NO
INSULATION, ADHESIVE, COATING SEALERS, TAPES, SHALL HAVE A FLAME
EQUIPMENT, TRANSPORTATION, HOISTING. RIGGING, INSURANCE,
FIRE RATED ENCLOSURE
SPREAD RATING OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS
NO
ETC.. TO PERFORM THE WORK AS INDICATED ON THE DRAWINGS AND
SUPPLY DIFFUSER &
IN ACCORDANCE WITH ASTM E -84 AND UL 723.
FIRE STOPPING (SEE ARCH.)
HEREIN SPECIFIED FOR A COMPLETE INSTALLATION.
1.
EXHAUST AIR DUCTWORK
2. ALL WORK SHALL BE IN ACCORDANCE WITH NATIONAL STATE AND
LOCAL CODES AND ORDINANCES. AIA 2006 AND NFPA LSC 101 2006 CODES.
SMOKE CONTROL
CONSTRUCTION: GALVANIZED SHEET METAL, ASTM A 653 653M,
G90 (2275 COATING DESIGNATION. JOINT AND SEAM TA E SEALANT
/
-HVAC
NO
QUANTITY
SHALL COMPLY WITH UL 181A. COMPI.Y WITH SMACNA'S D CT
FBC 2007 WITH 2009 AMENDMENTS.
EXHAUST GRILLE & AIR
INSTALLATION. PRESSURE CLASS: 1 W.G. SMACNA TABLE 1 -1S .
®
3. MANUFACTURES SHALL PROVIDE THEIR STANDARD GUARANTEES
QUANTITY
CONSTRUCTION STANDARDS, METAL AND FLEXIBLE- FOR FABRICATIE AND
THERMOSTAT
AND WARRANTIES FOR WORK UNDER THIS CONTRACT.
DUCT SMOKE DETECTOR
INSULATION: NONE UNLESS SPECIFIED OTHERWISE.
FIRE DAMPER
FSD
COMBINATION FIRE &
FLEXIBLE DUCTS: CORRUGATED ALUMINUM. INSULATION: NONE.
SMOKE DAMPER
4. LOCATIONS OF PIPING, DUCTWORK, CONDUITS AND EQUIPMENT
MANUAL VOLUME DAMPER
FLEXMASTER USA TYPE 8M- ACOUSTICAL INSULATED.
EXISTING TO REMAIN
SHALL BE ADJUSTED TO ACCOMMODATE THE NEW WORK. LINES
NEW
41%550
EQUIPMENT TO BE REMOVED
WHICH PITCH SHALL HAVE THE RIGHT -OF -WAY OVER THOSE WHICH
2.
SUPPLY AND RETURN DUCTWORK RECTANGLE -
TO THIS POINT
DO NOT PITCH. OFFSETS, TRANSITIONS AND CHANGES OF
ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED
DIRECTION IN ALL SYSTEMS SHALL BE MADE AS REQUIRED TO
SHEET METAL (ASTM A527), BASED ON 2" STATIC PRESSURE
MAINTAIN PROPER HEADROOM AND PITCH OF SLOPING LINES
WHETHER OR NOT INDICATED ON THE DRAWINGS. ALL WORK SHALL
SHALL BE CONSTRUED TO BE THE 'OPERATING PRESSURE" AS
L TO
BE INSTALLED IN A WAY TO PERMIT REMOVAL AND ALLOW PROPER
INDICATED SMACNA TABLE AND ASSOCIATED NOTES
ACCESS TO ALL EQUIPMENT INCLUDING DUCT ACCESS DOORS.
PROVIDE 2' DUCT WRAP AT R =6.
5. FINAL LOCATION OF ALL AIR DISTRIBUTION DEVICES, T -STATS
4.
CONDENSATE PIPING
TYPE L COPPER. PROVIDE P -TRAP.
CONTROL DEVICES, ETC. SHALL BE COORDINATED WITH THE
ARCHITECTURAL REFLECTED PLAN AND //OR OTHER ARCH. DETAILS.
5.
HOT WATER REHEAT WATER PIPE AND INSULATION
OFFSETS OF DUCTWORK. ADDED SHEETmETAL.. FITTINGS. ELBOWS
TYPE L COPPER. PROVIDE WITH 1" FIBERGLASS INSULATION.
ETC. BE PROVIDED AS REQUIRED TO COMPLY WITH ARCH.
PROVIDE KRAFT PAPER JACKET INSIDE AND ALUMINUM JACKET OUTSIDE.
amSHALL
5.
CHILLED WATER PIPE AND INSULATION
6. ALL EQUIPMENT SHALL BE NEW AND WITHOUT BLEMISH OR DEFECT.
TYPE L COPPER. PROVIDE WITH 1 I/2" FOAM GLASS
ALL EQUIPMENT SHALL MEET THE AUTHORITIES HAVING
PROVIDE KRAFT PAPER JACKET INSIDE.
JURISDICTION. WHERE ACCEPTANCE IS CONTINGENT UPON THE
6.
AIR HANDLING UNIT
PRODUCTS LISTED OR LABELED, THE PRODUCT SHALL BE LISTED
AS SPECIFIED IN SCHEDULE OR APPROVED BY OWNER.
OR LABELED.
7.
AIR DISTRIBUTION DEVICES
7. ALL EQUIPMENT OF ONE TYPE. SUCH AS VALVES. FANS AIR
AS SPECIFIED IN SCHEDULE OR APPROVED BY OWNER. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS PROVIDE MIN THICK
HANDLING UNITS, SHALL BE THE PRODUCT ON ONE MANUFACTURER.
GLASS -FIBER INSULATION EXTERNAL BLANKET FOR UNINSULATED SUPPLY
INS
8. PROVIDE ALL HANGERS AND SUPPORTS AS REQUIRED TO SUPPORT
AND RETURN AIR GRILLES.
ALL NEW DUCTWORK AND EQUIPMENT.
8.
MANUAL VOLUME DAMPERS IN RECTANGULAR DUCTS
GREENHECK MODEL VCD -15 WITH LOCKING QUADRANT OR APPROVED
9. PAY FOR ALL PERMITS AND FEES, OBTAIN ALL APPROVALS.
EQUAL INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
9.
HVAC CONTROLS SHALL BE AN EXTENSION OF THE BUILDINGS CONTROL SYSTEM
10. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL
CONNECT NEW AHU -2 -06 TO CONTROL SYSTEM.
CONTRACTOR TO STUDY ALL DRAWINGS AND DETAILS SO THAT THE
PROVIDE INTERFACE IN NEW EQUIPMENT AND ALL CONTROL WIRING.
INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED.
THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE TO SATISFY
D.
SUBMITTALS
HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS
OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS
1.
CONTRACTOR SHALL PROVIDE SUBMITTALS TO ENGINEER VIA ARCHITECT)
AND/OR SITE CONDITIONS, THE MECHANICAL CONTRACTOR SHALL
FOR ALL NEW EQUIPMENT & MATERIALS FOR FINAL APPROVAL PRIOR TO
ORDERING/PURCHASING.
NO FY THE ARCHITECT PRIOR TO SIGNING OF CONTRACT.
FAILURE TO DO SO WILL NOT BE ALLOWED AS A BASIS FOR
2.
CONTRACTOR SHALL SUBMIT TEST & BALANCE REPORT TO ENGINEER (VIA
ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OR
ARCHITECT) FOR APPROVAL ONE WEEK PRIOR TO FINAL INSPECTION.
DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE
CONTRACTOR SHALL BE AABC OR NEBB CERTIFIED AND ALL REPORTS
DRAWINGS THAT WOULD HAVE BEEN APPARENT DURING SAID VISIT.
SHALL INCLUDE THE AABC OR NEBB CERTIFICATE. ALL AIR FLOWS
11. ALL CUTTING, CORE DRILLING, PATCHING, ETC. REQUIRED FOR
SHALL BE WITHIN 10% OF DESIGN. PRESSURE RELATIONSHIPS WILL BE
THE INSTALLATION OF THE NEW MECHANICAL SYSTEMS SHALL. BE BY
AS INDICATED DRAWINGS AT A MINIMUM.
THE MECHANICAL CONTRACTOR UNDER SUPERVISION OF THE GENERAL
CONTRACTOR.
12. HVAC WORK IS DIAGRAMMATIC. EXACT LOCATION OF ALL COMPONENTS
ARE TO BE DETERMINED IN THE FIELD AND BY THE ACTUAL BUILDING
CONDITIONS. EQUIPMENT, DUCTS OR PIPES INTERFERING WHTH THE
INSTALLATION SHALL BE RELOCATED AS REQUIRED AT NO ADDITIONAL
COST TO THE OWNER. COORDINATE WITH ALL TRADES TO AVOID
INTERFERENCE OF EQUIPMENT.
13. INSTALLATION METHODS SHALL PERMIT ACCESSIBILITY FOR
SERVICE AND /OR REPLACEMENT OF EQUIPMENT PROVIDED.
14. ALL MECHANICAL EQUIPMENT SHALL BE ISOLATED FROM THE
BUILDING STRUCTURE BY MEANS OF NOISE AND VIBRATION
ISOLATORS. DUCTWORK PENETRATIONS THROUGH WALLS SHALL NOT
BE RIGIDLY CONNECTED TO THE BUILDING STRUCTURE. SLEEVES
SHALL BE PROVIDED WITH CLEARANCES AROUND THE OUTSIDE ALL
SUCH PENETRATIONS SHALL BE SMOKE AND FIRESTOPPED.
15. ALL DEBRIS TO BE REMOVED DAILY.
B. SCOPE OF WORK
1. INSTALL ALL DUCTWORK, PIPING. EQUIPMENT, ETC. AS INDICATED IN
THE CONSTRUCTION DOCUMENTS OR SPECIFICATIONS.
2. PROVIDE ALL NEW DISCONNECTS AND CAPPING TO FACILITATE
CONSTRUCTION. ALL REMOVAL AND DISPOSAL SHALL BE
ACCOMPLISHED BY THE GENERAL CONTRACTOR.
3. TEST AND BALANCE AS SHOWN ON PLANS BY MECHANICAL CONTRACTOR.
T&B REPORT WILL BE REQUIRED TO BE SUBMITTED TO ENGINEER FOR
APPROVAL
4. THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED
WITH THE ELECTRICAL SYSTEMS. IF THE CONTRACTOR ELECTS TO USE
ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL
COORDINATION WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY
EXPENSE TO THE ELECTRICAL CONTRACTOR RESULTING FROM SUCH
ALTERNATE SELECTIONS.
5. CONTRACTOR SHALL NOT DEVIATE FROM THESE DESIGN DOCUMENTS
WITHOUT PRIOR APPROVAL FROM ENGINEER. CONTRACTOR IS
RESPONSIBLE-FOR-ALL-AS-BUILT DRAWINGS AND SHALL BEAR ALL
COSTS REQUIRED TO DOCUMENT AS -BUILT DRAWINGS, CONTRACTOR
SHALL MAINTAIN REDLINE MARKUP DRAWINGS OF AS -BUILT CONDITIONS
is
IN
9 1 8 1 7
0
0
5 1 4
HVAC DESIGN REQUIRES
LEGEND
YES
QTY
DUCT SMOKE DETECTOR(S)
SUPPLY DUCTWORK
NO
FIRE DAMPERS
ICRA DEMOLITION PLAN- MECHANICAL
NO
SMOKE DAMPER(S)
NO
FIRE RATED ENCLOSURE
NO
FIRE RATED ROOF/FLOOR CEILING ASSEMBLY
SUPPLY DIFFUSER &
NO
FIRE STOPPING (SEE ARCH.)
NO
HOT WATER REHEAT COIL
NO
SMOKE CONTROL
NO
HVAC
LEGEND
DESCRIPTION
141.1
®
SUPPLY DUCTWORK
PARTIAL DEMO AND NEW WORK CONSTRUCTION PLAN - MECHANICAL
®
ICRA DEMOLITION PLAN- MECHANICAL
RETURN OR EXHAUST
DUCTWORK
®
CFM
SUPPLY DIFFUSER &
AIR QUANTITY
CFM
RETURN GRILLE & AIR
QUANTITY
EXHAUST GRILLE & AIR
®
CFM
QUANTITY
THERMOSTAT
SD
DUCT SMOKE DETECTOR
FD
FIRE DAMPER
FSD
COMBINATION FIRE &
SMOKE DAMPER
MANUAL VOLUME DAMPER
EXISTING TO REMAIN
NEW
41%550
EQUIPMENT TO BE REMOVED
CONNECT OR REMOVE EXISTING
TO THIS POINT
GENERAL NOTE
ALL FLEX DUCT TO BE REMOVED AND
REPLACED AS SHOWN WITH RIGID METAL
DUCT TYPE OR FLEX DUCT BY FLEXMASTER
USA TYPE BM ACOUSTICAL, INSULATED.
GENERAL NOTE:
CONTRACTOR TO PERFORM FINAL T &B AT THE
BEGINNING AND AT THE END OF PROJECT TO
MAKE SURE AND MAINTAIN NEUTRAL RELATIVE
AIR PRESSURE IN THE CORRIDORS DURING
CONSTRUCTION.
GENERAL NOTE
ALL NEW MECHANICAL EQUIPMENT AND A/C
DUCTS TO BE KEPT ABOVE FLOOR AND
COVERED PROPERLY BEFORE INSTALLATION.
MECHANICAL SHEET INDEX
DESCRIPTION
141.1
LEGENDS.NOTES.SCHEDULES & DETAILS - MECHANICAL
MI.2
PARTIAL DEMO AND NEW WORK CONSTRUCTION PLAN - MECHANICAL
Mt.3
ICRA DEMOLITION PLAN- MECHANICAL
5 4
1
3 2 1 ,
w_ F -R BID' 4c
I
- -DATA• i
I
I
CLIENT CODE /FILE
NUMBER: 23/1 0154
PROJECT ID- SUBMISSIO
NUMBER: 156 -001
i
r
ROBERT BROWN
ARCHITECT
LICENSE # AR912624
Architecture
Facility Assessmen
Plonning
Interior Design
El
7LINCOLN 5, i n c
ROAD, SUITE 258
616T, 01,Q @IDA 33139
FAUx305- 673 -0080
.0 C
-./ 0
�•�1 '� ago
Y.i� 1 : - 1
-C to Cu -o
0 ) Ism
0= �Qc�
'
CU 001
!".
CU 2 En ._
a) > IW E
-r= top cu
4-0 cn 0 -�
U) C7 c0
CU
'r
I
A
L
Q
Cr
W Q
z I-
Ld W
0 0
N9 DESCRIPTION; DATE
1
2
3
4
5
6
7
8
JOB No .4.1 00%.00
PROJECT # 2010014
1171 BY CHECKED B'
ASLAM M. DANGRA, P.E. Q JUAN ECHAVARRIA
LO MECHANICAL ENGINEER ELECTRICAL ENGINEER I RAWN im P.E. # 43911 P.E. # 18577 AD
DATE SCALE
EXPERT CONSULTING SERVICES I
CONSULTING ENGINEERS 6/10/10 N.T.S.
CA NO.: 27757
5190 N.W. 167th STREET, SUITE # 203 SHEET N4
r MIAMI LAKES, FL 33014
TEL: (786) 428 -0544
Fax: (305) 620-2787
E -Mail: Exconser@ecs- inc.us m 1 • r
C - 1 OF 3
copyright LINEA 5, in
I
,
Architecture
Facility Assessmen
Plonning
Interior Design
El
7LINCOLN 5, i n c
ROAD, SUITE 258
616T, 01,Q @IDA 33139
FAUx305- 673 -0080
.0 C
-./ 0
�•�1 '� ago
Y.i� 1 : - 1
-C to Cu -o
0 ) Ism
0= �Qc�
'
CU 001
!".
CU 2 En ._
a) > IW E
-r= top cu
4-0 cn 0 -�
U) C7 c0
CU
'r
I
A
L
Q
Cr
W Q
z I-
Ld W
0 0
N9 DESCRIPTION; DATE
1
2
3
4
5
6
7
8
JOB No .4.1 00%.00
PROJECT # 2010014
1171 BY CHECKED B'
ASLAM M. DANGRA, P.E. Q JUAN ECHAVARRIA
LO MECHANICAL ENGINEER ELECTRICAL ENGINEER I RAWN im P.E. # 43911 P.E. # 18577 AD
DATE SCALE
EXPERT CONSULTING SERVICES I
CONSULTING ENGINEERS 6/10/10 N.T.S.
CA NO.: 27757
5190 N.W. 167th STREET, SUITE # 203 SHEET N4
r MIAMI LAKES, FL 33014
TEL: (786) 428 -0544
Fax: (305) 620-2787
E -Mail: Exconser@ecs- inc.us m 1 • r
C - 1 OF 3
copyright LINEA 5, in
I