Loading...
10-525-011L I 12 I irl ire RE SCREWS MAY BE OMITTED IF HANGER 24' DIA. 50' DUI. MAX. MAX. ZD OF SAME SIZE AS HANGER STRAP HANGERS MUST NOT DEFORM DUCT SHAPE SUPPORT FROM UNDERSIDE OF STRUCTURE (TYP) HARD ELBOW w ROD SIZE BOLT(S) FOR LOAD a. a •� a; •r REINFORCEMENT MAY BE USED FOR ATTACHMENT a. • 1WA SITIM DO NOT EXCEED AUJDWABLE MAD LIMITS. DUCT A i • TRANSITION 11 SINGLE RUN OUT ' AS REQ'D. Li HAND DAMPER CEILING CEILING MOUNTED BRANCH DUCTS 15 M] 13 im 11 1 10 1 9 1 8 1 7 AIR DISTRIBUTION DEVICE SCHEDULE UNIT SERVICE AIR NECK SELECTION NO. FIRE DAMPERS PATTERN SIZE BASED ON A CEILING SUPPLY ONE WAY SEE PLANS TITUS TDC -AA B SUPPLY TWO WAY - 90' PLANS TITUS TDC -AA C SUPPLY TWO WAY - 180' P PLANS TITUS TDC -AA D CEILING SUPPLY THREE WAY SEE PLANS TITUS TDC -AA E SUZY FouP. WAY PSIS TITUS TDC -AA F RETURN - SEE TITUS 5OF DUCT SMOKE DETECTOR INSULATION: NONE UNLESS SPECIFIED OTHERWISE. FIRE DAMPER PLANS RETURN GRILLE G EXHAUST - SEE PLANS TITUS 5OF NOTES: 1. ALL DEVICES SHALL MATCH . CEILING TYPES. 2. FOR TYPES A -E, ALL DIFFUSERS SHALL BE SIZE 18X18 TO KEEP UNIFORM APPEARANCE WITH NECK SIZE AS SPECIFIED ON DRAWINGS. 3. TYPE F,G - PROVIDE PLENUM BOX FOR DUCT CONNECTION AS REQUIRED BOX SHALL BE 4" WIDER AND HIGHER THEN DUCT CONNECTION. - -10" ROUND NECK SIZE �,. 4. NOMENCLATURE 10 "0 4 -WAY SUPPLY DIFFUSER E -200 200 CFM ARE TO BE DETERMINED IN THE FIELD AND BY THE ACTUAL BUILDING CONDITIONS. EQUIPMENT, DUCTS OR PIPES INTERFERING WHTH THE INSTALLATION SHALL BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER. COORDINATE WITH ALL TRADES TO AVOID INTERFERENCE OF EQUIPMENT. 13. INSTALLATION METHODS SHALL PERMIT ACCESSIBILITY FOR SERVICE AND /OR REPLACEMENT OF EQUIPMENT PROVIDED. 14. ALL MECHANICAL EQUIPMENT SHALL BE ISOLATED FROM THE BUILDING STRUCTURE BY MEANS OF NOISE AND VIBRATION ISOLATORS. DUCTWORK PENETRATIONS THROUGH WALLS SHALL NOT BE RIGIDLY CONNECTED TO THE BUILDING STRUCTURE. SLEEVES SHALL BE PROVIDED WITH CLEARANCES AROUND THE OUTSIDE ALL SUCH PENETRATIONS SHALL BE SMOKE AND FIRESTOPPED. 15. ALL DEBRIS TO BE REMOVED DAILY. B. SCOPE OF WORK 1. INSTALL ALL DUCTWORK, PIPING. EQUIPMENT, ETC. AS INDICATED IN THE CONSTRUCTION DOCUMENTS OR SPECIFICATIONS. 2. PROVIDE ALL NEW DISCONNECTS AND CAPPING TO FACILITATE CONSTRUCTION. ALL REMOVAL AND DISPOSAL SHALL BE ACCOMPLISHED BY THE GENERAL CONTRACTOR. 3. TEST AND BALANCE AS SHOWN ON PLANS BY MECHANICAL CONTRACTOR. T&B REPORT WILL BE REQUIRED TO BE SUBMITTED TO ENGINEER FOR APPROVAL 4. THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED WITH THE ELECTRICAL SYSTEMS. IF THE CONTRACTOR ELECTS TO USE ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL COORDINATION WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY EXPENSE TO THE ELECTRICAL CONTRACTOR RESULTING FROM SUCH ALTERNATE SELECTIONS. 5. CONTRACTOR SHALL NOT DEVIATE FROM THESE DESIGN DOCUMENTS WITHOUT PRIOR APPROVAL FROM ENGINEER. CONTRACTOR IS RESPONSIBLE-FOR-ALL-AS-BUILT DRAWINGS AND SHALL BEAR ALL COSTS REQUIRED TO DOCUMENT AS -BUILT DRAWINGS, CONTRACTOR SHALL MAINTAIN REDLINE MARKUP DRAWINGS OF AS -BUILT CONDITIONS is IN 9 1 8 1 7 0 0 5 1 4 HVAC DESIGN REQUIRES MECHANICAL SPECIFICATIONS QTY A. .GENERAL REQUIREMENTS C. MATERIALS FIRE DAMPERS 1. SCOPE OF WORK SHALL INCLUDE ALL LABOR, MATERIALS, TOOLS, NO INSULATION, ADHESIVE, COATING SEALERS, TAPES, SHALL HAVE A FLAME EQUIPMENT, TRANSPORTATION, HOISTING. RIGGING, INSURANCE, FIRE RATED ENCLOSURE SPREAD RATING OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS NO ETC.. TO PERFORM THE WORK AS INDICATED ON THE DRAWINGS AND SUPPLY DIFFUSER & IN ACCORDANCE WITH ASTM E -84 AND UL 723. FIRE STOPPING (SEE ARCH.) HEREIN SPECIFIED FOR A COMPLETE INSTALLATION. 1. EXHAUST AIR DUCTWORK 2. ALL WORK SHALL BE IN ACCORDANCE WITH NATIONAL STATE AND LOCAL CODES AND ORDINANCES. AIA 2006 AND NFPA LSC 101 2006 CODES. SMOKE CONTROL CONSTRUCTION: GALVANIZED SHEET METAL, ASTM A 653 653M, G90 (2275 COATING DESIGNATION. JOINT AND SEAM TA E SEALANT / -HVAC NO QUANTITY SHALL COMPLY WITH UL 181A. COMPI.Y WITH SMACNA'S D CT FBC 2007 WITH 2009 AMENDMENTS. EXHAUST GRILLE & AIR INSTALLATION. PRESSURE CLASS: 1 W.G. SMACNA TABLE 1 -1S . ® 3. MANUFACTURES SHALL PROVIDE THEIR STANDARD GUARANTEES QUANTITY CONSTRUCTION STANDARDS, METAL AND FLEXIBLE- FOR FABRICATIE AND THERMOSTAT AND WARRANTIES FOR WORK UNDER THIS CONTRACT. DUCT SMOKE DETECTOR INSULATION: NONE UNLESS SPECIFIED OTHERWISE. FIRE DAMPER FSD COMBINATION FIRE & FLEXIBLE DUCTS: CORRUGATED ALUMINUM. INSULATION: NONE. SMOKE DAMPER 4. LOCATIONS OF PIPING, DUCTWORK, CONDUITS AND EQUIPMENT MANUAL VOLUME DAMPER FLEXMASTER USA TYPE 8M- ACOUSTICAL INSULATED. EXISTING TO REMAIN SHALL BE ADJUSTED TO ACCOMMODATE THE NEW WORK. LINES NEW 41%550 EQUIPMENT TO BE REMOVED WHICH PITCH SHALL HAVE THE RIGHT -OF -WAY OVER THOSE WHICH 2. SUPPLY AND RETURN DUCTWORK RECTANGLE - TO THIS POINT DO NOT PITCH. OFFSETS, TRANSITIONS AND CHANGES OF ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED DIRECTION IN ALL SYSTEMS SHALL BE MADE AS REQUIRED TO SHEET METAL (ASTM A527), BASED ON 2" STATIC PRESSURE MAINTAIN PROPER HEADROOM AND PITCH OF SLOPING LINES WHETHER OR NOT INDICATED ON THE DRAWINGS. ALL WORK SHALL SHALL BE CONSTRUED TO BE THE 'OPERATING PRESSURE" AS L TO BE INSTALLED IN A WAY TO PERMIT REMOVAL AND ALLOW PROPER INDICATED SMACNA TABLE AND ASSOCIATED NOTES ACCESS TO ALL EQUIPMENT INCLUDING DUCT ACCESS DOORS. PROVIDE 2' DUCT WRAP AT R =6. 5. FINAL LOCATION OF ALL AIR DISTRIBUTION DEVICES, T -STATS 4. CONDENSATE PIPING TYPE L COPPER. PROVIDE P -TRAP. CONTROL DEVICES, ETC. SHALL BE COORDINATED WITH THE ARCHITECTURAL REFLECTED PLAN AND //OR OTHER ARCH. DETAILS. 5. HOT WATER REHEAT WATER PIPE AND INSULATION OFFSETS OF DUCTWORK. ADDED SHEETmETAL.. FITTINGS. ELBOWS TYPE L COPPER. PROVIDE WITH 1" FIBERGLASS INSULATION. ETC. BE PROVIDED AS REQUIRED TO COMPLY WITH ARCH. PROVIDE KRAFT PAPER JACKET INSIDE AND ALUMINUM JACKET OUTSIDE. amSHALL 5. CHILLED WATER PIPE AND INSULATION 6. ALL EQUIPMENT SHALL BE NEW AND WITHOUT BLEMISH OR DEFECT. TYPE L COPPER. PROVIDE WITH 1 I/2" FOAM GLASS ALL EQUIPMENT SHALL MEET THE AUTHORITIES HAVING PROVIDE KRAFT PAPER JACKET INSIDE. JURISDICTION. WHERE ACCEPTANCE IS CONTINGENT UPON THE 6. AIR HANDLING UNIT PRODUCTS LISTED OR LABELED, THE PRODUCT SHALL BE LISTED AS SPECIFIED IN SCHEDULE OR APPROVED BY OWNER. OR LABELED. 7. AIR DISTRIBUTION DEVICES 7. ALL EQUIPMENT OF ONE TYPE. SUCH AS VALVES. FANS AIR AS SPECIFIED IN SCHEDULE OR APPROVED BY OWNER. INSTALL PER MANUFACTURER'S RECOMMENDATIONS PROVIDE MIN THICK HANDLING UNITS, SHALL BE THE PRODUCT ON ONE MANUFACTURER. GLASS -FIBER INSULATION EXTERNAL BLANKET FOR UNINSULATED SUPPLY INS 8. PROVIDE ALL HANGERS AND SUPPORTS AS REQUIRED TO SUPPORT AND RETURN AIR GRILLES. ALL NEW DUCTWORK AND EQUIPMENT. 8. MANUAL VOLUME DAMPERS IN RECTANGULAR DUCTS GREENHECK MODEL VCD -15 WITH LOCKING QUADRANT OR APPROVED 9. PAY FOR ALL PERMITS AND FEES, OBTAIN ALL APPROVALS. EQUAL INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 9. HVAC CONTROLS SHALL BE AN EXTENSION OF THE BUILDINGS CONTROL SYSTEM 10. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONNECT NEW AHU -2 -06 TO CONTROL SYSTEM. CONTRACTOR TO STUDY ALL DRAWINGS AND DETAILS SO THAT THE PROVIDE INTERFACE IN NEW EQUIPMENT AND ALL CONTROL WIRING. INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED. THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE TO SATISFY D. SUBMITTALS HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS 1. CONTRACTOR SHALL PROVIDE SUBMITTALS TO ENGINEER VIA ARCHITECT) AND/OR SITE CONDITIONS, THE MECHANICAL CONTRACTOR SHALL FOR ALL NEW EQUIPMENT & MATERIALS FOR FINAL APPROVAL PRIOR TO ORDERING/PURCHASING. NO FY THE ARCHITECT PRIOR TO SIGNING OF CONTRACT. FAILURE TO DO SO WILL NOT BE ALLOWED AS A BASIS FOR 2. CONTRACTOR SHALL SUBMIT TEST & BALANCE REPORT TO ENGINEER (VIA ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OR ARCHITECT) FOR APPROVAL ONE WEEK PRIOR TO FINAL INSPECTION. DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE CONTRACTOR SHALL BE AABC OR NEBB CERTIFIED AND ALL REPORTS DRAWINGS THAT WOULD HAVE BEEN APPARENT DURING SAID VISIT. SHALL INCLUDE THE AABC OR NEBB CERTIFICATE. ALL AIR FLOWS 11. ALL CUTTING, CORE DRILLING, PATCHING, ETC. REQUIRED FOR SHALL BE WITHIN 10% OF DESIGN. PRESSURE RELATIONSHIPS WILL BE THE INSTALLATION OF THE NEW MECHANICAL SYSTEMS SHALL. BE BY AS INDICATED DRAWINGS AT A MINIMUM. THE MECHANICAL CONTRACTOR UNDER SUPERVISION OF THE GENERAL CONTRACTOR. 12. HVAC WORK IS DIAGRAMMATIC. EXACT LOCATION OF ALL COMPONENTS ARE TO BE DETERMINED IN THE FIELD AND BY THE ACTUAL BUILDING CONDITIONS. EQUIPMENT, DUCTS OR PIPES INTERFERING WHTH THE INSTALLATION SHALL BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER. COORDINATE WITH ALL TRADES TO AVOID INTERFERENCE OF EQUIPMENT. 13. INSTALLATION METHODS SHALL PERMIT ACCESSIBILITY FOR SERVICE AND /OR REPLACEMENT OF EQUIPMENT PROVIDED. 14. ALL MECHANICAL EQUIPMENT SHALL BE ISOLATED FROM THE BUILDING STRUCTURE BY MEANS OF NOISE AND VIBRATION ISOLATORS. DUCTWORK PENETRATIONS THROUGH WALLS SHALL NOT BE RIGIDLY CONNECTED TO THE BUILDING STRUCTURE. SLEEVES SHALL BE PROVIDED WITH CLEARANCES AROUND THE OUTSIDE ALL SUCH PENETRATIONS SHALL BE SMOKE AND FIRESTOPPED. 15. ALL DEBRIS TO BE REMOVED DAILY. B. SCOPE OF WORK 1. INSTALL ALL DUCTWORK, PIPING. EQUIPMENT, ETC. AS INDICATED IN THE CONSTRUCTION DOCUMENTS OR SPECIFICATIONS. 2. PROVIDE ALL NEW DISCONNECTS AND CAPPING TO FACILITATE CONSTRUCTION. ALL REMOVAL AND DISPOSAL SHALL BE ACCOMPLISHED BY THE GENERAL CONTRACTOR. 3. TEST AND BALANCE AS SHOWN ON PLANS BY MECHANICAL CONTRACTOR. T&B REPORT WILL BE REQUIRED TO BE SUBMITTED TO ENGINEER FOR APPROVAL 4. THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED WITH THE ELECTRICAL SYSTEMS. IF THE CONTRACTOR ELECTS TO USE ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL COORDINATION WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY EXPENSE TO THE ELECTRICAL CONTRACTOR RESULTING FROM SUCH ALTERNATE SELECTIONS. 5. CONTRACTOR SHALL NOT DEVIATE FROM THESE DESIGN DOCUMENTS WITHOUT PRIOR APPROVAL FROM ENGINEER. CONTRACTOR IS RESPONSIBLE-FOR-ALL-AS-BUILT DRAWINGS AND SHALL BEAR ALL COSTS REQUIRED TO DOCUMENT AS -BUILT DRAWINGS, CONTRACTOR SHALL MAINTAIN REDLINE MARKUP DRAWINGS OF AS -BUILT CONDITIONS is IN 9 1 8 1 7 0 0 5 1 4 HVAC DESIGN REQUIRES LEGEND YES QTY DUCT SMOKE DETECTOR(S) SUPPLY DUCTWORK NO FIRE DAMPERS ICRA DEMOLITION PLAN- MECHANICAL NO SMOKE DAMPER(S) NO FIRE RATED ENCLOSURE NO FIRE RATED ROOF/FLOOR CEILING ASSEMBLY SUPPLY DIFFUSER & NO FIRE STOPPING (SEE ARCH.) NO HOT WATER REHEAT COIL NO SMOKE CONTROL NO HVAC LEGEND DESCRIPTION 141.1 ® SUPPLY DUCTWORK PARTIAL DEMO AND NEW WORK CONSTRUCTION PLAN - MECHANICAL ® ICRA DEMOLITION PLAN- MECHANICAL RETURN OR EXHAUST DUCTWORK ® CFM SUPPLY DIFFUSER & AIR QUANTITY CFM RETURN GRILLE & AIR QUANTITY EXHAUST GRILLE & AIR ® CFM QUANTITY THERMOSTAT SD DUCT SMOKE DETECTOR FD FIRE DAMPER FSD COMBINATION FIRE & SMOKE DAMPER MANUAL VOLUME DAMPER EXISTING TO REMAIN NEW 41%550 EQUIPMENT TO BE REMOVED CONNECT OR REMOVE EXISTING TO THIS POINT GENERAL NOTE ALL FLEX DUCT TO BE REMOVED AND REPLACED AS SHOWN WITH RIGID METAL DUCT TYPE OR FLEX DUCT BY FLEXMASTER USA TYPE BM ACOUSTICAL, INSULATED. GENERAL NOTE: CONTRACTOR TO PERFORM FINAL T &B AT THE BEGINNING AND AT THE END OF PROJECT TO MAKE SURE AND MAINTAIN NEUTRAL RELATIVE AIR PRESSURE IN THE CORRIDORS DURING CONSTRUCTION. GENERAL NOTE ALL NEW MECHANICAL EQUIPMENT AND A/C DUCTS TO BE KEPT ABOVE FLOOR AND COVERED PROPERLY BEFORE INSTALLATION. MECHANICAL SHEET INDEX DESCRIPTION 141.1 LEGENDS.NOTES.SCHEDULES & DETAILS - MECHANICAL MI.2 PARTIAL DEMO AND NEW WORK CONSTRUCTION PLAN - MECHANICAL Mt.3 ICRA DEMOLITION PLAN- MECHANICAL 5 4 1 3 2 1 , w_ F -R BID' 4c I - -DATA• i I I CLIENT CODE /FILE NUMBER: 23/1 0154 PROJECT ID- SUBMISSIO NUMBER: 156 -001 i r ROBERT BROWN ARCHITECT LICENSE # AR912624 Architecture Facility Assessmen Plonning Interior Design El 7LINCOLN 5, i n c ROAD, SUITE 258 616T, 01,Q @IDA 33139 FAUx305- 673 -0080 .0 C -./ 0 �•�1 '� ago Y.i� 1 : - 1 -C to Cu -o 0 ) Ism 0= �Qc� ' CU 001 !". CU 2 En ._ a) > IW E -r= top cu 4-0 cn 0 -� U) C7 c0 CU 'r I A L Q Cr W Q z I- Ld W 0 0 N9 DESCRIPTION; DATE 1 2 3 4 5 6 7 8 JOB No .4.1 00%.00 PROJECT # 2010014 1171 BY CHECKED B' ASLAM M. DANGRA, P.E. Q JUAN ECHAVARRIA LO MECHANICAL ENGINEER ELECTRICAL ENGINEER I RAWN im P.E. # 43911 P.E. # 18577 AD DATE SCALE EXPERT CONSULTING SERVICES I CONSULTING ENGINEERS 6/10/10 N.T.S. CA NO.: 27757 5190 N.W. 167th STREET, SUITE # 203 SHEET N4 r MIAMI LAKES, FL 33014 TEL: (786) 428 -0544 Fax: (305) 620-2787 E -Mail: Exconser@ecs- inc.us m 1 • r C - 1 OF 3 copyright LINEA 5, in I , Architecture Facility Assessmen Plonning Interior Design El 7LINCOLN 5, i n c ROAD, SUITE 258 616T, 01,Q @IDA 33139 FAUx305- 673 -0080 .0 C -./ 0 �•�1 '� ago Y.i� 1 : - 1 -C to Cu -o 0 ) Ism 0= �Qc� ' CU 001 !". CU 2 En ._ a) > IW E -r= top cu 4-0 cn 0 -� U) C7 c0 CU 'r I A L Q Cr W Q z I- Ld W 0 0 N9 DESCRIPTION; DATE 1 2 3 4 5 6 7 8 JOB No .4.1 00%.00 PROJECT # 2010014 1171 BY CHECKED B' ASLAM M. DANGRA, P.E. Q JUAN ECHAVARRIA LO MECHANICAL ENGINEER ELECTRICAL ENGINEER I RAWN im P.E. # 43911 P.E. # 18577 AD DATE SCALE EXPERT CONSULTING SERVICES I CONSULTING ENGINEERS 6/10/10 N.T.S. CA NO.: 27757 5190 N.W. 167th STREET, SUITE # 203 SHEET N4 r MIAMI LAKES, FL 33014 TEL: (786) 428 -0544 Fax: (305) 620-2787 E -Mail: Exconser@ecs- inc.us m 1 • r C - 1 OF 3 copyright LINEA 5, in I