Construction Infection Control Risk Assessment (ICRA)
Matrix of Precautions
Project Name and Number: Heart Center Sliding Glass Doors
Location: 2 Floor North Tower
AHCA Log Number:
Project Manager: Luigi Ramudo
K Architect: Linea 5
Engineer: Expert Consulting Services
Contractor:
Date Prepared: 4 -7 -10
NOTE` The ICRA Matrix shall be completed during preconstruction and approved by SMH Facilities,
Safety, and Infection Control. Contractor shall sign the ICRA Agreement as part of the construction
contract documents. Prescribed precautions must be in place prior to work start and must be
maintained throughout the duration of the project.
Step One:
Using the following table, identify the TYPE OF CONSTRUCTION PROJECT ACTIVITY (Type A -D).
1
0
9
19
X
N
1#00
A
This project has been identified as CONSTRUCTION PROJECT ACTIVITY TYPE C
SMH ICRA -page f - revised January 2006
Project Name and Number: Heart Center Sliding Glass Doors
Location: 2 Floor North Tower
AHCA Log Number:
Project Manager: Luigi Ramudo
Date Prepared: 4-7 -10
ICRA Matrix of Precautions - Appendix
A. REQUIRED INFEC77ON CONTROL PRECAUTIONS BY CLASS
SMH ICRA -page 5 - revised January 2006
11 I 10 1 9 1
Project Name and Number: Heart Center Sliding Glass Doors
Location: 2 Floor North Tower
AHCA Log Number:
Project Manager:
Date Prepared: 4 -7 -10
Step Two:
Using the following table, identify the INFECTION CONTROL RISK GROUP (Low to Highest) based
on the location and type of service that will be affected. Circle the specific risk group below.
Low
During Construction,orRenovation
Upon Cornplogon/Prlorto Occupancy.
1.
Execute work by methods to minimize raising dust
1.
Wet mop/wipe exposed surfaces with
�►
from construction operations
Echocardiography
disinfectant
2.
Immediately replace a ceiling ble displaced for visual
Endoscopy
Labor & Delivery
Cardiac Cath Lab
inspection.
imaging Services
Laboratories
1.
Provide active means to prevent airborne dust from
1.
Wet mop and/or vacuum with HEPA filtered
Intensive Care Units
dispersing into atmosphere
PT /OT
vacuum before releasing work area
2.
Remove or isolate HVAC system in areas where
2.
Wipe work surfaces with disinfectant
Medical i Surgical Units
work is being performed
3.
Remove isolation of HVAC system in areas
3.
Maintain negative pressure in work site. Conduct and
inspection
where work is being performed
iVR
document daily monitoring
dispersing into atmosphere
before releasing work area
_ 4.
Seal unused doors and above ceiling penetrations in
CLASS filtration. Conduct and document daily monitoring
3. Remove isolation of HVAC system in areas where work
Radiation Oncology
surrounding walls before cutting roof
surrounding walls before cutting roof
5.
Place track mat at entrance and exit of work area
5. Remove or isolate HVAC system in areas where work is
6.
Cover transport receptacles or carts. Tape covering
6. Cover transport receptacles or carts. Tape covering
U
unless solid lid
1. Complete all crit cal barriers (i e sheetrockr plywood;
1. Do not remove barriers from work are until completed
1,
Complete all critical barriers (i.e. sheetrock, plywood;
1.
00 not remove barriers from work are until
IiI sealed connection to work sate with HEPA vacuum prior
plastic,) to seal area'from non work area or
to exit) before construction begins
completed project is inspected by SMH
2. Seal holes, pipes, conduits, and punctures` appropriately
implement control cube method (cart with plastic,
3. Remove or, Isolate HVAC system in area where work is
Safety and Infection Control
being done to prevent contamination of duct system
covering and seated connection to work site with
2.1
Remove barrier materials carefully to
HEPA air filtration. Exhaust air may not discharge to
HEPA vacuum prior ,to exit) before construction
ceiling. Conduct and document daily monitoring
minimize spreading of dirt and debris
5. Cover transport receptacles or carts. Tape covering
begins
unless solid lid
associated with construction
2.
Seat holes, pipes, conduits, and punctures
3
Vacuum work area with HEPA filtered
1. Complete all critical barriers (Le, sheetrock,'plywood,
appropdatety
plastic) to seat area frorn nen -work area or implement
vacuums
3.
Remove or Isolate HVAC system in area where work
4.
Wet mop area with disinfectant
CLASS ! vacuuming prior to exit) before construction begins.
is being done to prevent contamination of duct
5.
Remove isolation of HVAC system in areas
3. Construct anteroom and require all personnel to pass
system
through this room so they can be vacuumed using a
where work is being performed
4,
Maintain negative pressure in work site of > D,Olwg
6.
Final cleaning by SMH Environmental
each time they leave the vork site.
using HEPA air filtration. Exhaust air may not
4. Remove or Isolate HVAC system in area where work is
Services prior to occupancy
being done to prevent contamination of duct system.
discharge to ceiling, Conduct and document daily
5. Maintain negative pressure in work site of? 0 01wwg using
_
monitoring
ceiling. Conduct and document daily monitoring.
5.
Cover transport receptacles or carts. Tape covering
covers_ shoe covers must be changed each time the
worker exits the work area
unless solid lid
before transport
7. Contain construction waste before transport in tightly
�; 6.
Contain construction waste in; tightly ,
Cofer transport receptacles or carts Tape covering unless
solid lid,
covered receptacles
Parties agree to implement required precautions, notify the ICRA Team of necessary changes and institute corrective action immediately
should violation of precautions be found. Contractor agrees to disseminate this information to subcontractors and assume responsibility
1,
Complete all critical barriers (i.e. sheetrock, plywood,
1.
Do not remove barriers from work are until
Project Manager
plastic) to seal area from non -work area or
Facilities Manager
completed project is inspected by SMH
Infection Control Practitioner
implementoontrol cube method (Cartwith plastic
Safety officer
Safety and infection Control
covering and sealed connection to work site with
2.
Remove barrier material carefully to
HEPA vacuum for vacuuming prior to exit) before
minimize spreading of dirt and debris
construction begins:
associated with construction.
2.
Seal holes, pipes, oondults, and punctures
3_
Vacuum vrork area with HEPA filtered
appropriately.
vacuums.
3.
Construct anteroom and require all personnel to pass
4,
Wet mop area with disinfectant,
through this room so they can be vacuumed using a
5
Remove isolation of HVAC system in areas
HEPA vacuum cleaner before leaving work site or
where work is being performed.
require workers to wear cloth' or paper coveralls that
6.
Final cleaning by SMH Environmental
are removed each time they leave the work site.
Services prior to occupancy
4.
Remove or isolate HVAC system in area where work
is being done to prevent contamination of duct
system.
5.
Maintain negative pressure in work site of > 0.01wg
using HEPA air filtration. Exhaust air may not
discharge to ceiling. Conduct and document daily
monitoring.
6.
All personnel entering work site are required to wear
shoe covers. Shoe covers must be changed each
time the worker exits the work area.
7.
Contain construction_ waste before transport in tightly
covered containers.
8.
Cover transport receptacles or carts. Tape covering
`
unless solid lid.
SMH ICRA -page 5 - revised January 2006
11 I 10 1 9 1
Project Name and Number: Heart Center Sliding Glass Doors
Location: 2 Floor North Tower
AHCA Log Number:
Project Manager:
Date Prepared: 4 -7 -10
Step Two:
Using the following table, identify the INFECTION CONTROL RISK GROUP (Low to Highest) based
on the location and type of service that will be affected. Circle the specific risk group below.
Low
Medium
High
-Highest
Office
Cardiology
CCU
Immuno- compromised Pts
Below
Echocardiography
Emergency Room
Burn Unit
N Lateral
Endoscopy
Labor & Delivery
Cardiac Cath Lab
E Lateral
imaging Services
Laboratories
Central Sterile Supply,
W Lateral
Nuclear Medicine
Newborn Nursery
Intensive Care Units
S Lateral
PT /OT
Outpatient Surgery
Isolation Rooms
REQUIRED PRECAUTIONS
Respiratory Therapy
Pediatrics
Medical i Surgical Units
1. Wet mop/wipe exposed surfaces with disinfectant
Cardiac Rehab
Pharmacy
NiCU
inspection
PACU
iVR
1. Wet mop and/or vacuum with HEPA filtered vacuum
dispersing into atmosphere
before releasing work area
Oncology
2. Wipe work surfaceswith disinfectant
CLASS filtration. Conduct and document daily monitoring
3. Remove isolation of HVAC system in areas where work
Radiation Oncology
is being performed
surrounding walls before cutting roof
Operating Rooms/
5. Remove or isolate HVAC system in areas where work is
C- section Rooms
This project has been identified as iNFEC77ON CONTROL RISK GROUP
Step Three:
Using the matrix below, match the CONSTRUCTION PROJECT ACTIVITY TYPE with the
INFECTION CONTROL RISK GROUP to determine the CLASS OF PRECAUTIONS required.
This project has been determined to require CLASS PRECAUTIONS.
Note: SMH infection Control approval will be required when Class 11, /it, or IV Precautions are
indicated. The required Precautions by Class are in the Appendix to this Matrix and included in the
required ICRA Agreement (see Step Sixteen).
Step Four:
Identify the AREAS SURROUNDING THE PROJECT, assessing the potential infection control
impact using the INFECTION CONTROL RISK GROUP designations from Step Two.
What additional precautions should be considered based on this assessment?
B. CONTRACTOR CONSTRUCTION ICRA AGREEMENT
Project Name: Heart Center Sliding Glass
Adjacent Service Area
Doors
Risk Group.
Above
Labor and Delivery
Project Manager: Luigi Ramudo
High
Below
Imaging
Superintendent:
Medium
N Lateral
Coridor
( } A Inspection, non - invasive activity ( }
Low
E Lateral
NiA
levels
Low
W Lateral
ICU
dust, requires greater 1 work shift
Highest
S Lateral
CVCU
requiring consecutive work shifts
Highest
What additional precautions should be considered based on this assessment?
B. CONTRACTOR CONSTRUCTION ICRA AGREEMENT
Project Name: Heart Center Sliding Glass
Project Number.,
Doors
Location of Work: 2 Floor North ToNver, ,
Start Date:
Project Manager: Luigi Ramudo
Estimated Duration:
General Contractor:
Office Phone:
Superintendent:
Cell Phone /Pager:
TYPE OF CONSTRUCTION ACTMTY
INFECTION CONTROL RISK GROUP
( } A Inspection, non - invasive activity ( }
LOW
( } B Small scale short duration, moderate to high ( }
MEDIUM
levels
( } G Activity generates moderate to high levels of ( }
HIGH
dust, requires greater 1 work shift
(X) D Major duration and construction activities ( X }
HIGHEST
requiring consecutive work shifts
REQUIRED PRECAUTIONS
During Construction
Upon Completion
1. Execute work by methods to minimize raising dust from
1. Wet mop/wipe exposed surfaces with disinfectant
CLASS construction operations
I 2. Immediately replace a ceiling tile displaced for visual
inspection
1. Provide active mans to prevent airborne dust from
1. Wet mop and/or vacuum with HEPA filtered vacuum
dispersing into atmosphere
before releasing work area
2. Maintain negative pressure of? 0.01wg using HEPA air
2. Wipe work surfaceswith disinfectant
CLASS filtration. Conduct and document daily monitoring
3. Remove isolation of HVAC system in areas where work
11 3. Seal unused doors and above ceiling penetrations in
is being performed
surrounding walls before cutting roof
4. Place track mat at entrance and exit of work area.
5. Remove or isolate HVAC system in areas where work is
being performed
6. Cover transport receptacles or carts. Tape covering
unless solid lid
1. Complete all crit cal barriers (i e sheetrockr plywood;
1. Do not remove barriers from work are until completed
plastic.) to seal area from non -work area or implement
project is inspected by SMH Safety and Infection Control
CLASS control cube method (cart With plastic covering and
2.' Remove barrier materials carefully to minimize
IiI sealed connection to work sate with HEPA vacuum prior
spreading of dirt and debris associated with construction
to exit) before construction begins
3.' Vacuum' work area with HEPA filtered vacuums
2. Seal holes, pipes, conduits, and punctures` appropriately
4, Wet mop area with disinfectant
3. Remove or, Isolate HVAC system in area where work is
5 Remove isolation of HVAC system in areas wtiere work
being done to prevent contamination of duct system
is being performed
4. Maintain negative pressure in work site of >0.01wg using
6. Final cleaning by; SMH Environmental Services prior to
HEPA air filtration. Exhaust air may not discharge to
occupancy
ceiling. Conduct and document daily monitoring
5. Cover transport receptacles or carts. Tape covering
unless solid lid
6. Contain construction waste before transport in tightly
covered receptacles
1. Complete all critical barriers (Le, sheetrock,'plywood,
1. Do not remove barriers from work are .until completed
plastic) to seat area frorn nen -work area or implement
project is inspected by SMH Safety and Infection Control
control cube method (Cart with plastic covering and
2. Remove barrier material carefully to minimize spreadimg
sealed connection to work site with HEPA vacuum for
of dirt and debris associated with construction.
CLASS ! vacuuming prior to exit) before construction begins.
3, Vacuum work area with HEPA filtered vacuums.
N 2. Seal holes, pipes, conduits, and punctures appropriately.
4. Wet mop area with disinfectant.
3. Construct anteroom and require all personnel to pass
5. Remove isolation of HVAC system in areas where work
through this room so they can be vacuumed using a
is being performed.
HEPAvacuum cleaner before leaving work site or require
6, Final cleaning by SNIH Environmental Services prior to
workers to wear cloth or paper coveralls that are removed
occupancy
each time they leave the vork site.
4. Remove or Isolate HVAC system in area where work is
being done to prevent contamination of duct system.
5. Maintain negative pressure in work site of? 0 01wwg using
HEPA air filtration. Exhaust air may not discharge to
ceiling. Conduct and document daily monitoring.
6. All personnel entering vxuk site are required to wear shoe
covers_ shoe covers must be changed each time the
worker exits the work area
7. Contain construction waste before transport in tightly
coveted containers.
Cofer transport receptacles or carts Tape covering unless
solid lid,
Parties agree to implement required precautions, notify the ICRA Team of necessary changes and institute corrective action immediately
should violation of precautions be found. Contractor agrees to disseminate this information to subcontractors and assume responsibility
for their compliance. SIGN WITH BLUE iNK ONLY
Contractor
Date
Project Manager
Date
Facilities Manager
Date
Infection Control Practitioner
Date
Safety officer
Date
S 1 7 1 6 1 5
Project Name and Number: Heart Center Sliding Glass Doors
Location: 2 Floor North Tower
AHCA Log Number:
Project Manager: Luigi Ramudo
Date Prepared: 4 -7 -10
Step Five:
identify SPECIFIC SiTE OF ACTIVITIES (e.g. patient rooms, medication rooms, etc.):
2 North Tower; Invasive Heart Center
Step Six:
Identify ISSUES RELATED TO VENTILATION, PLUMBING, AND ELECTRICAL in terms of the
occurrence of probable outages:
No plumbing work; electrical and duct work.
Step Seven:
Identify CONTAINMENT MEASURES using the prior assessments:
What type of bafflers will be required? Plastic Containment
Will HEPA filtration be required? Yes.
Note: Renovation/construction shall be isolated from the occupied areas during construction
and shall be negative (> 0.01 wg) with respect to surrounding areas.
Step Eight:
Consider potential RISK OF WATER DAMAGE. None
Is there a risk due to compromising structural barriers (e.g. roof, exterior walls, etc)? No
k
If so, please explain nfa
Step Nine:
WORK HOURS - Can or will the work be done during non - patient care hours?
yes. After 5 pm and on week ends.
Step Ten:
Do design plans allow for an adequate number of ISOLATION /NEGATIVE AIR FLOW ROOMS?
NiA
Step Eleven:
Do design plans allow for the required number and type of HAND WASHING SINKS?
nla
Step Twelve:
Does the INFECTION CONTROL STAFF AGREE with the minimum number of sinks for this project?
(Note: design professional to verify against AIA guidelines for typesiareas)
nla
Adapted with permission V Kennedy, Barnard, developed at St. Luke's Episccpal Hospital, Houston, TX ICRA Permit
SMH ICRA -page 6 - revised January 2006
0
IN
N
e
Project Name and Number: Heart Center Sliding Glass Doors
Location: 2 Floor North Tower
AHCA Log Number:
Project Manager: Luigi Ramudo
Date Prepared: 4 -7 -10
Step Thirteen:
Does the infection control staff agree with the plans relative to CLEAN AND SOILED
UTILITY ROOMS? n/a
Step Fourteen:
Discuss the following CONTAINMENT ISSUES with the project team (comment as to how
these will be addressed)
Traffic flow - Will be affected. For emergency purposes the entrance to proceedure room B
and E will be through the North entrance.
Housekeeping - Work areas are to be cleaned and sanatized after each work shift and plastic
containment is to be removed.
Debris Removal - In covered carts and plastic bags.
Step Fifteen:
Obtain required APPROVAL SIGNATURES of the ICRA team: Sign with Blue ink Only
Project Manager Date
Architect Date
Facilities Manager Date
Infection Control Practitioner Date
Safety Officer Date
Step Sixteen:
Implement through the CONTRACTOR CONSTRUCTION ICRA AGREEMENT
(see Appendix).
Steps 1 -3 Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX, C Fine CA
Steps 4 -14 Adapted with permission from Fairview University Medical Center, Minneapolis MN
Forms modified and provided courtesy of Judene Bartley, ECSI Inc. Beverly Hills, MN
SMH ICRA - page 4 - revised January 2006
a
oil
nµw .�.I33UMD OR
BID AND
CONSTRUCTION
DATE:
061/10110
CLIENT CODE/FILE
NUMBER: 231100154
PROJECT ID- SUBMISSION
NUMBER: 156 -001
ROBERT BROWN" r " i .
ARCHTECT
AR 92624
C
ArehMecfum J
F=Rty Aueamenft
k7tedar peign
LINEA 5, inc,
420 LINCOLN ROAD, SUTE 258
MAM BEACH, R -ORIDA 33139
305- 673 -0004
FAx 305- 673 -0080
•
• CIO C:
•
U.
•
co CZ •
• •
CO
•
.i
CO CO M
•
(D W
•
•
•
•
•
ii
i
• DESCFVP71ON DATE
•: 1i i1
r
[*;AZkd1L*1
DO,2
O copyright LINEA 5, inc.
IF