10-505-003O
C
Lu
W
ry-
LO
iY l�
II
II
II
II
II
II
EXISTING FPL ---,,.,
MANHOLE. // \
II
II
II
II
ii
II
II
II
II
II
II
II
� II
Il`
II
II
I I/
I
�I I
II
II
II
II
i II
II
II
�I p II
r II
II
+ II
II
I II
II
II
II
II
I II
II
II
II
II
II
I II
II
II
II
II
I II
II
II
II
I II
II
EXISTING FPL -�
DUCTBANK. I I
I II
- - - - - - - - - - ------- - -JL -.
EXISTING FPLJ
1 DUCTBANK.
KEY NOTES:
1O FPL STREET LIGHT (EXISTING)
02 STREET LIGHT PULL -BOX AND UNDERGROUND DISTRIBUTION.
OEXISTING FPL PAD MOUNTED TRANSFORMER.
OEXISTING PEDESTAL MOUNTED FPL METER.
OEXISTING BUILDING SIGN.
OEXISTING FLOOD LIGHTS.
07 EXISTING UNDERGROUND ELECTRICAL WIRING RELATED TO PALM UP
LIGHTING.
OEXISTING GRADE MOUNTED DRAINAGE STRUCTURE.
OEXISTING PALM TREE TO REMAIN.
10. EXISTING SECONDARY SERVICE FROM FPL PAD MOUNTED
TRANSFORMER TO EXISTING BUILDING ELECTRICAL ROOM.
11. EXISTING 5" DUCT BUILDING PRIMARY RUNNING UNDERGROUND TO
EXISTING FPL POLE ACROSS STREET TO REMAIN.
12. NEW 5" DUCT (ALTERNATE) BUILDING PRIMARY SERVICE EXTENDED
FROM EXITING FPL DUCTBANK.
13. PPROPOSED FPL SPLICE BOX (48" X 30 ") TO INTERCEPT EXISTING
PRIMARY SERVICE TO TRANSFORMER AND RE -ROUTE IT TO PROPOSED
FPL TRANSFER SWITCH VIA MOLDED VACUUM SWITCH. BOX TO BE
FLUSH W /GRADE IN STABLE BASE.
14. PROPOSED FPL MOLDED VACUUM SWITCH (4'-6" X 4' -6 ').
15. PROPOSED FPL TRANSFER SWITCH (8' -0" X 8' -0").
16. PROPOSED ROUTING OF 3 -5" FPL UNDERGROUND DUCTS. 1 -5' DUCT
(PREFERRED FPL SERVICE), 1 -5" DUCT (ALTERNATE FPL SERVICE) AND
1 -5" DUCT (PRIMARY SERVICE FROM TRANSFER SWITCH TO PAD
MOUNTED TRANSFORMER).
17. RE- ROUTED 3/4" PVC SCHEDULE 40 WITH 3 #10 CONDUCTORS TO
MATCH EXISTING INSTALLATION. ELECTRICAL CONTRACTOR TO
COORDINATE ROUTING OF NEW CONDUIT AND LOCATION OF FPL
DUCTS AND EQUIPMENT AND MAKE ANY NECESSARY ADJUSTMENTS TO
AVOID CONFLICTS.
18. POINT OF CONDUIT TO BE STUBBED OUT AND CAPPED IN PREPARATION
FOR FPL DOWNTIME AT WHICH POINT SECTION OF DUCT INTO
TRANSFORMER IS TO BE PROVIDED. SEE NOTE #20.
19. ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT CROSSING
WITH EXISTING PARKING GARAGE ELECTRICAL SERVICE.
CONTRACTOR IS TO CAREFULLY EXCAVATE BY HAND IN THIS AREA TO
AVOID DAMAGING EXISTING INSTALLATION.
20. AS AN OPTION, CONTRACTOR IS TO INTERCEPT AND USE SPARE 5"
DUCT INTO PAD MOUNTED TRANSFORMER TO PROVIDE PRIMARY
ELECTRICAL SERVICE IN LIEU OF NEW DUCT UNDER TRANSFORMER
PAD AS NOTED ABOVE IN NOTE #18.
21. PROPOSED NEW FPL SPLICE BOX (48" X 30 ") FOR NEW PRIMARY
SERVICE. BOX TO BE FLUSH WITH ADJACENT GRADE IN STABLE BASE.
WORK SEQUENCE NOTES
1. DUE TO NATURE OF BUILDING USE, EXISTING BUILDING SHALL BE
ENERGIZED AT ALL TIMES UNLESS PREVIOUSLY SCHEDULED IN
ADVANCE AND ACCEPTED BY CONTRACTOR, HOSPITAL PROJECT
MANAGER AND FPL PROJECT MANAGER.
2. NEW 5" DUCT FROM EXISTING FPL DUCT BANK, FPL MOLDED VACUUM
SWITCH, FPL TRANSFER SWITCH AND NEW 5" DUCT FROM TRANSFER
SWITCH TO EXISTING FPL PAD MOUNTED TRANSFORMER SHALL BE
PROVIDED AND INSTALLED IN PREPARATION FOR ELECTRICAL
SERVICE DOWNTIME.
3. ONCE ALL THE EQUIPMENT AND FEEDERS REFERENCED IN NOTE 2
ABOVE IS INSTALLED, CONTRACTOR IS TO REQUEST FROM FPL AND
HOSPITAL PROJECT MANAGER AND SCHEDULE A BUILDING POWER
OUTAGE TO MINIMIZE BUILDING DOWNTIME. DOWNTIME SHALL BE
SCHEDULED AFTER NORMAL BUILDING OPERATION HOURS OR
DURING WEEKENDS. DOWNTIME SHALL BE KEPT TO A MINIMUM TO
AVOID DISRUPTING BUILDING OCCUPANTS THE LEAST.
4. ONCE ALL UNDERGROUND CONDUITS AND FEEDERS ARE INSTALLED
AND PROPOSED FPL GEAR IS IN PLACE; GROUNDS SHALL BE
LEVELED, ADDITIONAL SOIL PROVIDED IF REQUIRED AND
MULCH /GRASS PROVIDED TO RESTORE AREA TO EXISTING
CONDITIONS.
5. ELECTRICAL CONTRACTOR IS TO CONSIDER DIRECTIONAL BORING
METHODS TO CROSS EXISTING COVERED WALKWAY AS THE
PREFERRED METHOD, OTHERWISE, SAW CUT EXISTING CONCRETE
WALKWAY AND RESTORE ONCE INSTALLATION IS COMPLETE TO
MATCH EXISTING.
MEDICAL ARTS BUILDING -FIRST FLOOR PLAN -NEW WORK
SCALE 1/8• - 1' -0'
O
O
I~
co
Cn
0
U
,y1..
10 D. F5AZ(,-x.S'4' E.
7
ti
0
1
'LJL1
_
O
O
"
�
JMI
O
I
U
W
Cn
�
O
d
C)
L
a
r:) -
CO
co I
U
= Z
O
D
a
W
Q
YLJ
ti
Q
.�
0
n
.�
'L�
�v)
•�
o�
Lo
rn
¢
project. no.
20004
date:
05-13-2010
scale:
drawn by:
A. P.
checked by:
A. G.
sheet no.
E3.01
sheet of
0
0J
_
L
F—
W
Cn
_rr
C)
m
V)
U
= Z
O
D
a
W
project. no.
20004
date:
05-13-2010
scale:
drawn by:
A. P.
checked by:
A. G.
sheet no.
E3.01
sheet of