Loading...
10-505-003O C Lu W ry- LO iY l� II II II II II II EXISTING FPL ---,,., MANHOLE. // \ II II II II ii II II II II II II II � II Il` II II I I/ I �I I II II II II i II II II �I p II r II II + II II I II II II II II I II II II II II II I II II II II II I II II II II I II II EXISTING FPL -� DUCTBANK. I I I II - - - - - - - - - - ------- - -JL -. EXISTING FPLJ 1 DUCTBANK. KEY NOTES: 1O FPL STREET LIGHT (EXISTING) 02 STREET LIGHT PULL -BOX AND UNDERGROUND DISTRIBUTION. OEXISTING FPL PAD MOUNTED TRANSFORMER. OEXISTING PEDESTAL MOUNTED FPL METER. OEXISTING BUILDING SIGN. OEXISTING FLOOD LIGHTS. 07 EXISTING UNDERGROUND ELECTRICAL WIRING RELATED TO PALM UP LIGHTING. OEXISTING GRADE MOUNTED DRAINAGE STRUCTURE. OEXISTING PALM TREE TO REMAIN. 10. EXISTING SECONDARY SERVICE FROM FPL PAD MOUNTED TRANSFORMER TO EXISTING BUILDING ELECTRICAL ROOM. 11. EXISTING 5" DUCT BUILDING PRIMARY RUNNING UNDERGROUND TO EXISTING FPL POLE ACROSS STREET TO REMAIN. 12. NEW 5" DUCT (ALTERNATE) BUILDING PRIMARY SERVICE EXTENDED FROM EXITING FPL DUCTBANK. 13. PPROPOSED FPL SPLICE BOX (48" X 30 ") TO INTERCEPT EXISTING PRIMARY SERVICE TO TRANSFORMER AND RE -ROUTE IT TO PROPOSED FPL TRANSFER SWITCH VIA MOLDED VACUUM SWITCH. BOX TO BE FLUSH W /GRADE IN STABLE BASE. 14. PROPOSED FPL MOLDED VACUUM SWITCH (4'-6" X 4' -6 '). 15. PROPOSED FPL TRANSFER SWITCH (8' -0" X 8' -0"). 16. PROPOSED ROUTING OF 3 -5" FPL UNDERGROUND DUCTS. 1 -5' DUCT (PREFERRED FPL SERVICE), 1 -5" DUCT (ALTERNATE FPL SERVICE) AND 1 -5" DUCT (PRIMARY SERVICE FROM TRANSFER SWITCH TO PAD MOUNTED TRANSFORMER). 17. RE- ROUTED 3/4" PVC SCHEDULE 40 WITH 3 #10 CONDUCTORS TO MATCH EXISTING INSTALLATION. ELECTRICAL CONTRACTOR TO COORDINATE ROUTING OF NEW CONDUIT AND LOCATION OF FPL DUCTS AND EQUIPMENT AND MAKE ANY NECESSARY ADJUSTMENTS TO AVOID CONFLICTS. 18. POINT OF CONDUIT TO BE STUBBED OUT AND CAPPED IN PREPARATION FOR FPL DOWNTIME AT WHICH POINT SECTION OF DUCT INTO TRANSFORMER IS TO BE PROVIDED. SEE NOTE #20. 19. ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT CROSSING WITH EXISTING PARKING GARAGE ELECTRICAL SERVICE. CONTRACTOR IS TO CAREFULLY EXCAVATE BY HAND IN THIS AREA TO AVOID DAMAGING EXISTING INSTALLATION. 20. AS AN OPTION, CONTRACTOR IS TO INTERCEPT AND USE SPARE 5" DUCT INTO PAD MOUNTED TRANSFORMER TO PROVIDE PRIMARY ELECTRICAL SERVICE IN LIEU OF NEW DUCT UNDER TRANSFORMER PAD AS NOTED ABOVE IN NOTE #18. 21. PROPOSED NEW FPL SPLICE BOX (48" X 30 ") FOR NEW PRIMARY SERVICE. BOX TO BE FLUSH WITH ADJACENT GRADE IN STABLE BASE. WORK SEQUENCE NOTES 1. DUE TO NATURE OF BUILDING USE, EXISTING BUILDING SHALL BE ENERGIZED AT ALL TIMES UNLESS PREVIOUSLY SCHEDULED IN ADVANCE AND ACCEPTED BY CONTRACTOR, HOSPITAL PROJECT MANAGER AND FPL PROJECT MANAGER. 2. NEW 5" DUCT FROM EXISTING FPL DUCT BANK, FPL MOLDED VACUUM SWITCH, FPL TRANSFER SWITCH AND NEW 5" DUCT FROM TRANSFER SWITCH TO EXISTING FPL PAD MOUNTED TRANSFORMER SHALL BE PROVIDED AND INSTALLED IN PREPARATION FOR ELECTRICAL SERVICE DOWNTIME. 3. ONCE ALL THE EQUIPMENT AND FEEDERS REFERENCED IN NOTE 2 ABOVE IS INSTALLED, CONTRACTOR IS TO REQUEST FROM FPL AND HOSPITAL PROJECT MANAGER AND SCHEDULE A BUILDING POWER OUTAGE TO MINIMIZE BUILDING DOWNTIME. DOWNTIME SHALL BE SCHEDULED AFTER NORMAL BUILDING OPERATION HOURS OR DURING WEEKENDS. DOWNTIME SHALL BE KEPT TO A MINIMUM TO AVOID DISRUPTING BUILDING OCCUPANTS THE LEAST. 4. ONCE ALL UNDERGROUND CONDUITS AND FEEDERS ARE INSTALLED AND PROPOSED FPL GEAR IS IN PLACE; GROUNDS SHALL BE LEVELED, ADDITIONAL SOIL PROVIDED IF REQUIRED AND MULCH /GRASS PROVIDED TO RESTORE AREA TO EXISTING CONDITIONS. 5. ELECTRICAL CONTRACTOR IS TO CONSIDER DIRECTIONAL BORING METHODS TO CROSS EXISTING COVERED WALKWAY AS THE PREFERRED METHOD, OTHERWISE, SAW CUT EXISTING CONCRETE WALKWAY AND RESTORE ONCE INSTALLATION IS COMPLETE TO MATCH EXISTING. MEDICAL ARTS BUILDING -FIRST FLOOR PLAN -NEW WORK SCALE 1/8• - 1' -0' O O I~ co Cn 0 U ,y1.. 10 D. F5AZ(,-x.S'4' E. 7 ti 0 1 'LJL1 _ O O " � JMI O I U W Cn � O d C) L a r:) - CO co I U = Z O D a W Q YLJ ti Q .� 0 n .� 'L� �v) •� o� Lo rn ¢ project. no. 20004 date: 05-13-2010 scale: drawn by: A. P. checked by: A. G. sheet no. E3.01 sheet of 0 0J _ L F— W Cn _rr C) m V) U = Z O D a W project. no. 20004 date: 05-13-2010 scale: drawn by: A. P. checked by: A. G. sheet no. E3.01 sheet of