Loading...
10-327-027■L gEdBREVIATIONS GEN�-ERAL NOTES RCH ITECTU RAL SYMBOLS - ,. j , A --- - - - - -_ ;,�- -"*,*,",-.....-,--"'..�'��""�I'l.�-.--.....-,�,."�.�.�...�..- i ; %,/ . i> L - dorry� L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS 'CONT'FI,I` cT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE ACOUS. WAL AMERICANS WITH AMERIC LAM LAMINATED FLORIDA BUILDING CODE (LATEST EDITION), CI�IY 1)1lIOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, ADA DISABILITIES ACT LT LIGHT NATIONAL ELECTRICAL CODE, N.F.P.A. 101, 0.S.H,A,N A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND ADJ ADJUSTABLE LTWT LIGHT WEIGHT REGULATIONS. AFF AGG ABOVE FINISH FLOOR AGGREGATE LF OR UN FT LINEAR FEET 02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HE'IRSE:Lf� WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE SO AS TO THOROUGHLY UINDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY A.C. AIR CONDITIONING M MAT MATERIAL MATCH LINE DRAWINGS AND SPECIFICATIONS, AMBIGUITIES OR WITH THE CONSIT(UCTIONl DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING ALUM ALUMINUM ML MAX MAXIMUM CONFLICTS PRIOR TO SUBMISSION OF BID. ! BM M BEAM BEAM MECH MECHANICAL SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT BLKG BLOCKING MET OR MTL MIN METAL MINIMUM 03. THE CONTRACTOR PRIOR TO THE j REQUIRED PERMITS A BE OBTAINED R SHALL II T .ALL REQU ,l MEN 5 THE WORK DESCRIBED IN THE CONSTRUCTION DC . , BOT BOTTOM MISC MISCELLANEOUS COMMENCEMENT OF WORK. BLDG BLKHD BUILDING BULKHEAD MACH MANUF MACHINE MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURE::; OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE THE 'SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT RE METAL Finished Blocking Blocking DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE ;:I,F CAB CABINET N NFPA NATIONAL FIRE SHOWN OR NOTED AND SHALL BE INCLUDED AS F'i" R OF THE PROJECT PRICING. CRP CARPET CEILING .......................- ....... __.......,............ . ....FMERG,�FN CY... DEPARTMENT - FN.T4IANLF ................ __ ......... . ... . ....... . ................. . .... _ _ _... PREVENTION ASSOCIATION A ELECTRICAL, MECHANICAL, LIFE SAFI::TY 11111) FIDE PR OTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, G ELECTR 05. EXISTING CLG CEM CEMENT NIC NOT IN CONTRACT , SURFACE/RECESSED LIGHT GHT FIXTURES, LIGHT /E` UI I£ENT SNTCHES , H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, CA CENTER LINE NOM NOMINAL SCALE INTERCOM SPEAKERS, FIRE ALARM HORNS /Sl'fZOEaI: � ?rSWI•rCHIES, HEAT /SMOKE DETECTORS, CONCEAL ED/ EXPOSED FIRE ORNAME NTAL FIXTURES ARE TO REM IN. CONTRACTOR CER CERAMIC TILE NTS NOT TO SPRINKLER HEADS AND ASSOCIATED PIPING, IUUC,11iIC)RK AND FOR REMOVAL AS RE:QUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND C.T. CO CERAMIC T CLEAN OUT O OC OH OR OPP.H D. ON CENTER OPPOSITE HAND SHALL BE RESPONSIBLE BE K INDICATED IN THE COIN;I; f1RUC•ITOIN DOCUMENTS. FURTHER, THE CONTRACTOR SHALL EW CONSTRUCTION WORK •, .. ORIGINAL S IN GOOD WORKING ORDER TO MATCH ORIGI X rUH(E ( CL OR CLOS CLOSET CL OD OUTSIDE DIAMETER t d ILLATION OF E)t15IINI,� FI RESPONSIBLE FOR THE REINSTALLATION COL COLUMN OFF OFFICE INSTALLATION) UPON COMPLETION OF REPAIR WO[1K'-. CONIC CM U CONCRETE OPN G OPENI NG DIMENSIONS WITH EXISTING 1NG FIE LD CrOR SHAVERIFY D I . CONTRACTOR TRA 6. ALL DIMENSIONS PROVIDED RE APPROXIMATE', 0 CONST CON STRUCTION OSHA OCCUPATIONAL R TH T HE WORK. CONDITION S. ANY DISCREPANCIES SHALL BE B - W , SAFETY CONT CG CONTINUOUS CORNER GUARD AND HEALTH ADMINISTRATION 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE CR CRASH RAIL OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUR DING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO CU CUBIC P PR PAIR STARTING WORK. D DEPT DEPARTMENT D SPAR PASS PENT PASSENGER SE PENTHOUSE PE O8. CONTRACTOR SHALL P ROTE CT ALL EXISTING I °'LOCyR ;�JURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF DST. /DTL DETAIL PC PRECAST ,;., , ; w• SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL F ROMD1. D IA DIAME TER Pi P ANEL JOIN T PMEN T S CAF=O.?IIIG AND CONSTRUCTION DEBRIS. THOSE AR EAS EXPOSED TO EQUIPMENT, UI DIM DN DIMENSION DOWN PLAS POL PLASTER POLISHED 09. ALL WALL /CEILING SURFACES WITHIN THE LIMITS O CONISTIRUCTION ARE TO BE REPAIRED /REPLACED TO MATCH DS DOWN SPOUT PMLI) PREMOULDED EXISTING ADJACENT SURFACES, THIS SHALL IINCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, DWG 1 DRAWING PNL PANEL CRACKED WALLBOARD, DAMAGED TAPE JOINT-4 ETC:. ALL DAMAGED WALLBOARD SHALL BE REPLACED. pF DRINKING FOUNTAIN O QT Y TILE QUARRY ' ipEF COATED IN ADVANCE OF PAINT FINISH. 10. ALL STAINED SURFACES ARE TO BE KILZ PRU � A E E.A. EXPOSED AGGREGATE QTM PROVIDE A MEANS OF CCiVTAINME:NT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT EL EACH ELEVATION (GRADE) M NIATURES 11 CONTRACTOR SHALL SHALL NOT COMPROMISE: THE EXISTING FIRE /FLAME SPREAD RATINGS OR MEANS OF EGRESS ELE ELEVATION (FACADE) R RAD RADIUS AREAS. CONTRACTOR WITHIN THE CONSTRUCTION AREAS AND ADJACENT ,AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. ELEV EP ELEVATOR ELECTRICAL PANEL R REINF RISER REINFORCED 12, THE CONTRACTOR SHALL MAINTAIN ALL COMPONENT'S FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND EQ E UA L R b REQUIRED ACCESSIBLE AT TIMES. EQUIP i EQUIPMENT RF ROOF SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. EXIST EXISTING RD ROOF DRAIN 13. THE CONTRACTOR EXP.JT. OR EJ EXPANSION JOINT EXPOSED RM RO ROOM ROUGH OPENING 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING EIRE: I��ITIN(S AT NEW CONSTRUCTION. EX P EXT EXTERIOR REFL OR REF REFLECTED SHALL PROVIDE ALLOWANCES IP�I SF'I�(;�IFlCATIC)NS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK ELEC ELECTRICAL RWL RAIN WATER 15. CONTRACTOR THE DAILY OPERATIONS OF PiE FACIUT'Y AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER EL C ELECTRIC WATER COLER LEADER WHICH IMPACTS THAN NORMAL WEEKDAY WORKING HOURS F FT FEET 8 SECT SECTION 16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID 'AITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES FIN FINISH SHT SHEET ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. FE FIRE EXTINGUISHER SHT MET OR SM SHEET METAL FEC FIRE EXTINGUISHER CABINET SIM SIMILAR 17. CONSTRUCTION ACTIVITY AFTER REGULAR WO+IKINII-3 HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 FC FIRE CABINET SQ SQUARE AM AND SATURDAY &SUNDAY 24 HOURS. FL FLOOR STD STANDARD FD FLOOR DRAIN SS STAINLESS STEEL 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. FLUOR FLUORESCENT FIRE RATING STL STOR STEEL STORAGE 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL RE-LD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE F.R. FS FULL SIZE STRUCT STRUCTURAL RESPONSIBLE FOR THEIR PRESERVATION. ANY DkAbIGE TO EXISTING SHALL BE REPAIRED AND /OR REPLACED AT NO FV FIELD VERIFY SUSP SUSPENDED ADDTIONAL COST TO OWNER. FVC FIRE VALVE CABINET SPECS SPECIFICATIONS O GALV GALVANIZED T TEL TELEPHONE 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. GA 11 GAUGE TEMP TEMPERED GC ii I GENERAL CONTRACTOR TLT. OR T01. TOILET 21. PROVIDE WALK -OFF MATS AT ALL ENTRY/EXITS OF' THE CCIINSTRUC110N SITE. WALK-OFF MATS MUST BE CLEANED OR GL GLASS T TREADS CHANGED DAILY TO AVOID DISPERSION OF DlU °yT i(iI'.J1fSIDE: WORK AREA. GB GR GRAB BAR GRADE TYP TR TYPICAL TELEPHONE 22. CONTRACTOR MAY NEED TO PENETRATE OR OIHEE.I 'Y'IISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF GYP i GYPSUM RECEPTACLE MECHANICAL, ELECTRICAL AND PLUMBING WIITI;I LIFE: SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL GYP BD GYPSUM WALLBOARD THK THICK SHOULD BE PRESERVED AT ALL TIMES. FOLLOW IDi ":TAILS PROVIDED IN SHEETS A -5.10 A -5.11 AND A -5.12 FOR SEALING FIRE PENETRATIONS. ALL DUCTS CROSSIN(2 FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH H HC HANDICAPPED U UL UNDERWRITER THE RATING OF THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. HRDW HARDWARE LABORATORIES HT ' HM HEIGHT HOLLOW METAL V VERT VERTICAL 23, IT SHALL BE THE RESPONSIBILITY OF THE QQI�`ISEM!"MLLIAISIA`' Lam` GENERAL CONTRACTOR (GCA AND THE ALL THE CRAININGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK HORIZ HORIZONTAL VT VB VINYL TILE VAPOR BARRIER SU QQNTRACTORS (SQ) TO STUDY CAN BE FULLY COORDINATED. THE CM, GC, AND SC: SHALL VISIT THE SITE, INCLUDING (TONG AN ABOVE CEILING T17 :]ATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE IN INCAND INCH INCANDESCENT VWC VINYL WALL COVERING INSPECTION, PRIOR TO PRICING OF THESE DaI'�IJ62J1,1S INS FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE ID INSUL INSIDE- DIAMETER INSULATION W VWC -GYP WAIL COVERING - CONTRACTOR SHALL NOTIFY THE GENERAL CC)IINTIR A(:; :TOR IN WRITING PRIOR T BID DUE _DATE, FAILURE TO DO SO WILL ON A BASIS FOR; ADDIT10N1111L t,,OI�,IIPEN:iA'IION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM INT INTERIOR GYPSUM BOARD NOT BE ALLOWED CONDITIONS INFERRED OR INDICATED ON THE DR,I KINGS. INV INVERT VWC -PLAS WAIL COVERING - PLASTER SHALL PREPARE AND IMPLEMENT' A MANAGEMENT OF TRAFFIC (MOT.) PLAN FOR ALL PEDESTRIAN AND WC WET COLUMN 24, CONTRACTOR AFFECTED BY THE PROJECT, CI';)NTRAC "rOR'S ACCESS OF EQUIPMENT AND PERSONNEL TO SITE AND J JT JST JOINT JOIST WP WATERPROOFING VEHICULAR TRAFFIC CONTRACTOR'S FORCES PARKING. SUBMIT DR'AWINC;S SHOWING MOT. DURING ALL PHASES OF THE PROJECT FOR OWNER JC JANITOR'S CLOSET WD WOOD APPROVAL. COORDINATE MOT. PLAN TO OWNERS '13,11ISFACTTON PRIOR TO PROJECT MOBILIZATION. OBTAIN APPROVAL W/ WITH ( AUTHORITY HAVING JURISDICTION FOR ALL 1314 I1UICADES AND CLOSURES. COORDINATE MOT. PLAN TO ARCHITECT'S W/o WITHOUT WC WATER CLOSET PROVIDED PHASING PLAN. Y YD YARD --- --- ______ I RCH ITECTU RAL SYMBOLS - ,. j , A --- - - - - -_ ;,�- -"*,*,",-.....-,--"'..�'��""�I'l.�-.--.....-,�,."�.�.�...�..- i ; %,/ . i> L - dorry� - - ,- , - " �. L_ ,r", INSULATION CONCRETE GRAVEL CEMENT CONCRETE Blanket PRECAST CRUSHED MORTAR FS.. PLAN ......................................................................... ...........................I... I ... ...... ........... I .................... C.-. 4-. ............................. ....... PA%ANG,...GRALNNG..,&.. LIRAINAGE.. P1.. AN............................................... ............................... STONE PLASTER ...... ^.. t. ., 1111, i i 1 NOW i .� EARTH C.-- .S....... _ ................ ...............WATER.,&_SEWER.. TILE SOLID CONC. CONCRETE MARBLE MAIN.. PROFILES ..... . ........... ..... ........ ..._. ------- . --------- ..... ---- .---------------- ..... --- ... ............... . .............. Ceramic or MAS. UNIT MASONRY ......................... .....C- 91........ ...............1...11...1...... ADLIITIDNAL... TR Al LFR.. SIT E.. P. LAN.......................... ..............I................ I ... . .... I .............. ........ ... .... . ............. ............. - ........... CTR.:7 1.. 1 ........ , ... . .......... Structural .TE;MPOJR,AR.Y...WA1.K- 1.IP.... F „MFR�ICY.. ENTRANLF..... __ ................. ............................... UNIT FMJERGFNLY ..DEPARIW.N.T...FN.TR.ANCE,,(,' t.ING.. &..ROOF ._PLAN. ..... .. ...... ... ....... . - r - - -- r 1111. r - , �,/ / , / /,? ..... ................... ..A4, 111 ..... . ..... .._ ................ . ... .SECTIONS - .AND- OFTAII S.....__........,....__.....,.........,..........__................ ............................... ,._ _.- .... � -.. ;f; SECTI WS.. AND.. DETAILS................... ........................ ... .................... - ........... I ............. I......... _ _ I ""I r 1111_ ;1111. SHEET WOOD WOOD _ WOOD BRICK METAL Finished Blocking Blocking Large A5, 11 .... - ...... _ ...................... WaL..INTEJRSECTIaN..nET AILS.._........_............ ....................... ... ......... . --------- ___ ...... ...... ... . Continuous Intermittent Scale 1111 -.� I.= - ' %�/!��:/%% ,, .......................- ....... __.......,............ . ....FMERG,�FN CY... DEPARTMENT - FN.T4IANLF ................ __ ......... . ... . ....... . ................. . .... _ _ _... 3 ..FNL,ARGED...0XYGEN_ ...TAMW_ENCL0,WRE............. __.......-......... .__.................._......... --- .... .................. . SI_ 3. ........ . ..... . ....... _ ............. GLASS GLASS .�.r....: INSULATION Small Large Rigid Scale Scale -- - { r � / ii/ u r - . ", z STEEL. STEEL. PLYWOOD Small Scale Large Scale REFERENCE :: " °V"1MOILS DOOR SYMBOL °I.. A TYPE 1( 10 DOOR NUMBER .�ta,t!'1I:' °•m 1- ELEVATION NUMBER EM.k21Ql8'..A_ ROOM NAME OFFICE --- -ROOM NAME lua,I.�IS�I1''� `T X- 0 2 FINISH SCHEDULE XX EI1.SMQ)I1�1. -ROOM NUMBER 3 NUMBER DETAIL .0I {,1al11(,rr+i 1 DETAIL BUILDING. PARTIAL 1 NUMBER ,- -_ NUMBER & DETAIL SECTION A_ SHEET MUM ( I A NUMBE SYMBOL NUMBER \, / .w, _, 1111 WINDOW TYPES 1 WINDOW x1SGiiri fu Iii -. - NUMBER TYPE EEET�i."IlIE,I", OR LETTER GENERAL NOTES ABCDEFGr-- - -NOTE M' �I:•- �1'10Q11U1E � ELEVATION O. DETAIL .211 ,I,1YAM NUMBER DRAWING TITLES 1 ABCDEF p$�',LNPJFIII[ REVISION A -1 SCALE: R�`{11�(((''}���ggqll /1n` Z�__ NUMBER EE liiJJ.` "211.'1. NUMBER X NOTE DEMOLITION NOTE ( 1--.- �'II VICINI IT AL - LOCATION } t i it, r 1, ... ��: 1 ! ,.. £ � .^s 3 I ' U 1 I: e 1 „.. s } I £ ' "j $. £ £ s jµ 1111, .. 1111,, 15 1 : s ?* s m,_ _i t ` 1111 ., . , , , 3 _, ',Z�...._. .,. ___,_ 6 � S1va /, .; / - r / /� _/ ., ' /' F l ` , .. : S ffil GEN!,RAL DEMOLITION NOTES 01. CONTRACTOR SHALL SUBMIT A a�HEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION WORK TO OWNER'S REPRESENTA! LIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND DAYS OF WEEK TO BE WORKED. - PROVIDE DETAILED SEQUENCE OF DEMOU11ON AND REMOVAL WORK TO ENSURE UNINTERRUPTED PROGRESS OF OWNER'S ON SITE OPERATIONS, - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT PRIOR TO START OF WORK. 03. OCCUPANCY- OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF OWNERS NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH STRONG ODORS. 0 4. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINT AINED BY OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. 05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PER MITTED. 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. B PROTECT FROM DAMAGE EXISTING G FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DEMOLITION OPERATIONS. C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY OR EXTENSIVE DIRT OR D UST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE. SCREWS, NAILS, ETC. WILL NOT BE PERMITTED. E. REMOVE PROTECTIONS AT COMPLETION OF WORK. FANS NEGATIVE PRESSURE BY USE OF SUITABLE BROUGHT T 0 A ST BE B F. ROOMS UNDER CONSTRUCTION MU EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING. G. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 07. DAMAGES: PROMPTLY REPAIR DAMAGE S CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. 08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FIREWATCH, DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. • MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. 09. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. • DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, POLLUTION AND DAMAGE TO EXISTING FINISHES. 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS WITHOUT UNDUE DELAY. 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR WORKING HOURS. • OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS MATERIALS RE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. • BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 13. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. • REPAIR DEMOU11ON PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK, TY MAP PROJECT LOCATION ,;,,,,,,,,,,,,,,,,,,, PARKING LOT SW i _9T _(SUNSET DR. 1111.. �I el : I.••. ......I EMERGENCY ENTRANCE H CORRIDOR V H FARMEN TANK 1 � �� i3 �� " I'll , � ��// �//N w . ;1 I , , 71", �: � , I - I I . w I � Lim == -1 O i Y I • Tr _ �� �_ 9 �- I- r I _ �- s, . III, .•/%i - „ OF , ' f LU / 19 (0 N 1 O`11� N C o DRAWING INDEX 1 � NEW SNEET • REVISION X ELIMINATED SHEET NO. 1111 ... ........................... __ ................................ DESCRIPTION CO VER........._...........,..,....._..............._.,.,.............._........,..,,.._.__.___..._____-----... _____........_- _...,..._......— ................... _ .... AO. 00 ................................... 1NDEX,..NIa TES.. &.. SyMB0LS...................,................. ....................I.......... ...11...........1.............1 ML PLAN--- ....... . ._. _---.._._..,,..----- ........_......... ---------- ...._... _.__,,._.......----- _ ----- ,. ....... I .... I .........rr.. .. .......................... . ......... ... CIYII....W.VE.R... SHEET................................................. . - ............ __ ................... I.- ..................... . ------ .__.... ------- ,,. L- 1 ....... . ------------ ----- ..,- ------ ,,GENF.R_ AL. N0,TFS.._..._._....,,._ _.............._...:...-._........__..........-............._. ...___..,._..___..:__......_,.- 1111... .............. 0:7r 2..... ............................... _DE M0IJ. T. UTN..... ...._........................._ ......... . ................ ...... ..... ......... .,............. ...............- ............... _ FS.. PLAN ......................................................................... ...........................I... I ... ...... ........... I .................... C.-. 4-. ............................. ....... PA%ANG,...GRALNNG..,&.. LIRAINAGE.. P1.. AN............................................... ............................... .- I ----- ..... .... - ... C- 4A_ ... ___ ... . ... _ ...... ...... PAY.N.G.-- GRADIN.G ... dc -ORANAGE- DETAILS.....................,................. ........,...................... ...... AND.. SEWER -P LAN............................ --_ .............,....... ............................... 1111_ ...................LS1�wX ,.. ..... I -- ..... ____ .... ....,..... - . ........................WATER.. NOW ' -' L 1111. . WATER A� iB SEWER PN 4Pi ................. ...................................................... ............................... C.-- .S....... _ ................ ...............WATER.,&_SEWER.. PLAN............................................. ............................... ...................11..11....... ----- ............ .. L- A......._ ................ ...... _--WA,l,lm..*". El",,. PTAN,.,,._._._...._.._.. ---- .. .............................. _...._.........._. _...,.....- ..._......._......,. ............C- .6............... .....................•...WATER.. MAIN.. PROFILES ..... . ........... ..... ........ ..._. ------- . --------- ..... ---- .---------------- ..... --- ... ............... . .............. 11.11 . VJ=MEN T..MARKIN!CS ..,da..SIGNACF :. DFTALI. S ...... . ............ ...--------------------------------------------- _ 1, i...- P......................... ...............r��1MFTRY..P..l. AN....... __ ...................................... .... ...... . ......................... . ............... . ......... ........... ......................... .....C- 91........ ...............1...11...1...... ADLIITIDNAL... TR Al LFR.. SIT E.. P. LAN.......................... ..............I................ I ... . .... I .............. ........ ... .... . ............. ............. - ........... CTR.:7 1.. 1 ........ , ... . .......... . ........ SW....74,IH,, STRFE.T... TURN...AR.OUNl).. PH ASE.... ONE....... _ ....... . ... ...... __ .......... _ _...........11. . .............. . ........ WISP.- 1 .............. _ _............... INFORMATIONAL... WATER-AND-SEWER-PLAN .... . ...................................... _ .................... .,......_..... .... ... SWPPP- O .......... ................- CCPA-- PLAN..C( VM_SHFFT. _ _...............- .- ............ .1.........,....1...1........11 ............._..........1.111.. ... ...._ .............SWPP-1._._ ._...___.....,.,......CLAP.,. PLAN--- ....... . ._. _---.._._..,,..----- ........_......... ---------- ...._... _.__,,._.......----- _ ----- ,. ...............RaSN --............_.... .. C Ra.DETAlLS.................._........._...._.............. .......- ........- .............. ....111 ......... ._.. SPPP . .. M...W O.T.0 LPERMF. ATFR .DISCHARGE ............... - ...... .................. ...... SWPPP.- 4....._.__..........._._.... ARAIA JER.- AREI=ATIAN••.CCAP..PLAN ---- .............. . ...... ._......._...........,.... ------ .----------------------- LnewsleE _. ..... .................L:..O,-1. - ......................... .... _EXISTING..TREE- 01SP.OSIT1O14 -- PLAN ...................... . ......... __ .......... . ..... . .... ..,........................ ................... ... ..)n -Q 2....,....... _................_EXISTING... TREE.. RELOCATION.. Ph AN .......... . ....... - ... . ...... . .... __ ...... . ... __ ....... . ... _ ....... .... ----- FP2111L1 ............................ _ REFER TO CONTRACTOR'S DRAWINGS FOR PHASING OF CONSTRUCTION aB�iLff.G�BIE ...1 ...... 1._ TE.. P1 AN ...... . .... . ........ ___ ... . ---- . .... ____ ...... . ........... ___ ........... __ .... ____ ............ ____ ... ..... 1111_ ...................LS1�wX ,.. ..... I -- ..... ____ .... ..LIEF_. SAFETY...- ...EXISTING -- FIRST-. F1.O OR,.. PI. AN.. ......... .... ... ._ .... __ .............. _......,....... ........ .. ----- . ......... t, S1.A n .................................. 1 „IFE..SAFFTY....- ..FIRST...FL0.0R... PLAN................................................. ............................... . - ... ... ... ............. _..... ..... ... ... - ........ . ................. ......................... AL11, 1.. 0............................. ..... .................._.........- ..... ..... ...... - ....... . ...... ................ OXYGEN ... TANK..FARLIM..DFA 40t. III. ON... Pt. AN .................. ......................... ........................ .............. . ........... AD1, 20 ... .......... . ................... FAIERCXNCY.. LIFPARTMENT..FNTtR,ANr,E..DF,1, OLIT1A N... Pt. AN ....................... ............. ALIT. 22 ..................... .... ........ IFMP0R,ARY ..WALK- LIP..ENTRANCE..DEmw..OW PLAN............ ............................... .................. ........ADrk,30...............1 ............. DFMa am... �LlI1DN.,.,......... ..........__.........._........ .....1.....1.......11.......... ..__....................- ........- ................ ............................................................ 1111.. ................... AIJ, O,,....... .....__....._..........OXYr,FN_ ........................I...... TANK..FAIR,M..FLOOR.. PLAN......-... ......__.............__....__.. ..1..111........_.............. ......... . ............... A1.. 20---- .......................... - .... FMERCaENCY. .DFPARTMIENT.,FN.TR,ANDF,,F,LOO R.. PLAN-,11.....-... ......._....................... _......_.. __....__ Al, 2. 1 ..... . ...... ........ .... . ........ ....TANK..ENr.1.ca nE..FLIIM,,P-. LAN.... ..... . ..... . ... ........... . ..... ____ ......___................_ _ ..... __ �... - --- 11 .... 11 Al r22 ...........................-...... .TE;MPOJR,AR.Y...WA1.K- 1.IP.... F „MFR�ICY.. ENTRANLF..... __ ................. ............................... ... ...... .........1111....---..... A1<3 0.........___ ... .................. FMJERGFNLY ..DEPARIW.N.T...FN.TR.ANCE,,(,' t.ING.. &..ROOF ._PLAN. ..... .. ...... ... ....... . ........1111 ............. A3, 10.... ..--- ..,......................f X,YhFN... TANK.. FARM.. F.. I. EUATtON..... ___ .... . ........ . .... . ...... ..__...... __ ... . ... . ....... . .... _ ....... ... ..... ................... ..A4, 111 ..... . ..... .._ ................ . ... .SECTIONS - .AND- OFTAII S.....__........,....__.....,.........,..........__................ ............................... .................. . ...... . A. 4-, 20. ..................... . ............. SECTI WS.. AND.. DETAILS................... ........................ ... .................... - ........... I ............. I......... .......... . .............. A4., 30. ....................... , ........... CORRIPW_ SF� .Mms --- . .................... _ - .................... ....-............... ............................... ....... .................. . ....... A4,,!W_ ................................. COtRRIDLIR- !S ._ Il N .......:................ ............................... ..................... ............................... ...... ..___ ........... A a, 01__......._ __ ....... . ...... . .... WAI.L..1W. . FS.., As.. DETAI IS............_.......................................................... ............................... ................. - ... . ... AS ,02 ....... .., ....... . ....... .. __... 0A, W_.. RFT. A14, S.....__........................-........................ ............................... ...... 11. ---- 1 ..... 1 ....... ... 1 ......... __ ........ AS, 03 ... .... ... .........- ..... .. ....... CONSTRUCTION ... TRAIt,F1?..IM.AT),ON ... NO RTH"L OT.................--- __....._..................._ .... ... ....... ............ A a, 10.........-............. ._.........WAI.L..PFNFTRATION.. DETAILS................_............._.......................... ................I....,........_ A5, 11 .... - ...... _ ...................... WaL..INTEJRSECTIaN..nET AILS.._........_............ ....................... ... ......... . --------- ___ ...... ...... ... . ........ --- . ........ . ..... AS., 12 ..... , ......... - ... . ..... . -------- UL- RATINGS_.SCHFDLILE ..... . ...... . ......... . ....... _ ........ .._........_..........,-.-. ... . ... ..__._..........-........___ .11.11 ................... A&0 0..........__..- ....,.......... - SCHEDULES... d4._ 1DETALL. S. ......... . -------- _ ................ _ _.........,........._............ ,..........._._.......,.,...... s...rt ....... ... - ........................................................................... _ ........................ S1., 1- .............. . ..... ... .. ........ .......................- ....... __.......,............ . ....FMERG,�FN CY... DEPARTMENT - FN.T4IANLF ................ __ ......... . ... . ....... . ................. . .... _ _ _... ...... . ... ...... .... ...... S1., 2...__... .... . ..... ....,. . ......... ..FNL,ARGED...0XYGEN_ ...TAMW_ENCL0,WRE............. __.......-......... .__.................._......... --- .... .................. . SI_ 3. ........ . ..... . ....... _ ............. aDHEDt1tES,...RO-1 S..,AtE1D...DET 1&..........-... .................__............ 1111........................... ARCHITECT: C. I � p p ° p ,., D n?n p �, ° N ° \ \ ° �' 7i _ 1 > "' Z BERMELLO AJAMIL &PARTNERS, INC. rn r h w 5 w� w" H °F \� U) O w rn cn Z ° " w W " w w " ° Z �,r�.litect,A�c Eng,r,e'ering Planning a� r C N ° " ~ o ° ' :'I' Interior. Design Landsceloe Architecture N } t°il U ¢ to O I z. 3 3 X a �. rr o X o ° �, c) w. a Z z w " o - w 2001 South °ayohore Drive 10th Floor °�����w���Na Miami, Florida 33133 i i i i i W w W w W W W W w W W w w W W w (305) 859 -2050 Fax (305) 860 -3700 a a , , , PLANNING ARCHITECT: 1111, 1111__ • ......I- .. '% ................ . ........................... . ,� ;i • 0//� j 60 -,.. • • • ,,, . ...1.....1.11 .................. � , ..................� ........... • < 1111. ' °/ ,,, c ,i , . , ; i,,: 1111. -•, .. , � ,, , . ........................................................ ............................... L ... _ ............ .................1............. A R C H I T E C T U R E 111 7.T ...... ...... ..... . ..... ..... .... .. ..... ... ___ ... ..... ... - .- .. .... ...... ...... X P L A N N I N G Ak 1.1.1 ..........l .. _ .................. 18310 Montgomery Village Avenue Gaithersburg, Maryland 20879 a 301- 590 -8150 I 301-590-2900 F x 111....1....___ .1111_ ....,..._ ..................._.. I N EER: STRUCTURAL RA L ENG 1 ........ ............................... f E F�,J(; nn�(��qq`ANGINER� INEVA 1. p CCSNSU ............. ............................... ........... . ............................... j ❑RAMON R. DONNELL p i ;; j A ❑PEDRO J. DUQUESNE a ^' ❑AIDA M. ALBAISA ;'` �o$rrlai Rnncr numavznna+ No t3oa 0/00 ... ............................... oel _0 2005 .... _ .__...._ . --- .1111... ---- .1111--- 1111... ..__ ......• MEP ENGINEER: 1111 . . ...............-. .... ...... ...... ... ................. ............ .... ....... ... ..... I � / . 1111........... 11_.1.1......... / i • 1111.._ 1111__ 1111, i i j /j //i ' i // 2121 Ponce s, Leon Blvd., Suite 350 Coral Gables, FL 33134 /� / phone: 305.569.1692 Professlonol Gonsul7�ng Engineers • • fax: 305.569.1693 11.11... 111-1 ................. I —..........,....... . ............... I Dallas •Houston . Nashville .Miami •Richmond 1 ....1111 ..0. ......... _.-........_........ -.1- - Austin . Denver . Phoenix . Washington D,C. ............. . ccrd project number: 405112.038 EB00007658 IT CONSULTANT: , I ,r GENE BURTON & ASSOCIATES 1893 (ienerat George Patton Drive 5810 West 1 -20, Suite 150 • ,,,,..... 1111, ,111....,._....1............_.. • Pranklinjwnessee37067 Arbo8ton,'rexas 76017 11111 ............ Phone : 615.376.31('X) Phone: 817563.2486 ........... 7.563._753 . 1111. ... Fax. 81 ... 1111, 1111. � 14 .............. 1111... Fax. 615.376.3] ......... 1111.... ebai,e: ww ,gbaina .... . ..I ............................ .. ............................... . � W 6 ................... . 1111 Medical Equipment and Communications Planners _.... r ....................... 0 ............ �. • • • • Nz -.__... MMER0, 9pI ! ..........................Al P P,..GENFRAL..INFORMAT ION..,..........._....,.......,......................................_, ..............._...._...,..... - 11111- - _......-- -___........- . ... ....1-- ....MEP1,,00AV.......... _..........MAFP.. S ....... ­- .................A FPA 1,. pQAV .....- ...._........MFP...9.TF . .. Pt. AN.. DFMM. IT LON..........................-.......-............................... .,............................. ...... . ...... ......... __ ... - ..... ... .. _......__... ..........1111................. . .1.1.1..1.................. ..................... MEP..1,.Q.QU _......... .......... ... . ... MEP.. SITE- P. L. AN......................... ......... .. .......... _ .......... ... ......... -... ... ...... - ............ .. .... .... I .............. . 111111-11-11- ............................. P PARTIAL- FIIRST ..FHOOR ... P1.AN.-- ..MEGRAN)CAI ..... ................... .......... ..........,..._._ ..... ___ FP2111L1 ............................ _ _PARTtA1.J1R,ST..FA(�(1tR:.P•.4 AN.. -.. EIRE.. PRSJTFD7Z(? t!-... ....... . ......... . ... .............. , .......... ... ...... ..... ..... ..... -F.2 OTU ..... ___ . ............._......PAJR.TIAL.. F FIRST.. FLI)( 1R., PI. AN...-.. FI. ECTRILAt .....- ..........__............. ........11.....1....1.......... ......................E? 021, 1....... .__.._.....•..__....P.AJRTIAL.. F FLOOR- P. LANS...-.. ELECTRIC AA,.............,............................... ............................... ....................._ E2. 03U......... ...- ...__..........OXYGEN...TA, K K.. FARM_ UGHTING.. PROTEC. TION... ........ . ..... ... ... . ...... . ..... ......... ... ......,. ...... ... .. .... . .............. .. E,",, 011A.,.._................,.._._... , ,CONSPUCTION...TRAlhEI2.. -...Ft . CTRICAL..._._.........,..__.._.._...._....... ,.,......- .............,....._. _,. .. ..................M1JFP3,(aOtJ. ,. ......... __ ......... M MEP.. SCH ED1AL FR... ... ..... .......... ... ........ . ............. .. .......... . ................. . ...................... 1 ............. 1 ....... . __._........ MEP. 3 ,0.1U . ...... ......... ...__ . ... .M MEP._ DETAII. S. ---- __ ................... ...-......_.........._..........._........___......._............_. ...,..._- _- ..._.....__._...._.. .................... _ MEP3.. 02U.......... ..........._._..ENLARGED...F1 I IECTRICAL -PL ANS.....-............._................_..................._11---................."I--.---- ....... ...... ........ MFP3_ O, 3L1.. ...... _ ................ F FLIFLTRICAI....ONF..t,INF .. DIA( 7'tiAM...............................................-......... ............................... MEP3 42- w-1......____ ....._._._.F1.JECTRIOAL_.PANJEL - - S.CHEDALI E__ ................_......._..._.._.. _.......,,....-- ____..._.._..., ---- 1_.._......_... ....... ..... . ........... MAFP3, a5tL ........... --- ..... ....... F Fl..(AEIADA .- P9Y1ER.,.Ar..1llTli T._ DETAII ,S. ......... __ .......... __ .... _ _ ............. ___ ......... __ ...... I ... .._... ....... . ..... ...... ...... AFP3,( a6U_ ..... , ..... .-. .... . . ... ..EI- (AtRADA.,- PG$#i"...SC..1 !Ca!•tT.. DETAIL, S............................._ --- ............-.- ...... __.._.............. _ _. ....... . ................ MEP3. 07U...__ ............ - .... . ..,jOXYC„EN..:),ANK.. INSTALL.. ATIO N.. SCO PE ... . ....................... .._..._..... ..._.,..- _... -------------- , ",------- .. ----- . .... .......__ MEP ,3_O8U................... -....- O OXYGEN... TANK- .INSTALLATION -. SCOPE. ...................__.......,.. __ .... . ........ 1 ...... 1 ... __ ............ APPLICABLE CODES FLORIDA BUILDING CODE 2007 EDITION NFPA LIFE 101 LIFE SAFETY CODE (2006 EDITION) AS ADOPTED BY FLORIDA FIRE PREVENTION CODE (2007 EDITION) NFPA 10 PORTABLE FIRE EXTINGUISHERS NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEM NFPA 72 (NEC) NATIONAL FIRE ALARM CODE. ANSI A117.1 HANDICAP CODE AMERICANS WITH DISABILITY ACT AS ADOPTED BY FBC 2007 CHAPTER 11 AIA 2006 GUIDELINES FOR DESIGN do CONST. OF HEALTH CARE FACILIII ES • 4 1110 *'I C I I PROJECT ADDRESS: �R.I -'. -.- 7400 S.W. 62nd Ave. 4 • South Miami, Florida 33143 I 1 "� OE Ss`t" Ib3` 4 MAW EVJILDIIIG DEN'. STRIICTUI",,o,'.. 16ECTION J, KEY PLAN COMM. NO. 40057.100 SCALE: AS NOTED DATE: 04 -08 -2010 DRAWN: JEC CHECKED: 1311 CADD FILE: HANSTITUTIONAL DRAWING TITLE: INDEX SHEET SHEET NO. /"'10.00 0 INDEX SHEET SHEET NO. /"'10.00 0