10-264-003DEMOLITION 140TES
1. THE CONTRACTOR SHALL VERIFY THAT CONSTRUCTION OF EXISTING WALLS MEETS THE FIRE
PROTECTION 'RATINGS DESIGNATED ON THESE DRAWINGS. HE SHALL ALSO MAKE ANY REPAIRS OR
MODIFICATIONS NECESSARY TO BRING EXISTING WALLS, DOORS, DUCTS, ETC. UP TO THE PROPER
INDICATED FIRE PROTECTION RATING. DOORS AND /OR FRAMES NOT MEETING RATING REQUIREMENTS
OR BEARING PROPER LABELS SHALL BE REPLACED.
2. THE CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURES AND ALL STRUCTURAL ELEMENTS AS
NECESSARY TO PRESERVE STRUCTURAL INTEGRITY DURING DEMOLITION. THE CONTRACTOR SHALL
NOT CUT STRUCTURAL WORK IN A MANNER RESULTING IN A REDUCTION OF LOAD CARRYING
CAPACITY OR LOAD /DEFLECTION RATIO. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL
STRUCTURAL CUTS PRIOR TO EXECUTION SO THAT APPROVAL CAN BE OBTAINED FROM THE
ARCHITECT AND STRUCTURAL ENGINEER,
3. THE CONTRACTOR SHALL VERIFY THAT EXIT EGRESS IS MAINTAINED FOR ALL OCCUPIED AREAS
OF THE BUILDING THROUGHOUT ALL PHASES OF CONSTRUCTION.
4. REMOVE EXISTING CONSTRUCTION AS INDICATED. TYPICAL WALL REMOVAL INCLUDES MECHANICAL,
PLUMBING, COMMUNICATIONS, INFORMATION SYSTEMS, AND ELECTRICAL SYSTEMS CONTAINED
THEREIN. REMOVE DOORS, CASEWORK, WINDOWS, FRAMES, FINISHES AND OTHER FIXTURES AS
REQUIRED.
AFTER REMOVAL OF PIPE CHASES, PATCH HOLES IN EXISTING FLOORS OR WALLS TO REMAIN TO
MEET ORIGINAL FIRE PROTECTION AND STRUCTURAL REQUIREMENTS. PATCH ADJOINING WALLS,
FLOOR, AND DECK. PREPARE SURFACES TO RECEIVE NEW FINISH PER FINISH SCHEDULE (WHERE NEW
FINISHES ARE CALLED FOR ON EXISTING SURFACES, REMOVE THE EXISTING FINISH AND PREPARE
SURFACE TO.RECEIVE THE NEW FINISH)
5_ COORDINATE DEMOLITION AND LOCATION OF G.C. DUMPSTER WITH HOSPITAL P.M. G.C. SHALL NOT
USE HOSPITAL'S DUMPSTERS NOR USE ANY OF THE HOSPITALS WASTE DISPOSAL CONTAINERS OR
SYSTEMS FOR DISPOSAL OF CONSTRUCTION MATERIALS AND DEBRIS. DEBRIS SHALL NOT
ACCUMULATE AT THE PROJECT SITE LOCATION AND SHALL BE CARTED OFF FOLLOWING DAILY WORK
IN ACCORD WITH OWNER'S I.C.R.A. POLICY.
6. IN ACCORD WITH MEP DRAWINGS REMOVE ALL DESIGNATED ELECTRICAL FIXTURES AND ALL
ELECTRICAL DROPS IN EXISTING PARTITIONS AND AREAS OF DEMOLITION.
7. ALL ITEMS INDICATED TO BE STORED FOR REUSE ARE TO BE STORED AS DIRECTED BY THE
OWNER'S P.M.
8. THE DEMOLITION CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS AND CROSS
REFERENCE TO THE DEMOLITION DOCUMENTS. IF ANY CONFLICT IS DISCOVERED, THE ARCHITECT
MUST BE NOTIFIED PRIOR TO BID OR DEMOLITION COMMENCEMENT. IF DISCOVERED AFTER DEMOLITION
HAS COMMENCED, WORK WILL STOP IN THE CONFLICT AREA UNTIL THE ARCHITECT HAS REVIEWED
THE CONFLICT.
9_ THE DEMOLITION DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED
USING DESIGN DOCUMENTS PROVIDED BY THE OWNER. ACTUAL CONDITIONS AT THE SITE MAY VARY.
THE DEMOLITION WORK IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION WORK AND IN
NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL DEMOLITION REQUIRED TO
COMPLETE THE NEW WORK.
10. REROUTE OR CAP, AS REQUIRED, ALL CONCEALED WIRING, PIPING, OR OTHER UTILITIES WITHIN
EXISTING AREAS TO BE DEMOLISHED AS PER TRADE STANDARDS AND APPLICABLE CODES.
11. REFER TO ARCHITECTURAL AND ENGINEERING DRAWINGS AND SPECIFICATIONS FOR REPLACEMENT
OR REPAIR AND REFINISHING OF EXISTING BUILDING SYSTEMS OR COMPONENTS TO REMAIN THAT
ARE DISTURBED OR OTHERWISE LEFT UNFINISHED BY THE DEMOLITION WORK.
12. REVIEW AND IMPLEMENT ALL I.C.R.A. REQUIREMENTS AS PROVIDED BY THE OWNER. LIMIT THE
AMOUNT OF NOISE AND DUST POLLUTION WITHIN THE CONSTRUCTION AREA BY INSTALLING
TEMPORARY ENCLOSURES AND BARRIERS SPECIFIED AS REQUIRED BY HOSPITAL'S I.C.R.A. POLICY TO
MAINTAIN OCCUPANCY AND USE OF SPACES IN EXISTING AREAS OF THE BUILDING 24 HOURS PER
DAY. THE EXACT C2 #YC2# ?LOCATION ANC2 #yC2 # ?D QUANTITY OF TEMPORARY PARC2 #YC2 # ?TITIONS
REQUIRED IS TO BE DETERMINED BY HOSPITAL'S I.C.R.A. POLICY. ALL TEMPORARY PARTITIONS
SEPARATING OCCUPIED AREAS FROM CONSTRUCTION ACTIVITY SHALL BE 1 -HOUR FIRE RATED.
WHERE POLYETHYLENE MEMBRANE IS USED IT SHALL BE U.L. RATED, 1 -HOUR FIRE RATED.
13. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS AND EXIT
LIGHTING ARE TO REMAIN. FIRE PROTECTIVE DEVICES AND FIRE ALARMS SHALL BE MAINTAINED.
14. ALL EXISTING AREAS TO REMAIN AND EXISTING AREAS AFFECTED BY DEMOLITION OR NEW
CONSTRUCTION WORK AS SHOWN ON DRAWINGS SHALL BE PATCHED AS REQUIRED TO MATCH
IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR, UNLESS
OTHERWISE NOTED. WORK TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED,
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR PATCHING ANY DAMAGE WHICH
MAY OCCUR DURING DEMOLITION ACTIVITIES. THE CONTRACTOR SHALL REPLACE OR REPAIR ANY
EXISTING TO REMAIN FINISHES, ETC., WHICH ARE DAMAGED DURING DEMOLITION (I.E. - CEILING GRID,
CEILING TILE, WALL COVERINGS, FLOOR COVERINGS, CORNER GUARDS, WALL GUARDS, HANDRAILS,
CHAIR RAIL, MOULDINGS, ETC.) REPAIRS TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED.
16. IF ANY EXISTING FIRE PROOFING OR FIRE ASSEMBLIES WHICH ARE SUPPOSED TO REMAIN ARE
DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO CONFORM TO ORIGINAL FIRE
PROTECTION REQUIREMENTS. CONTACT ARCHITECT TO VERIFY U.L. ASSEMBLIES TO BE USED FOR
REPAIRS.
17. THE DEMOLITION CONTRACTOR SHALL ADHERE TO ANY /ALL REQUIREMENTS AS PROVIDED BY
BAPTIST HEALTH, ET. AL. CONCERNING BUT NOT LIMITED TO DEBRIS REMOVAL AND DISPOSAL,
CONSTRUCTION WORK PATH AND RESTRICTIONS, ACCEPTABLE WORKING HOURS AND NOISE LEVELS,
PROTECTION OF NON - CONSTRUCTION AREAS, MITIGATION OF AIRBORN DUST AND PARTICULATES
(I.C.R.A.), AND ANY /ALL WORK PROCEDURES REQUIRED BY THE HOSPITALS' CONSTRUCTION SERVICE
DEPARTMENT. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO LEARN OF, COORDINATE,
AND IMPLEMENT THESE PROCEDURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
18. WHERE EXISTING CONSTRUCTION IS FOUND TO CONTAIN ASBESTOS, NOTIFY THE OWNER AND THE
ARCHITECT IN WRITING. REMOVAL, DISPOSAL AND REPLACEMENT OF THE ASBESTOS MATERIAL SHALL
BE IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.
M
ffi
0
Lia, 7
r
Sim 0
I
I I
_... _.._._. -_
� I
I I
EXISTING WINDOW TO BE I
REMOVED
ALL WALLS TO BE
PATCHED AND REPAIRED.
PREPARE TO RECEIVE
NEW FINISH.
CEILING TO REMAIN--//
DOOR TO REMAIN. �EI�- I -Ih�,G
PROTECT DURING OFFICE
CONSTRUCTION.
EXISTING VINYL FLOORING
AND BASE TO BE REMOVED.
PREPARE BASE TO RECEIVE
NEW FINISH
DOOR TO II E
REMAIN. /�bXl�, ING�RNpTURE Tp _ _— _ _— _— _ _ — — — — � .�.�F —TGL�
PROTECT / CBE RELOC�TED — — PRIVACY CURTA — t BE REMOVED I
DURING I I I� I I PRIVACY
TO BE REMOVE I— — — — — — — �I
CONSTRUCTION. — — �A L WA ,CREW= AIf�EB -� I— &
D .EPLAaD_F9i — I— NEW
/LJ AND PAINTFD. / I— `r I
EXISTING F E 11 II II I I
OFFICE E L -1 ::4�
_ I �
FLOORIN S
ND BA E TO— — Tflt,�1 3TING L — I-
-j BE REM D /PATCH & � I t„ILT SOUND
PREPARE TO RECEIVE E �-- —j� F-
n NEW MATERRyAl: , I I II II EXISTING FURNITURE
L_ —I J TO BE RELOCATED. L _
_f — — — — — GC TO COORDINATE
H �E �I I F I WITH BHE F�?R_�11EV_ J LOCH ION -
�11 CEI IING TO I�EMAIN.� I L — — — — I -
II I PTECT DURING
I—
1.1_1 QNSTRU�TION I _
EXISTING
CLOSET -
TO REMAIN
NEW DOOR
W/ LOCK -
INFILL OPENING AFTER WINDOW DEMO.
WATCH AND REPAIR IMMEDIATE
NEW HANDRAIL ADJACENT AREAS TO MATCH EXISTING
TO MATCH FINISHES. COORDINATE WITH BHE (PM)
EXISTING, SEE-] FOR REPAIR MATCHING LIMITS.
DETAIL 7/A7.1
NEW SHELF
CEILING MOUNTED
�— 71 PROJECTOR PROVIDED
i I BY OWNER.
INSTALLED BY GC
NEW
CLASSROOM
- - - - - -- -
I
I
I
I
I
I
BHE IS TO TEST HEAD
BOARD AND MED GAS
OPERATIONS PRIOR TO
ROOM OCCUPANCY r
LNEW PRIVACY COURTAIN TO
MATCH AND REPLACE EXISTING.
IENT ROOM
REMAIN AS IS
EXISTING
CLOSET — — —
TO REMAIN qpj
NEW DOOR
W% LOCK
INFILL OPENING AFTER WINDOW DEMO.
PATCH AND REPAIR IMMEDIATE
NEW HANDRAIL 6 ADJACENT AREAS TO MATCH EXISTING
TO MATCH A ®71 FINISHES. COORDINATE WITH BHE (PM)
EXISTING. SEE FOR REPAIR MATCHING LIMITS.
DETAIL 7/A7.1
ALIGN
NEW OFFICE
E NEW WALL PAINT AND
NEW FLOOR. SEE
FINISH SCHEDULE
3
A -7.0 NEW SHELF
NEW WALL PAINT, SEE
FINISH SCHEDULE
NEW
CLASSROOM
r- NEW FLOOR FINISH TO BE
CARPET. PER BHE
STANDARDS
I
I
0
x
DIY
F
I �
I I
NEW SIGNAGE-I1TO 'BE OWNER PROVIDED,
GC INSTALLED. MOUNTED AT LATCH S ;DE
WALL AT 60" IAFFI TO THE CENTERLINE
OF THE SIGN.I I
P -��—�
------- - - - - -�
BHE IS TO TEST HEAD
BOARD AND MED GAS
OPERATIONS PRIOR TO I
ROOM OCCUPANCY
I
I
IENT ROOM
REMAIN AS IS
I
I
I
® DETAIL NUMBER
I I A -aoo SHEET NUMBER
L —J
0 SECTION NUMBER
A-.ppO SHEET NUMBER
DO NOT DISTURB
1 NEW FLOOR PLAN
SCALE: 1 /4" = 1' -0"
m
m �F
I d II
"tw *[UUnm 'SLa':^M: .r.1L NL.G. L1:4.I.J.W3ll.IINb4gYf.4 }M u�x:l.
n I�`
�Ii I
edward lewis
architects
9024 SW 152 STREET
VILLAGE OF PALMETTO BAY, FL 33157
P (305) 234 -0576 F (786) 472 -4193
EDWARD LEWIS ARCHITECTS, INC.
AAC001678
C. EDWARD LEWIS AR 0009567
M /E /P Engineer
Structural Engineer
RCP LEGEND
2'X4' FLUORESCENT FIXTURE - EXIST
DIFFUSER '3' ' F SOUTH 'AIAMI
U ILDING Dr-- )T'.
DIFFUSER
01 r UCTIJRAI SE f.
. 1"10N
® SPRINKLER
�O HIHAT ' ?IV)VED 8Y, _
N DENOTES NEWS
.:.. f f 10
E DENOTES EXISTING `_' _ .m...m «T�:Z-.,
m
EXISTING CEILING GRID TO
TILE 8c D FIXTURE TO BE REMOVED
REMAIN RE FIXTURE TO BE RELOCATED
AREA OF CEILING TO BE
REPAIRED AFTER SCREEN AND
PROJECTOR INSTALLATIONS
CE�PR ING MOUNTED
JECTOR BY OWNER
GC TO PROVIDE
SUPPORT
EXISTING CEILING TILE
MKCRID TO REMAIN.
MEOW, — p-malmlIELACE TILES AS
E10.4 I IIPED
\p
()f JAG q .
01-0 9
e3 z
2 NEW LIGHTING PLAN
SCALE. 1/4" = V-0"
M
d'
==� Q O WW
a �pU)
O LL
QN-
M p
Q
C4
to
Seal
Edward L�ew 'e
ARO Og 7 f F3 a y} Z r x
:x
s 1
r
Revision
Project Number
09 -036
Date
February, 2010
Sheet Title
AREA 1
CD PLANS
It. o
Drawn bye KIL
Checked bye ELEWIS
w o Sheet Number
A 3..0
_J a_
0
Q J
W G
G
Ito
J
O
u QQ,a O
IOU.
CL Q
Q z
z a
a
""' C
CO
:. J —
<0
—I ,
,
y M •
• I
I-
Seal
Edward L�ew 'e
ARO Og 7 f F3 a y} Z r x
:x
s 1
r
Revision
Project Number
09 -036
Date
February, 2010
Sheet Title
AREA 1
CD PLANS
It. o
Drawn bye KIL
Checked bye ELEWIS
w o Sheet Number
A 3..0
_J a_
0