Loading...
10-264-003DEMOLITION 140TES 1. THE CONTRACTOR SHALL VERIFY THAT CONSTRUCTION OF EXISTING WALLS MEETS THE FIRE PROTECTION 'RATINGS DESIGNATED ON THESE DRAWINGS. HE SHALL ALSO MAKE ANY REPAIRS OR MODIFICATIONS NECESSARY TO BRING EXISTING WALLS, DOORS, DUCTS, ETC. UP TO THE PROPER INDICATED FIRE PROTECTION RATING. DOORS AND /OR FRAMES NOT MEETING RATING REQUIREMENTS OR BEARING PROPER LABELS SHALL BE REPLACED. 2. THE CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURES AND ALL STRUCTURAL ELEMENTS AS NECESSARY TO PRESERVE STRUCTURAL INTEGRITY DURING DEMOLITION. THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A MANNER RESULTING IN A REDUCTION OF LOAD CARRYING CAPACITY OR LOAD /DEFLECTION RATIO. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL STRUCTURAL CUTS PRIOR TO EXECUTION SO THAT APPROVAL CAN BE OBTAINED FROM THE ARCHITECT AND STRUCTURAL ENGINEER, 3. THE CONTRACTOR SHALL VERIFY THAT EXIT EGRESS IS MAINTAINED FOR ALL OCCUPIED AREAS OF THE BUILDING THROUGHOUT ALL PHASES OF CONSTRUCTION. 4. REMOVE EXISTING CONSTRUCTION AS INDICATED. TYPICAL WALL REMOVAL INCLUDES MECHANICAL, PLUMBING, COMMUNICATIONS, INFORMATION SYSTEMS, AND ELECTRICAL SYSTEMS CONTAINED THEREIN. REMOVE DOORS, CASEWORK, WINDOWS, FRAMES, FINISHES AND OTHER FIXTURES AS REQUIRED. AFTER REMOVAL OF PIPE CHASES, PATCH HOLES IN EXISTING FLOORS OR WALLS TO REMAIN TO MEET ORIGINAL FIRE PROTECTION AND STRUCTURAL REQUIREMENTS. PATCH ADJOINING WALLS, FLOOR, AND DECK. PREPARE SURFACES TO RECEIVE NEW FINISH PER FINISH SCHEDULE (WHERE NEW FINISHES ARE CALLED FOR ON EXISTING SURFACES, REMOVE THE EXISTING FINISH AND PREPARE SURFACE TO.RECEIVE THE NEW FINISH) 5_ COORDINATE DEMOLITION AND LOCATION OF G.C. DUMPSTER WITH HOSPITAL P.M. G.C. SHALL NOT USE HOSPITAL'S DUMPSTERS NOR USE ANY OF THE HOSPITALS WASTE DISPOSAL CONTAINERS OR SYSTEMS FOR DISPOSAL OF CONSTRUCTION MATERIALS AND DEBRIS. DEBRIS SHALL NOT ACCUMULATE AT THE PROJECT SITE LOCATION AND SHALL BE CARTED OFF FOLLOWING DAILY WORK IN ACCORD WITH OWNER'S I.C.R.A. POLICY. 6. IN ACCORD WITH MEP DRAWINGS REMOVE ALL DESIGNATED ELECTRICAL FIXTURES AND ALL ELECTRICAL DROPS IN EXISTING PARTITIONS AND AREAS OF DEMOLITION. 7. ALL ITEMS INDICATED TO BE STORED FOR REUSE ARE TO BE STORED AS DIRECTED BY THE OWNER'S P.M. 8. THE DEMOLITION CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS AND CROSS REFERENCE TO THE DEMOLITION DOCUMENTS. IF ANY CONFLICT IS DISCOVERED, THE ARCHITECT MUST BE NOTIFIED PRIOR TO BID OR DEMOLITION COMMENCEMENT. IF DISCOVERED AFTER DEMOLITION HAS COMMENCED, WORK WILL STOP IN THE CONFLICT AREA UNTIL THE ARCHITECT HAS REVIEWED THE CONFLICT. 9_ THE DEMOLITION DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING DESIGN DOCUMENTS PROVIDED BY THE OWNER. ACTUAL CONDITIONS AT THE SITE MAY VARY. THE DEMOLITION WORK IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION WORK AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL DEMOLITION REQUIRED TO COMPLETE THE NEW WORK. 10. REROUTE OR CAP, AS REQUIRED, ALL CONCEALED WIRING, PIPING, OR OTHER UTILITIES WITHIN EXISTING AREAS TO BE DEMOLISHED AS PER TRADE STANDARDS AND APPLICABLE CODES. 11. REFER TO ARCHITECTURAL AND ENGINEERING DRAWINGS AND SPECIFICATIONS FOR REPLACEMENT OR REPAIR AND REFINISHING OF EXISTING BUILDING SYSTEMS OR COMPONENTS TO REMAIN THAT ARE DISTURBED OR OTHERWISE LEFT UNFINISHED BY THE DEMOLITION WORK. 12. REVIEW AND IMPLEMENT ALL I.C.R.A. REQUIREMENTS AS PROVIDED BY THE OWNER. LIMIT THE AMOUNT OF NOISE AND DUST POLLUTION WITHIN THE CONSTRUCTION AREA BY INSTALLING TEMPORARY ENCLOSURES AND BARRIERS SPECIFIED AS REQUIRED BY HOSPITAL'S I.C.R.A. POLICY TO MAINTAIN OCCUPANCY AND USE OF SPACES IN EXISTING AREAS OF THE BUILDING 24 HOURS PER DAY. THE EXACT C2 #YC2# ?LOCATION ANC2 #yC2 # ?D QUANTITY OF TEMPORARY PARC2 #YC2 # ?TITIONS REQUIRED IS TO BE DETERMINED BY HOSPITAL'S I.C.R.A. POLICY. ALL TEMPORARY PARTITIONS SEPARATING OCCUPIED AREAS FROM CONSTRUCTION ACTIVITY SHALL BE 1 -HOUR FIRE RATED. WHERE POLYETHYLENE MEMBRANE IS USED IT SHALL BE U.L. RATED, 1 -HOUR FIRE RATED. 13. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS AND EXIT LIGHTING ARE TO REMAIN. FIRE PROTECTIVE DEVICES AND FIRE ALARMS SHALL BE MAINTAINED. 14. ALL EXISTING AREAS TO REMAIN AND EXISTING AREAS AFFECTED BY DEMOLITION OR NEW CONSTRUCTION WORK AS SHOWN ON DRAWINGS SHALL BE PATCHED AS REQUIRED TO MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR, UNLESS OTHERWISE NOTED. WORK TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED, 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR PATCHING ANY DAMAGE WHICH MAY OCCUR DURING DEMOLITION ACTIVITIES. THE CONTRACTOR SHALL REPLACE OR REPAIR ANY EXISTING TO REMAIN FINISHES, ETC., WHICH ARE DAMAGED DURING DEMOLITION (I.E. - CEILING GRID, CEILING TILE, WALL COVERINGS, FLOOR COVERINGS, CORNER GUARDS, WALL GUARDS, HANDRAILS, CHAIR RAIL, MOULDINGS, ETC.) REPAIRS TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED. 16. IF ANY EXISTING FIRE PROOFING OR FIRE ASSEMBLIES WHICH ARE SUPPOSED TO REMAIN ARE DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO CONFORM TO ORIGINAL FIRE PROTECTION REQUIREMENTS. CONTACT ARCHITECT TO VERIFY U.L. ASSEMBLIES TO BE USED FOR REPAIRS. 17. THE DEMOLITION CONTRACTOR SHALL ADHERE TO ANY /ALL REQUIREMENTS AS PROVIDED BY BAPTIST HEALTH, ET. AL. CONCERNING BUT NOT LIMITED TO DEBRIS REMOVAL AND DISPOSAL, CONSTRUCTION WORK PATH AND RESTRICTIONS, ACCEPTABLE WORKING HOURS AND NOISE LEVELS, PROTECTION OF NON - CONSTRUCTION AREAS, MITIGATION OF AIRBORN DUST AND PARTICULATES (I.C.R.A.), AND ANY /ALL WORK PROCEDURES REQUIRED BY THE HOSPITALS' CONSTRUCTION SERVICE DEPARTMENT. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO LEARN OF, COORDINATE, AND IMPLEMENT THESE PROCEDURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 18. WHERE EXISTING CONSTRUCTION IS FOUND TO CONTAIN ASBESTOS, NOTIFY THE OWNER AND THE ARCHITECT IN WRITING. REMOVAL, DISPOSAL AND REPLACEMENT OF THE ASBESTOS MATERIAL SHALL BE IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS. M ffi 0 Lia, 7 r Sim 0 I I I _... _.._._. -_ � I I I EXISTING WINDOW TO BE I REMOVED ALL WALLS TO BE PATCHED AND REPAIRED. PREPARE TO RECEIVE NEW FINISH. CEILING TO REMAIN--// DOOR TO REMAIN. �EI�- I -Ih�,G PROTECT DURING OFFICE CONSTRUCTION. EXISTING VINYL FLOORING AND BASE TO BE REMOVED. PREPARE BASE TO RECEIVE NEW FINISH DOOR TO II E REMAIN. /�bXl�, ING�RNpTURE Tp _ _— _ _— _— _ _ — — — — � .�.�F —TGL� PROTECT / CBE RELOC�TED — — PRIVACY CURTA — t BE REMOVED I DURING I I I� I I PRIVACY TO BE REMOVE I— — — — — — — �I CONSTRUCTION. — — �A L WA ,CREW= AIf�EB -� I— & D .EPLAaD_F9i — I— NEW /LJ AND PAINTFD. / I— `r I EXISTING F E 11 II II I I OFFICE E L -1 ::4� _ I � FLOORIN S ND BA E TO— — Tflt,�1 3TING L — I- -j BE REM D /PATCH & � I t„ILT SOUND PREPARE TO RECEIVE E �-- —j� F- n NEW MATERRyAl: , I I II II EXISTING FURNITURE L_ —I J TO BE RELOCATED. L _ _f — — — — — GC TO COORDINATE H �E �I I F I WITH BHE F�?R_�11EV_ J LOCH ION - �11 CEI IING TO I�EMAIN.� I L — — — — I - II I PTECT DURING I— 1.1_1 QNSTRU�TION I _ EXISTING CLOSET - TO REMAIN NEW DOOR W/ LOCK - INFILL OPENING AFTER WINDOW DEMO. WATCH AND REPAIR IMMEDIATE NEW HANDRAIL ADJACENT AREAS TO MATCH EXISTING TO MATCH FINISHES. COORDINATE WITH BHE (PM) EXISTING, SEE-] FOR REPAIR MATCHING LIMITS. DETAIL 7/A7.1 NEW SHELF CEILING MOUNTED �— 71 PROJECTOR PROVIDED i I BY OWNER. INSTALLED BY GC NEW CLASSROOM - - - - - -- - I I I I I I BHE IS TO TEST HEAD BOARD AND MED GAS OPERATIONS PRIOR TO ROOM OCCUPANCY r LNEW PRIVACY COURTAIN TO MATCH AND REPLACE EXISTING. IENT ROOM REMAIN AS IS EXISTING CLOSET — — — TO REMAIN qpj NEW DOOR W% LOCK INFILL OPENING AFTER WINDOW DEMO. PATCH AND REPAIR IMMEDIATE NEW HANDRAIL 6 ADJACENT AREAS TO MATCH EXISTING TO MATCH A ®71 FINISHES. COORDINATE WITH BHE (PM) EXISTING. SEE FOR REPAIR MATCHING LIMITS. DETAIL 7/A7.1 ALIGN NEW OFFICE E NEW WALL PAINT AND NEW FLOOR. SEE FINISH SCHEDULE 3 A -7.0 NEW SHELF NEW WALL PAINT, SEE FINISH SCHEDULE NEW CLASSROOM r- NEW FLOOR FINISH TO BE CARPET. PER BHE STANDARDS I I 0 x DIY F I � I I NEW SIGNAGE-I1TO 'BE OWNER PROVIDED, GC INSTALLED. MOUNTED AT LATCH S ;DE WALL AT 60" IAFFI TO THE CENTERLINE OF THE SIGN.I I P -��—� ------- - - - - -� BHE IS TO TEST HEAD BOARD AND MED GAS OPERATIONS PRIOR TO I ROOM OCCUPANCY I I IENT ROOM REMAIN AS IS I I I ® DETAIL NUMBER I I A -aoo SHEET NUMBER L —J 0 SECTION NUMBER A-.ppO SHEET NUMBER DO NOT DISTURB 1 NEW FLOOR PLAN SCALE: 1 /4" = 1' -0" m m �F I d II "tw *[UUnm 'SLa':^M: .r.1L NL.G. L1:4.I.J.W3ll.IINb4gYf.4 }M u�x:l. n I�` �Ii I edward lewis architects 9024 SW 152 STREET VILLAGE OF PALMETTO BAY, FL 33157 P (305) 234 -0576 F (786) 472 -4193 EDWARD LEWIS ARCHITECTS, INC. AAC001678 C. EDWARD LEWIS AR 0009567 M /E /P Engineer Structural Engineer RCP LEGEND 2'X4' FLUORESCENT FIXTURE - EXIST DIFFUSER '3' ' F SOUTH 'AIAMI U ILDING Dr-- )T'. DIFFUSER 01 r UCTIJRAI SE f. . 1"10N ® SPRINKLER �O HIHAT ' ?IV)VED 8Y, _ N DENOTES NEWS .:.. f f 10 E DENOTES EXISTING `_' _ .m...m «T�:Z-., m EXISTING CEILING GRID TO TILE 8c D FIXTURE TO BE REMOVED REMAIN RE FIXTURE TO BE RELOCATED AREA OF CEILING TO BE REPAIRED AFTER SCREEN AND PROJECTOR INSTALLATIONS CE�PR ING MOUNTED JECTOR BY OWNER GC TO PROVIDE SUPPORT EXISTING CEILING TILE MKCRID TO REMAIN. MEOW, — p-malmlIELACE TILES AS E10.4 I IIPED \p ()f JAG q . 01-0 9 e3 z 2 NEW LIGHTING PLAN SCALE. 1/4" = V-0" M d' ==� Q O WW a �pU) O LL QN- M p Q C4 to Seal Edward L�ew 'e ARO Og 7 f F3 a y} Z r x :x s 1 r Revision Project Number 09 -036 Date February, 2010 Sheet Title AREA 1 CD PLANS It. o Drawn bye KIL Checked bye ELEWIS w o Sheet Number A 3..0 _J a_ 0 Q J W G G Ito J O u QQ,a O IOU. CL Q Q z z a a ""' C CO :. J — <0 —I , , y M • • I I- Seal Edward L�ew 'e ARO Og 7 f F3 a y} Z r x :x s 1 r Revision Project Number 09 -036 Date February, 2010 Sheet Title AREA 1 CD PLANS It. o Drawn bye KIL Checked bye ELEWIS w o Sheet Number A 3..0 _J a_ 0