Loading...
10-264-001GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH A.H.C.A. (STATE) AND F.B.C. REQUIREMENTS OF HOSPITAL FACILITIES, ZONING REQUIREMENTS, AND ALL OTHER APPLICABLE FEDERAL, MUNICIPAL, AND COUNTY CODE REQUIREMENTS. 2. BEFORE PERFORMING ANY WORK OR ORDERING ANY MATERIALS THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF ANY EXISTING AND NEW WORK AND SHALL BE RESPONSIBLE FOR ITS ACCURACY. ANY DIFFERENCES FOUND SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER FOR VERIFICATION BEFORE PROCEEDING WITH THE WORK. 3. THE CONSTRUCTION PROCEDURES AND REQUIREMENTS OF BAPTIST HEALTH, ET. AL. SHALL BE CONSIDERED AN INCLUSIVE PART OF THESE SPECIFICATIONS AND /OR DRAWINGS. 4. ALL SUBCONTRACTORS AS WELL AS THE GENERAL CONTRACTOR, SHALL BE GOVERNED BY ALL APPLICABLE SECTIONS OF THESE DOCUMENTS WITH REFERENCE TO THEIR RESPECTIVE AREAS OF WORK. 5. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ADVISE HIS SUBCONTRACTORS AND SUPPLIERS OF THESE REQUIREMENTS HEREIN AND FURNISH THEM WITH THEIR RESPECTIVE SPECIFICATION SECTIONS. 6. DIVISIONS OF THE WORK FOR SUBCONTRACTING PURPOSES SHALL BE BY SPEC. SECTION. ALL WORK SHALL BE PERFORMED BY QUALIFIED CONTRACTORS IN STRICT ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS. 7. THIS DRAWING PACKAGE IS BASE UPON DOCUMENTS, SPECIFICATIONS AND RELATED INFORMATION PROVIDED BY THE OWNER AND /OR OWNER AGENT - NOTIFY THE ARCHITECT IMMEDIATELY IF THERE ARE DISCREPANCIES. 8. THE DESIGN INFORMATION INDICATED ON THE PLANS IS INTENDED TO BE A COMPLETE AND WORKABLE SYSTEM IN ACCORDANCE WITH ALL PRODUCT MANUFACTURERS SPECIFICATIONS, EXISTING AND /OR PROPOSED, BUILDING DESIGN, FIELD CONDITIONS, ETC. ALL MISCELLANEOUS MATERIALS, PARTS, DESIGN DIMENSIONS, WHETHER INDICATED ON PLANS OR NOT, SHALL BE INCLUDED AS PART OF THIS DRAWING PACKAGE. 9. THE ARCHITECT SHALL BE NOTIFIED PRIOR TO START OF CONSTRUCTION, SHOULD EXISTING FIELD CONDITIONS VARY FROM DRAWINGS BY GREATER THAN 1" 10. THE GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE REMOVAL AND STORAGE OF MATERIALS AND ITEMS REFERRED TO AS "TO BE REMOVED AND STORED" AS DETERMINED BY THE HOSPITAL'S CONSTRUCTION SERVICES REPRESENTATIVE. 11. THE GENERAL CONTRACTOR SHALL ALLOW FOR ALL REQUIRED PROVISIONS FOR THE REMOVAL OF TRASH FROM THE SITE, INCLUDING ENVIRONMENTAL CHARGES, DUMPING FEES, ETC. IN HIS ORIGINAL BID SUBMISSION. 12. THE GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING IN EXISTING FLOORS, WALLS AND CEILINGS AS REQUIRED FOR ALL TRADES, EXCLUDING REMOVAL AND RELOCATED ITEMS SHOWN. 13. THE GENERAL CONTRACTOR SHALL REMOVE ALL SPECIFIC ITEMS INDICATED ON DRAWINGS, ALSO REMOVE ANY OTHER ITEM OR CONSTRUCTION AS REQUIRED TO ACCOMPLISH ALL NEW WORK AND /OR REVISION WORK TO, AND /OR REVISION TO EXISTING AREAS AS SHOWN OR DESCRIBED ELSEWHERE IN THE CONTRACT DOCUMENTS. 14. THE GENERAL CONTRACTOR SHALL GRIND AND /OR FILL ALL PROJECTIONS AND VOIDS IN EXISTING FLOORS AS REQUIRED FOR ALL NEW FINISHES: PATCH AND REPAIR AS REQUIRED. 15. THE GENERAL CONTRACTOR OF SUBCONTRACTORS SHALL BE HELD RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF MATERIALS AND ITEMS REFERRED TO AS "DEBRIS" OR DETERMINED BY THE ARCHITECT TO BE REFUSE. 16. THE GENERAL CONTRACTOR SHALL HAVE MADE ALL REQUIRED PROVISIONS FOR THE REMOVAL OF DEBRIS FROM SITE, HAVING CHARGES, DUMPING FEES, ETC., IN HIS ORIGINAL_ BID SUBMISSION. THE GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING 17. IN EXISTING FLOORS, WALLS AND CEILINGS AS REQUIRED FOR ALL TRADES, EXCLUDING REMOVAL AND RELOCATED ITEMS AS SHOWN. Qygk � +fjp- f„7 1 ! p Jf U. � c .011110111111- =L Ong- 0 OOD "A%j rm I M am AM oft M AM IN Mw Im Opp" 3 LABOR &a &aELIV my "I, 0'mLjP""`ffiDA ma ;3`3143' 6 2 0 0 %%`36 www 7 3 !""13'T E ET S 0 U; I rf M I A M Im H I PERMIT AND BID SET Y 18. PRIOR TO STARTING ANY WORK THE CONTRACTOR IS TO TAKE PRECAUTIONS TO SECURE ALL PERMITS, LICENSES, UTILITY CONNECTION CONFIRMATIONS, GOVERNMENTAL APPROVALS, ETU., NECESSARY FOR FULL COMPLETION OF THE PROJECT. 19. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS OF ALL SHOP FABRICATED ITEMS. 20. THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL SIGNAGE, BARRIO - CADDIES, FENCING, LIGHTING, ETC., AS REQUIRED FOR THE PREVENTION OF THE PERSONAL INJURIES TO THE OWNERS, ITS EMPLOYEES, REPRESENTATIVES, CLIENTELE, OR OTHERS WITHIN THE AREAS OF CONSTRUCTION. 21. PROTECTIVE DEVICES TO BE INSTALLED SHALL COMPLY WITH THE RE- REQUIREMENTS OF ALL LOCAL, STATE, AND NATIONAL GOVERNING CODES, THE BUILDING OWNER GUIDELINES, AND OTHER GOVERNING FORMS OF AUTHORITY. THE GENERAL CONTRACTOR SHALL TAKE ORDINARY PRECAUTIONS TO PREVENT THEIR DISRUPTION DURING THE COURSE OF WORK. 22. THE GENERAL CONTRACTOR SHALL TAKE ORDINARY PRECAUTIONS TO SECURE AND PROTECT MATERIALS TO BE RELOCATED OR WAREHOUSE AS DETERMINED BY THE OWNER OR ARCHITECT. - 23. PRIOR TO START TAKE ORDINARY PRECAUTIONS TO SECURE ALL PERMITS, LICENSES, UTILITY CONNECTION CONFIRMATIONS, GOVERNMENTAL APPROVAL, ETC., NECESSARY FOR FULL COMPLETION OF THE PROJECT. 24. THE GENERAL CONTRACTOR SHALL LOCATE ALL GENERAL REFERENCE POINTS AND TAKE ORDINARY PRECAUTIONS TO PREVENT THEIR DISRUPTION. 25. THE GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAWINGS OF ALL SHOP FABRICATED ITEMS. 26. THE GENERAL CONTRACTOR SHALL BE HELD TO HAVE EXAMINED THE SITE WITH RESPECT TO ALL EXISTING FIELD CONDITIONS AND TO HAVE FULLY EXAMINED THE COMPLETE SET OF ARCHITECTURAL DRAWINGS AND SHALL BE RESPONSIBLE FOR THE COORDINATION AND INSERTION OF ALL DRAWING SETS (ARCHITECTURAL, MEP, FIRE SAFETY & FIRE PROTECTION) INCLUDED AS PART OF THE ORIGINAL DRAWING PACKAGE AS PART OF THE CONTRACT DOCUMENTS. IT IS THE RESPONSIBILITY OF THE G.C. TO IMPLEMENT IN THE FIELD ONLY THE WORK SHOWN AND INDICATED ON THE OFFICIAL APPROVED PERMIT SET OF DRAWINGS AND APPROVED CONTRACT MODIFICATIONS. IT IS THE RESPONSIBILITY OF THE G.C. TO COMMENCE WORK ONLY WHEN IN HAND OF ALL GOVERNING AUTHORITIES' REQUIRED CONSTRUCTION PERMITS. 27. THE CONTRACTORS SHALL SUBMIT A CONSTRUCTION SCHEDULE AND SCHEDULE OF VALUES PRIOR TO COMMENCEMENT OF WORK FOR THE OWNERS (P.M.) APPROVAL. 28. THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER (P.M.) WITH A SET OF AS -BUILT PLANS UPON COMPLETION OF THE JOB, SHOWING RUNS OF MEP LINES AND SERVICES AND ANY SIGNIFICANT CHANCES MADE TO BUILDING. AS -BUILT DRAWINGS SHALL BE SUBMITTED ON CD IN .DWG FORMAT. ARCHITECTURE o INTERIORS o PLANNING M /E /P Engineer JGP ENGINEERING GROUP P.A. - -- MIAMI, FLORIDA U3400007788 9300 N.W. 25TH STREET SUITE 207 _ -_- MIAMI, FLORIDA, 33172 (305) 435 -9292 FAX (305) 436 -9272 E -MAIL: JGPMIAMIOBELLSOUTH.NET JOSE G. PUIG SR. FLORIDA P.E. # 47517 JOSE G. PUIG JR. FLORIDA P.E. # 49145 HECTOR M. BLASCO FLORIDA P.E. If 56115 Luigi Ramud® (PM) Baptist Health of South Florida 8900 N. Kendall Dr., Miami, Florida 33176 Ph. 305.786.1960 END USERS REVIEW AND APPROVAL KIM ZIMMERMAN MITZI CATER EILEEN LORING KATHY DE FEO LINDA SARGENT JANINE BALKIN ENGINEERING ELECTRICAL MECHANICAL PLUMBING PM L 1AIIII161 _ *0 M-01 MECHANICAL LAYOUT nw FIRE PROTECTION .. ELECTRIC.4L A EDWARD LEWIS AC 11, INC La �' v v H"ITECTS 0 9024 SW 152 STREET VILLAGE OF PA N AREA OF WORK N.T.S. PH. 305 . 234 0576 © FAX 786. 472 4193 E -MAIL design @elamiami.com v+ 'W'^ a m Q w Q 0 c� rri N 0 v w 41 0 M7 00 I OD 0 Q J W c� W Q �o co LL 0. a N I Q � Q Q O m3:oW 1 O N LL �ONXh V N O O N O