10-1035-025STEEL COLUMN
SEE PLAN r I i 11 12x12x5l8 STEEL
8 -05 VE: Z PLATE W/ (4) 5l
(3)
03 69 "c /c III STUD 8" MIN. Er
GB -1 SEE
SCHEDULE FOR RE INF.
DETAIL
62 SCALE: N.T.S.
STEEL COL.
STEEL I£ -
w -I UJ -1
IL -J2FC;
CONC. COL.
w -i
STEEL COL.
STEEL P_ —
PLAN
STEEL COL. 5TI
STEEL COLUMN
SEE PLAN
GB -1 SEE
SCHEDULE FOR RE INF.
CONC. COL.
W-1 UJ -1
—� 2Pc
W -1
I
I 1
-T I— — — —I T-
- -- -� - - -_J L -- — —
W -1 STEEL fe W -1
ELEVATION
DETAIL
62 SCALE: N.T.S.
n
NEW CONC. COLUMN
SEE PLAN
NEW GONG. SLA5--i
SEE PLAN
Nis
Ali
oil
Nis
KEY TO DRAWING
DENOTES BATTERED PILES, 116 (HORIZONTAL t VERTICAL)
,TYPICAL UNLESS OTHERWISE NOTED.
DENOTES VERTICAL PILE.
(T) DENOTES TENSION PILE.
SEE PLAN
Z FOR REINFORCING
CLEAR
T'
4" IN SHEARWALL PILECAP,
3" IN ALL OTHER PILECAPS
NOTE: DO NOT I I PILE
115RICK" OFF
OF PILES TO
REINFORCING
COMPRESSION PILE DETAIL
CONC. COL. (D
EXISTING BUILDING
TO REMAIN
' - -CUT MONOLITHIC EXISTING
L.]�Lj
FOOTING AS NEEDED TO
LOCATE NEW COLUMN AND
NEW GB -2 GRADE BEAM
SEE PLAN I �-ADD'L 04 612 "c /c DOUBLE
NEW 2PC NEW G5-2
SEE PLAN SEE PLAN
PI E
DETAIL
�a2 SCALE: N.T.S.
CONCRETE WALL
SEE PLAN AS SCHEDULED
TOP BARS AS SCHEDULED
BOTTOM BARS AS SCHEDULED
EL_ AS SCH.
T.O. G.B.
INTM. BARS I I I I I I I I
I I
TIES AS
SCHEDULED'--I I I I I I I I I 11 I
18 "x18" Col
W /4 -#9 VEF
#3 TIES AT
,6 EL-SEE PL
"V TOP OF
PILE CAP
NOTE: DO NOT
"BRICK" OFF
OF PILES TO
SUPPORT
REINFORCING
SEE PLAN
FOR REINFORCING
CLEAR
4" IN SHEARWALL PILECAP,
3" IN ALL OTHER PILECAPS
PILE
T= TENSION PILES
Z SEE PLAN FOR COMPRESSION
OR TENSION PILES, FOR
REINFORCING.
3" IN ALL OTHER PILECAPS
NOTE: DO NOT I I PILE
"BRICK" OFF
OF PILES TO
SUPPORT 6
REINFORCING
I 3 BATTER PILE DETAIL
DETAIL
62
�nr J75 SCALE: 3/8' =1' -0"
_— (—
PILE CAP BEYOND, SEE PLAN _J L_ =I I (=
AS SCHEDULED. =1 I = 1=
III— III— IIIIiIII�II(IIE�I(IIIEIII I�III111I(III�III(�
C GRADE BEAM ABOVE PILECAP -PIER DETAIL
SCALE = N.T.S.
_1
C'*1
r r Ell!
7' -0'1 11 -011
1' -6" 21 -0" 2' -0" 1' -6" 1' -6" 4' -0" 1' -6"
r I
2 PC 2 PC-SP2
DEPTH =36 DEPTH =36 "
8 - 08 SHORT WAY BOTTOM 5-#10 TOP 4 BOTT. LONG WAY
5 - 010 LONG WAY BOTTOM 8 -#8 TOP 4 BOTT. SHORT WAY
8'-6"
1' -611 5�_ oil 1._ oil
I I I
E
.Q,
2 -SPI (FUTURE PHASE 111)
DEPTH =36"
10 -08 SHORT WAY BOTTOM
S -010 LONG WAY BOTTOM
(T) DENOTES TENSION PILE
13
40 A
21_011 21 -10" 2' -1011 21_011
81 -011 S!/
2' -0" 2' -0" 2' -0" 21 -0"
� e
1
- + - j---I- - 14 e 1 =
C -- - -- - I - -= Q C -- ----- - - -I --
t---- 1 I H
/ \ I /--N `14
—� I �— + + �t' + —
I I I I @ ( Q
1
4 PC
DEPTH =44"
11 -08 BOTTOM E.W.
GRADE BEAM SYMMETRICAL
M
DATE:
ABOUT CENTERLINE, SEE PLAN
DRAWN:
NOT SHOWN FOR CLARITY.
BH
CADD FILE: H:INSTITIITIONAL
CONCRETE COLUMN BEYOND
_
cn
PILE CAP
DETAILS
SEE PLAN AS SCHEDULED
M
8
I
\\m
TOP BARS AS SCHEDULED
\
\
cv
BOTTOM BARS AS SCHEDULED
J% EL. AS SCH.
1T.O�. G.5.
Q
—
_
Cn
_I
1 1 1 1 1 1 I I
1J J J I
1 1 1 1 1 1 I
—L
A
,L EL. SEE PLAN
I I I I I I I I I
-a- -I- -4- -}- I
4
TOP OF
PILE CAP
/ 1
d
a
°
d
0
—1
CV
XXXXX
1 i
I 4"
XXXXX
PILE CAP BEYOND, SEE PLAN
/
I
GB -1 SEE
SCHEDULE FOR RE INF.
DETAIL
62 SCALE: N.T.S.
STEEL COL.
STEEL I£ -
w -I UJ -1
IL -J2FC;
CONC. COL.
w -i
STEEL COL.
STEEL P_ —
PLAN
STEEL COL. 5TI
STEEL COLUMN
SEE PLAN
GB -1 SEE
SCHEDULE FOR RE INF.
CONC. COL.
W-1 UJ -1
—� 2Pc
W -1
I
I 1
-T I— — — —I T-
- -- -� - - -_J L -- — —
W -1 STEEL fe W -1
ELEVATION
DETAIL
62 SCALE: N.T.S.
n
NEW CONC. COLUMN
SEE PLAN
NEW GONG. SLA5--i
SEE PLAN
Nis
Ali
oil
Nis
KEY TO DRAWING
DENOTES BATTERED PILES, 116 (HORIZONTAL t VERTICAL)
,TYPICAL UNLESS OTHERWISE NOTED.
DENOTES VERTICAL PILE.
(T) DENOTES TENSION PILE.
SEE PLAN
Z FOR REINFORCING
CLEAR
T'
4" IN SHEARWALL PILECAP,
3" IN ALL OTHER PILECAPS
NOTE: DO NOT I I PILE
115RICK" OFF
OF PILES TO
REINFORCING
COMPRESSION PILE DETAIL
CONC. COL. (D
EXISTING BUILDING
TO REMAIN
' - -CUT MONOLITHIC EXISTING
L.]�Lj
FOOTING AS NEEDED TO
LOCATE NEW COLUMN AND
NEW GB -2 GRADE BEAM
SEE PLAN I �-ADD'L 04 612 "c /c DOUBLE
NEW 2PC NEW G5-2
SEE PLAN SEE PLAN
PI E
DETAIL
�a2 SCALE: N.T.S.
CONCRETE WALL
SEE PLAN AS SCHEDULED
TOP BARS AS SCHEDULED
BOTTOM BARS AS SCHEDULED
EL_ AS SCH.
T.O. G.B.
INTM. BARS I I I I I I I I
I I
TIES AS
SCHEDULED'--I I I I I I I I I 11 I
18 "x18" Col
W /4 -#9 VEF
#3 TIES AT
,6 EL-SEE PL
"V TOP OF
PILE CAP
NOTE: DO NOT
"BRICK" OFF
OF PILES TO
SUPPORT
REINFORCING
SEE PLAN
FOR REINFORCING
CLEAR
4" IN SHEARWALL PILECAP,
3" IN ALL OTHER PILECAPS
PILE
T= TENSION PILES
Z SEE PLAN FOR COMPRESSION
OR TENSION PILES, FOR
REINFORCING.
3" IN ALL OTHER PILECAPS
NOTE: DO NOT I I PILE
"BRICK" OFF
OF PILES TO
SUPPORT 6
REINFORCING
I 3 BATTER PILE DETAIL
DETAIL
62
�nr J75 SCALE: 3/8' =1' -0"
_— (—
PILE CAP BEYOND, SEE PLAN _J L_ =I I (=
AS SCHEDULED. =1 I = 1=
III— III— IIIIiIII�II(IIE�I(IIIEIII I�III111I(III�III(�
C GRADE BEAM ABOVE PILECAP -PIER DETAIL
SCALE = N.T.S.
_1
C'*1
r r Ell!
7' -0'1 11 -011
1' -6" 21 -0" 2' -0" 1' -6" 1' -6" 4' -0" 1' -6"
r I
2 PC 2 PC-SP2
DEPTH =36 DEPTH =36 "
8 - 08 SHORT WAY BOTTOM 5-#10 TOP 4 BOTT. LONG WAY
5 - 010 LONG WAY BOTTOM 8 -#8 TOP 4 BOTT. SHORT WAY
8'-6"
1' -611 5�_ oil 1._ oil
I I I
E
.Q,
2 -SPI (FUTURE PHASE 111)
DEPTH =36"
10 -08 SHORT WAY BOTTOM
S -010 LONG WAY BOTTOM
(T) DENOTES TENSION PILE
13
40 A
21_011 21 -10" 2' -1011 21_011
81 -011 S!/
2' -0" 2' -0" 2' -0" 21 -0"
� e
1
- + - j---I- - 14 e 1 =
C -- - -- - I - -= Q C -- ----- - - -I --
t---- 1 I H
/ \ I /--N `14
—� I �— + + �t' + —
I I I I @ ( Q
1
4 PC
DEPTH =44"
11 -08 BOTTOM E.W.
GRADE BEAM SYMMETRICAL
M
DATE:
ABOUT CENTERLINE, SEE PLAN
DRAWN:
NOT SHOWN FOR CLARITY.
BH
CADD FILE: H:INSTITIITIONAL
CONCRETE COLUMN BEYOND
_
cn
PILE CAP
DETAILS
SEE PLAN AS SCHEDULED
I
\\m
TOP BARS AS SCHEDULED
\
\
cv
BOTTOM BARS AS SCHEDULED
J% EL. AS SCH.
1T.O�. G.5.
_ _f — L� — L= _ —
—
INTM. BARS
1 1 1 1 1 1 I I
1J J J I
1 1 1 1 1 1 I
—L
,L EL. SEE PLAN
I I I I I I I I I
-a- -I- -4- -}- I
4
TOP OF
PILE CAP
/ 1
, -1-41' 1
I
XXXXX
1 i
I 4"
XXXXX
PILE CAP BEYOND, SEE PLAN
/
I
AS SCHEDULED. =1
I I=
J4j
111-
I=
111���111- 111 - - 1 =III:
11I
I I—I I —II
CONNECTION DETAIL PILE
II I► —I O I —I I -111 I — I
CAP TO GRADE BEAM
SCALE = N.T.S.
3 PC
DEPTH =42"
5-#e B. HOOKED, 3 WAYS, T. 4 B.
12' -0"
14 It
2' -0" 41 -011 41 -0'1 2' -011
M
DATE:
07-09 -2010
DRAWN:
CHECKED:
BH
CADD FILE: H:INSTITIITIONAL
_
cn
PILE CAP
DETAILS
I
\\m
c �1
\
\
cv
3 PC
DEPTH =42"
5-#e B. HOOKED, 3 WAYS, T. 4 B.
12' -0"
14 It
2' -0" 41 -011 41 -0'1 2' -011
6 PC
5 � DEPTH =!56 II
DEPTH =44" 18 -#9 SHORT WAY BOTTOM
13 -09 BOTTOM E.W. 12 -09 LONG WAY BOTTOM
GRADE SEAM SYMMETRICAL
ABOUT CENTERLINE, SEE PLAN
NOT SHOWN FOR CLARITY.
CONCRETE COLUMN BEYOND
SEE PLAN AS SCHEDULED
TOP BARS AS SCHEDULED
BOTTOM BARS AS SCHEDULED
EL. 0' -011
T.O. SLAB _7TT-7rT=1
I -III
36 Bar diam.
Ah EL. SEE PLAN
IRV TOP OF I— ;
PILE CAP
I I I I I)
I I I I
_ I —
GRADE BEAM (— =1
SEE PLAN _ _ 1
AS SCHEDULED
_ I -III III III I I III III II1=1 II -III.
I—
PILE CAP BEYOND,
SEE PLAN
AS SCHEDULED.
GRA12E 5EAM LEVEL WITH
P
�1 TYPICAL PILE TO GRADEBEAM CONNECTION DETAIL
SCALE = N.T.S.
I.
J
ARCHITECT:
Architecture Engineering Planning
Interiorbe-sign LAnd.,;cape Architecture
- -2601 S 'outh- Bayshor� Drive 10th Floor
KMiami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
PLANNING ARCHITECT:
WILMOT SANZ
A R C H I T E C T U R E
P L A N N I N G
18310 Montgomery and Avenue
Gaft w%ury. 20879
301 -590 -2900 (Fox 301 -590 -8180
STRUCTURAL ENGINEER: ems` p
1p
R6t4gol_ INZiINE NCiiNE�F�B
AiAl❑RAMON R. DONNELL PE. 001TO90
CfY1l/$THUCT1a O
■PEDRO J. DUQUESNEcPnEits 7 4`
�V OAIDA
A&A$ LB T. A PAM
� 9. th QT'. MAAS. STATE OF FLORDA - AUTHONZATIM W wn
Qsu.c 2006
MEP ENGINEER:
2121 Ponce de Leon Blvd..
Suite 350, Coral Gables, FL 33134
eman n nears phone: 305.569.1692
fez: 305.569.1693
Dallas . Houston Nashville . Miami . Richmond
cord project number.
IT CONSULTANT:
VW�hile.' ENE BURTON & ASSOCIATES
General CeoW Patton D&e 5840 West I- 20,Suite 150
klin,Tennessee37067 Arlington, Te 76017
PM— 615.376.310D Pho u- 817.5632486
. 615.3763114 Par 8173632753
,vw.r.gbainc.com
Medical Equipment and Communications Planners
22 76 A
PERMIT SET
REVISIONS:
PROJECT NAME:
SMH- CLINICAL EXPANSION
FOUNDATION PACKAGE
PHASE II
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
SCALE:
AS SHOWN
DATE:
07-09 -2010
DRAWN:
CHECKED:
BH
CADD FILE: H:INSTITIITIONAL
DRAWING TITLE:
PILE CAP
DETAILS
I
�
/
I
C
--
- - - -
- --
---
'j- -
--
- -:
N
U
I
N
6 PC
5 � DEPTH =!56 II
DEPTH =44" 18 -#9 SHORT WAY BOTTOM
13 -09 BOTTOM E.W. 12 -09 LONG WAY BOTTOM
GRADE SEAM SYMMETRICAL
ABOUT CENTERLINE, SEE PLAN
NOT SHOWN FOR CLARITY.
CONCRETE COLUMN BEYOND
SEE PLAN AS SCHEDULED
TOP BARS AS SCHEDULED
BOTTOM BARS AS SCHEDULED
EL. 0' -011
T.O. SLAB _7TT-7rT=1
I -III
36 Bar diam.
Ah EL. SEE PLAN
IRV TOP OF I— ;
PILE CAP
I I I I I)
I I I I
_ I —
GRADE BEAM (— =1
SEE PLAN _ _ 1
AS SCHEDULED
_ I -III III III I I III III II1=1 II -III.
I—
PILE CAP BEYOND,
SEE PLAN
AS SCHEDULED.
GRA12E 5EAM LEVEL WITH
P
�1 TYPICAL PILE TO GRADEBEAM CONNECTION DETAIL
SCALE = N.T.S.
I.
J
ARCHITECT:
Architecture Engineering Planning
Interiorbe-sign LAnd.,;cape Architecture
- -2601 S 'outh- Bayshor� Drive 10th Floor
KMiami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
PLANNING ARCHITECT:
WILMOT SANZ
A R C H I T E C T U R E
P L A N N I N G
18310 Montgomery and Avenue
Gaft w%ury. 20879
301 -590 -2900 (Fox 301 -590 -8180
STRUCTURAL ENGINEER: ems` p
1p
R6t4gol_ INZiINE NCiiNE�F�B
AiAl❑RAMON R. DONNELL PE. 001TO90
CfY1l/$THUCT1a O
■PEDRO J. DUQUESNEcPnEits 7 4`
�V OAIDA
A&A$ LB T. A PAM
� 9. th QT'. MAAS. STATE OF FLORDA - AUTHONZATIM W wn
Qsu.c 2006
MEP ENGINEER:
2121 Ponce de Leon Blvd..
Suite 350, Coral Gables, FL 33134
eman n nears phone: 305.569.1692
fez: 305.569.1693
Dallas . Houston Nashville . Miami . Richmond
cord project number.
IT CONSULTANT:
VW�hile.' ENE BURTON & ASSOCIATES
General CeoW Patton D&e 5840 West I- 20,Suite 150
klin,Tennessee37067 Arlington, Te 76017
PM— 615.376.310D Pho u- 817.5632486
. 615.3763114 Par 8173632753
,vw.r.gbainc.com
Medical Equipment and Communications Planners
22 76 A
PERMIT SET
REVISIONS:
PROJECT NAME:
SMH- CLINICAL EXPANSION
FOUNDATION PACKAGE
PHASE II
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
SCALE:
AS SHOWN
DATE:
07-09 -2010
DRAWN:
CHECKED:
BH
CADD FILE: H:INSTITIITIONAL
DRAWING TITLE:
PILE CAP
DETAILS
SHEET NO.
s�.2aF