Loading...
10-1035-025STEEL COLUMN SEE PLAN r I i 11 12x12x5l8 STEEL 8 -05 VE: Z PLATE W/ (4) 5l (3) 03 69 "c /c III STUD 8" MIN. Er GB -1 SEE SCHEDULE FOR RE INF. DETAIL 62 SCALE: N.T.S. STEEL COL. STEEL I£ - w -I UJ -1 IL -J2FC; CONC. COL. w -i STEEL COL. STEEL P_ — PLAN STEEL COL. 5TI STEEL COLUMN SEE PLAN GB -1 SEE SCHEDULE FOR RE INF. CONC. COL. W-1 UJ -1 —� 2Pc W -1 I I 1 -T I— — — —I T- - -- -� - - -_J L -- — — W -1 STEEL fe W -1 ELEVATION DETAIL 62 SCALE: N.T.S. n NEW CONC. COLUMN SEE PLAN NEW GONG. SLA5--i SEE PLAN Nis Ali oil Nis KEY TO DRAWING DENOTES BATTERED PILES, 116 (HORIZONTAL t VERTICAL) ,TYPICAL UNLESS OTHERWISE NOTED. DENOTES VERTICAL PILE. (T) DENOTES TENSION PILE. SEE PLAN Z FOR REINFORCING CLEAR T' 4" IN SHEARWALL PILECAP, 3" IN ALL OTHER PILECAPS NOTE: DO NOT I I PILE 115RICK" OFF OF PILES TO REINFORCING COMPRESSION PILE DETAIL CONC. COL. (D EXISTING BUILDING TO REMAIN ' - -CUT MONOLITHIC EXISTING L.]�Lj FOOTING AS NEEDED TO LOCATE NEW COLUMN AND NEW GB -2 GRADE BEAM SEE PLAN I �-ADD'L 04 612 "c /c DOUBLE NEW 2PC NEW G5-2 SEE PLAN SEE PLAN PI E DETAIL �a2 SCALE: N.T.S. CONCRETE WALL SEE PLAN AS SCHEDULED TOP BARS AS SCHEDULED BOTTOM BARS AS SCHEDULED EL_ AS SCH. T.O. G.B. INTM. BARS I I I I I I I I I I TIES AS SCHEDULED'--I I I I I I I I I 11 I 18 "x18" Col W /4 -#9 VEF #3 TIES AT ,6 EL-SEE PL "V TOP OF PILE CAP NOTE: DO NOT "BRICK" OFF OF PILES TO SUPPORT REINFORCING SEE PLAN FOR REINFORCING CLEAR 4" IN SHEARWALL PILECAP, 3" IN ALL OTHER PILECAPS PILE T= TENSION PILES Z SEE PLAN FOR COMPRESSION OR TENSION PILES, FOR REINFORCING. 3" IN ALL OTHER PILECAPS NOTE: DO NOT I I PILE "BRICK" OFF OF PILES TO SUPPORT 6 REINFORCING I 3 BATTER PILE DETAIL DETAIL 62 �nr J75 SCALE: 3/8' =1' -0" _— (— PILE CAP BEYOND, SEE PLAN _J L_ =I I (= AS SCHEDULED. =1 I = 1= III— III— IIIIiIII�II(IIE�I(IIIEIII I�III111I(III�III(� C GRADE BEAM ABOVE PILECAP -PIER DETAIL SCALE = N.T.S. _1 C'*1 r r Ell! 7' -0'1 11 -011 1' -6" 21 -0" 2' -0" 1' -6" 1' -6" 4' -0" 1' -6" r I 2 PC 2 PC-SP2 DEPTH =36 DEPTH =36 " 8 - 08 SHORT WAY BOTTOM 5-#10 TOP 4 BOTT. LONG WAY 5 - 010 LONG WAY BOTTOM 8 -#8 TOP 4 BOTT. SHORT WAY 8'-6" 1' -611 5�_ oil 1._ oil I I I E .Q, 2 -SPI (FUTURE PHASE 111) DEPTH =36" 10 -08 SHORT WAY BOTTOM S -010 LONG WAY BOTTOM (T) DENOTES TENSION PILE 13 40 A 21_011 21 -10" 2' -1011 21_011 81 -011 S!/ 2' -0" 2' -0" 2' -0" 21 -0" � e 1 - + - j---I- - 14 e 1 = C -- - -- - I - -= Q C -- ----- - - -I -- t---- 1 I H / \ I /--N `14 —� I �— + + �t' + — I I I I @ ( Q 1 4 PC DEPTH =44" 11 -08 BOTTOM E.W. GRADE BEAM SYMMETRICAL M DATE: ABOUT CENTERLINE, SEE PLAN DRAWN: NOT SHOWN FOR CLARITY. BH CADD FILE: H:INSTITIITIONAL CONCRETE COLUMN BEYOND _ cn PILE CAP DETAILS SEE PLAN AS SCHEDULED M 8 I \\m TOP BARS AS SCHEDULED \ \ cv BOTTOM BARS AS SCHEDULED J% EL. AS SCH. 1T.O�. G.5. Q — _ Cn _I 1 1 1 1 1 1 I I 1J J J I 1 1 1 1 1 1 I —L A ,L EL. SEE PLAN I I I I I I I I I -a- -I- -4- -}- I 4 TOP OF PILE CAP / 1 d a ° d 0 —1 CV XXXXX 1 i I 4" XXXXX PILE CAP BEYOND, SEE PLAN / I GB -1 SEE SCHEDULE FOR RE INF. DETAIL 62 SCALE: N.T.S. STEEL COL. STEEL I£ - w -I UJ -1 IL -J2FC; CONC. COL. w -i STEEL COL. STEEL P_ — PLAN STEEL COL. 5TI STEEL COLUMN SEE PLAN GB -1 SEE SCHEDULE FOR RE INF. CONC. COL. W-1 UJ -1 —� 2Pc W -1 I I 1 -T I— — — —I T- - -- -� - - -_J L -- — — W -1 STEEL fe W -1 ELEVATION DETAIL 62 SCALE: N.T.S. n NEW CONC. COLUMN SEE PLAN NEW GONG. SLA5--i SEE PLAN Nis Ali oil Nis KEY TO DRAWING DENOTES BATTERED PILES, 116 (HORIZONTAL t VERTICAL) ,TYPICAL UNLESS OTHERWISE NOTED. DENOTES VERTICAL PILE. (T) DENOTES TENSION PILE. SEE PLAN Z FOR REINFORCING CLEAR T' 4" IN SHEARWALL PILECAP, 3" IN ALL OTHER PILECAPS NOTE: DO NOT I I PILE 115RICK" OFF OF PILES TO REINFORCING COMPRESSION PILE DETAIL CONC. COL. (D EXISTING BUILDING TO REMAIN ' - -CUT MONOLITHIC EXISTING L.]�Lj FOOTING AS NEEDED TO LOCATE NEW COLUMN AND NEW GB -2 GRADE BEAM SEE PLAN I �-ADD'L 04 612 "c /c DOUBLE NEW 2PC NEW G5-2 SEE PLAN SEE PLAN PI E DETAIL �a2 SCALE: N.T.S. CONCRETE WALL SEE PLAN AS SCHEDULED TOP BARS AS SCHEDULED BOTTOM BARS AS SCHEDULED EL_ AS SCH. T.O. G.B. INTM. BARS I I I I I I I I I I TIES AS SCHEDULED'--I I I I I I I I I 11 I 18 "x18" Col W /4 -#9 VEF #3 TIES AT ,6 EL-SEE PL "V TOP OF PILE CAP NOTE: DO NOT "BRICK" OFF OF PILES TO SUPPORT REINFORCING SEE PLAN FOR REINFORCING CLEAR 4" IN SHEARWALL PILECAP, 3" IN ALL OTHER PILECAPS PILE T= TENSION PILES Z SEE PLAN FOR COMPRESSION OR TENSION PILES, FOR REINFORCING. 3" IN ALL OTHER PILECAPS NOTE: DO NOT I I PILE "BRICK" OFF OF PILES TO SUPPORT 6 REINFORCING I 3 BATTER PILE DETAIL DETAIL 62 �nr J75 SCALE: 3/8' =1' -0" _— (— PILE CAP BEYOND, SEE PLAN _J L_ =I I (= AS SCHEDULED. =1 I = 1= III— III— IIIIiIII�II(IIE�I(IIIEIII I�III111I(III�III(� C GRADE BEAM ABOVE PILECAP -PIER DETAIL SCALE = N.T.S. _1 C'*1 r r Ell! 7' -0'1 11 -011 1' -6" 21 -0" 2' -0" 1' -6" 1' -6" 4' -0" 1' -6" r I 2 PC 2 PC-SP2 DEPTH =36 DEPTH =36 " 8 - 08 SHORT WAY BOTTOM 5-#10 TOP 4 BOTT. LONG WAY 5 - 010 LONG WAY BOTTOM 8 -#8 TOP 4 BOTT. SHORT WAY 8'-6" 1' -611 5�_ oil 1._ oil I I I E .Q, 2 -SPI (FUTURE PHASE 111) DEPTH =36" 10 -08 SHORT WAY BOTTOM S -010 LONG WAY BOTTOM (T) DENOTES TENSION PILE 13 40 A 21_011 21 -10" 2' -1011 21_011 81 -011 S!/ 2' -0" 2' -0" 2' -0" 21 -0" � e 1 - + - j---I- - 14 e 1 = C -- - -- - I - -= Q C -- ----- - - -I -- t---- 1 I H / \ I /--N `14 —� I �— + + �t' + — I I I I @ ( Q 1 4 PC DEPTH =44" 11 -08 BOTTOM E.W. GRADE BEAM SYMMETRICAL M DATE: ABOUT CENTERLINE, SEE PLAN DRAWN: NOT SHOWN FOR CLARITY. BH CADD FILE: H:INSTITIITIONAL CONCRETE COLUMN BEYOND _ cn PILE CAP DETAILS SEE PLAN AS SCHEDULED I \\m TOP BARS AS SCHEDULED \ \ cv BOTTOM BARS AS SCHEDULED J% EL. AS SCH. 1T.O�. G.5. _ _f — L� — L= _ — — INTM. BARS 1 1 1 1 1 1 I I 1J J J I 1 1 1 1 1 1 I —L ,L EL. SEE PLAN I I I I I I I I I -a- -I- -4- -}- I 4 TOP OF PILE CAP / 1 , -1-41' 1 I XXXXX 1 i I 4" XXXXX PILE CAP BEYOND, SEE PLAN / I AS SCHEDULED. =1 I I= J4j 111- I= 111���111- 111 - - 1 =III: 11I I I—I I —II CONNECTION DETAIL PILE II I► —I O I —I I -111 I — I CAP TO GRADE BEAM SCALE = N.T.S. 3 PC DEPTH =42" 5-#e B. HOOKED, 3 WAYS, T. 4 B. 12' -0" 14 It 2' -0" 41 -011 41 -0'1 2' -011 M DATE: 07-09 -2010 DRAWN: CHECKED: BH CADD FILE: H:INSTITIITIONAL _ cn PILE CAP DETAILS I \\m c �1 \ \ cv 3 PC DEPTH =42" 5-#e B. HOOKED, 3 WAYS, T. 4 B. 12' -0" 14 It 2' -0" 41 -011 41 -0'1 2' -011 6 PC 5 � DEPTH =!56 II DEPTH =44" 18 -#9 SHORT WAY BOTTOM 13 -09 BOTTOM E.W. 12 -09 LONG WAY BOTTOM GRADE SEAM SYMMETRICAL ABOUT CENTERLINE, SEE PLAN NOT SHOWN FOR CLARITY. CONCRETE COLUMN BEYOND SEE PLAN AS SCHEDULED TOP BARS AS SCHEDULED BOTTOM BARS AS SCHEDULED EL. 0' -011 T.O. SLAB _7TT-7rT=1 I -III 36 Bar diam. Ah EL. SEE PLAN IRV TOP OF I— ; PILE CAP I I I I I) I I I I _ I — GRADE BEAM (— =1 SEE PLAN _ _ 1 AS SCHEDULED _ I -III III III I I III III II1=1 II -III. I— PILE CAP BEYOND, SEE PLAN AS SCHEDULED. GRA12E 5EAM LEVEL WITH P �1 TYPICAL PILE TO GRADEBEAM CONNECTION DETAIL SCALE = N.T.S. I. J ARCHITECT: Architecture Engineering Planning Interiorbe-sign LAnd.,;cape Architecture - -2601 S 'outh- Bayshor� Drive 10th Floor KMiami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 PLANNING ARCHITECT: WILMOT SANZ A R C H I T E C T U R E P L A N N I N G 18310 Montgomery and Avenue Gaft w%ury. 20879 301 -590 -2900 (Fox 301 -590 -8180 STRUCTURAL ENGINEER: ems` p 1p R6t4gol_ INZiINE NCiiNE�F�B AiAl❑RAMON R. DONNELL PE. 001TO90 CfY1l/$THUCT1a O ■PEDRO J. DUQUESNEcPnEits 7 4` �V OAIDA A&A$ LB T. A PAM � 9. th QT'. MAAS. STATE OF FLORDA - AUTHONZATIM W wn Qsu.c 2006 MEP ENGINEER: 2121 Ponce de Leon Blvd.. Suite 350, Coral Gables, FL 33134 eman n nears phone: 305.569.1692 fez: 305.569.1693 Dallas . Houston Nashville . Miami . Richmond cord project number. IT CONSULTANT: VW�hile.' ENE BURTON & ASSOCIATES General CeoW Patton D&e 5840 West I- 20,Suite 150 klin,Tennessee37067 Arlington, Te 76017 PM— 615.376.310D Pho u- 817.5632486 . 615.3763114 Par 8173632753 ,vw.r.gbainc.com Medical Equipment and Communications Planners 22 76 A PERMIT SET REVISIONS: PROJECT NAME: SMH- CLINICAL EXPANSION FOUNDATION PACKAGE PHASE II PROJECT ADDRESS: 7400 S.W. 62nd Ave. SCALE: AS SHOWN DATE: 07-09 -2010 DRAWN: CHECKED: BH CADD FILE: H:INSTITIITIONAL DRAWING TITLE: PILE CAP DETAILS I � / I C -- - - - - - -- --- 'j- - -- - -: N U I N 6 PC 5 � DEPTH =!56 II DEPTH =44" 18 -#9 SHORT WAY BOTTOM 13 -09 BOTTOM E.W. 12 -09 LONG WAY BOTTOM GRADE SEAM SYMMETRICAL ABOUT CENTERLINE, SEE PLAN NOT SHOWN FOR CLARITY. CONCRETE COLUMN BEYOND SEE PLAN AS SCHEDULED TOP BARS AS SCHEDULED BOTTOM BARS AS SCHEDULED EL. 0' -011 T.O. SLAB _7TT-7rT=1 I -III 36 Bar diam. Ah EL. SEE PLAN IRV TOP OF I— ; PILE CAP I I I I I) I I I I _ I — GRADE BEAM (— =1 SEE PLAN _ _ 1 AS SCHEDULED _ I -III III III I I III III II1=1 II -III. I— PILE CAP BEYOND, SEE PLAN AS SCHEDULED. GRA12E 5EAM LEVEL WITH P �1 TYPICAL PILE TO GRADEBEAM CONNECTION DETAIL SCALE = N.T.S. I. J ARCHITECT: Architecture Engineering Planning Interiorbe-sign LAnd.,;cape Architecture - -2601 S 'outh- Bayshor� Drive 10th Floor KMiami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 PLANNING ARCHITECT: WILMOT SANZ A R C H I T E C T U R E P L A N N I N G 18310 Montgomery and Avenue Gaft w%ury. 20879 301 -590 -2900 (Fox 301 -590 -8180 STRUCTURAL ENGINEER: ems` p 1p R6t4gol_ INZiINE NCiiNE�F�B AiAl❑RAMON R. DONNELL PE. 001TO90 CfY1l/$THUCT1a O ■PEDRO J. DUQUESNEcPnEits 7 4` �V OAIDA A&A$ LB T. A PAM � 9. th QT'. MAAS. STATE OF FLORDA - AUTHONZATIM W wn Qsu.c 2006 MEP ENGINEER: 2121 Ponce de Leon Blvd.. Suite 350, Coral Gables, FL 33134 eman n nears phone: 305.569.1692 fez: 305.569.1693 Dallas . Houston Nashville . Miami . Richmond cord project number. IT CONSULTANT: VW�hile.' ENE BURTON & ASSOCIATES General CeoW Patton D&e 5840 West I- 20,Suite 150 klin,Tennessee37067 Arlington, Te 76017 PM— 615.376.310D Pho u- 817.5632486 . 615.3763114 Par 8173632753 ,vw.r.gbainc.com Medical Equipment and Communications Planners 22 76 A PERMIT SET REVISIONS: PROJECT NAME: SMH- CLINICAL EXPANSION FOUNDATION PACKAGE PHASE II PROJECT ADDRESS: 7400 S.W. 62nd Ave. SCALE: AS SHOWN DATE: 07-09 -2010 DRAWN: CHECKED: BH CADD FILE: H:INSTITIITIONAL DRAWING TITLE: PILE CAP DETAILS SHEET NO. s�.2aF