Loading...
09-979-030N �u a� N O N 0) 0 0 N L2 0 N 0 u� n._ Ld I n U E 0) U (D a I a 0 a 0 I Ln U) 0 0 0 I 2 FAN COIL UNIT PLAN MARK SERVING SELECTION BASED ON FAN DATA COOLING COIL DATA FAN MOTOR DATA UNIT ELECTRIC DATA MANUFACTURER ' • A A A A • n A A • SENS MBM TOTAL MBH EAT F'' WATER TEMP F' FLOW GPM MP FLA MCA VOLT PHASE MCA MOCP DB WB EWT LWT FCU -1 ATS ROOM TRANE FCC603 300 BELT 6 1 8.1 80 67 i 55 1.7 1/20 0.8 1 120 1 1 15 FCU -2 I UPS ROOM TRANE FCCB10 1000 0 BELT 24 36 80 67 1 45 55 7.5 1/16 -1/8 1 1.0 -1.4 1 3 120 1 da 1 15 2 A•o• A • A • A ! Z ENGINEERING FOR ARCHITECTURE 255 S. Orange Avenue ' Suite 1600 Orlando, Florida 32801 PH: 407.841.9050 www.tic- engineers.com E B #0000015 © Copyright 2009 TLC Engineering for Architecture, Inc. CID FAN COIL UNIT PLAN MARK SERVING SELECTION BASED ON FAN DATA COOLING COIL DATA FAN MOTOR DATA UNIT ELECTRIC DATA MANUFACTURER MODEL CFM O.A. DRIVE TYPE SENS MBM TOTAL MBH EAT F'' WATER TEMP F' FLOW GPM MP FLA MCA VOLT PHASE MCA MOCP DB WB EWT LWT FCU -1 ATS ROOM TRANE FCC603 300 0 BELT 6 1 8.1 80 67 45 55 1.7 1/20 0.8 1 120 1 1 15 FCU -2 I UPS ROOM TRANE FCCB10 1000 0 BELT 24 36 80 67 1 45 55 7.5 1/16 -1/8 1 1.0 -1.4 1 3 120 1 3 1 15 NOTES: 1. FCU -1 AND FCU -2 ARE CONCEALED HORIZONTAL TYPE WITH NO HEATING CAPABILITY, NO VENTILATION (OUTSIDE) AIR REQUIREMENT AND FREE DISCHARGE. PROVIDE 1/2" WIRE MESH SCREEN ON INLET AND DISCHARGE. 2. PROVIDE WITH WALL - MOUNTED THERMOSTAT TO MAINTAIN SETPOINT BY MODULATING 3 -WAY CHILLED WATER VALVE. NO CONNECTIONS TO EXISTING BUILDING CONTROLS SYSTEM. 3. SELECTION REPRESENTED AT HIGH FAN SPEED. PROVIDE THREE -SPEED FAN CONTROL SWITCH. 4. FCU TO SHUT DOWN UPON SIGNAL FROM ROOM SMOKE DETECTOR. 5. PROVIDE WITH THROWAWAY FILTER IN STANDARD MANUFACTURER FILTER FRAME. 6. FCU -2 HAS TWO MOTORS AND TWO FANS. A•o• A • A • A ! Z ENGINEERING FOR ARCHITECTURE 255 S. Orange Avenue ' Suite 1600 Orlando, Florida 32801 PH: 407.841.9050 www.tic- engineers.com E B #0000015 © Copyright 2009 TLC Engineering for Architecture, Inc. CID V tj) V1 0 109355 Issue Date: I 10/05/2009 M ESC Approved By: ESC Scale: NTS E CIO U M cn SCHEDULES co yi (o -a M302 Q M -C _O F- L.L. 0 U) 4 Q co s Revisions: No. Date Description 1 f Seal THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF 100% CONSTRUCTION DOCUMENTS V tj) Project No.: 109355 Issue Date: 10/05/2009 Drawn By: ESC Approved By: ESC Scale: NTS Drawing Title: HVAC SCHEDULES Drawing No.: M302 THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF 100% CONSTRUCTION DOCUMENTS