09-963-003V
a
0
0
J
a
!I
0
Eo�
FC11
PW
PW
EXISTING LX20
TO BE REMOVE
EXISTING VITROU!
TO BE REMOVED,
PW
PW
EXISTING EYEWASH
EX.1' LOOP
EX.1'CW
\/ —
At_
� 1
L7!"
C> CC
ol lo
I�
al
a-
03
� � 3
n.
3
1:01 L]
�11F
PARTIAL FIFTH FLOOR
TEMP. DEMOLITION PLAN - PLUMBING
Ll
i
FF
rHK i iAL I- It- i n rLCavH
02 4 NEW WORK PLAN - PLUMBING Ai�
GENERAL NOTES
A. COORDINATE WITH OWNER'S REPRESENTATIVE ALL PIPE ROUTING AND THE DEMOLITION
/ RESTORATION OF ALL EXISTING / NEW FINISHES.
B. CONTRACTOR TO COORDINATE WITH OWNER THE WORK HOURS / SCHEDULE. PROVIDE
ALLOWANCE IN YOUR BID FOR LATE HOURS / WEEKEND WORK.
C. FIELD VERIFY ALL EXISTING PLUMBING ROUTING.
CONNECT EQUIPMENT HOSE TO AIR GAP FITTING USING
STAINLESS STEEL PIPE. CUP HOSE TO EDGE OF PIPE
USING CLAMPS. USE PIPE SIZE NECESSARY TO HOLD ALL
HOSES. COORDINATE WITH EQUIPMENT SUPPLIER NUMBER
AND SIZE OF HOSES
PROVIDE CHROME PLATTED AIR GAP FITTING
TO HOLD ALL EQUIPMENT DRAIN HOSES.
COORDINATE WITH EQUIPMENT SUPPLIER.
PROVIDE REDUCING FITTING AS
NECESSARY TO REDUCE TO 1' PIPE
CONNECT TO EXISTING 1'
INDIRECT WASTE FROM EYEWASH
EXISTING 1' INDIRECT WASTE PIPE
CONNECTS TO EXISTING FLOOR DRAIN
EQUIPMENT DRAIN
nn HOSE CONNECTION DETAIL
V %3 NTS
LEGEND NOTES
O1 SHORTEN EXISTING HUB DRAIN AND ALL ASSOCIATED APPURTENANCES. REMOVE BRANCH SEWER
PIPING BACK TO MAINS / RISERS.
OREMOVE EXISTING PURE WATER EQUIPMENT AND ALL ASSOCIATED APPURTENANCES. REMOVE WATER
LINE SERVING DI UNIT BACK TO RISER, AS HIGHLIGHTED. REMOVE COMPLETELY PURE WATER LOOP.
REMOVE CONNECTIONS TO ALL SINKS, EQUIPMENT INCLUDING VALVES, FAUCETS. RESTORE ALL
FINISHES (CABINETS, WALLS, SINKS, ETC.) AS REQUIRED.
O3 ON THE EYEWASH'S INDIRECT WASTE CONNECTION PROVIDE A 1' TEE FOR NEW ANALYZER WASTE
DISCHARGE CONNECTION. RUN HOSES FROM ANALYZERS TO NEW TEE AND CONNECT WITH AIR GAP
FITTING. HOSES TO BE CONNECTED TO FITTING SUCH AS PROVIDE EASY ACCESS TO END OF HOSE
IN ORDER TO BE USED AS SAMPLING PORT BY DERM INSPECTOR OR ANY OTHER AUTHORITY
HAVING JURISDICTION. SEE DETAIL 03 THIS SHEET.
OPER MANUFACTURER DATA SHEETS AND INFORMATION RECEIVED FROM HOSPITAL SEE BELOW LISTED
ALL SUBSTANCES THAT COULD BE FOUND IN THE WASTE STREAMS FROM THE VISTA CHEMISTRY
ANALYZERS AND THEIR CORRESPONDING LIMITS IN THE WASTES. WE HAVE LISTED ALL REGULATED
SUBSTANCES SUCH AS DESCRIBED IN SECTION 24.42.4 OF THE MIAMI -DADE COUNTY CODE.
• MERCURY - 0.00 mg /L
CHROMIUM < 0.05 mg/L
• POLY CHLORINATED BIPHENYLS < 0.008 mg/L
• ESTIMATED pH - BETWEEN 6 AND 7 _ ,,-/
0
LO
r)
0
�U
m`^cvc�
0 % -
Z
�vi LoLoCV)0'
L6 L'i0
�C)��
D�
0
a__�
D-_
oo
CV � �O X
O j
c�UQa
E }o
U U p
.(D m
9
p Qw
-
c
X
°c
—
(D U
— O U
o
p a
U
o
Q
REVISIONS
MARK: REMARKS:
I0 I BUILDING DEPARTMENT COMMENTS
1 11 /2A Innnn
J �
Q W
� N
CL CD ~
=
Z W
- a LL
a>_a
�cl) a
W
m Ir
O=
cl)U
a �
w
�. AAA
KEYPLAN
Job No:
409325.000
Date:
08 -31 -2009
Sheet Title:
PARTIAL FIFTH
FLOOR PLANS
PLUMBING
Sheet No:
P2.02