09-963-002PARTIAL FIFTH FLOOR
0 1 SCALE: 1/4" = T-0"
DEMOLITION PLAN - PLUMBING
d
H
O
J
a
PARTIAL FIFTH FLOOR
02SCALE: 1/4" = T-0" 7v
TEMPORARY PLAN - PLUMBING Jr►
GENERAL NOTES
A. COORDINATE WITH OWNER'S REPRESENTATIVE ALL PIPE ROUTING AND THE DEMOLITION
/ RESTORATION OF ALL EXISTING / NEW FINISHES.
B. CONTRACTOR TO COORDINATE WITH OWNER THE WORK HOURS / SCHEDULE. PROVIDE
ALLOWANCE IN YOUR BID FOR LATE HOURS / WEEKEND WORK.
C. FIELD VERIFY ALL EXISTING PLUMBING ROUTING.
LEGEND NOTES
�1 SHORTEN EXISTING HUB DRAIN SUCH THAT IT WALL NOT EXTEND MORE THAN 2" ABOVE FINISHED
FLOOR.
OIN TEMPORARY SET -UP ROUTE INDIRECT WASTE (HOSE) FROM, RELOCATED LX20 UNIT AND TWO
NEW ANALYZERS TO EXISTING HUB DRAIN.
OCONNECT TO EXISTING 1 1/" CW RISER A NEW 1 /2 "CW LINE. PROVIDE NEW 1/2" CONTINUOUS
PRESSURE TYPE VACUUM BREAKER AND CHECK VALVE ABOVE CEILING FOR NEW RO MACHINE
CONNECTION. PROVIDE DRIP PAN UNDER VACUUM BREAKER.
OPROVIDE A 2" HUB DRAIN WITH SHALLOW P -TRAP UNDER CABINET SUCH THAT DRAIN FROM RO
UNIT CAN BE DISCHARGED INTO IT. RAISE RO UNIT IF NECESSARY. CONNECT 2 "SS TO SINK'S
VENTED WASTE RISER.
5OPROVIDE AN UNDERCOUNTER MILLIPORE ELIX ADVANTAGE 3 RO UNIT WITH PROGARD TS2
PRETREATMENT FILTER AND 30 GALLON UNDER BENCH RESERVOIR. INSTALL REMOTE E -POD
DISPENSER ON COUNTER NEXT TO SINK. ROUTE RO UNIT DRAIN TO HUB DRAIN LOCATED UNDER
SINK. FOR ADDITIONAL INFORMATION ON RO UNIT CONTACT SAM RIVERA, MILLIPORE REPRESENTATIVE
0 407 376 9982. COORDINATE EXACT UNIT LOCATION WITH OWNER BEFORE INSTALLATION.
OCONNECT NEW 3 /4'HW AND 3 /4 "CW TO THE EXISTING 1 1 /eHW AND 1 1 /4 -CW RISER ABOVE
CEILING. FIELD VERIFY EXACT LOCATION.
7OPROVIDE CONTINUOUS PRESSURE TYPE VACUUM BREAKER ABOVE CEILING AND ROUTE 3 /4 "HW do
3 /4 "CW DOWN TO THE BOTTOM OF CABINET. PROVIDE DRIP PANS UNDER VACUUM BREAKERS.
Og PROVIDE ON THE BOTTOM SHELF OF THE CABINET A MIXING VALVE ASSEMBLY AS FOLLOWS.
PROVIDE A CHECK VALVE AND SHUT -OFF VALVE ON EACH PIPE AND THEN CONNECT USING UNIONS cA, A)
TO MIXING VALVE PROVIDED BY EQUIPMENT SUPPLIER. DOWNSTREAM OF MIXING VALVE PROVIDE C�'n1+"�
TEMPERATURE GAUGE AND THEN TWO SHUT -OFF VALVES FOR EQUIPMENT FLEX CONNECTION.�`����O�t1
EQUIPMENT CONNECTION SHOULD BE 1/2" NPT MALE FITTING. COORDINATE WITH EQUIPMENT
SUPPLIER AND OWNER INSTALLATION.
ORECONNECT EXISTING PURE WATER HOSE FROM RELOCATED LX20 UNIT TO EXISTING PURE WATER
VALVE.
CD
cr
r�
H
a�
J
~
cl)
a� U
=
Z
oo�rnrn
d o
OIn - -
Z
���°'
C'4
-co
1010 �
U-) LO
c N 011
o
� 00
0
Q
�
Q
_ � � co
t
LO
O X
U Q.
O Z)
� o
L L J
E2
U U C)
O
m
a
Q W
X Q
�
C �
0)
-
O U
— O U
o
p W
o -
o -rte -
a Vn C)
ID_ .-
� Q
REVISIONS
MARK: REMARKS:
J
a
cr
H
W
J
~
cl)
=
Z
W
-
a
W
0
Q
�
Q
D
L L J
�
W
O=
�U
GNE HA&
a, g 0
k
ENM, 05fW AAA
KEYPLAN
Job No:
409325.000
Date:
08 -31 -2009
Sheet Title:
PARTIAL FIFTH
FLOOR PLANS
PLUMBING
Sheet No:
P2.01
f,