INFECTION CONTROL RISK ASSESSMENT 0CRA)
ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND CONSTRUCTION POLICIES,
PROCESSES AND OWNER'S PROJECT-SPECIFIC INFECTION CONTROL RISK ASSESSMENT PLAN.
ICRA MATRIX :4
SYMBOL
DESCRIPTION
IC RISK
CONSTRUCTION ACTIVITY TYPE
TYPE A
TYPE B
TYPE C 7-TYPE
D
LEVEL
GROUP 1
CLASS I
CLASS II
CLASS II
CLASS III /IV
GROUP 2
CLASS I
CLASS II
CLASS III
CLASS IV
GROUP 3
CLASS I
CLASS III
CLASS III /IV
CLASS IV
GROUP 4
CLASS III
CLASS III /IV
CLASS III /IV
CLASS IV
ICON CONTROL RISK LEVELS
GROUP 1
GROUP 2
GROUP 3
GROUP 4
LOWEST
MEDIUM
MEDIUM HIGH
HIGHEST
OFFICE AREAS
ALL PATIENT CARE UNITS
EMERGENCY ROOM
TRANSPLANT CLINIC
CONFERENCE ROOMS
WAITING ROOMS*
RADIOLOGY AREAS
SURGERY SUITES
PUBLIC BATHROOMS
/-TAG
A 20O -AIR DISTRIBUTION DEVICE
ROCP
RECOVERY ROOMS
WAITING ROOMS*
\-CFM
LABOR AND DELIVERY
LABOR & DELIVERY ORs
- STANDARD BRANCH TAKE OFF
NURSERIES
CARDIAC CATH / ANGIO
J
Mr
PEDIATRICS
CVICU
a
d)
RIO SURGERY
OUTPATIENT UNITS
~
=Z�y��
_
ALL INTENSIVE CARE AREAS
DIALYSIS AND TRANSPLANT
INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN
c)
NUCLEAR MEDICINE
ONCOLOGY / BONE MARROW
NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO
Q
ADMISSION / DISCHARGE AREA
CARDIOLOGY
N
CO
SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S
REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE
PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE
PHYSICAL THERAPY TANK AREA
HYPERBARIC MEDICINE
Q
CAFETERIA
ENDOSCOPY
SYMBOL DESCRIPTION
LL
=
ECHOCARDIOGRAPHY
PHARMACY ADMIXTURE
-CEILING
EILING DIFFUSER,
(C DIFFUSERS ARE 4-WAY THROW UNO)
LABORATORIES
AND ALL FIRE RATED AND FIRE /SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF
RATED WALLS.
CO
-ROUND DIFFUSER
PHARMACY
24x12
-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
* DEPENDENT ON LOCATION APPLIES TO PROJECT.
ACTIVITY TYPES
INSPECTIONS AND NON - INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TYPE A
TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT
Q
GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE AND
(YP E
COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING TILES
TYPE C
AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY
ISSUED
WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS,
- RECTANGULAR DUCT SECTION UP, EXHAUST
REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION.
KM C 88MATION SCHEDILE
CLASS I
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
-SHEET NOTE CALLOUT
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION.
El
3. MINOR DEMOLITION FOR REMODELING.
1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
CLASS II
4. BLOCK OFF AND SEAL AIR VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
El
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND /OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES.
5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT.
CLA III
6. VACUUM WORK WITH HEPA FILTERED VACUUMS.
7. WET MOP WITH DISINFECTANT.
8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
CLASS IV
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND
RELEASED BY SAFETY AND INFECTION CONTROL
9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
10. WET MOP WITH DISINFECTANT.
11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE.
HVAC SYMBOL LEGEND
HVAC ABBREVIATIONS
HVAC GENERAL NOTES
SYMBOL
DESCRIPTION
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.
F-
UP DN
-T -y
- CHANGE OF ELEVATION
CFM -CUBIC FEET PER MINUTE ! SA - SUPPLY AIR
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT
FURNISHED.
-�
J
2. DIMENSIONS SHALL BE FIELD- VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
11Z11Z1IIIII IMM11
- FLEXIBLE DUCT
EA - EXHAUST AIR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS
SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE
~
D
- TRANSITION, CONCENTRIC
o
TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR
PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH
AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS,
PLUMBING, AND ELECTRICAL CONDUIT.
- TRANSITION, ECCENTRIC
CL
3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE
SMACNA HVAC DUCT CONSTRUCTION STANDARD.
10x8
- TRANSITION, SQUARE TO ROUND
�_
4.
PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
- SQUARE THROAT ELBOW
W/TURNING VMES
Z
5. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT
EQUIPMENT FURNISHED.
HVAC EQUIPMENT TAGS
_
6. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND /OR SPECIFIED.
PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION -FREE, RIGID
D
E
O
Z
T-WM
MMd.
INSTALLATION.
Q
- SQUARE THROAT TEE
/-TAG
A 20O -AIR DISTRIBUTION DEVICE
7. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
04
O
F-
"
\-CFM
8. ACCESS PANELS IN DUCTWORK AND COUNGS SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
W
- STANDARD BRANCH TAKE OFF
9. ALL DUCTWORK IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES,
ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS.
M
J
Mr
10. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN,
a
d)
AIR HANDLING UNITS, AND FAN COIL UNITS.
~
=Z�y��
_
.J
11.
INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN
c)
0
NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO
Q
a
},o
C
N
N
CO
SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S
REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE
PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE
HVAC SYMBOL LEGEND
°
Q
12. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE
OWNER OR DISPOSED of LEGALLY, AS DIRECTED BY OWNER.
13. MAINTAIN CLEARANCE OF A MINIMUM OF 6' BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC.,
SYMBOL DESCRIPTION
SYMBOL DESCRIPTION
LL
=
0
J
-CEILING
EILING DIFFUSER,
(C DIFFUSERS ARE 4-WAY THROW UNO)
2402 - EXISTING DUCTWORK TO REMAIN
AND ALL FIRE RATED AND FIRE /SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF
RATED WALLS.
CO
-ROUND DIFFUSER
24x12
-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
m
0
DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING
DOOWW00 UP W /IN FLOOR
Q
- CEILING EXHAUST
- CEILING DIFFUSER, RECTANGULAR OR
�TMI(CEILING U )
-DUCT ELBOW, EXHAUST
-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE
IR - RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE,
SUPPLY OR OUTSIDE AIR
HVAC DRAWING INDEX
SHEET
DESCRIPTION
ISSUED
- SUPPLY REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
RETURN /EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
- RECTANGULAR DUCT SECTION UP, EXHAUST
MO.1
M1.1
M1.2
HVAC LEGEND, GENERAL NOTES & SHEET INDEX
PARTIAL THIRD FLOOR PLAN - HVAC EXISTING
PARTIAL THIRD FLOOR PLAN - HVAC NEW
Yes
Yes
Yes
1Q -.
-SHEET NOTE CALLOUT
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
ENGINEERING
FOR ARCHITECTURE
5757 Blue Lagoon Dr.
Suite 400
Miami, FL 33126
Phone: 305.266.6553
Fax: 305.266.6695
www.tic- engineers.com
EB #0000015
o CopXight 2009 TLC Engineering for Arftadn, Inc.
Revisions:
No. Date Description
Seal
DON C.'�JR1LY'
FL PE # 35067
Project No.: 609524
Issue Date:
08 -10 -09
Drawn By: .1 R
Approved By: MB /RB
Scale: N.T.S.
Drawing Title:
LEGEND, SYMBOLS,
GENERAL NOTES,
DAWING INDEX
Drawing No.:
M0.1
F-
-�
J
r
I-
~
D
o
CL
rM
LO
�_
W
Z
r
LO
C:)
_
D
E
O
Z
T-WM
MMd.
Q
a
04
O
F-
"
M
W
m
Z
M
J
Mr
0
a
d)
~
=Z�y��
_
.J
C j
c)
0
L1.
Q
a
},o
C
N
N
CO
CO
°
Q
LL
=
0
J
U
CO
LL
m
0
Q
Revisions:
No. Date Description
Seal
DON C.'�JR1LY'
FL PE # 35067
Project No.: 609524
Issue Date:
08 -10 -09
Drawn By: .1 R
Approved By: MB /RB
Scale: N.T.S.
Drawing Title:
LEGEND, SYMBOLS,
GENERAL NOTES,
DAWING INDEX
Drawing No.:
M0.1