09-57-017PARTIAL SECOND FLOOR PLAN - DEMOLITION - ELECTRICAL -41 0' 1' 2' 4' f' 12' DEMOLITION KEYED NOTES. ORELOCATE EXISTING FIRE ALARM DEVICES AND ASSOCIATED CONDUIT AND WIRING. REFER TO SHEET E -2.1 FOR NEW LOCATION. ORELOCATE EXISTING RECEPTACLE AND ASSOCIATED CONDUIT AND WIRING. REFER TO SHEET E -2.1 FOR NEW LOCATION. 0 RELOCATE EXISTING WALL MOUNTED PHONE AND ASSOCIATED CONDUIT AND WIRING. REFER TO SHEET E -2.1 FOR NEW LOCATION. OCONTRACTOR SHALL REMOVE EXISTING LIGHT FIXTURES AND SWITCHES SERVING SAID LIGHT FIXTURES, REMOVE FEEDERS BACK TO NEAREST SOURCE OF POWER. DEMOLITION NOTES IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL AND ELECTRICAL WORK SHOWN ON THE OTHER DRAWINGS OF THIS THIS SET TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED. WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT. THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS REQUIRED TO PREVENT DAMAGE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION DEBRIS GENERATED FROM WORK ON ALL FLOORS. TAKING CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES. THE CONTRACTOR SHALL MAINTAIN CONTINUITY OF CIRCUITS WHERE EXISTING EQUIPMENT IS TO BE REMOVED AND DOWN STREAM DEVICES MAY BE EFFECTED. THE CONTRACTOR SHALL COORDINATE ALL POWER INTERRUPTIONS WITH OWNER. SEE SPECIFICATIONS. WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL REMAINING OPENINGS IN THE SLAB AND WALLS SHALL BE FILLED IN BY THE CONTRACTOR. REMOVE ALL MISCELLANEOUS FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AN EMERGENCY EGRESS EQUIPMENT. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS AND STAIRS. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE. THIS EFFORT SHALL INCLUDE SCHEDULED COORDINATION WITH OWNER OF ELECTRICAL SHUTDOWNS. PROVIDE PANEL SCHEDULES, TO THE ENGINEER, INDICATING THE CIRCUITS MADE SPARE BY DEMOLITION AND THE EXISTING CIRCUITS THAT REMAIN ACTIVE. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING INSPECTION, DURING BIDDING TO SATISFY HIM /HER SELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE DRAWINGS. DRAWINGS ARE DIAGRAMMATIC AND DO NOT INDICATE ALL DEVICES TO BE DEMOLISHED. CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID TO FIELD CONFIRM ALL REQUIREMENTS. a .... .r• f • off•• ••f • f • • • • :fee: •• U U Y U • f • 0000 • • U • • • • • • • • U U • • U • • • • • • W r • Y •• • • • • • • Y r • • • • 4 i W U Y • • 000 • • • • •••• U•••• ••• •f•• •••• • • • • • • • • W r • Y • • Y W Y r•oo • ••••• r •or • •••o W 14c -�SYS ��; To r'E [,NST/kL:l F,17 IX AC:C --nl DEMOLITION LEGEND SYMBOL DESCRIPTION EXISTING TO REMAIN (ETR) 12 -19 -08 Drawn: EXISTING TO BE REMOVED �- -- REMOVE EXISTING TO THIS POINT BERMELLO- AJAMIL & PARTNERS MC Architecture Engineering Planning Interior Design Landscape Architecture 26101 So. Bayshore Drive Suite 1000 Miami, Florida 33133 (305) 859 -2050 FAX (305) 859 -9638 Smith SSJVI Seckmzn Reid, Inc. j 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EX- 0000357 Alfred Equivel PE - 45863 Bruce W' peek PE - 36901 Chris A, Freyer PE - 4328 Dennis Davis PE - 58598 Donald Netinh• PE -48454 Jahn E. Moulder PE - 33200 Jua■ Echavarria PE - 19677 SSE J0I3 # 0432103.0 STRUCTURAL ENGINEERS DONNELL, DUQUESNE � ALIAISA, P.A. CONSULTING ENGINEERS ❑RAMON R. DONNELL P.E. 0011190 CIVIL /STRUCTURAL s€ ❑PEDRO J. DUOUESNEP.E. 0022714 ... __.. ,; i ?�i CIVIL /STRUCTURAL ❑AIDA M. AL©AISA P.E. 0045130 == CIVIL /STRUCTURAL 4530 S.W. 74th CT. MIAMI. FLORIDA 3315`. .... .... .... .... .... .... .... (305) 66C.-0711 FAX 666-525 t, !r r r � ! , #, • :ia 34 -64[` zoo s' Revlslons: Project Name: SOUTH MIAMI HEART CENTER PBX RENOVATION 6200 S.W. 73 STREET MIAMI, FLORIDA 33143 KEY PLAN LOCATION OF NON — INVASIVE .o n Comm. No. 40002.000 Scale: Date 12 -19 -08 Drawn: HS /LFC Checked: DOD CADD File; Draw'g Title: PARTIAL SECOND FLOOR PLAN - DEMOLITION - ELECTRICAL Sheet No.