09-57-011AIR DEVICE SCHEDULE
1. AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS.
2. BRANCH & OPTIONAL BRANCH DUCT SIZES ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS.
3. ALL AIR DEVICES INSTALLED IN INACCESSIBLE AND /OR DRYWALL CEILINGS SHALL BE PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS.
4. ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND /OR LAY -IN CEILINGS SHALL HAVE SPIN -IN FITTINGS (WITHOUT SCOOPS) WITH A
MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF.
5. MAXIMUM PRESSURE DROP FOR ALL AIR DEVICES SHALL NOT EXCEED 0.10 IN. W.G.
G. ALL AIR DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED.
7. MAXIMUM NC RATING FOR ALL AIR DEVICES SHALL NOT EXCEED 25.
8. ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED.
9. THROW VALUES ARE GIVEN FOR TERMINAL VELOCITIES OF 150.100 & 50 FPM RESPECTIVELY.
MARK
MFGR & MODEL
CFM RANGE
FACE SIZE /
MODULE SIZE
NECK SIZE
BRANCH DUCT SIZE/
SQ. TO RND. ADAPTER
THROW
REMARKS
A
TITUS TMS -AA
0 - 100
12x12 / 12x12
610
8x6 / 6'0
2 -3 -6
TURNING
ELBOW
■
TITUS TMS -AA
101 - 225
24x24 / 24x24
810
10x6 / 8'0
3 -5 -9
C
TITUS TMS -AA
226 - 380
24x24 / 24x24
1010
12x8 / 10'0
4 -6 -13
D
TITUS TMS -AA
381 - 600
24x24 / 24x24
12'0
14x10 / 12'0
5 -8 -16
E
TITUS TMS -AA
601 - 750
24x24 / 24x24
14'0
16x10 / 14'0
6-10 -19
F
TITUS 300FL
0 - 125
8x6 / 10x•
8x6
8X6 / -
8 -11 -16
G
TITUS 300FL
126 - 300
12x• / 14x10
12x8
12x8 / -
12 -18 -25
H
TITUS 300FL
301 - 550
18x10 / 20x12
18x10
18x10 / -
16 -23 -34
1
TITUS 50F
0 - 180
8x8 / 10x10
8x8
10x6 / 8 "*
-
2
TITUS 5OF
181 - 300
10x10 / 24x24
10x10
12x6 / 10'0
-
3
TITUS 5OF
301 - 450
12x12 / 24x24
12x12
14x8 / 12'0
-
4
TITUS 50F
451 - 650
14x14 / 24x24
14x14
I6x10 / 14'0
-
5
TITUS 50F
651 - 850
16x16 / 24x24
16x16
18x10 / 16'0
-
6
TITUS 5OF
851 - 1000
18x18 / 24x24
18x18
20x10 / 18'0
-
7
TITUS 5OF
1001 - 1900
18x18 / 24x24
22x22
-
8
TITUS 350FL
0 - 125
8x6 / 10x8
8x6
8x6 / -
-
9
TITUS 350FL
126 - 285
10x8 / 12x10
1Ox8
10x8
10
TITUS 350FL
286 - 440
18x10 / 20x12
18x10
I8x10
HVAC GENERAL NOTES
1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT
EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL
CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES.
2, DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND
DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE
BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED
USING 45 DEGREE OR LONG RADIUS ELBOWS.
3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING
INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS.
CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND PIPING
CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN.
4. PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH
DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES AND TO ALL LOW
PRESSURE BRANCH DUCTS TO REHEAT COILS. PROVIDE DAMPERS AS
CLOSE AS POSSIBLE TO BRANCH CONNECTION TO MAIN. SEE DIFFUSER
AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
5. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN
ADVANCE. CONSTRUCTION WORK AND DEMOLITION SHALL BE
PERFORMED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO
ADDITIONAL COST TO THE OWNER.
`, ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING
CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE
SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER.
7. DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH
PIPING. DUCTWORK. ETC.. (FLANGED OR REMOVABLE SECTIONS MAY BE
USED IN SOME INSTANCES WHERE TIGHT CLEARANCES EXISTS).
8. NO PIPING, DUCTWORK. OR CONDUIT SHALL BE INSTALLED UNTIL IT IS
COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL
OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES;
EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT
LIMITED TO. THOSE SHOWN.
9. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE
SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE.
10. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL
BE INSTALLED WITH MINIMUM C' CLEARANCE TO ALLOW FOR INSPECTION
OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12" CLEARANCE
WHERE POSSIBLE, COORDINATE.
11. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL
INSTALLATION REQUIREMENTS.
12. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND
ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER
WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE
REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
PROPER MANNER BY CONTRACTOR.
13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK
NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION
AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES,
OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE
REPAIRED AND FINISHED TO MATCH EXISTING.
14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE
REQUIREMENTS OF THE OWNER.
15. PROVIDE TEMPORARY FILTERS ON ALL RETURN AIR GRILLES AND
TRANSFER OPENINGS IN THE WORK AREA.
16. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON
AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY
VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND
INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO
SUBMITTING THE BID.
17, FRONT OF PA CONTROL PANELS TO PROVIDE FOR 3' -0' MIN. CLEARANCE IN
I8. UNLESS OTHERWISE NOTED ON PLANS LOW RETURN AIR GRILLES AND
LOW EXHAUST GRILLES SHALL BE 6'140 8' AFF TO BOTTOM OF GRILLE.
19. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE
USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE.
20. PROVIDE CLEAR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, AND
VALVES.
21. PROVIDE MANUFACTURERS CERTIFIED DATA (NOA) OR CALCULATIONS ON
ALL EXTERIOR MOUNTED EQUIPMENT DURING SUBMITTAL PHASE WHICH
INDICATES THAT THE EQUIPMENT CAN WITHSTAND A WIND LOA6
REQUIRED BY THE FSBC.
HVAC LEGEND
DUCTWORK
SUPPLY DUCTWORK
SHEET
NUMBER
R• _ �-
RISE IN
DUCTWORK
RETURN OR EXHAUST
DUCTWORK
® FSD COMBINATION FIRE &
SMOKE DAMPER
X
D. _-
DROP IN
CONICAL
DUCTWORK
TEE CONN.
JAI 340 SURLY DIFFUSER A
AIR QUANTITY
120 R. RETURN GRILLE A AIR
QUANTITY
160 E. EXHAUST GRILLE A AIR
W
�-
R
BELLMOUTH CONN.
45' THROAT TAP
BRANCH CONNECTION
RADIUS ELBOW R /W =1.5
.. ....-.
930 "W. 741 h CT. MIAM l'L,'
3315!
X
F�
TURNING
ELBOW
VANES IN
HVAC DESIGN REQUIRES
SHEET
NUMBER
YES
NO
DUCT SMOKE DETECTOR(S)
M -1.1
X
FIRE DAMPER(S)
PARTIAL FLOOR PLAN- DUCTWORK
X
SMOKE DAMPER(S)
X
FIRE RATED ENCLOSURE
.. ....-.
930 "W. 741 h CT. MIAM l'L,'
3315!
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY
X
FIRE STOPPING (SEE ARCH.
X
SMOKE CONTROL
X
MECHANICAL DEMOLITION NOTES
1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL DE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF
EXISTING DUCT AND PIPING ETC. BEFORE .DEMOLITION WORK IS BEGUN. REPORT
ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE
OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK.
2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS. THIS INCLUDES ALL
HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL
SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS
DIRECTED BY THE OWNER).
3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM
DUCTWORK THAT WILL REMAIN.
4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE
WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED.
(MAINTAIN THE EXISTING RATINGS).
5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE
ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND
DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS.
6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS
OF THE OWNER.
SEQUENCE OF OPERATION
UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA
SERVED BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL
EQUIPMENT SHALL DE- ENERGIZE.
DUCT AND PIPE INSULATION
DUCTWORK
1. INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE (WITH ROOF
INSULATION >R12)i 2' THICK, R -6.0 MIN, FIBERGLASS.
2. OUTDOORS DUCTWORK$ 2' THICK, R -8 MIN., FIBERGLASS.
•4i.• ••U • • 6066! ••U
y Y1 •�.�
yyy � � � v • i 6666!
•iy ••U • • • 6686 U Y •
Y y • • Y Y •
Y Y i i • • • i • Y •
Y W Y • • • • • Y Y • •
U Y Y Y • •• W • Y
Y i Y • • • • Y •
• ••a Y•i • i ••
MECHANICAL ROOM NOTES.... ..... .rYrt
I. REFER TO ARCHITECTURAL. STRUCTURAL, PLUMBINr, , JF'iRF, Pf-_OTFCTION '\Nth : • W . W
ELECTRICAL DRAWINGS FOR COORDINATING ALL INSTALLED MATERIALS.
2. EQUIPMENT SIZES AND SERVICES SPACE REQUIREMENTS MAY VARY BETWEEN
DIFFERENT MANUFACTURERS. CONSULT MANUFACTURER INSTALLATION
DRAWINGS SUBMITTED AND APPROVED FOR APPLICATION WITH MECHANICAL
ROOM EQUIPMENT.
3. SLEEVE PIPE PENETRATION AT WALLS AND FLOORS.
4. DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH PIPING
DUCTWORK. ETC.FLANGED OR REMOVABLE SECTIONS MAYBE USED IN SOME
INSTANCES WHERE TIGHT CLEARANCES EXIST.
5. REFER TO DRAWINGS AND EQUIPMENT SCHEDULES FOR BRANCH PIPE SIZES TO
INDIVIDUAL EQUIPMENT.
6, ALL CAPPED LINES FROM EQUIPMENT SHALL BE IDENTIFIED WITH STENCILED
SERVICE. TYPE WITHIN 3' -0' OF CAP.
7. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN. REFER TO
DRAWINGS FOR LOCATIONS OF FLOOR DRAINS.
8. PROVIDE BELT GUARDS FOR ANY EXTERNALLY BELT DRIVEN EQUIPMENT.
TEST &BALANCE NOTES
1. PRECONSTRUCTIONI
PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB
CERTIFIED T&B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT
THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING
EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE
RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW.
THE FOLLOWING INFORMATION IS REQUIRED-
- AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S).
- AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED
AREA(S).
- AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE
RENOVATED AREA(S).
- SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S).
- MEASURED FAN RPM.MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED
AREA(S).
- PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE.
- WATERFLOW TO COILS AS APPLICABLE.
2. FINAL CONSTRUCTION:
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL
REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED
AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS,
ADJUSTMENTS. (FAN SPEED. CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL
BE INCLUDED IN THIS CONTRACTORS PROPOSAL.
3. FINAL REPORT•
SUBMIT FINAL .TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE
ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
AHU OPERATION DURING CONSTRUCTION
THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS
APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY.
I. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE
ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE
CONSTRUCTION WORK.
2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY
CLEANED ■EFORE PLACEMENT IN ITS FINAL LOCATION. THE ENDS OF DUCTWORK SHALL BE CLOSED DURING
CONSTRUCTION.
3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERAL
WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE
COVERED WITH ROLL -UP FILTER MATERIAL.
4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED
DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS.
5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED.
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
M -0.1
HVAC LEGENDS, NOTES is SCHEDULES
M -1.1
PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE
M -2.1
PARTIAL FLOOR PLAN- DUCTWORK
M -4.1
HVAC DETAILS
❑AIDA M. AUAISA R.E. 0RR0uC45L13L0
.. ....-.
930 "W. 741 h CT. MIAM l'L,'
3315!
4 GG ST25,
BERMELLO- AJAMIL
& PARTNERS MC
Architecture Engineering Planning
Interior Design Landscape Architecture
2601 So. Bayshore Drive
Suite 1000
Miami, Florida 33133
(305) 859 -2050 FAX (305) 859 -9638
Smith
ffik Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - Es- 000OS57
Alfr•i Ec.iuivel t] -4 96
)truce W. reek PE - 35901
Chris A. Freyer PE - 43222
Dennis Drvi, PE -1$622
Donali N•tinho PE - 4$454
JohY E. Manlier 2E - 33200
Juan Echavarria FE -12577
SSE JOB # 0432103.0
STRUCTURAL ENGINEERS
DONNELL, DUQUESNE d ALBAISA, P.A.
CONSULTING ENGINEERS
❑RAMON R. DONNELL c�rv�� u610
/sTmgl
❑PEDRO J. DUOUESNEP. FI 0022764
CIV L /STRUCTURAL
❑AIDA M. AUAISA R.E. 0RR0uC45L13L0
.. ....-.
930 "W. 741 h CT. MIAM l'L,'
3315!
4 GG ST25,
S ,'11
01 .
Revisions:
Project Name:
SOUTH MIAMI
HEART CENTER
PBX RENOVATION
6200 S.W. 73 STREET
MIAMI, FLORIDA 33143
PLAN
,
LOCATIO
B
■�w;�i:Lil
Comm. No. 40002-000
Scale:
Date: 12 -19 -08
Drawn:
Checked:
CADD File:
Draw'g Title:
HVAC LEGENDS,
NOTES &
SCHEDULES
Sheet No.