09-57-002ARCHITECTURAL SYMBOLS GENERAL NOTES 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H -A., A.D.A. k ALL OTHER APPLICABLE CODES, RULES AND REGULATIONS. 02- THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PRIOR TO SUBMISSION OF BID. 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS TO CARRY OUT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF WORK. 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, SURFACE /RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, HN.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL INSTALLATION) UPON COMPLETION OF REPAIR WORK. 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONDITIONS. 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO STARTING WORK. 08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. 09, ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED /REPLACED TO MATCH EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE /FUME SPREAD RATINGS OR MEANS OF EGRESS WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. 12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND ACCESSIBLE AT ALL TIMES. 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. 15. CONTRACTOR SHALL MAKE ALLOWANCES FOR ALL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER THAN NORMAL WEEKDAY WORKING HOURS 16. CONTRACTOR SHALL MAKE ALLOWANCES IN BID FOR ALL WORK STOPPAGES ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERA11ONS OF THE FACILITY. 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 AM AND SATURDAY Jt SUNDAY 24 HOURS. 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE RESPONSIBLE FOR THEIR PRESERVATION.. 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. 21. PROVIDE WALK -OFF MATS AT ALL ENTRY /EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR CHANGED AS NEEDED TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -8, A -9 AND A -10 FOR SEALING FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. REFERENCE SYMBOLS DOOR SYMBOL WALL CONSTRUCTION A WALL TYPE 10 DOOR NUMBER f--- -- ELEVATION NUMBER INSULATION CONCRETE GRAVEL. or CEMENT CONCRETE Blanket PRECAST CRUSHED MORTAR EX & IN RI 4 X--- 0 2 STONE PIASTER ROOM NAME OFFICE -• ROOM NAME FINISH SCHEDULES XX) ROOM NUMBER ELEVATION SYMBOL 3 SHEET NUMBER EARTH TILE SOLID CONC. CONCRETE MARBLE CONSTRUC1ION DETAIL Ceramic or MAS. UNIT MASONRY DETAIL NUMBER r - DETAIL NUMBER BUILDING. PARTIAL SYMBOL Structural UNIT is DETAIL SECTION A- j SHEET NUMBER A- j SHEET NUMBER Ll 1 BOL SHEET WOOD WOOD WOOD BRICK -- NUMBER OR LETTER METAL Finished Blocking docking Large Q WINDOW TYPE Continuous Intermittent Scale i 7__ _ GENERAL NOTES ABCDEFG NOTE TOP OF CONCRETE ELEVATION 0.00 GLASS GLASS INSULATION DETAIL NUMBER 5L.AB ELEVATION Smell Large Rigid 4 Scale Scale DRAWING T111�S 1 ABCDEF - -- -1 - DRAWING REVISIONS REVISION NUMBER a -I SCALE: 1 S>Ta STEEL PLYWOOD SHEET NUMBER Small Scale Large Scale DEMOLITION NOTE NOTE THIS DRAWING X NOTE GENERAL DEMOLITION NOTES DRAWING 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ARCHI_T_ECTURE WORK TO OWNERS REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND COVER SHEET DAYS OF WEEK TO BE WORKED. A -0.0 INDEX- GENERAL NOTES- VICINITY AND LOCATION - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED LS -2.0 PARTIAL SECOND FLOOR LIFE SAFETY PROGRESS OF OWNER'S ON SITE OPERATIONS. PLAN - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. A-1.0 PARTIAL SECOND FLOOR DEMOLITION PLAN 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE SURFACES, EQUIPMENT, A -2.0 PARTIAL SECOND FLOOR NEW PLAN AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. A -3.0 PARTIAL SECOND FLOOR REFLECTED CEILING PLAN CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE AND ARCHITECT FOR A -4.0 WALL TYPES, ELEVATIONS k SECTIONS VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT A -8.0 DOOR k FINISH SCHEDULE PRIOR TO START OF WORK, A -10.0 WALL PENETRATION DETAILS 03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE A -10.1 MISCELLANEOUS DETAILS DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH STRONG ODORS. 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. MECHANICAL 05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. M -0.1 HVAC LEGENDS, NOTES Jc SCHEDULES 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S M -1.1 PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. M -2.1 PARTIAL FLOOR PLAN -NEW WORK -- HVAC A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DEMOLITION OPERATIONS. ELECTRICAL C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. E -0.1 ELECTRICAL LEGEND, SCHEDULES & DRAWING INDEX D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE E -0.2 ELECTRICAL DETAILS NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND E -1.0 PARTIAL SECOND FLOOR REFERENCE PLAN SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. E -1.1 PARTIAL SECOND FLOOR - DEMOLITION ELECTRICAL E'2.1 PARTIAL SECOND FLOOR NEW WORK E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE, SCREWS, NAILS, ETC. WILL NOT BE E -3.1 PARTIAL POWER RISER DIAGRAM PERMITTED. E -3.2 PANEL SCHEDULE F. REMOVE PROTECTIONS AT COMPLETION OF WORK. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED FIRE PROTECTION WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT FP-0.1 GEN. NOTES FIRE PROTECTION CONTAMINATION OF DUCT SYSTEM. FP -1.1 PARTIAL SECOND FLOOR DDEM EMOLITION PLAN -FIRE PROTECTION FP -2.1 PARTIAL SECOND NEW WORK PUN - FIRE PROTECTION 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. 08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. PLUMBING - DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING P -0.1 GEN. NOTES SCHEDULES PLUMBING BUILDING SYSTEMS /UTILI TIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. P -1.1 PARTIAL SECOND FLOOR DEMOLITION PLAN - PLUMBING - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. P -2.1 PARTIAL SECOND FLOOR NEW WORK PLAN - PLUMBING OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 09. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, POLLUTION AND DAMAGE TO EXISTING FINISHES. 10. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS WITHOUT UNDUE DELAY. 11. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR WORKING HOURS. - IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 12. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS /VIDEO. - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED 8Y SELECTIVE DEMOLITION WORK. VICINITY MAP � t � PROJECT LOCATION x1 PR (1 L=j 0 RI f ir { 1 Iii t 1 1 Adjacent Zoning Soule: Cl of SaA On! Zonllng Php t t Updated Noy 2001. • i AS NOTED Date: ABBREVIATIONS Drawn: �•Y A AC ACOUSTICAL L LAV LAVATORY o Y ADJ ADJUSTABLE LAM LAMINATED AFF ABOVE FINISH FLOOR • • LT LIGHT AGG AGGREGATE LTWT LIGHT WEIGHT A.C. AIR CONDITIONING LF OR LIN FT LINEAR FEET ALUM ALUMINUM v • M MAT MATERIAL r r` B BM BEAM ••••U ML MATCH LINE •••t BLK BLOCK MAX MAXIMUM BLKG BLOCKING MECH MECHANICAL BOT BOTTOM MET OR MTL METAL BLDG BUILDING MIN MINIMUM BLKHD BULKHEAD 0 MISC MISCELLANEOUS MACH MACHINE G CAB CABINET MANUF MANUFACTURER CARP CARPET CLG CEILING N NOM NOMINAL CEM CEMENT NIC NOT IN CONTRACT C/L CENTER LINE NTS NOT TO SCALE CER CERAMIC C.T. CERAMIC TILE U OFF OFFICE CO CLEAN OUT OPNG OPENING CL OR CLOS CLOSET OD OUTSIDE DIAMETER COL COLUMN OC ON CENTER CONC CONCRETE OH OR OPP.HD. OPPOSITE HAND CMU CONCRETE MASONRY UNIT CONST CONSTRUCTION P PR PAIR CONT CONTINUOUS PASS PASSENGER CG CORNER GUARD PENT . PENTHOUSE CU CUBIC PC PRECAST Pi PANEL JOINT D DEPT DEPARTMENT PLAS PLASTER DIA DIAMETER POL POLISHED DIM DIMENSION PMLD PREMOULDED ON DOWN PNL PANEL DS DOWN SPOUT O QT QUARRY TILE DWG DF DRAWING DRINKING FOUNTAIN QTM QUARRY TILE MINIATURES E E.A. EXPOSED AGGREGATE R RAD RADIUS EA EACH R RISER EL ELEVATION GRADE) REINF REINFORCED ELE ELEVATION FACADE) REQ`D REQUIRED ELEV ELEVATOR RF ROOF EQ EQUAL RD ROOF DRAIN EQUIP EQUIPMENT RM ROOM EXIST EXISTING RO ROUGH OPENING EXP.JT. OR EJ EXPANSION JOINT REFL OR REF REFLECTED EXP EXPOSED EXT EXTERIOR S SECT SECTION ELEC ELECTRICAL SHT SHEET SHT MET OR SM SHEET METAL F FT FEET SIM SIMILAR FIN FINISH SQ SQUARE FE FIRE EXTINGUISHER STD STANDARD FEC FIRE EXTINGUISHER CABINET SS STAINLESS STEEL FHC FIRE HOSE CABINET STL STEEL FL FLOOR STOR STORAGE FD FLOOR DRAIN STRUCT STRUCTURAL FLUOR FLUORESCENT SUSP SUSPENDED FS FULL SIZE SPECS SPECIFICATIONS FV FIELD VERIFY FVC FIRE VALVE CABINET T TEL TELEPHONE 0 GALV GALVANIZED TEMP TEMPERED GA GAUGE T TOILET GC GENERAL CONTRACTOR T TREADS GL GLASS m' TYPICAL GR GRADE TR TELEPHONE RECEPTACLE GYP GYPSUM THK THICK GYP BD GYPSUM WALLBOARD H HRDW HARDWARE V VERT VERTICAL HT HEIGHT VT VINYL TILE HM HOLLOW METAL VB VAPOR BARRIER HORIZ HORIZONTAL VWC VINYL WALL COVERING IN INCH W VWC -GYP WALL COVERING - GYPSUM BOARD INCAND INCANDESCENT VWC -PLAS WALL COVERING - PLASTER ID INSIDE DIAMETER WC WET COLUMN INSUL INSULATION WP WATERPROOFING WT INTERIOR WD WOOD INV INVERT W/0 WITHOUT J JT JOINT WC WATER COOLER JST JOIST JC JANITOR'S CLOSET Y YD YARD ARCHITECTURAL SYMBOLS GENERAL NOTES 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H -A., A.D.A. k ALL OTHER APPLICABLE CODES, RULES AND REGULATIONS. 02- THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PRIOR TO SUBMISSION OF BID. 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS TO CARRY OUT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF WORK. 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, SURFACE /RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, HN.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL INSTALLATION) UPON COMPLETION OF REPAIR WORK. 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONDITIONS. 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO STARTING WORK. 08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. 09, ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED /REPLACED TO MATCH EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE /FUME SPREAD RATINGS OR MEANS OF EGRESS WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. 12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND ACCESSIBLE AT ALL TIMES. 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. 15. CONTRACTOR SHALL MAKE ALLOWANCES FOR ALL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER THAN NORMAL WEEKDAY WORKING HOURS 16. CONTRACTOR SHALL MAKE ALLOWANCES IN BID FOR ALL WORK STOPPAGES ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERA11ONS OF THE FACILITY. 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 AM AND SATURDAY Jt SUNDAY 24 HOURS. 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE RESPONSIBLE FOR THEIR PRESERVATION.. 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. 21. PROVIDE WALK -OFF MATS AT ALL ENTRY /EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR CHANGED AS NEEDED TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -8, A -9 AND A -10 FOR SEALING FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. REFERENCE SYMBOLS DOOR SYMBOL WALL CONSTRUCTION A WALL TYPE 10 DOOR NUMBER f--- -- ELEVATION NUMBER INSULATION CONCRETE GRAVEL. or CEMENT CONCRETE Blanket PRECAST CRUSHED MORTAR EX & IN RI 4 X--- 0 2 STONE PIASTER ROOM NAME OFFICE -• ROOM NAME FINISH SCHEDULES XX) ROOM NUMBER ELEVATION SYMBOL 3 SHEET NUMBER EARTH TILE SOLID CONC. CONCRETE MARBLE CONSTRUC1ION DETAIL Ceramic or MAS. UNIT MASONRY DETAIL NUMBER r - DETAIL NUMBER BUILDING. PARTIAL SYMBOL Structural UNIT is DETAIL SECTION A- j SHEET NUMBER A- j SHEET NUMBER Ll 1 BOL SHEET WOOD WOOD WOOD BRICK -- NUMBER OR LETTER METAL Finished Blocking docking Large Q WINDOW TYPE Continuous Intermittent Scale i 7__ _ GENERAL NOTES ABCDEFG NOTE TOP OF CONCRETE ELEVATION 0.00 GLASS GLASS INSULATION DETAIL NUMBER 5L.AB ELEVATION Smell Large Rigid 4 Scale Scale DRAWING T111�S 1 ABCDEF - -- -1 - DRAWING REVISIONS REVISION NUMBER a -I SCALE: 1 S>Ta STEEL PLYWOOD SHEET NUMBER Small Scale Large Scale DEMOLITION NOTE NOTE THIS DRAWING X NOTE GENERAL DEMOLITION NOTES DRAWING 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ARCHI_T_ECTURE WORK TO OWNERS REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND COVER SHEET DAYS OF WEEK TO BE WORKED. A -0.0 INDEX- GENERAL NOTES- VICINITY AND LOCATION - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED LS -2.0 PARTIAL SECOND FLOOR LIFE SAFETY PROGRESS OF OWNER'S ON SITE OPERATIONS. PLAN - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. A-1.0 PARTIAL SECOND FLOOR DEMOLITION PLAN 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE SURFACES, EQUIPMENT, A -2.0 PARTIAL SECOND FLOOR NEW PLAN AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. A -3.0 PARTIAL SECOND FLOOR REFLECTED CEILING PLAN CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE AND ARCHITECT FOR A -4.0 WALL TYPES, ELEVATIONS k SECTIONS VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT A -8.0 DOOR k FINISH SCHEDULE PRIOR TO START OF WORK, A -10.0 WALL PENETRATION DETAILS 03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE A -10.1 MISCELLANEOUS DETAILS DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH STRONG ODORS. 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. MECHANICAL 05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. M -0.1 HVAC LEGENDS, NOTES Jc SCHEDULES 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S M -1.1 PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. M -2.1 PARTIAL FLOOR PLAN -NEW WORK -- HVAC A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DEMOLITION OPERATIONS. ELECTRICAL C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. E -0.1 ELECTRICAL LEGEND, SCHEDULES & DRAWING INDEX D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE E -0.2 ELECTRICAL DETAILS NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND E -1.0 PARTIAL SECOND FLOOR REFERENCE PLAN SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. E -1.1 PARTIAL SECOND FLOOR - DEMOLITION ELECTRICAL E'2.1 PARTIAL SECOND FLOOR NEW WORK E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE, SCREWS, NAILS, ETC. WILL NOT BE E -3.1 PARTIAL POWER RISER DIAGRAM PERMITTED. E -3.2 PANEL SCHEDULE F. REMOVE PROTECTIONS AT COMPLETION OF WORK. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED FIRE PROTECTION WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT FP-0.1 GEN. NOTES FIRE PROTECTION CONTAMINATION OF DUCT SYSTEM. FP -1.1 PARTIAL SECOND FLOOR DDEM EMOLITION PLAN -FIRE PROTECTION FP -2.1 PARTIAL SECOND NEW WORK PUN - FIRE PROTECTION 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. 08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. PLUMBING - DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING P -0.1 GEN. NOTES SCHEDULES PLUMBING BUILDING SYSTEMS /UTILI TIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. P -1.1 PARTIAL SECOND FLOOR DEMOLITION PLAN - PLUMBING - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. P -2.1 PARTIAL SECOND FLOOR NEW WORK PLAN - PLUMBING OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 09. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, POLLUTION AND DAMAGE TO EXISTING FINISHES. 10. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS WITHOUT UNDUE DELAY. 11. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR WORKING HOURS. - IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 12. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS /VIDEO. - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED 8Y SELECTIVE DEMOLITION WORK. VICINITY MAP � t � PROJECT LOCATION x1 PR (1 L=j 0 RI f ir { 1 Iii t 1 1 Adjacent Zoning Soule: Cl of SaA On! Zonllng Php t t Updated Noy 2001. • i .�11 J,0: :1 GVT%l 0 �AG rI" C�1Q' CATY OF SOUTH WAIPAt BUILDING DEPT. STRUCTURt _ -'CCTION �)PROVEO BY: f BE RMELLO • AJAMIBL & PARTNERS - INC I Architecture Engineerin Planning Interior Design Landscape chitecture' 2601 So. Bayshore Dr ve Suite 1000 Miami, Florida 33133 (305) 859 -2050 FAX (305) 859 -9638 Smith, Seckman, iteid, Inc. CONSLT1- 1317YNG' ENGIN7EJE]IFZ I 600 Nest Hillsboro, Suite 300 Deerfield Reach, Florida 33441 rhone(954)421 -12130 Fax(. 54)421-1466 l '" DONNELL, DUQU SNE L ALSAISA P.A. EE CONSULTING ENGINffERS LJRAMON R. DONNELL P.E.II 001100 LL G W ILXIB I PUCTI I[ I_ ❑PEDRO J. DUgUESNE P.E. 0022764 UNILYr� LkiRC:T UHAL. ❑AIDA M. ALSAISA P.E.1 0045130 L ,T L L 4f�q C.W. 74th Ci. MIAMI, FLOFIInA 33155 .... .... .... .... .... .... ..ii MR eH -D711 FAX ��� -6260 i R0L .wc y y 65714 u 1 Revisions: i ICI i Project Name: SOUTH MIA HOSPITAL PBX AREA 6200 73 STREET MIAMI, FLORIDA 33143 KEY PLAN PROJECT ; LOCATION .x Comm. No. 400021.000 Scale: AS NOTED Date: 12/121/08 Drawn: �•Y Checked: BNH Y Y V W • o Y INDEX • • .. v • •r• V•• y•N r r` •••• ••••U ••• •••t • • 0 .�11 J,0: :1 GVT%l 0 �AG rI" C�1Q' CATY OF SOUTH WAIPAt BUILDING DEPT. STRUCTURt _ -'CCTION �)PROVEO BY: f BE RMELLO • AJAMIBL & PARTNERS - INC I Architecture Engineerin Planning Interior Design Landscape chitecture' 2601 So. Bayshore Dr ve Suite 1000 Miami, Florida 33133 (305) 859 -2050 FAX (305) 859 -9638 Smith, Seckman, iteid, Inc. CONSLT1- 1317YNG' ENGIN7EJE]IFZ I 600 Nest Hillsboro, Suite 300 Deerfield Reach, Florida 33441 rhone(954)421 -12130 Fax(. 54)421-1466 l '" DONNELL, DUQU SNE L ALSAISA P.A. EE CONSULTING ENGINffERS LJRAMON R. DONNELL P.E.II 001100 LL G W ILXIB I PUCTI I[ I_ ❑PEDRO J. DUgUESNE P.E. 0022764 UNILYr� LkiRC:T UHAL. ❑AIDA M. ALSAISA P.E.1 0045130 L ,T L L 4f�q C.W. 74th Ci. MIAMI, FLOFIInA 33155 .... .... .... .... .... .... ..ii MR eH -D711 FAX ��� -6260 i R0L .wc y y 65714 u 1 Revisions: i ICI i Project Name: SOUTH MIA HOSPITAL PBX AREA 6200 73 STREET MIAMI, FLORIDA 33143 KEY PLAN PROJECT ; LOCATION .x Comm. No. 400021.000 Scale: AS NOTED Date: 12/121/08 Drawn: JCR Checked: BNH CARD File: Draw'g Title: INDEX SHEET Sheet No. A=0.0