09-510-001FIRE SPRINKLER PLAN
NU I E5:
V,Aw e 2 WA Vill
ISOill
i
SCALE: 1/4" = 1'
1. THE FIRE SPRINKLER SYSTEM, INCLUDING THE FIRE SPRINKLER, HANGERS, PIPE, AND ALL OTHER RELATED DEVICES, SHALL BE INSTALLED, LOCATED, AND DESIGNED IN ACCORDANCE
WITH NFPA 13, FIRE PREVENTION CODE, AND THE AUTHORITY HAVING JURISDICTION.
2. THE MINIMUM PIPING TO BE USED IS 1 ". ALL PIPING 2" TO A MINIMUM OF 1" SHALL BE XL PIPE WITH SCREWED OR ROLLED GROOVED ENDS AND FITTINGS. ALL PIPING 2 -1/2" OR
LARGER SHALL BE SCH. 10 PIPE WITH SCREWED OR ROLL GROOVED ENDS AND FITTINGS.
3. ALL PIPING SHALL BE SUPPORTED FROM BUILDING IN AN APPROVED MANNER AS SHOWN ON HANGER DETAILS ON PLANS.
4. FOR SPRINKLER TYPE SEE SPRINKLER CHARTS ON RESPECTIVE DRAWINGS.
5. ALL MATERIALS USED SHALL BE NEW AND FREE OF ANY DEFECTS. ANY PAINTING OR WIRING SHALL BE DONE BY OTHERS.
6. PLANS ARE FOR REFERENCE ONLY AND MAY NOT SHOW EVERY OFFSET.
7. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID CONFLICTS AND INTERFERNCE WITH PROGRESS OF INSTALLATION.
8. SPARE HEADS CABINET, IDENTIFICATION TAGS, MATERIAL TEST CERTIFICATES, AND ANY OTHER ITEMS CONCERNING THE FIRE SPRINKLER SYSTEM SHALL BE PROVIDED IF APPLICABLE.
9. THE BUILDING HAS 100% COVERAGE FROM THE EXISTING FIRE SPRINKLER SYSTEM.
10. - TESTING OF SPRINKLER PIPING SHALL BE DONE AT 200 PSI MINIMUM HYDROSTATIC PRESSURE FOR MINIMUM OF 2 HOURS, OR AT 50 PSI IN EXCESS OF THE MAXIMUM PRESSURE TO
MAINTAINED IN SYSTEMS WHICH IS IN EXCESS OF 150 PSI.
HANGER
off` �
CONCRETE SLAB V
DROP -IN ANCHOR W
ALL THREAD ROD I'I C)
RING
CONCRETE SLAB POWDER DRIVEN STUD
ROD COUPLING
ALL THREAD ROD
eTrrl 1 nru.
RING
BEAM CLAMP
ALL THREAD ROD
PIPE
HANGER RING
0
LU I
t
LU �I
TYPICAL ARMOVER DETAIL (Nr.s,0�
SCHEDULE
1. EXISTING DROP TO BE
} REMOVED.
2. EXISTING BRANCHUNE.
J. 1'ARMOVER'
4 1 -DROP.
5. NEW FIRE SPRINKLER HEAD
a I
Q
m 7i
2
SCHEDULE
1. EXISTING DROP TO BE
REMOVED.
2. EXISTING BRANCHUNE. SCHEDULE
1 , *DROP* 2. l*AR EXISTING VERANCHUNE.
1. ,'DROP. y 3
3. 1'ARMOVER•
S. NEW FIRE SPRINKLER HEAD (� I ,' DROP.
5
� 5. NEW FIRE SPRINKLER HEAD
MAXIMUM PRESSURE > 100 PSI, ARM -OVERS 12" OR GREATER SHALL BE SUPPORTED BY HANGER.
• MAXIMUM PRESSURE < 100 PSI, ARM -OVERS 24" OR GREATER SHALL BE SUPPORTED BY HANGER.
HANGER LOCATION (N.T.S.)
HANGER ROD SIZES U HOOK ROD SIZES EYE ROD SIZES
UP TO 4. PIPE 3/8" DIA UP TO 2" PIPE 5/16" DIA. UP TO 4" PIPE 3/8' DIA.
5' TO 8' PIPE 1/2" DIA 21/2" TO 6" PIPE 3/8" DIA. 5"& 6" PIPE 12" DIA
10 & 12' PIPE 518' DIA 8" PIPE 5/8' DIA. 8" PIPE 3/4" DIA
MAXIMUM HANGER SPACING (FT)
PIPE SIZE (INCHES)
O
1"
1 -1/4-
o
2-
2 -12"
3-
4-
SCHEDULE
U_
THREADED UGHTWALL
1. NEW MECH -TYPE
TEE.
2 EXISTING BRANCHUNE.
3 ARMOVER.•
17-0"
17-0-
5. DROP.
N
5 NEW FIRE SPRINKLER HEAD
7
L
17 -0"
17 -0'
,I
N/A
N/A
X
CEILING /SOFFIT ELEVATION
m
EXISTING PIPE
2
SCHEDULE
1. EXISTING DROP TO BE
REMOVED.
2. EXISTING BRANCHUNE. SCHEDULE
1 , *DROP* 2. l*AR EXISTING VERANCHUNE.
1. ,'DROP. y 3
3. 1'ARMOVER•
S. NEW FIRE SPRINKLER HEAD (� I ,' DROP.
5
� 5. NEW FIRE SPRINKLER HEAD
MAXIMUM PRESSURE > 100 PSI, ARM -OVERS 12" OR GREATER SHALL BE SUPPORTED BY HANGER.
• MAXIMUM PRESSURE < 100 PSI, ARM -OVERS 24" OR GREATER SHALL BE SUPPORTED BY HANGER.
HANGER LOCATION (N.T.S.)
HANGER ROD SIZES U HOOK ROD SIZES EYE ROD SIZES
UP TO 4. PIPE 3/8" DIA UP TO 2" PIPE 5/16" DIA. UP TO 4" PIPE 3/8' DIA.
5' TO 8' PIPE 1/2" DIA 21/2" TO 6" PIPE 3/8" DIA. 5"& 6" PIPE 12" DIA
10 & 12' PIPE 518' DIA 8" PIPE 5/8' DIA. 8" PIPE 3/4" DIA
MAXIMUM HANGER SPACING (FT)
PIPE SIZE (INCHES)
314-
1"
1 -1/4-
1 -12"
2-
2 -12"
3-
4-
6'
1 8-
THREADED UGHTWALL
N/A
17-0"
17-0-
17-0'
17 -0'
17 -0"
17 -0'
N/A
N/A
N/A
STEEL PIPE
CEILING /SOFFIT ELEVATION
EXISTING PIPE
NEW PIPE
< =`t <-'•
( FOR TYPE OF
HEADS SEE TITLEEILOCN
STEEL PIPE EXCEPT
THREADED UGHTWALL
N/A
17-0"
17 -0"
15 -0"
15 -0"
15-0-
15-0-
15 -0'
15'-0"
15 -0'
DUCTILE IRON
N/A
N/A
N/A
N/A
N/A
N/A
151-0'
15' -0"
15' -0"
! 150"
COPPER
8'4"
8'40-
10'4'
10'40"
17-0-
12'-0-
174"
15'4"
15'
'ALL HANGERS AT CEILING PENDENT END OF LINE SPRINKLERS SHALL PREVENT UPWARD MOVEMENT OF PIPE.
'ALL HANGERS AT ARMOVERS TO CEILING PENDENT SPRINKLERS SHALL PREVENT UPWARD MOVEMENT OF PIPE
\���'to
Hanger Loca9on Detect -
PIPE SIZE
A'
FIRE LEGEND - NTS
KEY PLAN -
1'
EXISTING HEADS TO REMAIN
17 -0- MAX
00
ADD /RELOCATED SPRINKLERS
4' -0- MAX
OEXISTING
OUTLET
1 -12" thru 8'
ONEW
SPRINKLERS
3" MIN. -
.o
HANGER
C
j SPRINKLER HEAD TI
STEEL PIPE
HANGER
• MAXIMUM HANGER SPACING FOR THREADED LIGHTWALL STEEL PIPE
IS 17-0' FOR ALL PIPE SIZES.
POINT OF CONNECTION
y
e.
Lu cn w
w���
CEILING /SOFFIT ELEVATION
EXISTING PIPE
NEW PIPE
< =`t <-'•
( FOR TYPE OF
HEADS SEE TITLEEILOCN
Hanger Loca9on Detect -
PIPE SIZE
A'
B'
C
1'
X -0- MAX.
17 -0- MAX
3' MIN.
1 -1/4-
4' -0- MAX
17 -0- MAX
3' MIN.
1 -12" thru 8'
5' -0' MAX.
151 -0" MAX
3" MIN. -
.o
A B'
C
j SPRINKLER HEAD TI
STEEL PIPE
HANGER
• MAXIMUM HANGER SPACING FOR THREADED LIGHTWALL STEEL PIPE
IS 17-0' FOR ALL PIPE SIZES.
APPROVED BY E�
,l -DADE Coum FIRE DEPAM
BLDG. tT NSITE
SPK_, --
, E:XT St _
WATER TE 131 A BY - - -.
LOCATI
OF
NON - I f'
• r
Z M
Ln
V) �
CL_
O
U
M
LU
U)
Z `1
U
C
cn cy
LU
Q co
LL L6
Y
x LU
U) F—
Z x
U_
CL LO
LU
Lo
x
LU U_
J LL
LU
J U
LU Z
0
O O U
I
1%4?
I
I
II��I
I
Ci cl - -
wl'71-[ I
STEM #: -
J
Q WQ
I- w
0-
U) c/)o
O 1L
1 )
�
a
Q 2
c NU)
CD
w
Q
0
W
U)
Z
Cry
U)
{1
I
I
� r
.n
r
M
C13
O
Z
O
U)
C)
Q
LLI
x
IL
O
4t
J
r
ILL]
LU
Z
O
V]
0
w
x
LL
O
J
DRAWN BY:
A. RAGOONAN
CHECKED BY:: ; 1 21w
D. RQPRTSA
M
AHJ:
JOB IF: •
AREA OF WORK
v
' R.,px . Z1
FP1
0 F�;1w: w;
M .r
.o
I
Z
y
e.
Lu cn w
w���
v
T0LL
wo-
J cy))
.
r
--�
O
CL)
cn
"' a
C a
co co
1 ��
w
I
Ci cl - -
wl'71-[ I
STEM #: -
J
Q WQ
I- w
0-
U) c/)o
O 1L
1 )
�
a
Q 2
c NU)
CD
w
Q
0
W
U)
Z
Cry
U)
{1
I
I
� r
.n
r
M
C13
O
Z
O
U)
C)
Q
LLI
x
IL
O
4t
J
r
ILL]
LU
Z
O
V]
0
w
x
LL
O
J
DRAWN BY:
A. RAGOONAN
CHECKED BY:: ; 1 21w
D. RQPRTSA
AHJ:
JOB IF: •
AREA OF WORK
S. MIAMI
' R.,px . Z1
FP1
0 F�;1w: w;
.o