09-384-002STING
J WALL.
TOOLED JOINT.
PAINTABLE
SILICONIZED
ACRYLIC SEALANT.
S FIBER
'RIP, TYP.
Co.
3EAM.
STUCCO JOINT DETAIL
9 SCALE: 6' = 1' -0'
EXISTING CMU WALL REINFORCEMENT. FNEW STUCCO
WALL. REFER TO STRUCTURAL
DRAWINGS
EXISTING COLUMN.
l.. . ° .
° •' EXISTING STUCCO TO
• REMAIN.
16" MAX. ••a•• . .
°
d • ° °
EXISTING CMU WALL.
PLAN DETAIL
(���WALL
LE: 1 -1/2' _ 1' -0'
+/- 43' -0" (V.I.F.)
DOWEL RE -BAR INTO
EXISTING TIE BEAM, (TYP.).
SCARIFY EXISTING CONC.
BEAMS AND COLUMNS
PRIOR INSTALLING NEW
STUCCO, (TYP.).
EXISTING CMU WALL
TO BE REINFORCED.
FOR SIZE AND SPACING
OF NEW RE -BAR REFER
TO STRUCTURAL
DRAWINGS, (TYP.).
NEW STUCCO
TOOLED JOINT. REFFR TO
DETAIL 9/A -1, (TYP.).
DOWEL RE -BAR INTO
EXISTING TIE BEAM (TYP.).
TYP. STUCCO EXTERIOR
WALL DETAIL
SCALE: 3/4' _ 1'-0'
NEW 16 GA. CONTINUOS SILICONE
STAINLESS STEEL SEALANT
DOOR RAIN GUARD
cl
NEW 16 GA.
STAINLESS STEEL FULL BED OF
DOOR RAIN GUARD SILICONE SEALANT
I
N O
N
•
N
1 1 -o-
DOOR AT UPPER ROOF LEVEL 1•
STAIRWELL. COORDINATE WITH DOOR AT FIRST FLOOR
DRIP EDGE ROOFING FLASHING. STAIRWELL.
RAIN GUARD SECTION VIEW RAIN GUARD SECTION VIEW
12 SCALE: 1' = 1' -0' 11 SCALE: 1' = V -0'
NEW 16 GA.
STAINLESS STEEL
DOOR RAIN GUARD
FLANGE ANCHORED
TO WALL WI TH
STAINLESS STEEL
TAPCONS 0 6"
O.C. MAX.
CONTINUOS WATERTIGHT
SEALANT, (TYP.)
2"
ISOMETRIC VIEW ELEVATION VIEW AT OPENING
nDOOR RAIN GUARD DETAIL
z
03
U W
w5
In
5
SIM. A'
SCALE: 3/4' 1' -0'
1
AND ELECTRICAL EQUIPMENT, AND SHALL BE LIABLE FOR ANY
REMOVE EXISTING
I
DAMAGE TO THE SAME. REPAIR ANY DAMAGED STRUCTURE AND /OR
7 STUCCO, REINFORCE
1
FINISHES AND INCORPORATE INTO NEW WORK AT NO EXTRA COST TO
A -1 WALL AND APPLY
THE OWNER. INSTALL SCAFFOLDING ABOVE ELECTRICAL AND
NEW STUCCO
MECHANICAL EQUIPMENT, UTILITY PIPING AND WHERE REQUIRED.
I
L 7
OFFICE O
ROOF SLAB EL:
ALL CONTRACTORS ARE RESPONSIBLE FOR THEIR OWN CLEAN -UP ON L
_TOP 7th FL. EL:
77
A DAY -TO -DAY BASIS. UPON COMPLETION OF THE PROJECT, THE
+66' -8"
GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS,
I
BROOM CLEAN THE ENTIRE PROJECT AREA, AND LEAVE THE SITE IN I
1
,
LD Q I
I
A CLEAN CONDITION.
I
2.
0
lu
PER OSHA REGULATIONS. O
101
THE CONTRACTOR SHALL REMOVE, CLEAN AND STORE THE EXISTING O
I
SIGN. AFTER COMPLETION OF WALL REPAIR WORK, THE CONTRACTOR
3.
�
z z
ui
NEW ANCHORS APPROPRIATELY SEALED AT ALL PENETRATIONS. I
I
I
REMOVE EXISTING STUCCO ON THE EAST WALLS AND STAIR TOWER.
U
NEW STUCCO SHALL BE PAINTED WITH ONE COAT ACRYLIC PRIMER, O
OFFICE
AND TWO COATS SATIN LATEX FINISH PAINT TO MATCH EXISTING
I
I
FACADE.
I
4.
_TOP 6th FL. EL:
- 5_5 4" -
_TOP 6th FL. EL:
+54' -4"
I
I
I
1
1
5.
C, m
0
0o
00
0 I
I
6.
Fj
7.
I
5th FL. EL:
TOP 5th FL. EL:
_TOP
+43' -10" - f
-
10"
I
I
I
8.
I
I
s.
m
1
zz
L)
I
I
,
of
o
REMOVE EXISTING
00
o
I
I
STUCCO AND APPLY
z zz
0
NEW STUCCO
11
I
I
TOP 4th FL. EL:
4" -
_T_OP 4th FL. EL:
+33' -4"
1
TT
T--'73T-
I
I
I
I
I
0
zcD
�Z
1
°o
Z
I
-}-
TOP 3rd
+22' -10 "-
TOP 3rd FL. EL:
-
1
I
1
OP
I
0
z
1
0�
cO
z°
z
1
X0
TOP 2nd FL. EL:
I
TOP 2nd FL. EL:
+12' -4 "-
I
+12' -4" -
I
I
EXISTING CMU
WALL.
TOP F.F. EL:
1
_TOP F.F. EL:
SECTION
AT EXISTING
SECTION AT EXISTING
ROOM END WALLS
4
STAIR WALLS
3
3/18'
SCALE: 3/16' = V -0'
SCALE: =
1' -0'
I
r —
A
EOC
16' -10" (V.I.F.)
3
a -' SIM
PHASE 1
0
I
r-
PHASE 2
4
SIM. A'
PHASE 1
AT UPPER ROOF
8' -8" (V.I.F.)
3 PHASE 1
AI
16' -10" (V.1 F.)- _ ¢.
^-- - _l.
- . --
L 3
'
SIM. PHASE 1
HATCHED AREA —
INDICATES FACADE
UNDER CONTRACT.
Z444444 //-Z/ZZZZZZZZZ
a
A -1
PHASE 1
AT UPPER ROOF
0
5
A -1
110311000210=2 Fill
PHASE 1 I
AT UPPER ROOF
t
2 DETAIL FLOOR PLAN N
LL)i I - - .." _. .1
SCALE: 1/4' = 1' -0'
7 /,/)j.
THE GENERAL CONTRACTOR AND ALL SUB - CONTRACTORS SHALL
BE REQUIRED TO FIELD CHECK AND VERIFY ALL EXISTING
CONDITIONS AND BE RESPONSIBLE FOR COORDINATION OF SAME.
NOTIFY THE ARCHITECT IN WRITING IF ANY DISCREPANCY EXISTS.
ALL CUTTING do PATCHING REQUIRED TO INCORPORATE THE NEW A -1 CONSTRUCTION FLOOR PLAN
WORK WITH THE EXISTING ITEMS TO REMAIN SHALL BE INCLUDED BY
EACH CONTRACTOR.
DURING ANY CUTTING REQUIRING THE USE OF TORCHES, THE
CONTRACTOR SHALL MAINTAIN PERSONNEL WITH FIRE
EXTINGUISHERS AT THE WORK LOCATIONS. I I S -1 CONSTRUCTION FLOOR PLAN
ALL CONTRACTORS ARE RESPONSIBLE TO PROTECT THE EXISTING S —Z CONSTRUCTION DETAILS
BUILDING, ADJOINING SPACES, ALL ADJACENT FINISHES, MECHANICAL
AND ELECTRICAL EQUIPMENT, AND SHALL BE LIABLE FOR ANY
DAMAGE TO THE SAME. REPAIR ANY DAMAGED STRUCTURE AND /OR
FINISHES AND INCORPORATE INTO NEW WORK AT NO EXTRA COST TO
THE OWNER. INSTALL SCAFFOLDING ABOVE ELECTRICAL AND
MECHANICAL EQUIPMENT, UTILITY PIPING AND WHERE REQUIRED.
L 7
OFFICE O
OFFICE
ALL CONTRACTORS ARE RESPONSIBLE FOR THEIR OWN CLEAN -UP ON L
77
A DAY -TO -DAY BASIS. UPON COMPLETION OF THE PROJECT, THE
GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS,
BROOM CLEAN THE ENTIRE PROJECT AREA, AND LEAVE THE SITE IN I
I
A CLEAN CONDITION.
ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED
PER OSHA REGULATIONS. O
OFFICE
THE CONTRACTOR SHALL REMOVE, CLEAN AND STORE THE EXISTING O
OFFICE
SIGN. AFTER COMPLETION OF WALL REPAIR WORK, THE CONTRACTOR
SHALL REINSTALL THE SIGN BACK TO ITS ORIGINAL LOCATION USING
NEW ANCHORS APPROPRIATELY SEALED AT ALL PENETRATIONS. I
I
REMOVE EXISTING STUCCO ON THE EAST WALLS AND STAIR TOWER.
NEW STUCCO SHALL BE PAINTED WITH ONE COAT ACRYLIC PRIMER, O
OFFICE
AND TWO COATS SATIN LATEX FINISH PAINT TO MATCH EXISTING
FACADE.
PROCEDU
R -6
ENDOSC
OCEDURE
R -1
PROCEDURE
R -2
OFFICE
R -3
OFFICE
R -5
PROCEDURE
\ R -4
TYPICAL F
SCALE: 1/18' = V -0'
Own
INI t9I STOR
NURSE
N
O!Sc-S. EY PLAN
WAITING
ROOM
�7 R -659 ,.
R -651
R -652
R -658
R -653
R PLAN, EAST TOWER N
R -657
R -654
R -656
R -655
CU
Z
[w �4 �l
C!)
L11 It
Z a
Z U)
W LO
1..✓ ^ — z
(� m W co
M
~ w
W
g
uj 00 rn
I— _j °i
z
o
U 2
cp cp
larf < m g o
Q
Q r ch
0
d !2
w
W
W
Z
�W wLLon�
� _j
OQ Q10
�us
$�-No
M
dlpladmpplddd
dl tll tld !k! dd E:: tld
IIS�iei;a; I
"Al
dl��pda;pglgpq
tlll.�i-i -illplgdq
pl tll qd id W Id qp
0 ~
r__lq rn
wN
�0 CO)
+.5
w r-
C� an LL
—1 O
J
4—,
2
cd rA
4J 0 cz
<
`�--� N M O
I—
vi
CC3 p Lt oc ►-
M z
m Lu)
w
a
w
cn
w
z
0
z
0
ir
U
U)
w
w
cr
w
0
�. V ,d ;l
-f _A
iE
UJI �1f'•: G�
��.
DRAWN
CHECKED
SCALE AS NOTED
DATE 02 -06 -09
PROJ. No. 2009 -04
SHEET No.
CONSTRUCTION
FLOOR PLAN
AND DETAILS
A -1