Loading...
09-384-002STING J WALL. TOOLED JOINT. PAINTABLE SILICONIZED ACRYLIC SEALANT. S FIBER 'RIP, TYP. Co. 3EAM. STUCCO JOINT DETAIL 9 SCALE: 6' = 1' -0' EXISTING CMU WALL REINFORCEMENT. FNEW STUCCO WALL. REFER TO STRUCTURAL DRAWINGS EXISTING COLUMN. l.. . ° . ° •' EXISTING STUCCO TO • REMAIN. 16" MAX. ••a•• . . ° d • ° ° EXISTING CMU WALL. PLAN DETAIL (���WALL LE: 1 -1/2' _ 1' -0' +/- 43' -0" (V.I.F.) DOWEL RE -BAR INTO EXISTING TIE BEAM, (TYP.). SCARIFY EXISTING CONC. BEAMS AND COLUMNS PRIOR INSTALLING NEW STUCCO, (TYP.). EXISTING CMU WALL TO BE REINFORCED. FOR SIZE AND SPACING OF NEW RE -BAR REFER TO STRUCTURAL DRAWINGS, (TYP.). NEW STUCCO TOOLED JOINT. REFFR TO DETAIL 9/A -1, (TYP.). DOWEL RE -BAR INTO EXISTING TIE BEAM (TYP.). TYP. STUCCO EXTERIOR WALL DETAIL SCALE: 3/4' _ 1'-0' NEW 16 GA. CONTINUOS SILICONE STAINLESS STEEL SEALANT DOOR RAIN GUARD cl NEW 16 GA. STAINLESS STEEL FULL BED OF DOOR RAIN GUARD SILICONE SEALANT I N O N • N 1 1 -o- DOOR AT UPPER ROOF LEVEL 1• STAIRWELL. COORDINATE WITH DOOR AT FIRST FLOOR DRIP EDGE ROOFING FLASHING. STAIRWELL. RAIN GUARD SECTION VIEW RAIN GUARD SECTION VIEW 12 SCALE: 1' = 1' -0' 11 SCALE: 1' = V -0' NEW 16 GA. STAINLESS STEEL DOOR RAIN GUARD FLANGE ANCHORED TO WALL WI TH STAINLESS STEEL TAPCONS 0 6" O.C. MAX. CONTINUOS WATERTIGHT SEALANT, (TYP.) 2" ISOMETRIC VIEW ELEVATION VIEW AT OPENING nDOOR RAIN GUARD DETAIL z 03 U W w5 In 5 SIM. A' SCALE: 3/4' 1' -0' 1 AND ELECTRICAL EQUIPMENT, AND SHALL BE LIABLE FOR ANY REMOVE EXISTING I DAMAGE TO THE SAME. REPAIR ANY DAMAGED STRUCTURE AND /OR 7 STUCCO, REINFORCE 1 FINISHES AND INCORPORATE INTO NEW WORK AT NO EXTRA COST TO A -1 WALL AND APPLY THE OWNER. INSTALL SCAFFOLDING ABOVE ELECTRICAL AND NEW STUCCO MECHANICAL EQUIPMENT, UTILITY PIPING AND WHERE REQUIRED. I L 7 OFFICE O ROOF SLAB EL: ALL CONTRACTORS ARE RESPONSIBLE FOR THEIR OWN CLEAN -UP ON L _TOP 7th FL. EL: 77 A DAY -TO -DAY BASIS. UPON COMPLETION OF THE PROJECT, THE +66' -8" GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS, I BROOM CLEAN THE ENTIRE PROJECT AREA, AND LEAVE THE SITE IN I 1 , LD Q I I A CLEAN CONDITION. I 2. 0 lu PER OSHA REGULATIONS. O 101 THE CONTRACTOR SHALL REMOVE, CLEAN AND STORE THE EXISTING O I SIGN. AFTER COMPLETION OF WALL REPAIR WORK, THE CONTRACTOR 3. � z z ui NEW ANCHORS APPROPRIATELY SEALED AT ALL PENETRATIONS. I I I REMOVE EXISTING STUCCO ON THE EAST WALLS AND STAIR TOWER. U NEW STUCCO SHALL BE PAINTED WITH ONE COAT ACRYLIC PRIMER, O OFFICE AND TWO COATS SATIN LATEX FINISH PAINT TO MATCH EXISTING I I FACADE. I 4. _TOP 6th FL. EL: - 5_5 4" - _TOP 6th FL. EL: +54' -4" I I I 1 1 5. C, m 0 0o 00 0 I I 6. Fj 7. I 5th FL. EL: TOP 5th FL. EL: _TOP +43' -10" - f - 10" I I I 8. I I s. m 1 zz L) I I , of o REMOVE EXISTING 00 o I I STUCCO AND APPLY z zz 0 NEW STUCCO 11 I I TOP 4th FL. EL: 4" - _T_OP 4th FL. EL: +33' -4" 1 TT T--'73T- I I I I I 0 zcD �Z 1 °o Z I -}- TOP 3rd +22' -10 "- TOP 3rd FL. EL: - 1 I 1 OP I 0 z 1 0� cO z° z 1 X0 TOP 2nd FL. EL: I TOP 2nd FL. EL: +12' -4 "- I +12' -4" - I I EXISTING CMU WALL. TOP F.F. EL: 1 _TOP F.F. EL: SECTION AT EXISTING SECTION AT EXISTING ROOM END WALLS 4 STAIR WALLS 3 3/18' SCALE: 3/16' = V -0' SCALE: = 1' -0' I r — A EOC 16' -10" (V.I.F.) 3 a -' SIM PHASE 1 0 I r- PHASE 2 4 SIM. A' PHASE 1 AT UPPER ROOF 8' -8" (V.I.F.) 3 PHASE 1 AI 16' -10" (V.1 F.)- _ ¢. ^-- - _l. - . -- L 3 ' SIM. PHASE 1 HATCHED AREA — INDICATES FACADE UNDER CONTRACT. Z444444 //-Z/ZZZZZZZZZ a A -1 PHASE 1 AT UPPER ROOF 0 5 A -1 110311000210=2 Fill PHASE 1 I AT UPPER ROOF t 2 DETAIL FLOOR PLAN N LL)i I - - .." _. .1 SCALE: 1/4' = 1' -0' 7 /,/)j. THE GENERAL CONTRACTOR AND ALL SUB - CONTRACTORS SHALL BE REQUIRED TO FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND BE RESPONSIBLE FOR COORDINATION OF SAME. NOTIFY THE ARCHITECT IN WRITING IF ANY DISCREPANCY EXISTS. ALL CUTTING do PATCHING REQUIRED TO INCORPORATE THE NEW A -1 CONSTRUCTION FLOOR PLAN WORK WITH THE EXISTING ITEMS TO REMAIN SHALL BE INCLUDED BY EACH CONTRACTOR. DURING ANY CUTTING REQUIRING THE USE OF TORCHES, THE CONTRACTOR SHALL MAINTAIN PERSONNEL WITH FIRE EXTINGUISHERS AT THE WORK LOCATIONS. I I S -1 CONSTRUCTION FLOOR PLAN ALL CONTRACTORS ARE RESPONSIBLE TO PROTECT THE EXISTING S —Z CONSTRUCTION DETAILS BUILDING, ADJOINING SPACES, ALL ADJACENT FINISHES, MECHANICAL AND ELECTRICAL EQUIPMENT, AND SHALL BE LIABLE FOR ANY DAMAGE TO THE SAME. REPAIR ANY DAMAGED STRUCTURE AND /OR FINISHES AND INCORPORATE INTO NEW WORK AT NO EXTRA COST TO THE OWNER. INSTALL SCAFFOLDING ABOVE ELECTRICAL AND MECHANICAL EQUIPMENT, UTILITY PIPING AND WHERE REQUIRED. L 7 OFFICE O OFFICE ALL CONTRACTORS ARE RESPONSIBLE FOR THEIR OWN CLEAN -UP ON L 77 A DAY -TO -DAY BASIS. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS, BROOM CLEAN THE ENTIRE PROJECT AREA, AND LEAVE THE SITE IN I I A CLEAN CONDITION. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED PER OSHA REGULATIONS. O OFFICE THE CONTRACTOR SHALL REMOVE, CLEAN AND STORE THE EXISTING O OFFICE SIGN. AFTER COMPLETION OF WALL REPAIR WORK, THE CONTRACTOR SHALL REINSTALL THE SIGN BACK TO ITS ORIGINAL LOCATION USING NEW ANCHORS APPROPRIATELY SEALED AT ALL PENETRATIONS. I I REMOVE EXISTING STUCCO ON THE EAST WALLS AND STAIR TOWER. NEW STUCCO SHALL BE PAINTED WITH ONE COAT ACRYLIC PRIMER, O OFFICE AND TWO COATS SATIN LATEX FINISH PAINT TO MATCH EXISTING FACADE. PROCEDU R -6 ENDOSC OCEDURE R -1 PROCEDURE R -2 OFFICE R -3 OFFICE R -5 PROCEDURE \ R -4 TYPICAL F SCALE: 1/18' = V -0' Own INI t9I STOR NURSE N O!Sc-S. EY PLAN WAITING ROOM �7 R -659 ,. R -651 R -652 R -658 R -653 R PLAN, EAST TOWER N R -657 R -654 R -656 R -655 CU Z [w �4 �l C!) L11 It Z a Z U) W LO 1..✓ ^ — z (� m W co M ~ w W g uj 00 rn I— _j °i z o U 2 cp cp larf < m g o Q Q r ch 0 d !2 w W W Z �W wLLon� � _j OQ Q10 �us $�-No M dlpladmpplddd dl tll tld !k! dd E:: tld IIS�iei;a; I "Al dl��pda;pglgpq tlll.�i-i -illplgdq pl tll qd id W Id qp 0 ~ r__lq rn wN �0 CO) +.5 w r- C� an LL —1 O J 4—, 2 cd rA 4J 0 cz < `�--� N M O I— vi CC3 p Lt oc ►- M z m Lu) w a w cn w z 0 z 0 ir U U) w w cr w 0 �. V ,d ;l -f _A iE UJI �1f'•: G� ��. DRAWN CHECKED SCALE AS NOTED DATE 02 -06 -09 PROJ. No. 2009 -04 SHEET No. CONSTRUCTION FLOOR PLAN AND DETAILS A -1 r