Loading...
09-252-01115 A K J F C 0 0 15 14 1 13 1 12 1 11 1 10 1 9 1 8 1 7 6 1 5 TEST & BALANCE NOTES A. CONTRACTOR SHALL BE RESPONSIBLE TO TEST AND BALANCE THE SYSTEM TO ACHIEVE RATES AS SHOWN ON PLANS AND SCHEDULES. TEST/BALANCE RESULTS SHALL BE SUBMITTED TO ARCHITECT/ENGINEER FOR REVIEW PRIOR TO FINAL PAYMENT REQUISITION. THE TEST AND BALANCE SHALL BE PERFORMED BY AN INDEPENDENT T &B CONTRACTOR CERTIFIED BY THE A.A.B.C. AND /OR N.E.B.B. THE SUBMITTED TEST AND BALANCE REPORT SHALL BE ON OFFICIAL A.A.B.C. OR N.E.B.B. REPORT FORMS. B. BALANCE AIR SYSTEM TO DELIVER SPECIFIED QUANTITIES AT EACH OUTLET WITHIN 10% USING A.A.B.C. PROCEDURES AND TESTS. SUBMIT AIR BALANCE TEST RESULTS FOR REVIEW PRIOR TO FINAL INSPECTION AND ACCEPTANCE. C. FINAL CONSTRUCTION UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED AIR QUANTITIES TO THE RENO- VATED SPACE, ANY ADDITION OF DAMPERS, ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTOR PROPOSAL D. FINAL REPORT SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. MECHANICAL SPECIFICATIONS A. GENERAL REQUIREMENTS 1. SCOPE OF WORK SHALL INCLUDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, TRANSPORTATION, HOISTING, RIGGING, INSURANCE, ETC., TO PERFORM THE WORK AS INDICATED ON THE DRAWINGS AND HEREIN SPECIFIED FOR A COMPLETE INSTALLATION. 2. ALL WORK SHALL BE IN ACCORDANCE WITH NATIONAL STATE AND LOCAL CODES AND ORDINANCES. AIA 2006 AND NFPA LSC 101 2003 CODES. FBC 2004 WITH 2006 AMENDMENTS. 3. MANUFACTURES SHALL PROVIDE THEIR STANDARD GUARANTEES AND WARRANTIES FOR WORK UNDER THIS CONTRACT. 4. LOCATIONS OF PIPING, DUCTWORK, CONDUITS AND EQUIPMENT SHALL BE ADJUSTED TO ACCOMMODATE THE NEW WORK. LINES WHICH PITCH SHALL HAVE THE RIGHT -OF -WAY OVER THOSE WHICH DO NOT PITCH. OFFSETS, TRANSITIONS AND CHANGES OF DIRECTION IN ALL SYSTEMS SHALL BE MADE AS REQUIRED TO MAINTAIN PROPER HEADROOM AND PITCH OF SLOPING LINES WHETHER OR NOT INDICATED ON THE DRAWINGS. ALL WORK SHALL BE INSTALLED IN A WAY TO PERMIT REMOVAL AND ALLOW PROPER ACCESS TO ALL EQUIPMENT INCLUDING DUCT ACCESS DOORS. 5. FINAL LOCATION OF ALL AIR DISTRIBUTION DEVICES, T -STATS CONTROL DEVICES, ETC. SHALL BE COORDINATED WITH THE ARCHITECTURAL REFLECTED PLAN AND /OR OTHER ARCH. DETAILS. OFFSETS OF DUCTWORK, ADDED SHEETMETAL, FITTINGS, ELBOWS ETC. SHALL BE PROVIDED AS REQUIRED TO COMPLY WITH ARCH. PLANS. 6. ALL EQUIPMENT SHALL BE NEW AND WITHOUT BLEMISH OR DEFECT. ALL EQUIPMENT SHALL MEET THE AUTHORITIES HAVING JURISDICTION. WHERE ACCEPTANCE IS CONTINGENT UPON THE PRODUCTS LISTED OR LABELED, THE PRODUCT SHALL BE LISTED OR LABELED. 7. ALL EQUIPMENT OF ONE TYPE, SUCH AS VALVES, FANS AIR HANDLING UNITS, SHALL BE THE PRODUCT ON ONE MANUFACTURER. 8. PROVIDE ALL HANGERS AND SUPPORTS AS REQUIRED TO SUPPORT ALL NEW DUCTWORK AND EQUIPMENT. 9. PAY FOR ALL PERMITS AND FEES, OBTAIN ALL APPROVALS. 10. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO STUDY ALL DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED. THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE MECHANICAL CONTRACTOR SHALL NOTIFY THE ARCHITECT PRIOR TO SIGNING OF CONTRACT. FAILURE TO DO SO WILL NOT BE ALLOWED AS A BASIS FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OR DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE DRAWINGS THAT WOULD HAVE BEEN APPARENT DURING SAID VISIT. 11. ALL CUTTING, CORE DRILLING, PATCHING, ETC. REQUIRED FOR THE INSTALLATION OF THE NEW MECHANICAL SYSTEMS SHALL BE BY THE MECHANICAL CONTRACTOR UNDER SUPERVISION OF THE GENERAL CONTRACTOR. 12. HVAC WORK IS DIAGRAMMATIC. EXACT LOCATION OF ALL COMPONENTS ARE TO BE DETERMINED IN THE FIELD AND BY THE ACTUAL BUILDING CONDITIONS. EQUIPMENT, DUCTS OR PIPES INTERFERING WITH THE INSTALLATION SHALL BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER. COORDINATE WITH ALL TRADES TO AVOID INTERFERENCE OF EQUIPMENT. 13. INSTALLATION METHODS SHALL PERMIT ACCESSIBILITY FOR SERVICE AND /OR REPLACEMENT OF EQUIPMENT PROVIDED. 14. ALL MECHANICAL EQUIPMENT SHALL BE ISOLATED FROM THE BUILDING STRUCTURE BY MEANS OF NOISE AND VIBRATION ISOLATORS. DUCTWORK PENETRATIONS THROUGH WALLS SHALL NOT BE RIGIDLY CONNECTED TO THE BUILDING STRUCTURE. SLEEVES SHALL BE PROVIDED WITH CLEARANCES AROUND THE OUTSIDE. ALL SUCH PENETRATIONS SHALL BE SMOKE AND FIRESTOPPED. 15. ALL DEBRIS TO BE REMOVED DAILY. B. SCOPE OF WORK 1. INSTALL ALL DUCTWORK, PIPING, EQUIPMENT, ETC. AS INDICATED IN THE CONSTRUC11ON DOCUMENTS OR SPECIFICATIONS. 2. PROVIDE ALL NEW DISCONNECTS AND CAPPING TO FACILITATE CONSTRUCTION. ALL REMOVAL AND DISPOSAL SHALL BE ACCOMPLISHED BY THE GENERAL CONTRACTOR. 3. TEST AND BALANCE AS SHOWN ON PLANS BY MECHANICAL CONTRACTOR. T &B REPORT WILL BE REQUIRED TO BE SUBMITTED TO ENGINEER FOR APPROVAL. 4. THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED WITH THE ELECTRICAL SYSTEMS. IF THE CONTRACTOR ELECTS TO USE ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL COORDINATION WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY EXPENSE TO THE ELECTRICAL CONTRACTOR RESULTING FROM SUCH ALTERNATE SELECTIONS. 5. CONTRACTOR SHALL NOT DEVIATE FROM THESE DESIGN DOCUMENTS WITHOUT PRIOR APPROVAL FROM ENGINEER. CONTRACTOR IS RESPONSIBLE FOR ALL AS -BUILT DRAWINGS AND SHALL BEAR ALL COSTS REQUIRED TO DOCUMENT AS -BUILT DRAWINGS, CONTRACTOR SHALL MAINTAIN REDLINE MARKUP DRAWINGS OF AS -BUILT CONDITIONS AT THE JOB SITE. C. MATERIALS INSULATION, ADHESIVE, COATING SEALERS, TAPES, SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE WITH ASTM E -84 AND UL 723. 1. EXHAUST AIR DUCTWORK CONSTRUCTION: GALVANIZED SHEET METAL, ASTM A 653P /6/53M, SHALLZCOMP Y COATING WITH UL 1181vA.RO OMP YNWIT AND SEAM SMA NA'S "HVAC TAPE/SEALANT INSTALLATION. PRESSURE CLASS: 1'� W.G. (SMACNA TABLE 1 -1S)CT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE" FOR FABRICATION AND INSULATION: NONE UNLESS SPECIFIED OTHERWISE. FLEXIBLE DUCTS: CORRUGATED ALUMINUM. INSULATION: NONE. 2. SUPPLY AND RETURN DUCTWORK RECTANGLE - ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET METAL (ASTM A527), BASED ON 2" STATIC PRESSURE WHICH SHALL BE CONSTRUED TO BE THE "OPERATING PRESSURE" AS INDICATED IN SMACNA TABLE 1 -1 AND ASSOCIATED NOTES. PROVIDE 2" DUCT WRAP AT R =6. 4. CONDENSATE PIPING TYPE L COPPER. PROVIDE P -TRAP. 5. HOT WATER REHEAT WATER PIPE AND INSULATION TYPE L COPPER. PROVIDE WITH 1" FIBERGLASS INSULATION. PROVIDE KRAFT PAPER JACKET INSIDE AND ALUMINUM JACKET OUTSIDE. 5. CHILLED WATER PIPE AND INSULATION TYPE L COPPER. PROVIDE WITH 1 1/2" FOAM GLASS PROVIDE KRAFT PAPER JACKET INSIDE, 6. AIR HANDLING UNIT AS SPECIFIED IN SCHEDULE OR APPROVED BY OWNER. 7. AIR DISTRIBUTION DEVICES AS SPECIFIED IN SCHEDULE OR APPROVED BY OWNER. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE MIN R =6 THICK GLASS -FIBER INSULATION BLANKET FOR UNINSULATED SUPPLY AND RETURN AIR GRILLES. 8. MANUAL VOLUME DAMPERS IN RECTANGULAR DUCTS GREENHECK MODEL VCD -15 WITH LOCKING QUADRANT OR APPROVED EQUAL INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 9. HVAC CONTROLS SHALL BE AN EXTENSION OF THE BUILDINGS CONTROL SYSTEM CONNECT NEW AHU -2 -06 TO CONTROL SYSTEM. PROVIDE INTERFACE IN NEW EQUIPMENT AND ALL CONTROL WIRING. D. SUBMITTALS 1. CONTRACTOR SHALL PROVIDE SUBMITTALS TO ENGINEER (VIA ARCHITECT) FOR ALL NEW EQUIPMENT & MATERIALS FOR FINAL APPROVAL PRIOR TO ORDERING /PURCHASING. 2. CONTRACTOR SHALL SUBMIT TEST & BALANCE REPORT TO ENGINEER (VIA ARCHITECT) FOR APPROVAL ONE WEEK PRIOR TO FINAL INSPECTION. CONTRACTOR SHALL BE AABC OR NEBB CERTIFIED AND ALL REPORTS SHALL INCLUDE THE AABC OR NEBB CERTIFICATE. ALL AIR FLOWS SHALL BE WITHIN 10% OF DESIGN. PRESSURE RELATIONSHIPS WILL BE AS INDICATED DRAWINGS AT A MINIMUM. 4 1 3 1 2 AIR DISTRIBUTION DEVICE SCHEDULE UNIT SERVICE AIR NECK SELECTION NO. FIRE DAMPER(S) PA`I`TERN SIZE BA 'SED ON A CEILING SUPPLY ONE WAY SEE PLANS TITUS TDC -AA B CEILING SUPPLY TWO WAY - 90' SEE PLANS TITUS TDC -AA C CEILING SUPPLY TWO WAY - 180 SEE PLANS TITUS TDC -AA D CEILING SUPPLY THREE WAY SEE PLANS TITUS TDC -AA E CEILING SUPPLY FOUR WAY SEE PLANS TITUS TDC -AA F RETURN - SEE TITUS 50F N m PLANS RETURN GRILLE FOR SUPPLY G EXHAUST - SEE PLANS TITUS 50F NOTES: 1. ALL DEVICES SHALL MATCH CEILING TYPES. 2. FOR TYPES A -E, ALL DIFFUSERS SHALL BE SIZE 18X18 TO KEEP UNIFORM APPEARANCE WITH NECK SIZE AS SPECIFIED ON DRAWINGS. 3. TYPE F,G - PROVIDE PLENUM BOX FOR DUCT CONNECTION AS REQUIRED BOX SHALL BE 4" WIDER AND HIGHER THEN DUCT CONNECTION. -10" ROUND NECK SIZE 4. NOMENCLATURE 10 "� 4 -WAY SUPPLY DIFFUSER E -200 200 CFM HVAC DESIGN REQUIRES M -1 YES NO DUCT SMOKE DETECTOR(S) M -3 NO FIRE DAMPER(S) W 0� NO SMOKE DAMPER(S) C� NO FIRE RATED ENCLOSURE r NO FIRE RATED ROOF/FLOOR CEILING ASSEMBLY • M M NO FIRE STOPPING (SEE ARCH.) Cr r J NO SMOKE CONTROL CO s.. NO HVAC /1 CFM z CFM z CFM 0 m F- FSD v0 .0 LEGEND SUPPLY DUCTWORK RETURN OR EXHAUST DUCTWORK SUPPLY DIFFUSER & AIR QUANTITY RETURN GRILLE & AIR QUAN 11 TY EXHAUST GRILLE & AIR QUANTITY THERMOSTAT DUCT SMOKE DETECTOR FIRE DAMPER COMBINATION FIRE & SMOKE DAMPER MANUAL VOLUME DAMPER EXISTING TO REMAIN NEW EQUIPMENT TO BE REMOVED CONNECT OR REMOVE EXISTING TO THIS POINT MECHANICAL SHEET INDEX M -1 HVAC SCHEDULES, NOTES & SPECIFICATIONS- MECHANICAL M -2 PARTIAL DEMOLITION & RENOVATION PLAN- MECHANICAL M -3 ICRA DEMOLITION PLAN FOR (INVASIVE PHYSICIAN OFFICE) - MECHANICAL v W 0� ISSUED FOR PERMIT AND 'ON STRU CT ON DATE: 02/27/2009 CLIENT CODE /FILE NUMBER: PROJECT ID- SUBMISSION NUMBER: ROBERT BROWN ARCHITECT LICENSE # AR92624 Architecture Facility Assessments PI onning Interior Design � WA4 ri L I N E A 5, i n c, 420 LINCOLN ROAD, SUITE 258 MIAMI BEACH, FLORIDA 33139 305 -673 -0004 FAX305- 673 -0080 CIS 0 •0 O W (13 = v W 0� I I ' C� O r : O= cc; p •V_ • M M W • CIO Cr r J --+ >O CO s.. I` r*-- cc� Q -+--� • (n Cf) +w�� Q-U> > O C N m � a � N N W o U H o w J U 5'z 92 W Cf) vi 00 Q n N O D V tx Ha`�'•3a�ow a. aWZzo��. WdUo EW-wi rLj a w 0�: w Li w ¢Z aZOO 00 Z �ww JQ Q J U Q Z LJ (/l U Lq ¢_� � J U W 0 �W Qw Q� w ❑ ❑ I NO DESCRIPTION DATE 1 JOB NO 40827.00 DRAWN BY CHECKED B I.Q A.D DATE SCALE 1 /4" =1' -0" µ SHEET No J t C* !y e 17� �'SR ✓Fj�/) V L fi M44° 4 ti r ;° N 1 OF 3 (�Ndi , 5c47 �� J E I