Loading...
09-1110-021W J W W i- a 0 SPRINKLER NOTES I. ALL FIRE PROTECTION SYSTEM SHALL BE IN COMPLIANCE WITH THE LOCAL FIRE CODES AND ORDINANCES AND AS PER NFPA 13 2002 EDITION REQUIREMENTS. 2. SPRINKLER SYSTEM SHALL BE INSTALLED BY A STATE CERTIFIED FIRE PROTECTION CONTRACTOR. 3. EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE AND SIZE PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR COORDINATION PRIOR TO CONSTRUCTION. 4. CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING FIRE MAINS AND SPRINKLER PIPING TO FACILITATE THE INSTALLATION OF NEW ELECTRICAL, MECHANICAL, PLUMBING AND STRUCTURAL SYSTEMS. 5. PRESSURE TEST PIPING AT 200 PSIG FOR A MINIMUM OF TWO HOURS. IF LEAKS ARE FOUND THEN CONTRACTOR SHALL FIX LEAKS AND TEST AGAIN. 6. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. 7. ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PIPING OR EQUIPMENT DUE TO NEW CONSTRUCTION AND HE SHALL RESTORE EXISTING WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE OWNER. 9. WARRANTY /GUARANTEE A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE YEAR. B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. 10. THE FIRE PROTECTION CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO FIRE PROTECTION DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED FOR APPROVAL. 11. FIRE PROTECTION SERVICES TO BE REMOVED SHALL BE CAPPED. 12. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES OR FACILITIES SHALL BE KEPT TO A MINIMUM AND THE EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED BY THE OWNER. ALL SUCH CONNECTIONS AND TIE -INS SHALL BE COORDINATED THROUGH THE OWNERS PROJECT MANAGER. I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT (48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION OF EXISTING SERVICE. ANY AREA AFFECTED BY SHUTDOWN SHALL REQUIRE A 24 HOUR /7 DAYS PER WEEK FIRE WATCH. 1 i 2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE OF THE CONTRACT. 13. CONTRACTOR SHALL COORDINATE WITH FIRE ALARM CONTRACTOR FOR THE REMOVAL OF FIRE ALARM DEVICES. 14. CONTRACTOR SHALL PATCH WALLS, FLOORS, ROOFING AND CEILINGS TO MATCH EXISITNG FINISHES FOR DEMOLITION OF FIRE PROTECTION SYSTEMS. COORDINATE WITH ARCHITECTURAL DRAWINGS. 15. CONTRACTOR SHALL PROVIDE (2) COMPLETE SETS OF AS BUILT DRAWINGS ALONG WITH ALL CLOSE OUT DOCUMENTS PRIOR TO PROJECT COMPLETION. FIRE PROTECTION LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION F FIRE LINE OR MAIN = FIRE DEPARTMENT VALVE CABINET —A/S— AUTOMATIC SPRINKLER MAIN FP -I, ETC FIXTURE INDENTIFICATION D DRAIN LINE F.SP. CONNECTION TO EXISTING R.P.B.P. PIPE TURNED UP 0 FIRE EXTINGUISHER a PIPE TURNED DOWN T.S. FLOW SWITCH F.S. BALL VALVE F.D.V. CAP ON LINE ��— CHECK VALVE E.P. HYDRAULIC CALCULATION PIPE NODE 1 -100 - --�{+— UNION IN PIPE HYDRAULIC CALCULATION SPRINKLER NODE AC'S, BB'S, CC'S --►�— SECTIONAL CONTROL VALVE FIRE HYDRANT WITH VALVE - -fie( REMOVE EXISTING HEAD AND PLUG FITTING O.S. &Y. GATE OR BUTTERFLY VALVE W / TAMPER SWITCH. REMOVE EXISTING HEAD & EXTEND 1' BRANCH LINE TO NEW HEAD LOCATION ---t FIRE DEPARTMENT CONNECTION PIPING TO BE REMOVED ,�- CHECK VALVE i---0 -o SPRINKLER HEAD BELOW DUCT WORK _xKr— CONTROL VALVE AND CHECK VALVE WITH FLOW AND TAMPER SWITCHES FIRE PROTECTION ABBREVIATIONS F.H.C. FIRE HOSE CABINET O.S. & Y. OUTSIDE STEM AND YOKE F.E. FIRE EXTINGUISHER S.C.V. SECTIONAL CONTROL VALVE A/S AUTOMATIC SPRINKLER F.H. FIRE HYDRANT F.SP. FIRE STANDPIPE R.P.B.P. REDUCED PRESSURE BACKFLOW PREVENTER RCV RISER CONTROL VALVE A.F.F. ABOVE FINISHED FLOOR T.S. TAMPER SWITCH F.S. FLOW SWITCH F.D.V. FIRE DEPARTMENT VALVE N.O. NORMALLY OPEN E.P. ELECTRICAL PANEL w INFECTION CONTROL MEASURES--. - I. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHPt- L- RCKIEW - THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORD6Nr,F- WITH . THOSE REQUIREMENTS. CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS -OF -" THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO-THE p " PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA SHALL BE COORDINATED WITH THE OWNER AND PERFORMED IN ACCORDANCE WITH THE ICRA REPORT, UNDER THE SUPERVISION OF THE OWNER'S REPRESENTATIVE OR OTHER DESIGNATED ICRA COMMITTEE OFFICER. 2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN AREAS SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, AND ELSEWHtRE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRAREPORT WILL REQUIRE MEASURES TO THIS EFFECT INCLUDING ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE RELATIVE TO OTHER AREAS OF THE FACILITY. 3.IN ADDITION TO THE MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE CONTRACTOR AT A MINIMUM SHALL PROVIDE EQUIPMENTAND COMPONENTS NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION WORK ZONE RELATIVE TO ADJACENT AREA. EXISTING HVAC SYSTEMS AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AT A MINIMUM AS FOLLOWS: VERIFY ALL EXISTING FIRE PROTECTION WHICH PASSES THROUGH THE CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED DURING THE CONSTRUCTION DURATION. AIR REMOVED FROM THE CONSTUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL COMMITTEE. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTATION TO THE OWNER AS REQUIRED. 4. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH THE OWNER, AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR PRESSURE RELATIONSHIPS WILL NOT BE ADVERSELY AFFECTED. FIRE PROTECTION DRAWING INDEX NO. SHEET TITLE FPO.01 FIRE PROTECTION LEGEND, SCHEDULES & DRAWING INDEX FPI.01 FIRST FLOOR - DEMOLITION - FIRE PROTECTION FPI.02 SECOND FLOOR - DEMOLITION - FIRE PROTECTION i i I ^600 West Hillsboro, Suite 300 Po Dearfield Beach, FL 33441 h M (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm certification - EB- 0000857 Alfred EsqutM PE - 45863 Erik S. Wafter PE - 63429 John E. Moulder PE - 33200 Michael A. Steward PE - 65701 SSR JOB # 0932026.0 <Z CC W z w WV U T J w Cr? Q CL w< co � 0 M V- O w T CI) 20 o= Q CC) =) -0 o �z C0 F- 0 Z) 0 0(.) �V - k d ✓r y� G w S i r; DRAWN CHECKED DATE 12/04/09 REVISED SHEET NO. FIRE PROTECTION LEGEND, SCHEDULES & DRAWING INDEX � 9 09 $-Too