Loading...
09-1110-019s� w J U- W W a. 0 GENERAL NOTES: A. CONTRACTOR SHALL COORDINATE ALL WORK AND PHASING WITH MECHANICAL B. ALL WIRING TO COOLING TOWER AND VFD (BOTH INTERIOR AND EXTERIOR) SHA CONDUIT OR RIGID GALVANIZED STEEL CONDUIT. C. MAINTAIN EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF AND RE- CONNEC TOWER. KEYED NOTES: 0 CONNECT NEW COOLING TOWER AS INDICATED. REFER TO RISER ON SHEET O COORDINATE EXACT LOCATION OF NEW DISCONNECT IN FIELD TO MAINTAIN 1 (D APPROXIMATE LOCATION FOR NEW COOLING TOWER *2 VFD. COORDINATE EX� ENSURE VFD IS NOT INSTALLED BELOW ANY DUCTWORK OR PIPING AND IS I PER NEC art 110.26. OPROVIDE LIGHTNING PROTECTION AIR STRIKE TERMINALS ON THE HIGHEST PC ENCLOSURE. i CONNECT TO EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF WITH MAIN SIZE CONDUCTOR. PROVIDE I ' CONDUIT WITH 2 *12 CONDCUTORS TO CONNECT VIBRATION SWITCH ON COOLING TOWER TO REMOTE TOP CONTACT OF VFD. OBTAIN CONTROL VOLTAGE FROM CONTROL POWER TRANSFORMER WITHIN VFD. COORDINATE CONTACTS AND TERMINATIONS WITH DIV 15 SUCH THAT COOLING TOWER DOES NOT RUN UPON ACTIVATION OF VIBRATION SWITCH. ONEW LOCATION FOR EXISTING FLOOD LIGHTS. LIGHTS SHALL BE CLEANED, RE-LAMPED AND MOUNTED ON COOLING TOWER SCREEN WALL FRAME AT APPROXIMATELY THE SAME ELEVATION AS BEFORE. ADD ALTERNATE: REPLACE EXISTING LIGHTS WITH NEW (NITEBRIGHT *WLI- 26C -C -U) OR EQUAL) O CONNECT NEW RECEPTACLE TO EXISTING ROOF RECEPTACLE CIRCUIT 21-6 -31. ROOF PLAN - NEW WORK - EL E YICAL 0' 2' 4' $' 16' 24' FIRST FLOOR PLAN - NEW WORK - N EC TR /CAL ,- 0' 2' 4' s' 16' 24' NEW CONSTRUCTION LEGEND SYMBOL DIESCRIMON EXISTING TO REMAIN NEW CONSTRUCTION M. h ei* Tnc. el Inc 606West Hillsboro, Suite 300 Deerfield Beach, FL 33441 " (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 Alfred EsqukW PE - 45863 Erik S. Walter PE - 63929 John E. Moulder PE - 33200 Michael A. Steward PE - 65707 SSR JOB # 0932026.0 J � Q Z w zW WU V T s�..� �W M Q (L wQ W F-- a- co o W MU- 0w N F- (0 Z) o �z = J F- 0 Z) 0 0L) DRAWN CHECKED DATE 12/04/09 REVISED SHEET N0. FLOOR PLAN NEW WORK - ELECTRICAL 4 Z c r I rf� Pl DRAWN CHECKED DATE 12/04/09 REVISED SHEET N0. FLOOR PLAN NEW WORK - ELECTRICAL 4