GENERAL NOTES:
A. CONTRACTOR SHALL COORDINATE ALL WORK AND PHASING WITH MECHANICAL
B. ALL WIRING TO COOLING TOWER AND VFD (BOTH INTERIOR AND EXTERIOR) SHA
CONDUIT OR RIGID GALVANIZED STEEL CONDUIT.
C. MAINTAIN EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF AND RE- CONNEC
TOWER.
KEYED NOTES:
0 CONNECT NEW COOLING TOWER AS INDICATED. REFER TO RISER ON SHEET
O COORDINATE EXACT LOCATION OF NEW DISCONNECT IN FIELD TO MAINTAIN 1
(D APPROXIMATE LOCATION FOR NEW COOLING TOWER *2 VFD. COORDINATE EX�
ENSURE VFD IS NOT INSTALLED BELOW ANY DUCTWORK OR PIPING AND IS I
PER NEC art 110.26.
OPROVIDE LIGHTNING PROTECTION AIR STRIKE TERMINALS ON THE HIGHEST PC
ENCLOSURE.
i
CONNECT TO EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF WITH MAIN SIZE CONDUCTOR.
PROVIDE I ' CONDUIT WITH 2 *12 CONDCUTORS TO CONNECT VIBRATION SWITCH ON COOLING TOWER TO
REMOTE TOP CONTACT OF VFD. OBTAIN CONTROL VOLTAGE FROM CONTROL POWER TRANSFORMER
WITHIN VFD. COORDINATE CONTACTS AND TERMINATIONS WITH DIV 15 SUCH THAT COOLING TOWER
DOES NOT RUN UPON ACTIVATION OF VIBRATION SWITCH.
ONEW LOCATION FOR EXISTING FLOOD LIGHTS. LIGHTS SHALL BE CLEANED, RE-LAMPED AND MOUNTED ON
COOLING TOWER SCREEN WALL FRAME AT APPROXIMATELY THE SAME ELEVATION AS BEFORE.
ADD ALTERNATE: REPLACE EXISTING LIGHTS WITH NEW (NITEBRIGHT *WLI- 26C -C -U) OR EQUAL)
O CONNECT NEW RECEPTACLE TO EXISTING ROOF RECEPTACLE CIRCUIT 21-6 -31.
ROOF PLAN - NEW WORK - EL E
YICAL
0' 2' 4' $' 16' 24'
FIRST FLOOR PLAN - NEW WORK - N EC TR /CAL
,-
0' 2' 4' s' 16' 24' NEW CONSTRUCTION LEGEND
SYMBOL DIESCRIMON
EXISTING TO REMAIN
NEW CONSTRUCTION
M. h
ei* Tnc.
el Inc
606West Hillsboro, Suite 300
Deerfield Beach, FL 33441
" (954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
Alfred EsqukW PE - 45863
Erik S. Walter PE - 63929
John E. Moulder PE - 33200
Michael A. Steward PE - 65707
SSR JOB # 0932026.0
J �
Q Z
w
zW
WU
V
T
s�..� �W M
Q (L wQ
W F--
a- co o
W MU-
0w
N F-
(0 Z)
o
�z
= J
F- 0
Z) 0
0L)
DRAWN
CHECKED
DATE 12/04/09
REVISED
SHEET N0.
FLOOR PLAN
NEW WORK
- ELECTRICAL
4
Z c
r
I
rf�
Pl
DRAWN
CHECKED
DATE 12/04/09
REVISED
SHEET N0.
FLOOR PLAN
NEW WORK
- ELECTRICAL
4