09-1110-016I%..
W
J
LL
w
w
F_
Q
0
KEYED NOTES:
(D PROVIDE 1200 TON COOLING TOWER LOCATED ON STEEL BEAMS
OVER EXISTING SUMP. REFER TO STRUCTURAL DRAWINGS. _ m
0 CONNECT TO EXISTING 20 PSI CONTROL AIR FROM EXISTING 10' CWR MOTOR
ACTUATED CONTROL VALVE TO 8' CWR MOTOR ACTUATED CONTROL VA-LVS. m
SEQUENCE MOTOR ACTUATED CONTROL VALVE WITH EXISTING I-Z CWR MOTOR -
ACTUATED CONTROL VALVE.
O CONNECT ABOVE EXISTING 10' MOTOR ACTUATED BUTTERFLY VALVE.
0 PROVIDE FULL PORT PLUG VALVE IN 8' CWR RISER.
PIPE INSULATION
t
PIPE SADDLE
GRINNELL FIG. 264
PROVIDE SHEET METAL
I SADDLE FOR INSULATED
PIPING
THREAD PIPE
SUPPORT TO
ALLOW HEIGHT ( PIPE SUPPORT
ADJUSTMENT
o REFER TO ROOF MOUNTED
a EQUIPMENT PIPE SUPPORT
o DETAIL.
ROOF i
NOTES
USE WHERE SHOWN ON PLANS AND WHERE REQUIRED FOR SUPPORT.
EQUIPMENT SHALL BEAR NO WEIGHT OF PIPING.
ROOF MOUNTED PIPE STAND
2%' GALV. SCH. 40 PIPE
F0& UP TO 500 LBS.LOAD
AND UP TO 24' LONG
PIPE EQUIPMENT
SUPPORT
LAP SEALANT
UNCURED FORMFLASH
3' MIN. s 2 —PIECE BASE LAP OF
Z UNCURED FORMFLASH
2' MIN.
LAP SEALANT
E.P.D.M.
iUTDOWNS WITH HOSPITAL FACILITIES DEPT. N INH at
HUTDOWNS SHALL BE BID AS PREMIUM TIME. _
'S TO MINIMIZE DECK �� �' INSULATION
—2 BASIN SHALL BE AT THE SAME ELEVATION 6'X62XI' STEEL PLATE
WELDEQ TO PIPE SUPPORT 4-3/8' EXPANSION
BASIN. COORDINATE WITH STRUCTURAL. WITH fa ' WELD BOLTS PER SUPPORT
LEG WITH 3' IMBEDMENT
NOTES:
1. PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE, ETC.
2. DO NOT INSTALL CLAMPING RING AROUND TOP OF FLASHING.
3. IF DETAILS ON ARCHITECTURAL DRAWINGS DIFFER, THEY TAKE
PRECEDENCE OVER THIS DETAIL.
4. DETAIL SHOWN IS FOR E.P.D.M. ROOF. FOR 4 PLY CONVENTIONAL
ROOF, PROVIDE COPPER PITCH POCKET AROUND BASE OF PIPE SUPPORT.
5. LOCATE SUPPORTS OVER ROOF BEAMS.
PIPE SUPPORT FOR
ROOF MOUNTED EQUIPMENT
8'FLOW CONTROL
VALVE (TYP)
TOWER
BASIN 4' PVC
DISCHARGE
PIPE INTO
sum
SUMP
COOLING TOWER
BASIN SUMP. SEE
SCHEDULE FOR SUMP
PIPE CONNECTION SIZE
PROVIDE ELASTORIB OR
EQUAL ISOLATION BETWEEN
TOWER & SUPPORTING STEEL
NEW CONSTRUCTION LEGEND
SECOND E NEW WORK H A C SYMBOL DESCRIPTION N O T E
I. REFER TO PLUMBING DRAWINGS FOR MAKE —UP WATER TO EXISTING COLD WATER
N EXISTING TO REMAIN SUMP AND DRAIN LINE OF EXISTING SUMP.
2. PROVIDE MAKE —UP WATER ASSEMBLY FOR INSTALLATION AS PER PLUMBING
DRAWINGS.
09 1' 2' 4' 8' 12' NEW CONSTRUCTION
PIPING AT INDUCED,,
- CONNECT TO EXIST. AT THIS POINT DRAFT COOLING TOWER
ei[ an
el , nc.
'600 -West Hillsboro, Suite 300
rt „Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Flan Certification - EB-0000857
Alfred Eaquhrel PE - 45863
Erik S. Walter PE - 63928
John E Moulder PE-
Michael A. Steward PE - 66701
SSR JOB # 0932026.0
Z
W
F- m
Z W
wv
U
T
U j CM
w Q
W h
U M V-
OW �-
Q
_ —
a ��
O H
Q F- =)
o
z Cl)
F— O
Do
o(.)
DRAWN
CHECKED
DATE 12/04/09
REVISED
SHEET NO.
SECOND FLOOR —
NEW WORK — HVAC
LM�iL%
a,
r