Loading...
09-1110-012w W W Q 0 HVAC GENERAL NOTES I. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT Ii. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ITEMS TO DUCT SMOKE DETECTORIS) EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS. X BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER WISHES TO RETAIN IQ= HAND CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL SMOKE DAMPERIS) SHALL BE TURNED OVER TO OWNER.AND THE REMAINDER SHALL BE REMOVED X CONDITIONS INCLUDING PIPING LOCATIONS AND SIZES. SECOND FLOOR - NEW WORK - HVAC FROM THE SITE AND DISPOSED OF IN A PROPER MANNER BY CONTRACTOR. 2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS & DROPS X CONTRACTOR TO GIVE OWNER A LIST OF SLAVAGABLE ITEMS. II =PROVIDE EXTERNAL GEAR DRIVE ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE BID - SMOKE CONTROL g= 3 = LADDER Q X WHERE NOT POSSIBLE ALL RISERS & DROPS SHALL BE CONSTRUCTED USING 12. ALL COMPONENTS REQUIRED FOR A COMPLETE INSTALLATION ARE NOT SHOWN ON 45 DEGREE OR LONG RADIUS ELBOWS. N0. THE DRAWINGS. REFER TO EQUIPMENT INSTALLATION INSTRUCTIONS FOR 3. PROVIDE AND INSTALL NECESSARY PIPING ADDITIONAL REQUIREMENTS, INCLUDING CONNECTION LOCATION AND SIZES. INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS. 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK E.W.B. CONSULT MANUFACTURER'S DATA FOR ACTUAL PIPING BASIN TYPE OPERATING WEIGHT CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN. STARTER NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION AND /OR REMARKS N0. H.P. DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES, OPENINGS 4. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN LOCATION AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE REPAIRED TYPE ADVANCE. CONSTRUCTION WORK AND DEMOLITION SHALL BE PERFORMED REFRIG AT SUCH TIMES AND UNDER SUCH CONDITIONS AS SUITS THE OWNER. AND FINISHED TO MATCH EXISTING. PROVIDE OWNER 2 WEEK NOTICE OF PROPOSED PLANT SHUTDOWNS. 14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS 5. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE OF THE OWNER. SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 15. IN ORDER TO MAINTAIN THE EXISTING ROOF WARRANTY, ALL ROOFING WORK 6. SEAL ALL WALL, ROOF, AND FLOOR PENETRATIONS AIR TIGHT AT PIPE 3600 (CUTTING AND REPAIRS) SHALL BE PERFORMED BY THE OWNER'S ROOF WARRANTY 85 AND CONDUIT PENETRATIONS. ALL PENETRATIONS THRU 14'x24'x25' VENDOR (PAID FOR BY THIS CONTRACTOR). 51,500 LBS FIRE RATED WALLS TO BE SEALED AS PER UL DETAILS. 125 1800 7. DO NOT BLOCK SERVICE SPACE ON EQUIPMENT WITH 16. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON TffC PIPING. (FLANGED OR REMOVABLE SECTIONS MAY BE (1) (2) AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY USED IN SOME INSTANCES WHERE TIGHT CLEARANCES EXISTS). PARTIALLY VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND INVESTIGATE ALL CONDITIONS THAT BAC 31301CN AFFECTS THE WORK PRIOR TO SUBMITTING THE BID. 8. NO PIPING OR CONDUIT SHALL BE INSTALLED UNTIL IT IS COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL 17. PROVIDE AIR VENTS AT ALL HIGH POINTS IN PIPING SYSTEMS OFFSETS REQUIRED TO AVOID INTERFERENCES WITH OTHER TRADES; 18. PROVIDE PROVIDE DRAIN VALVES AT ALL LOW POINTS IN PIPING EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED T0, THOSE SHOWN. 19. PROVIDE VALVE TAGS ON ALL NEW VALVES THAT MATCHES THE FACILITY'S STANDARD. TAGS SHALL BE NUMBERED SEQUENTIALLY AND PROVIDE DRAWINGS AND SCHEDULES THAT INDICATES EXACT 9. FIELD VERIFY TO ELECTRICAL, PLUMBING, FIRE PROTECTION, ARCHITECTURAL AND LOCATION, SIZE AND SERVICE OF VALVES. STRUCTURAL FOR COORDINATION WITH THESE DRAWINGS. 20. PROVIDE MANUFACTURERS CERTIFIED DATA ON ALL EXTERIOR 10. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL INSTALLATION MOUNTED EQUIPMENT DURING SUBMITTAL PHASE, WHICH INDICATES REQUIREMENTS. THAT THE EQUIPMENT CAN MEET THE FLORIDA BUILDING CODE WIND LOAD. 21. PROVIDE CLEAR ACCESS TO VALVES. HAZARDOUS MATERIAL NOTES 1. PORTIONS OF THE EXISTING SYSTEM CONTAIN HAZARDOUS MATERIAL. COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF HAZARDOUS MATERIALS. 2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF HAZARDOUS MATERIAL AND IS TO BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT. DISPOSAL SHALL BE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS FOR EACH IDENTIFIED HAZARDOUS MATERIAL. 3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED. HVAC DESIGN REQUIRES SHEET NUMBER YES NO DUCT SMOKE DETECTORIS) COOLING.TOW X FIRE DAMPER(S) ( IQ= HAND X SMOKE DAMPERIS) M2.01 X FIRE RATED ENCLOSURE SECOND FLOOR - NEW WORK - HVAC X FIRE RATED ROOF/FLOOR CEILING ASSEMBLY DEPRESSED SUMP OUTLET X FIRE STOPPING (SEE ARCH) II =PROVIDE EXTERNAL GEAR DRIVE X SMOKE CONTROL g= 3 = LADDER Q X MECHANICAL DEMOLITION NOTES I. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S - - - _ ----- RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATOONt -OF EXISTING PIPING BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUALLY FIELD CONDITIONS TO THE OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK. 2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL HANGERS AND RELATED MATERIAL AS DIRECTED THIS MATERIAL SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS DIRECTED BY THE OWNER). 3. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE WAIL WHERE PIPING, ETC. HAVE BEEN REMOVED. (MAINTAIN THE EXITING RATINGS) 4. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW PIPING BEFORE FABRICATION BEGINS AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. HVAC LEGEND PIPING CWS CONDENSER WATER � BUTTERFLY VALVE SUPPLY CyR CONDENSER WATER RETURN � MOTOR ACTUAtE0 D DRAIN LINE BUTTERFLY VALVE No REDUCER -���- SHUT -OFF VALVE CONDENSER WATER - CWE EQUALIZER CONTROL VALVE STRAINER STRAINER &SLOWDOWN ��- VALVE - ���- -- PLUG COCK �I ( COMPANION FLANGE UNION CHECK VALVE i GAUGE &GAUGE COCK �- THERMOMETER NOTE I: DISCONNECT AND RECONNECT EXISTING SIEMENS CONTROLS TO TOWER 2 VARIABLE FREQUENCY DRIVE. REFER TO ELECTRICAL DRAWINGS EI.01 AND E2.01. DRAWING INDEX SHEET NUMBER SHEET TITLE MO.00 COVER SHEET COOLING.TOW ER IQ= HAND RAIL 4Q = 8' FLOW CONTROL VALVES M2.01 7Q =INVERTER DUTY HI EFF. MOTOR C =TOWER SHALL BE ALL STANLESS STEEL CONSTRUCTION SECOND FLOOR - NEW WORK - HVAC BASIN COVERS SO= DEPRESSED SUMP OUTLET W/ REMOVABLE SCREEN Q= BIRDSCREEN ON INTAKE LOUVERS II =PROVIDE EXTERNAL GEAR DRIVE (I) = COOLING TOWER TO BE CONSTRUCTED OVER EXISTING CONCRETE BASIN. REFER TO STRUCTURAL DWGS FOR SUPPORT REQUIREMENTS g= 3 = LADDER Q =MAKE-UP WATER VALVE Q= 14'SUMP OUTLET W/ 14'PVC DRAIN LINE INTO EXT'G SUMP (2) FM APPROVAL N0. TYPE NOM. CAP. 111 MANUFACTURER & MODEL N0. GPM E.W.T. L.W.T. E.W.B. APPROXIMATE SIZE �L X W X H) BASIN TYPE OPERATING WEIGHT STARTER ACCESSORIES REMARKS N0. H.P. RPM ELEC. TYPE LOCATION Rh TYPE REFRIG TOWER 2 INDUCED DRAFT 1200 MARLEY OR NC8414YANI 3600 95 85 19 14'x24'x25' STSIN�LELSS 51,500 LBS I 125 1800 480/3/60 VFD ELECTRICAL ROOM DIV.16 TffC OO OO OO 4 5 6 7 COQ @ (1) (2) BAC 31301CN NOTE I: DISCONNECT AND RECONNECT EXISTING SIEMENS CONTROLS TO TOWER 2 VARIABLE FREQUENCY DRIVE. REFER TO ELECTRICAL DRAWINGS EI.01 AND E2.01. DRAWING INDEX SHEET NUMBER SHEET TITLE MO.00 COVER SHEET MO.01 MECHANICAL LEGENDS AND SCHEDULES M1.01 FIRST FLOOR - DEMOLITION - HVAC M1.02 SECOND FLOOR - DEMOLITION - HVAC M2.01 FIRST FLOOR - NEW WORK - HVAC M2.02 SECOND FLOOR - NEW WORK - HVAC mi h ep Inan el nc. X600 -West Hillsboro, Suite 300 Z�eer5eld Beach, FL 33441 (954) 421 -1260 FAX; (954) 421 -1466 www.ssr- inc.com Firm Certification - E84X000857 Alfred Esquival PE - 45663 Erik S. Wafter PE - 63929 John E. Moulder PE - 33200 Michael A. Steward PE - 6=1 SSR JOB # 0932026.0 ..J Z__ W Z W W U T J �jM <C CL W Q F- Lv Ct o CD 0 M V- OW - '17 3: Q 0 ° F- o F- Q 0 z Cl) J F- p 0 0(.) to ol gw t Uj f c� DRAWN CHECKED DATE 12/04/09 REVISED SHEET N0. MECHANICAL LEGENDS AND SCHEDULES