Loading...
09-1110-002PROJECT NAME' =fv1tk!_r#v"i lljr_4�00 7400 S.W. 62nd Ave. South Miami, Floiida 33143 KEY PLAN ABBREVIATIONS GENERAL NOTES GENERAL DEMOLITION NOTES DRAWING INDEX A ACOUS. ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS-1, THE 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ARC ADA AMERICANS WITH DISABILITIES ACT LAM LAMINATED FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY/COUNTY ZONING CODES, WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE ADJ ADJUSTABLE LT LIGHT NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS COVER AFF ABOVE FINISH FLOOR LTWT LIGHT WEIGHT REGULATIONS, FOR DUST AND NOISE CONTROL PROTECTION, INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND AO.O INDEX AGG AGGREGATE LF OR UN FT LINEAR FEET DAYS OF WEEK TO BE WORKED, A1.0 2ND FLOOR GENERAL FLOOR PLAN A.C. AIR CONDITIONING 02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE A1.1 ENLARGED FLOOR PLAN ALUM ALUMINUM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED A2.0 ELEVATIONS 8 BM BEAM ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PROGRESS OF OWNER'S ON SITE OPERATIONS. A2.1 ELEVATIONS AND DETAILS BLK BLOCK MAX MAXIMUM PRIOR TO SUBMISSION OF BID. BLKG BLOCKING MECH MECHANICAL - COORDINATE WITH OWNER'S CONTINUING OCCIJPA11ON OF PORTIONS OF EXISTING BUILDING AND BOT BOTTOM MET OR MTL METAL 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. BLDG BUILDING MIN MINIMUM THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE BLKHD BULKHEAD MISC MISCELLANEOUS COMMENCEMENT OF WORK 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, MACH MACHINE EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL C CAB CABINET MANUF MANUFACTURER 04. OMISSIONS. IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNERS REPRESENTATIVE, ENGINEER AND CARP CARPET DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE CLG CEILING N NFPA NATIONAL FIRE PREVENTION ASSOCIATION SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. WITH ARCHITECT PRIOR TO START OF WORK. CEM CA CEMENT CENTER LINE NIC NOM NOT IN CONTRACT NOMINAL 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, 03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE STRUCTURAL CER CERAMIC NTS NOT TO SCALE SURFACE/RECESSED LIGHT FIXTURES, LIGHT/tQUIPMENT SWITCHES, HN.A.C. REGISTERS, THERMOSTATS; ACCESS PANELS, DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF C.T. CERAMIC 11LE INTERCOM SPEAKERS, FIRE ALARM HORNS/STROBES/SWITCHES, HEAT/SMOKE DETECTORS, CONCEALED / EXPOSED FIRE OWNER'S NORMAL OPERATIONS. ALL WRITTEN REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION S-1 FLOOR PLAN CO CLEAN OUT 0 OC ON CENTER SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR ACTIVITIES THAT WILL AFFECT OWNERS NORMAL OPERATIONS INCLUDING BUT NOT UMITED TO LOUD LOISES AND S-2 FRAME ELEVATION AND GENERAL NOTES CL OR CLOS CLOSET OH OR OPP.HD. OPPOSITE HAND SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES M ACCOMPLISH DEMOLITION WORK AND PRODUCTS WITH STRONG ODORS. S-3 FRAME ELEVATION AND GENERAL NOTES COL COLUMN OD OUTSIDE DIAMETER NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE S-4 FLOOR PLAN AND DETAILS CONK CONCRETE OFF OFFICE RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (M MATCH ORIGINAL 04. CONDITION OF STRUCTURES. OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES CMU CONCRETE MASONRY UNIT OPNG OPENING INSTALLATION) UPON COMPLETION OF REPAIR WORK. M BE DEMOLISHED, CONDITIONS EXISTING AT 11ME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY CONST CONSTRUCTION OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE. CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD OWNER INSOFAR AS PRACTICABLE HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. CANT CG CONTINUOUS CORNER GUARD CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING NTH THE WORK, 05. PARTIAL DEMOLITION AND REMOVAL- STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED, CR CU CRASH RAIL CUBIC P PR PASS PAIR PASSENGER 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNERS PENT PENTHOUSE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR M PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. D DEPT DEPARTMENT PC PRECAST STARTING WORK. MECHANICAL DET./DTL DETAIL Pi PANEL JOINT 08. A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL DIA DIAMETER PLAS PLASTER CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. MO.00 COVER SHEET DIM DIMENSION POL POLISHED THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND MO.01 MECHANICAL LEGENDS AND SCHEDULES DN DOWN PMLD PREMOULDED THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING M1.01 FIRST FLOOR - DEMOLITION - HVAC DS DOWN SPOUT PNL PANEL DEMOLITION OPERATIONS. M1.02 SECOND FLOOR - DEMOLITION -HVAC DWG DRAWING 09• ALL WALL/CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH M2.01 FIRST FLOOR - NEW WORK - HVAC OF DRINKING FOUNTAIN 0 QT QUARRY 11LE EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, C. PROTECT FLOORS/CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. M2.02 SECOND FLOOR - NEW WORK - HVAC QTM QUARRY 11LE MINIATURES CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. E I- A. EXPOSED AGGREGATE D. CONSTRUCT 1 HR. FIRE RATED TEMPORARY INSULATED RUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE EA EACH R RAD RADIUS 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. AREAS WHERE NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF EL ELEVATION R RISER DOORS AND SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. ELE �GRADE) ELEVATION FACADE) RELIVE REINFORCED 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT ELEV ELEVATOR REQD REQUIRED AREAS, CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWD-WAY TAPE. SCREWS, NAILS, ETC. WILL NOT BE EP ELECTRICAL PANEL RF ROOF WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES (SEE MECH. PERMITTED. (SEE WALL TYPE T ON SHEET A-6.0) EQ EQUAL RD ROOF DRAIN 12. WVAACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND F. REMOVE PROTECTIONS AT COMPLETION OF WORK. EQUIP EQUIPMENT RM ROOM ACCESSIBLE AT ALL TIMES. EXIST EXISTING RO ROUGH OPENING G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A lOffe NEGATIVE PRESSURE BY USE OF SUITABLE FANS EXP.JT. OR EJ EXPANSION JOINT REEL OR REF REFLECTED 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES, EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING M THE EXTERIOR OF THE BUILDING. (SEE MECH. DRAWINGS) ELECTRICAL EXP EXPOSED RW_ RAIN WATER LEADER EXT EXTERIOR 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW AND EXISTING CONSTRUCTION, H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT ELEC ELECTRICAL CONTAMINATION OF DUCT SYSTEM. EO.01 ELECTRICAL LEGEND, STUDIES AND DRAWING INDEX EWC ELECTRIC WATER COILER 8 SECT SECTION 15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK E1.01 FLOOR PLAN - DEMOLITION ELECTRICAL SHT SHEET WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK E2.01 FLOOR PLAN - NEW WORK ELECTRICAL F FT FEET SHT MET OR SM SHEET METAL THAN NORMAL WEEKDAY WORKING HOURS E3.01 ELECTRICAL RISER DIAGRAM FIN FINISH SIM SIMILAR 08. MAINTAIN EXISTING BUILDING SYSTEMS/UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST FE FIRE EXTINGUISHER so SQUARE 16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FIREWATCH, FEC FIRE EXTINGUISHER CABINET STD STANDARD ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. FC FIRE CABINET SS STAINLESS STEEL - DO NOT INTERRUPT BUILDING SYSTEMS/NTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT MEN AUTHORIZED FL FLOOR STL STEEL 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6: 00 IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING I'D FLOOR DRAIN STOR STORAGE AM AND SATURDAY & SUNDAY 24 HOURS WITH OWNER APPROVAL BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. FLUOR F.R. FLUORESCENT FIRE RATING STRUCT SUSP STRUCTURAL SUSPENDED 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. FS FV FULL SIZE FIELD VERIFY SPECS SPECIFICATIONS 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE 09• OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL FVC FIRE VALVE CABINET RESPONSIBLE FOR THEIR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND/OR REPLACED AT NO OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASES PLANS. DO NOT EXCEED THE LIMITS OF THE T TEL TELEPHONE ADDTIONAL COST TO OWNER. PHASES UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 0 GALV GALVANIZED TEMP TEMPERED FIRE GA GAUGE TLT. OR Mi. TOILET 10. ENVIRONMENTAL CONTROLS. - USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST ER01[EQ11QU GC GENERAL CONTRACTOR T TREADS 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING M ENVIRONMENTAL PROTECTION. GL GLASS TYP TYPICAL FPO.01 FIRE PROTECTION LEGEND, SCHEDULES AND DRAWING INDEX GB GRAB BAR TR TELEPH ONE RECEPTACLE 21- PROVIDE WALK-OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK-OFF MATS MUST BE CLEANED OR - DO NOT USE WATER MEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, FP1.01 FIRST FLOOR - DEMOLITION - FIRE PROTECTION GR GRADE THK TH ICK CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. POLLUTION AND DAMAGE TO EXISTING FINISHES. FP1.02 SECOND FLOOR - DEMOU11ON - FIRE PROTECTION GYP GYPSUM GYP BD GYPSUM WALLBOARD 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR U UL UNDERWRITER MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT H HC HANDICAPPED LABORATORIES SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A6.2 AND A6.1 FOR SEALING FIRE TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S HRDW HARDWARE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF REPRESENTATIVE. REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS HT HEIGHT V VERT VER11CAL THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. WITHOUT UNDUE DELAY. HM HOLLOW METAL HORIZ HORIZONTAL VT VB VINYL TILE VAPOR BARRIER 23. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM I IN INCH VWC VINYL WALL COVERING SUB-CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK DEMOLITION OPERATIONS, TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER PLUMBING INCANDESCENT CAN BE FULLY COORDINATED. THE CM, CO, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING REGULAR WORKING HOURS. ID INSIDE DIAMETER W VWC-GYP WALL COVERING - GYPSUM BOARD INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND/OR SITE CONDITIONS. THE CONTRACTOR SHALL N011FY THE - OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS PO.01 PLUMBING LEGEND, SCHEDULES AND DRAWING INDEX INSUL INT INSULATION INTERIOR VWC-FLAB we WALL COVERING PLASTER WET COLUMN GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND P1.01 ROOF PLAN - DEMOLITION - PLUMBING INV INVERT WP WATERPROOFING FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. P2.01 FIRST FLOOR - NEW WORK - PLUMBING WD WOOD ON THE DRAWINGS. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. P2_02 ROOF PLAN - NEW WORK - PLUMBING P5.01 PLUMBING DETAILS AND ISOMETRIC RISERS J JT JOINT W/ WITH JST JOIST W/o WITHOUT 13. UPON COMPLETION OF DEMOLJ110N WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE ic JANITOWS CLOSET WC WATER CLOSET PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND Y YD YARD SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS VICINITY MAP & PROJECT LOCATION mm_ DOOR SYMBOL WALL ONSTRUCTION � WALL TYPE P HOSITA L --------- - 10 DOOR NUMBER ELEVATION LOCATION INSULATION CONCRETE GRAVEL or CEMENT CONCRETE NUMBER Blanket PRECAST CRUSHED MORTAR STONE PLASTER 2 ROOM NAME OFFICE -ROOM NAME EXTERIOR A INTERIOR 4 X- 0 2 re -A FINISH SCHEDULE ELEVATION SYMBOL (���ROOM NUMBER SHEET NUMBER 3 3 H J LJL EARTH TILE Ceramic or structural SOUD CONC. IWAS. UNIT CONCRETE MASONRY UNIT MARBLE CONSTRUCTION DETAIL �JDETAIL NUMBER BUILDING. PARTIAL DETAIL NUMBER SYMBOL 'RT M0 .. . . ......... DETAIL SECTION SHEET NUMBER A-1 SHEET NUMBER SYMBOL ------ PR j Ln SHEET WOOD METAL Finished wow BloWng WOOD Blocking F BRICI( Large WINDOW TYPES WINDOW TYPE COLUMN REFERENCE NUMBER OR LETTER In F - _ -T7; -R continuous intermittent Scale GENERAL NOTES ABC)EFG -NOTE R ------------ ci S t4G C'TJON UC'TUR .Te r'TUR GLASS GLASS INSULATION TOP OF CONCRETE ELEVATION 0.00 Smog Large Scale Scde Rigid DETAIL NUMB ER SAS UIMQN Alp, I DRAWING TITLES 1 ABCDEF SCALE: DRAWING REVISIONS REVISION NUMBER j 0 Z -2-1-Z - ------ ..... T STEEL Small Scale Large Scale PLYWOM SHEET NUMBER NOTE THIS DRAWING >_ NOTE N DEMOLITION NOTE rT"I\ PROJECT NAME' =fv1tk!_r#v"i lljr_4�00 7400 S.W. 62nd Ave. South Miami, Floiida 33143 KEY PLAN SCOPE OF WORK J 1 1