08-957-016
SPECIFICATIONS GENERAL CONDITIONS: A. THE SCOPE OF THE WORK SHALL INCLUDE THE FURNISHING AND INSTALLA11ON OF THE NECESSARY MATERIAL AND LABOR TO ACCOMPLISH THE SPRINKLER AND FIRE PROTECTION WORK INDICATED BY THE DRAWINGS AND HEREIN SPECIFIED. ALL WORK BY THIS CONTRACTOR SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL BUILDING CODES. B. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING THE EXISTING CONDITIONS AT THE JOB SITE BEFORE SUBMITTING PROPOSALS. SUBMISSION OF PROPOSALS SHALL BE TAKEN AS EVIDENCE THAT SUCH INSPECTION HAS TAKEN PLACE. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE COMPLETE SET OF CONSTRUCTION DOCUMENTS, AND THE LACK OF SPECIFIC INFORMATION ON THE DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR OF ANY RESPONSIBILITY. C. MATERIALS AND EQUIPMENT FURNISHED UNDER THIS CONTRACT SHALL BE NEW AND SHALL BEAR THE UL AND FM LABEL WHERE APPLICABLE, UNLESS NOTED OTHERWISE. ALL WORK SHALL BE GUARANTEED AGAINST DEFECTIVE MATERIALS AND WORKMANSHIP FOR A PERIOD OF NOT LESS THAN ONE (1) YEAR AFTER COMPLETION AND ACCEPTANCE BY THE OWNER. D. CONTRACTOR SHALL INSTALL FIRE PROTECTION SYSTEMS WITHOUT INTERFERENCE AND IN STRICT COORDINATION WITH OTHER TRADES. E. CUTTING OF HOLES NECESSARY FOR THE INSTALLATION OF WORK SPECIFIED UNDER THIS SECTION. COORDINATE CUTTING OF MATERIAL WITH OTHER DIVISIONS. EMPLOY SERVICES OF OTHER TRADES FOR PATCHING OF CONCRETE, MASONRY, AND OTHER MATERIAL USE SAME MATERIAL FOR PATCHING AND FINISH NEATLY. F. UNLESS OTHERWISE NOTED ON THE DRAWINGS OR THESE SPECIFICATIONS, THE ENTIRE PROJECT SHALL BE FULLY PROTECTED, EXCLUDING NO SPACES. G. INSTALL SYSTEM(S) IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, AND REQUIREMENTS OF NFPA 13, NFPA 14, NFPA 20, AND NFPA 24. IN CASE OF DIFFERENCE BETWEEN APPLICABLE CODES AND STANDARDS AND THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ARCHITECT /ENGINEER AND THE OWNER IN WRITING OF SUCH DIFFERENCE. SHOULD THE CONTRACTOR PERFORM ANY WORK THAT DOES NOT COMPLY WITH THE REQUIREMENTS OF APPLICABLE CODES AND STANDARDS, HE SHALL BEAR ALL COSTS ARISING IN CORRECTING SUCH DEFECTS. APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL ORDINANCES, U11UTY COMPANY REGULATIONS, AND APPLICABLE REQUIREMENTS OF NA11ONALLY ACCEPTED CODES AND STANDARDS. SHOULD THE CONTRACTOR SUPPLY EQUIPMENT DIFFERING FROM THE SPECIFIED ITEMS IN THE CONTRACT DOCUMENTS WITHOUT NOTIFICATION TO THE ENGINEER, HE SHALL BEAR ALL COSTS TO UPGRADE DEFICIENCIES ARISING FROM SUCH. H. WHERE ONLY ONE MANUFACTURER'S NAME IS LISTED IN THE EQUIPMENT SPECIFICATION, OTHER MANUFACTURERS OF SIMILAR CHARACTERISTICS AND OF EQUAL OR BETTER PERFORMANCE CAPACITIES MAY BE CONSIDERED FOR "OR EQUAL" APPROVAL BY THE ENGINEER. WHERE MORE THAN ONE MANUFACTURER IS LISTED IN THE NOTES AND EQUIPMENT SPECIFICATIONS, ONLY THOSE NAMED MANUFACTURERS WILL BE CONSIDERED FOR APPROVAL I. SHOULD A SUBSTITUTION BE ACCEPTED, AND SHOULD THE SUBSTITUTE MATERIAL PROVE DEFECTIVE, OR OTHERWISE UNSATISFACTORY FOR THE SERVICE INTENDED WITHIN THE GUARANTEE PERIOD, THIS MATERIAL OR EQUIPMENT SHALL BE REPLACED WITH THE MATERIAL OR EQUIPMENT SPECIFIED AT NO COST TO THE OWNER. J. PROVIDE ACCESS, INCLUDING NECESSARY ACCESS DOORS, FOR NEW AND EXISTING EQUIPMENT REQUIRING OPERATION AND /OR MAINTENANCE. RELOCATE EXISTING AND LOCATE ALL NEW EQUIPMENT SUCH THAT OPERATION OR MAINTENANCE IS NOT RESTRICTED. K. THE INSTALLING SPRINKLER CONTRACTOR SHALL BE LICENSED OR PERMITTED BY THE STATE AND LOCAL AUTHORITY HAVING JURISDICTION TO PERFORM FIRE PROTECTION INSTALLATIONS. THIS SHALL BE IN COMPLIANCE WITH ALL APPLICABLE STATE AND LOCAL LAWS. PRODUCTS AND EQUIPMENT: A. INTERIOR PIPE AND FITTINGS 1. PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE CONFORMING TO ASTM A135 OR ASTM A53 AND SCHEDULE 10 BLACK STEEL PIPE CONFORMING TO ASTM A135. 2. FITTINGS a. CAST IRON THREADED FITTINGS, ANSI 816.4 CLASS 125 AND 250 (EXTRA HEAVY). b. CAST IRON FLANGED FITTINGS, ANSI 816.1 CLASS 125 AND 250. c. MECHANICAL JOINT, GROOVED COUPLINGS, AS MANUFACTURED BY VICTAULIC, SPRINK, GRUVLOK, OR EQUIVALENT. COUPLINGS SHALL BE RIGID TYPE, EQUIVALENT TO VICTAULIC'S STYLE 07, ZERO FLEX OR STYLE 005 FIRELOCK. ALL GROOVE COUPLINGS AND FITTINGS SHALL BE FURNISHED BY A SINGLE MANUFACTURER. 3. PIPING FOR DRAINAGE SYSTEMS SHALL BE SCHEDULE 40 GALVANIZED STEEL PIPE, ASTM A795 OR A135 WITH GALVANIZED THREADED FITTINGS, ANSI 816.4, GALVANIZED COATED, BOTH INTERIOR AND EXTERIOR OF PIPE AND FITTINGS. B. HANGERS, SUPPORTS, AND SLEEVES 1. SUPPORT PIPING WITH UL AND FM APPROVED HANGERS. ACCEPTABLE MANUFACTURERS: GRINNELL, B -LINE, FEE & MASON. 2. ADJUSTABLE CLEVIS: GRINNELL FIG. 260. 3. ADJUSTABLE SWIVEL: GRINNELL FIG. 69. 4. BEAM CLAMP: GRINNELL FIG. 92 AND GRINNELL FIG. 218. 5. CONCRETE FASTENERS: GRINNELL STEEL SHELL AND EXPANDER PLUG. 6. CONCRETE INSERT: GRINNELL FIG. 152. 7. RISER CLAMP: GRINNELL FIG. 261. B. POWDER- DRIVEN INSERTS SHALL NOT BE ACCEPTED. 9. ALL PIPES PASSING THROUGH RATED FLOORS OR WALLS SHALL BE SLEEVED AND FIRESTOPPED TO AN EQUIVALENT RATING OF THE FLOOR OR WALL ASSEMBLY. FIRESTOP MATERIALS SHALL MEET ASTM E814 REQUIREMENTS. C. SPRINKLER HEADS 1. PROVIDE THE FOLLOWING SPRINKLER HEADS OF PROPER TYPES, RATINGS, AND SPACINGS FOR AREAS INVOLVED. PROVIDE APPROPRIATE FINISHES COMPATIBLE WITH SPACE FINISHES BEING SERVED. ACCEPTABLE MANUFACTURERS: VIKING, GRINNELL, AUTOMATIC SPRINKLER, CENTRAL, STAR, AND RELIABLE. 2. QUICK RESPONSE SPRINKLER HEAD TYPE a. PENDENT AND BRASS UPRIGHT CHROME: CENTRAL GB -QR (F.M. APPROVED). b. SEMI - RECESSED, CHROME: CENTRAL GB -QR. c. FULLY CONCEALED: CENTRAL ROYAL FLUSH GB4 -FR, WHITE COVERPLATE. 3. PENDENT HEADS IN CEILINGS AND HORIZONTAL SIDEWALL HEADS SHALL HAVE ONE- PIECE, NONADJUSTABLE ESCUTCHEONS. TWO -PIECE OR SLIP TYPE ESCUTCHEONS SHALL NOT BE ACCEPTED. THIS DOES NOT APPLY TO SEMI- RECESSED HEADS. D. SWITCHES 1. FLOW SWITCH: NOTIFIER MODEL NO. WFD -6 VANE TYPE FLOW SWITCH WITH PNEUMATIC RETARD ADJUSTABLE FROM 0 TO 90 SECONDS, COMPLETE WITH DOUBLE POLE, DOUBLE THROW MICRO FEATURE. 2. TAMPER SWITCHES: NOTIFIER MODEL NO. SGV FOR 4" AND LARGER, POTTER MODEL NO. OSYSU -A2 FOR PIPE SIZE LESS THAN 4 ", TAMPER SWITCH DOUBLE POLE, DOUBLE THROW MICRO FEATURE FOR 1/2 -INCH TO 12 -INCH VALVES. E. PROVIDE AND INSTALL UNIONS AT PROPER POINTS TO PERMIT REMOVAL OF A PIPE, EQUIPMENT, ETC., WITHOUT INJURY TO OTHER PARTS OF THE SYSTEM AND TO PREVENT CORROSION DUE TO ELECTROLYSIS. ALL EQUIPMENT SHALL BE INSTALLED IN A MANNER TO PERMIT ACCESS FOR SERVICE WITHOUT DISASSEMBLY. UNIONS SHALL BE DIELECTRIC WHERE DISSIMILAR MATERIALS OCCUR. PRESSURE RATINGS SAME AS FITTINGS. III EXECUTION: A. COORDINATE INSTALLATION WITH OTHER DIVISIONS TO INSURE THERE ARE NO CONFLICTS. FIRE PROTECTION PIPING SHALL NOT TAKE PRIORITY IN ROUTING OVER HVAC DUCTWORK. B. PIPE INSTALLA11ON 1. CONNECT TO WATER MAIN AS SHOWN ON DRAWINGS. 2. ATTACHED HANGERS TO STRUCTURAL STEEL WORK BY CLAMPING OR OTHER APPROVED METHODS, EXCEPT THAT STRUCTURAL WORK SHALL NOT BE DRILLED AND PUNCHED. WHEREVER NECESSARY, FURNISH, INSTALL, AND SECURELY ANCHOR TO OR BETWEEN BUILDING MEMBERS SUITABLE ANGLE IRON OR OTHER STEEL MEMBERS TO SUPPORT SPRINKLER WORK. 3. PROVIDE SUPPORT FOR GROOVED PIPING IN CONFORMANCE WITH REQUIREMENTS OF MSS- SP -69, "PIPE HANGERS AND SUPPORTS - SELECTION AND APPLICATION IN ADDITION TO THESE REQUIREMENTS, LEAVE NO HORIZONTAL PIPE UNSUPPORTED BETWEEN ANY TWO COUPLINGS NOR SHALL ANY PIPE BE LEFT UNSUPPORTED WHENEVER A CHANGE IN DIRECTION OF FLOW TAKES PLACE. PROVIDE SUPPORTS MEETING THE REQUIREMENTS STATED ABOVE, BUT ENSURE THAT THE DISTANCE BETWEEN SUPPORTS DOES NOT EXCEED THE FOLLOWING: PIPE SIZE MAXIMUM SPAN BETWEEN HANGERS 1 INCH 8 FEET 1 -1/4 THROUGH 2 INCH 10 FEET 2-1/2 THROUGH 4 INCH 12 FEET 5 THROUGH 8 INCH 14 FEET 10 THROUGH 12 INCH 15 FEET 4. SUPPORT VERTICAL PIPING AT EVERY OTHER FLOOR OR EVERY OTHER PIPE LENGTH, WHICHEVER IS MOST FREQUENT. SET THE BASE OF THE RISER OR BASE FITTING ON A PEDESTAL OR FOUNDATION. C. SPRINKLERS 1. INSTALL SPRINKLER HEADS AND REQUIRED PIPING IN AREAS SUCH AS CONCEALED SPACES, LAB HOODS, DIETARY FREEZER AND CHILL BOXES AND OTHER SPECIAL AREAS AND SPACES AS REQUIRED BY NFPA 13, NFPA 101, APPLICABLE STATE AND LOCAL CODES. 2. PROVIDE DRAIN VALVES, PIPES AND TEST CONNECTIONS AS REQUIRED BY NFPA 13. PIPE DRAIN LINES AND TEST CONNECTIONS TO OUTSIDE BUILDING AS SHOWN ON THE DRAWINGS AND DETAILS. TEST LINES MUST ORIGINATE FROM THE MOST HYDRAULICALLY REMOTE POINT OF EACH SPRINKLER ZONE. ALL DRAIN PIPING AND FITTINGS SHALL BE GALVANIZED COATED, NO EXCEPTION. 3. INSTALL SPRINKLER HEADS CENTERLINE OF CORRIDORS AND LOCATE IN THE CENTER OF THE CEILING TILES. INSTALL SPRINKLER HEADS IN OTHER DESIGNATED SPACES IN THE CENTER OF THE CEILING TILES AND SYMMETRICALLY LOCATE WITH OTHER HEADS WITHIN THE CEILING. (SEE ARCHITECTURAL REFLECTED CEILING PLANS.) DO NOT INSTALL SPRINKLER HEADS IN OTHER LOCATIONS ANY CLOSER THAN SIX (6) INCHES TO ANY CEILING GRID OR WALL 4. CROSS MAINS AND FEED MAINS SHALL NOT PASS THROUGH ELECTRICAL ROOMS OR SIMILAR SPACES. ONLY THE BRANCH LINE SERVING SUCH SPACES SHALL BE PERMITTED WITHIN THE BOUNDARIES OF THESE ROOMS. 5. DRAIN PLUGS SHALL BE INSTALLED ON TRAPPED SECTIONS OF PIPING, 50 GALLONS OR LESS. AUXILIARY DRAIN VALVES, 3/4 INCH OR LARGER, AND PLUGS SHALL BE INSTALLED ON TRAPPED SECTIONS OF PIPE GREATER THAN 50 GALLONS. IV RECORDS FOR OWNER: A. THE CONTRACT DOCUMENTS CONTAIN FIRE PROTECTION DESIGN DRAWINGS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PREPARE DETAILED AND COORDINATED WORKING DRAWINGS, ACCURATELY REPRESENTING THE DESIGN OF RECORD. B. CONTRACTOR SHALL KEEP A CLEAN SET OF DRAWINGS ON THE JOB, NOTING DAILY ALL CHANGES MADE IN THESE DRAWINGS IN CONNECTION WITH THE FINAL INSTALLATION INCLUDING EXACT DIMENSIONED LOCATIONS OF ALL NEW AND UNCOVERED EXISTING UTILITIES AND SHALL, WITH HIS REQUEST FOR FINAL PAYMENT, TURN OVER A CLEAN, NEATLY MARKED SET OF 2 MIL REPRODUCIBLE MYLARS SHOWING "AS INSTALLED" WORK TO THE ARCHITECT FOR SUBSEQUENT REVIEW AND TRANSMITTAL TO THE OWNER. CONTRACTOR SHALL NOTE ALL CONSTRUCTION CHANGES, DATE EACH SHEET AND LABEL "AS- BUILTS" IN THE REVISION BLOCK ON THE DRAWINGS. CONTRACTOR SHALL ALSO FURNISH ONE (1) SET OF BLUELINE PRINTS FROM THE "AS- BUILTS" MYLARS. C. PREPARE COMPLETE DETAILED WORKING DRAWINGS FOR FIRE PROTECTION SYSTEM. SUBMIT DRAWINGS TO STATE FIRE MARSHAL AND TO /FACTORY MUTUAL / /OWNER'S INSURANCE UNDERWRITER/ FOR APPROVAL AFTER RECEIVING THIS APPROVAL, SUBMIT SHOP DRAWINGS TO DESIGNER FOR HIS REVIEW AND APPROVAL PRIOR TO STARTING INSTALLATION. PRIOR APPROVAL BY ABOVE LISTED AUTHORITIES IS REQUIRED BEFORE SPRINKLER INSTALLATION IS BEGUN. D. IN ADDITION TO THE ABOVE, CONTRACTOR SHALL ACCUMULATE DURING THE JOB'S PROGRESS, THE FOLLOWING DATA, IN TRIPLICATE, PREPARED IN A NEAT BROCHURE OR PACKET FOLDER AND TURNED OVER TO THE ARCHITECT FOR REVIEW AND SUBSEQUENT DELIVERY TO THE OWNER. 1. ALL WARRANTIES AND GUARANTEES AND MANUFACTURER'S DIRECTIONS ON EQUIPMENT AND MATERIAL COVERED BY THE CONTRACT INCLUDING THE NAMES, ADDRESSES AND TELEPHONE NUMBERS OF THE MANUFACTURER'S REPRESENTATIVE. E. EQUIPMENT SUBMITTAL DRAWINGS AND DATA ARE REQUIRED ON ALL ITEMS NAMED BY MANUFACTURER, INCLUDING THE FOLLOWING: 1. SPRINKLER HEADS - TYPE AND MANUFACTURER. 2. VALVES - TYPE AND MANUFACTURER, INTERIOR AND EXTERIOR. 3. WATER FLOW AND TAMPER SWITCHES - TYPE AND MANUFACTURER. 4. PIPING AND FITTINGS. F. APPLICABLE CODES 1. 2002 NFPA 13 GENERAL FIRE PROTECTION NOTES I IT IS THE INTENT THAT THE FIRE PROTECTION SUB - CONTRACTOR BE RESPONSIBLE FOR THE INSTALLATION OF THE FIRE SUPPRESSION SYSTEMS IN ACCORDANCE WITH APPLICABLE CODES. II FIRE PROTECTION SUB - CONTRACTOR SHALL UTILIZE EXISTING PIPING SYSTEM AND SPRINKLER HEADS WHERE POSSIBLE, AND ADD PIPING AND HEADS AS REQUIRED TO PROVIDE CODE APPROVED COVERAGE OR MATCH EXISTING BUILDING SPRINKLER GRID COVERAGE. III SPRINKLER HEADS TO MATCH EXISTING HEADS WITHIN THE BUILDING. IV COORDINATE HEAD LOCATIONS WITH LIGHT FIXTURES, DIFFUSERS, GRILLES, ETC FIRE PROTECTION NOTES 1. PROVIDE WORKING DRAWINGS FROM THE ENGINEERED CONTRACT DRAWINGS AND SPECIFICATIONS. THE DRAWINGS SHALL MEET ALL OF THE REQUIREMENTS FOR WORKING DRAWINGS PER NFPA 13. PROVIDE SPRINKLERS AND PIPING IN LOCATIONS AND CONFIGURATION INDICATED; HOWEVER, THE CONTRACTOR SHALL COORDINATE THE LOCATION AND ELEVATION OF ALL SPRINKLERS AND PIPING WITH ALL BUILDING COMPONENTS AND SYSTEMS. PIPE SIZES SHALL NOT BE LESS THAN INDICATED ON THE DRAWINGS. 2. OBTAIN A PERMIT FOR THE WORKING DRAWINGS IN ACCORDANCE WITH LOCAL DRAWINGS AND STATE REQUIREMENTS. 3. PROVIDE WET -PIPE SPRINKLER SYSTEMS IN ACCORDANCE WITH 2004 FLORIDA BUILDING CODE, 2004 FLORIDA FIRE PREVENTION CODE, 2002 NFPA 13, AND LOCAL REQUIREMENTS. ALL PIPING, SPRINKLERS, AND COMPONENTS TO BE UL LISTED AND FM APPROVED FOR AUTOMATIC SPRINKLER SYSTEMS. 4. STORAGE ROOMS, EQUIPMENT ROOMS, AND SIMILAR AREAS ARE ORDINARY HAZARD, GROUP 1; AND EXAM ROOM, PROCEDURE ROOMS, LOBBY AREAS AND RESTROOMS ARE LIGHT HAZARD. THE SYSTEM IS DESIGNED IN ACCORDANCE WITH NFPA 13. THE SYSTEM ARE DESIGNED TO PROVIDE 0.10 AND 0.15. GPM /SQ. FT. FOR LIGHT AND ORDINARY GROUP 1 AREAS, RESPECTIVELY. 5. THE SPRINKLER SPACING SHALL BE AS INDICATED ON THE DRAWINGS BUT SHALL NOT EXCEED 225 SO. FT AND 130 SQ. FT. FOR LIGHT AND ORDINARY HAZARD, RESPECTIVELY, EXCEPT WHERE EXTENDED COVERAGE SPRINKLERS ARE SHOWN. 6. COORDINATE ROUTING OF PIPING, ETC. WITH PLUMBING AND MECHANICAL (HVAC) ROUTING. PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS, ETC. PER NFPA 70. 7. ALL TEST/DRAIN LINES (MORE THAN 5 GALLONS) SHALL DISCHARGE DIRECTLY TO THE EXTERIOR WITH THE APPROPRIATE SPLASH PROTECTION. AUXILIARY DRAINS MAY DISCHARGE INTO MECHANICAL ROOM FLOOR DRAINS. DRAINS SHALL BE SIZED IN ACCORDANCE WITH NFPA 13 AND NFPA 14. WORKING DRAWINGS SHALL INDICATE THE LOCATION OF ALL TEST/DRAIN VALVES AND DISCHARGE POINTS. 8. ALL PIPES SERVING A SINGLE SPRINKLER ARE 1 INCH MINIMUM. PROVIDE ASTM A 53 SCHEDULE 40 STEEL PIPE FOR WELDED, THREADED, AND GROOVED FITTINGS ONLY. PROVIDE ASTM A135 OR A795 SCHEDULE 10 STEEL PIPE FOR WELDED OR ROLLED - GROOVE FITTINGS ONLY. 9. PROVIDE 1/2 -INCH RECESSED PENDENT OR CONCEALED SPRINKLERS (ORDINARY TEMPERATURE) IN INTERIOR SPACES WITH FINISHED CEILINGS, AS INDICATED ON THE DRAWINGS. SPRINKLERS SHALL BE CENTERED IN CEILING TILE (BOTH DIRECTIONS). SPRINKLERS IN GYPSUM BOARD CEILINGS SHALL BE INSTALLED UNIFORMLY AND CENTERED WITH RESPECT TO LIGHTS, ETC. SPRINKLERS IN AREAS WITHOUT CEILINGS SHALL BE PENDENT OR UPRIGHTS IN ACCORDANCE WITH NFPA 13. PROVIDE OTHER SPRINKLERS AS INDICATED ON THE DRAWINGS. COORDINATE THE LOCATION AND ELEVATION OF SPRINKLERS WITH RESPECT TO STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13. 10. PROVIDE HANGERS IN ACCORDANCE WITH NFPA 13. HANGERS TYPES AND LOCATIONS IN THE CONCRETE MEMBERS MUST BE SUBMITTED TO AND APPROVED BY THE STRUCTURAL ENGINEER. 2121 Por5Ce de LeUn Bled., Suite 350 FIRE PROTECTION SYMBOLS ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE. SYMBOL DESCRIPTION EX - EXISTING PIPING TO REMAIN X -X-X -- X EXISTING PIPING TO BE REMOVED 0 CONNECT NEW TO EXISTING - F - FIRE PROTECTION (STANDPIPE, SPRINKLER, SERVICE) -DFS- DRY FIRE STANDPIPE PIPING - SP - SPRINKLER PIPING (SPRK.) -SDR- SPRINKLER DRAIN RISER PIPING -DSP- DRY SPRINKLER PIPING - PAP PRE - ACTION SPRINKLER PIPING -4- 104 GATE VALVE -►N- GLOBE VALVE _ PRESSURE REGULATION VALVE (PRV) -- CHECK VALVE WITH AUTOMATIC BALL DRIP CDT- D VALVE IN VERTICAL OS & Y VALVE SUPERVISED (HORIZ. POSITION/VERT. POSITION) rL w INDICATING BUTTERFLY VALVE SUPERVISED (HORIZ. POSITION /VERT. POSITION) FCA SPRINKLER SYSTEM FLOOR CONTROL ASSEMBLY .E DOUBLE CHECK VALVE ASSEMBLY (D.C.V.A.) WITH OS & Y VALVES SUPERVISED FLOW SWITCH FIRE HOSE VALVE rrrrrrrn FIRE HOSE CABINET (SURFACE MOUNTED) --anm= FIRE HOSE CABINET (RECESSED) C-0 2 -WAY SIAMESE FIRE DEPARTMENT CONNECTION DIRECTION OF SLOPE no DIRECTION OF FLOW =j CAP OUTLET OR PLUGGED OUTLET lie UNION • QUICK RESPONSE CONCEALED SPRINKLER Q• QUICK RESPONSE RECESSED PENDENT SPRINKLER O QUICK RESPONSE UPRIGHT SPRINKLER ► QUICK RESPONSE SIDEWALL SPRINKLER ABBREVIATIONS AFF ABOVE FINISH FLOOR AFG ABOVE FINISH GRADE A/C ABOVE HUNG CEILING AP ACCESS PANEL OR DOOR BFF BELOW FINISH FLOOR B/F BELOW FLOOR B/G BELOW GRADE GC GENERAL CONTRACTOR INV INVERT I.E. INVERT ELEVATION MH MANHOLE PRV PRESSURE REDUCING VALVE FIRE PROTECTION SHEET LIST DWG No. DRAWING TITLE SCALE 170.00 GENERAL INFORMATION - FIRE PROTECTION NTS F2.51 PARTIAL FIFTH FLOOR PLAN - FIRE PROTECTION 1/4" = 1' -0" F2.71 PARTIAL SEVENTH FLOOR PLAN - FIRE PROTECTION 1/4" = 1' -0" J 0 cn cem cem Q W U W z U NO Q 0 N C) o Z cn O C o ��?ti E ti go ti� Q U 04 C9 >, W C3) N rn n 0 U ��� �N p LL CIO �N o 2c` cn c`o u_ � c o N Z > >, 0 -0 co o = (� J� Y m cCL EQVQ u7 LLnOELMF- � o LL Comm. No: 08061 CO 07/07/08 Drawn: qqt T .O f+ C 0 00 0 0 cc rL w .E a� cc rl "C cc 0 0 E m ._ E V) O 0 CO) M 0 Ln � CL O C � N CID O V Comm. No: 08061 Date: 07/07/08 Drawn: Revised: a r, © 2008 HARVARD JOLLY, INC F0.00