08-957-015
0 PARTIAL FIFTH FLOOR PLAN — ICRA 2SCALE: 1/4" = 1' -0" ICRA GENERAL NOTES 1. TYPE 'C' HIGHEST RISK, CLASS III. 2. VENTILATION: A/C SUPPLY TO ADJACENT AREAS WILL NOT BE AFFECTED. T&B CONTRACTOR WILL CHECK THE AIR BALANCE AFTER THE RETURN IS BLOCKED TO MAKE SURE THE PRESSURIZATION OF THE ADJACENT SPACES ARE MAINTAINED AS REQUIRED. 3. THE A/C SUPPLY AND RETURN AIR TO THE CONSTRUCTION AREA TO BE ADJUSTED AS REQUIRED. ONE PORTABLE HEPA FILTER NEGATIVE AIR MACHINE(FA2000EC) SHALL BE INSTALLED .TO CLEAN THE AIR IN THE ROOM. THIS MACHINE SHALL FILTER AIR. AIR QUANTITY SHALL BE ADJUSTED TO MAINTAIN A MINIMUM OF 0.02" W.g. NEGATIVE PRESSURE VISUAL PRESSURE INDICATORS (ADI- 69 -V -N) WILL BE INSTALLED AT THE ENTRANCE. AFTER INSTALLATION OF CONSTRUCTION BARRIER WALLS AND THE ABOVE MEASURES, A CERTIFIED TEST AND BALANCE FIRM SHALL CONFIRM THAT THE ABOVE ITEMS ARE IN PLACE AND WORKING PRIOR TO STARTING DEMOLITION. STICKY MAT SHALL ALSO BE INSTALLED. VISQUEEN SHALL BE INSTALLED AT THE EXISTING DOORS. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHEN WORK IS REQUIRED IN THE CORRIDORS. HEPA VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS BEEN COMPLETED. 4. CONTRACTOR SHALL COMPLY WITH OWNER REQUIREMENTS FOR INFECTION CONTROL MAINTAIN RENOVATION AREA UNDER NEGATIVE PRESSURE AT ALL TIMES. CONTRACTOR PROVIDE NEGATIVE AIR MACHINE TO PROTECT DUCTWORK FROM EXCESSIVE DUST. PROVIDE PRESSURE GAUGE TO MONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACES. LOCATE PRESSURE GAUGE AT ENTRANCE TO CONSTRUCTION AREA. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION OF CONSTRUCTION BARRIERS. ADJUST THE VOLUME OF THE NEGATIVE AIR MACHINE SIMILAR TO FARR SEPHYR TO PROVIDE A NEGATIVE PRESSURE OF -0.02" W.G. WITHIN THE SPACE AS IT IS BEING MODIFIED. IT IS PERMISSIBLE TO MAINTAIN SUPPLY TO THE SPACE, BUT MAINTAIN THE SPACE UNDER NEGATIVE PRESSURIZATION. PROVIDE PROPER FILTRATION WITHIN THE MACHINE TO ENSURE THAT EXISTING DUCTWORK IS NOT CONTAMINATED WITH CONSTRUCTION DUST. FINAL FILTER EFFICIENCY SHALL BE 99.99 % OR HIGHER FOR 1 MICRON PARTICLES. NEGATIVE AIR MACHINE SHAD. BE FARR ZEPHYR OR APPROVED EQUAL DO NOT POSITIVELY PRESSURIZE EXISTING DUCTWORK. USE THE NEGATIVE AIR MACHINE FOR SPOT FILTRATION/EXHAUST SERVICE WHEN WORKING ABOVE THE CEILING OUTSIDE THE WALLS OF THE RENOVATED SPACE. 5. REFERENCE ARCHITECTURAL PLANS FOR LOCATION OF TEMPORARY CONSTRUCTION WALLS. 6. REFERENCE CONSTRUCTION DOCUMENTS FOR ADDITIONAL REQUIREMENTS. KEY NOTES: O1 CONTRACTOR SHALL INSTALL NEGATIVE AIR MACHINE AND TEMPORARY ROUND FLEX DUCT FROM MACHINE AS INDICATED. TEMPORARILY CONNECT TO NEAREST EMERGENCY POWER. CONTRACTOR SHALL PROVIDE ALL NECESSARY ELECTRICAL APPRENTICES AS REQUIRED FOR THIS CONNECTION. REMOVE MACHINE AND ALL ASSOCIATED EQUIPMENT AT END OF CONSTRUCTION. OCONTRACTOR SHALL INSTALL MAGNETIC DRAFT GAUGE. MAINTAIN 0.02" W.C. NEGATIVE PRESSURE. OCONTRACTOR SHALL INSTALL TEMPORARY FILTER MEDIUM AND COVER AIR DEVICES WITH VISQUEEN PLASTIC. OTEMPORARY 12" ROUND FLEX DUCT. �Y t� I 75 CFM 12x12 DIFFUSER AIRFLOW W METAL FLEX (TYP•) PORTABLE AIR SCRUBBER TRANSFER 75 CFM WITH HEPA FILTER UNDER DOOR --jp► 0 3 AIR SCRUBBER DETAIL SCALE: NTS T ) T. r - -- -III 1 F 75 CFM I= A(�TE SA --�M 62VCFM 2 Q � % SA VATS ROOM x1/0 �J O 729 IVATE R OM 700 CFM RA 729A TOILET ii -1 SEVENTH FLOOR PLAN — ICRA olPARTIAL SCALE: 1/4" = 1' -0" ICRA GENERAL NOTES 1. TYPE 'C' HIGHEST RISK, CLASS III. 2. VENTILATION: A/C SUPPLY TO ADJACENT AREAS WILL NOT BE AFFECTED. T&B CONTRACTOR WILL CHECK THE AIR BALANCE AFTER THE RETURN IS BLOCKED TO MAKE SURE THE PRESSURIZATION OF THE ADJACENT SPACES ARE MAINTAINED AS REQUIRED. 3. THE A/C SUPPLY AND RETURN AIR TO THE CONSTRUCTION AREA TO BE ADJUSTED AS REQUIRED. ONE PORTABLE HEPA FILTER NEGATIVE AIR MACHINE(FA2000EC) SHALL BE INSTALLED TO CLEAN THE AIR IN THE ROOM. THIS MACHINE SHALL FILTER AIR. AIR QUANTITY SHALL BE ADJUSTED TO MAINTAIN A MINIMUM OF 0.02" W.g. NEGATIVE PRESSURE VISUAL PRESSURE INDICATORS (ADI- 69 -V -N) WILL BE INSTALLED AT THE ENTRANCE. AFTER INSTALLATION OF CONSTRUCTION BARRIER WALLS AND THE ABOVE MEASURES, A CERTIFIED TEST AND BALANCE FIRM SHALL CONFIRM THAT THE ABOVE ITEMS ARE IN PLACE AND WORKING PRIOR TO STARTING DEMOLITION. STICKY MAT SHALL ALSO BE INSTALLED. VISQUEEN SHALL BE INSTALLED AT THE EXISTING DOORS. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHEN WORK IS REQUIRED IN THE CORRIDORS. HEPA VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS BEEN COMPLETED. 4. CONTRACTOR SHALL COMPLY WITH OWNER REQUIREMENTS FOR INFECTION CONTROL MAINTAIN RENOVATION AREA UNDER NEGATIVE PRESSURE AT ALL TIMES. CONTRACTOR PROVIDE NEGATIVE AIR MACHINE TO PROTECT DUCTWORK FROM EXCESSIVE DUST. PROVIDE PRESSURE GAUGE TO MONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACES. LOCATE PRESSURE GAUGE AT ENTRANCE M CONSTRUCTION AREA. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION OF CONSTRUCTION BARRIERS. ADJUST THE VOLUME OF THE NEGATIVE AIR MACHINE SIMILAR TO FARR SEPHYR TO PROVIDE A NEGATIVE PRESSURE OF - 0.02" W.G. WITHIN THE SPACE AS IT IS BEING MODIFIED. IT IS PERMISSIBLE TO MAINTAIN SUPPLY TO THE SPACE, BUT MAINTAIN THE SPACE UNDER NEGATIVE PRESSURIZATION. PROVIDE PROPER FILTRATION WITHIN THE MACHINE TO ENSURE THAT EXISTING DUCTWORK IS NOT CONTAMINATED WITH CONSTRUCTION DUST. FINAL FILTER EFFICIENCY SHALL BE 99.99 % OR HIGHER FOR 1 MICRON PARTICLES. NEGATIVE AIR MACHINE SHALL BE FARR ZEPHYR OR APPROVED EQUAL DO NOT POSITIVELY PRESSURIZE EXISTING DUCTWORK. USE THE NEGATIVE AIR MACHINE FOR SPOT FILTRATION/EXHAUST SERVICE WHEN WORKING ABOVE THE CEILING OUTSIDE THE WALLS OF THE RENOVATED SPACE. 5. REFERENCE ARCHITECTURAL PLANS FOR LOCATION OF TEMPORARY CONSTRUCTION WALLS. 6. REFERENCE CONSTRUCTION DOCUMENTS FOR ADDITIONAL REQUIREMENTS. KEYNOTES: OCONTRACTOR SHALL INSTALL NEGATIVE AIR MACHINE AND TEMPORARY ROUND FLEX DUCT FROM MACHINE AS INDICATED. TEMPORARILY CONNECT TO NEAREST EMERGENCY POWER. CONTRACTOR SHALL PROVIDE ALL NECESSARY ELECTRICAL APPRENTICES AS REQUIRED FOR THIS CONNECTION. REMOVE MACHINE AND ALL ASSOCIATED EQUIPMENT AT END OF CONSTRUCTION. OCONTRACTOR SHALL INSTALL MAGNETIC DRAFT GAUGE MAINTAIN 0.02" W.C. NEGATIVE PRESSURE. OCONTRACTOR SHALL INSTALL TEMPORARY FILTER MEDIUM AND COVER AIR DEVICES WITH VISQUEEN PLASTIC. OTEMPORARY 12" ROUND FLEX DUCT. O5 EXISTING DOOR SHALL REMAIN OPEN THROUGHOUT THE ICRA PHASE. : � W--1 Q CD CL ai 0 UM .J LL WW J W ❑ g x ry U Q Cl CD o c' r- o m 0001 'h CO E � L6 M ti L � N , t OD � � N cn N9C;tiCD O m�2)19a) 2)o I9 M ^ N "E C-4, 2, (M N 10 0 12 o cm W „o R I=0 N 10 N N 12- o J� U N c a V W z 7 .J cu QQ Li u. --j O a cn I- a Comm. No: 08061 co 07/07/08 Drawn: r C M ,O CIO I c O U. w "E Q co O co W O m E E (%) O 0 Cc CO M c :3 I` 0 (L 0 c Cn � > (o 0 Comm. No: 08061 Date: 07/07/08 Drawn: Revised: © 2008 HARVARD JOLLY, INC M.ICRA