Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
08-957-010
MECHANICAL SYMBOLS ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE. —HPS HIGH PRESSURE STEAM —HPR HIGH PRESSURE CONDENSATE RETURN SYMBOL DESCRIPTION - - -LPS - -- LOW PRESSURE STEAM A # NEW EQUIPMENT DESIGNATION (TOP - EQUIP. ABBREV., BOTTOM -MARK) - -LPR - -- LOW PRESSURE CONDENSATE RETURN —PCR PUMPED CONDENSATE RETURN A e NEW DIFFUSER DESIGNATION (TOP - SCHEDULE DESIG., BOTTOM - CFM) - DOMESTIC COLD WATER \� �]� NEW EQUIPMENT -- — DOMESTIC HOT WATER — - -- — DOMESTIC HOT WATER RETURN GSF EXISTING EQUIPMENT BV SANITARY WASTE LINE MVD MANUAL VOLUME DAMPER NEW DUCT CD CONDENSATE DRAIN P PUMPED SANITARY LINE CONDENSATE RETURN UNIT EXISTING DUCT — — — VENT LINE - - - -- -- - - --'- ' EXISTING DUCT TO BE REMOVED OR RELOCATED �— DIRECTION OF SLOPE —� DIRECTION OF FLOW ® NEW SUPPLY DIFFUSER DIGITAL OUTPUT EXPANSION LOOP RECIRCULATED (RETURN) AIR ® DISCONNECT SWITCH EXISTING SUPPLY DIFFUSER ♦ — GATE VALVE -- -{-r�— BUTTERFLY VALVE SUPPLY AIR EXISTING SUPPLY DIFFUSER TO BE REMOVED OR RELOCATED — BALL VALVE UNIT HEATER NEW R/A OR EXHAUST GRILLE ELECTRIC UNIT HEATER GLOBE VALVE VARIABLE AIR VOLUME TEMPERATURE AND PRESSURE RELIEF VALVE EXHAUST FAN WH WATER HEATER EXISTING R/A OR EXHAUST GRILLE Q —�y— AUTOMATIC 2 -WAY CONTROL VALVE WATER- SOURCE HEAT PUMP EXISTING R/A OR EXHAUST GRILLE TO BE REMOVED OR RELOCATED EXHAUST AIR AUTOMATIC 3 -WAY CONTROL VALVE FILTER MIXING BOX NEW SLOT DIFFUSER — PLUG VALVE /BALANCING COCK -M_ FLEXIBLE DUCT T SOLENOID VALVE INCHES WATER COLUMN (PRESSURE) EXISTING SLOT DIFFUSER �— CHECK VALVE -- - - - - -- EXISTING SLOT DIFFUSER TO BE REMOVED OR RELOCATED Q HYDRAULIC SHOCK ARRESTOR OT THERMOSTAT —EDT- VALVE IN VERTICAL T; EXISTING THERMOSTAT TO BE REMOVED OR RELOCATED —}�— UNION MIXED AIR 45' PRESSURE TAP W/ VOLUME DAMPER —�V — VACCUUM BREAKER F. CONICAL TAP WITH VOLUME DAMPER Jp P -TRAP CONICAL TAP W/O VOLUME DAMPER x]O FLOOR DRAIN W/ P -TRAP ® SQUARE TO ROUND DUCT TRANSITION oO HUB DRAIN J MANUAL VOLUME DAMPER sO FLOOR CLEANOUT OR GRADE CLEANOUT —� FIRE DAMPER --II CLEANOUT OR WALL CLEANOUT • SMOKE DAMPER L PETE'S PLUG FIRE /SMOKE DAMPER -}� GAUGE COCK MOTORIZED DAMPER _ y THERMOMETER © BAROMETRIC DAMPER — CHS — CHILLED WATER SUPPLY PIPE — -F THERMOMETER WELL — CHR — CHILLED WATER RETURN PIPE STRAINER WITH BLOW -OFF VALVE CS CONDENSER WATER SUPPLY PIPE �— F & T STEAM TRAP CR CONDENSER WATER RETURN PIPE PREVENT DAMAGE DURING THE REMOVAL AND REINSTALLATION. WHERE DAMAGE OCCURS, STEAM BUCKET TRAP RL REFRIGERANT LIQUID PIPE CONNECT TO EXISTING RG REFRIGERANT GAS PIPE EP ELECTRIC PNEUMATIC SWITCH HS HEATING WATER SUPPLY HR HEATING WATER RETURN IECHANICAL BBREVIATIONS AC ABOVE CEILING LOCATION: CITY /STATE MIAMI , FLORIDA AFF ABOVE FINISHED FLOOR FCU FAN COIL UNIT AI ANALOG INPUT FPB FAN POWERED BOX AO ANALOG OUTPUT FPI FINS PER INCH BFC BELOW FINISHED CEILING GC GENERAL CONTRACTOR BF BELOW FLOOR, BLIND FLANGE GEF GENERAL EXHAUST FAN BG BELOW GRADE GSF GENERAL SUPPLY FAN BV BUTTERFLY VALVE MVD MANUAL VOLUME DAMPER CRU COMPUTER ROOM UNIT N NEW CRU CONDENSATE RETURN UNIT OBD OPPOSED BLADE DAMPER CU CONDENSING UNIT R RELOCATED DI DIGITAL INPUT RA RETURN AIR DO DIGITAL OUTPUT RCA RECIRCULATED (RETURN) AIR DS DISCONNECT SWITCH RLA RELIEF AIR E EXISTING SA SUPPLY AIR EDH ELECTRIC DUCT HEATER UH UNIT HEATER EUH ELECTRIC UNIT HEATER VAV VARIABLE AIR VOLUME EF EXHAUST FAN WH WATER HEATER SF SUPPLY FAN WHP WATER- SOURCE HEAT PUMP EA EXHAUST AIR FMB FILTER MIXING BOX OA OUTSIDE AIR IN HG INCHES MERCURY (PRESSURE) CHIN CHILLED WATER IN WC INCHES WATER COLUMN (PRESSURE) UNO UNLESS NOTED OTHERWISE IBT INVERTED BUCKET TRAP PRV PRESSURE RELIEF VALVE TAV THERMOSTATIC AIR VENT i_ PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOUTION WORK SHALL BE H. (STEAM SYSTEM) SV SAFETY VALVE MA MIXED AIR CL LE LAUNDRY EQUIPMENT PROJECT DESIGN CRITERIA LOCATION: CITY /STATE MIAMI , FLORIDA APPLICABLE CODES: BUILDING 2004 FBC FIRE DAMPER(S) W/ 2005, 2006 REV. MECHANICAL 2004 FMC W/ REV. PLUMBING 2004 FPC W /REV. HOSPITAL AND 2006 AIA HEALTH CARE GUIDELINES FACILITY STANDARDS OR IF APPROVED BY THE OWNER, BE OF THE SAME QUALITY AS REPRESENTED BY THE SCHEDULED ITEM. *REFER TO SPECIFICATIONS FOR ALL OTHER APPLICABLE CODES LATITUDE: DEG. N. LAT. 25.8 LONGITUDE: DEG. W. LONG. 80.3 ELEVATION: FT. ABOVE SEA LEVEL 13.0 ASHRAE SUMMER DESIGN CONDITIONS 0.49 DB MWB 91/78 ASHRAE WINTER DESIGN CONDITIONS 99% DB 47 BUILDING SPACE DESIGN TEMPERATURES SUMMER DB 72 WINTER DB 68 ROOF: U FACTOR - WALL: U FACTOR - SUPPLY AIR TEMPERATURE: DEG. F. DRY BULB 55 GENERAL DEMOLITION NOTES: GENERAL NOTES: A. ALL CAPPED DUCT TAPS AND CONNECTING DUCTS THAT ARE NOT A ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE FLORIDA UNIFORM STATEWIDE BUILDING CODE STATE AND MO.00 BEING USED ARE TO BE REMOVED BACK TO THE MAIN DUCT AND FIRE DAMPER(S) LOCAL CODES IBC, AIA, IMC, NEC THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). AND THE LOCAL AUTHORITIES HAVING X PATCHED AS PER ITEM B BELOW. M2.71 JURISDICTION. ALL EQUIPMENT, MATERIALS, CONTROLS, ETC.SHALL BE NEW UNLESS NOTED OTHERWISE AND SHALL MATCH ALL FIRE RATED ENCLOSURE M3.00 X FACILITY STANDARDS OR IF APPROVED BY THE OWNER, BE OF THE SAME QUALITY AS REPRESENTED BY THE SCHEDULED ITEM. B. PATCH OPENINGS IN EXISTING DUCTWORK THAT IS TO REMAIN FIRE STOPPING M.ICRA X INCLUDING OPENINGS. WHERE TAPS OR DUCTWORK ARE TO BE X REMOVED, THE FOLLOWING SHALL OCCUR: B. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, AND COMPLY WITH ALL NATIONAL, STATE, AND MUNICIPAL C O LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETY. • OPENINGS IN THE MAIN DUCTS ARE TO BE COVERED WITH A LL w SHEET METAL PATCH. THE PATCH IS TO BE LARGER THAN THE C. CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED FOR A COMPLETE WORKING AND COORDINATED EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL SYSTEM. SCREWS FOUR INCHES ON CENTERS. D. COORDINATE THE EXACT LOCATION OF MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHT FIXTURES, PIPING, ca.}+ CONDUIT, AND OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT. • A LIBERAL QUANTITY OF FIRE RESISTANT ADHESIVE IS TO BE Q APPLIED TO THE EDGESIOF THE METAL PATCH AND THE E COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS ASSEMBLY SCREWED IN' PLACE. REQUIRED. C. ALL WORK SHALL BE PERFORMED IN STRICT COORDINATION WITH HOSPITAL SCHEDULES, F. IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND HEIGHTS TO BE AS SHOWN ON THE i OCCUPANCIES AND WORK. CONTRACTOR SHALL COORDINATE WITH HOSPITAL REPRESENTATIVE. ARCHITECTURAL DRAWINGS. COORDINATE THE LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED TO MEET THIS INTENT. D. ALL NECESSARY SHUTDOWNS OR OUT OF PHASE WORK SHALL BE SCHEDULED WITH THE HOSPITAL cis o REPRESENTATIVE G. CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH SUPPORT SHALL BE INDEPENDENT OF cu M PARTITION AND CEILING SYSTEM SUPPORTS. WHERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT SYSTEM SHALL BE UTILIZED. E. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING DUCTWORK AND PIPING i_ PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOUTION WORK SHALL BE H. ALL WORK SHALL BE SCHEDULED AND PERFORMED IN STRICT COORDINATION WITH ARCHITECTURAL PHASING PLANS AND WITH 0 COORDINATED WITH THE NEW WORK TO ASSURE PROPER LIMITS OF DEMOLITION. HOSPITAL SCHEDULES, OCCUPANCIES, AND WORK. CL I. PROTECT EQUIPMENT AND WORK FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL COMPLETION OF CONSTRUCTION. F. REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED PIPING, WHETHER SPECIFICALLY co C.) INDICATED OR NOT, THAT IS NO LONGER REQUIRED. J. REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON COMPLETION OF WORK. TOUCH UP WITH PAINT G. REMOVE AND CAP EXISTING BRANCH PIPING AND DUCTWORK NO LONGER REQUIRED TO WHERE REQUIRED. REMAIN AS PART OF AN ACTIVE SYSTEM, AT THE APPROPRIATE MAIN. REINSULATE PIPING AND K. ALL CONNECTION BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH DIELECTRIC UNIONS. DUCTWORK THAT HAS MISSING OR DAMAGED INSULATION PER SPECIFICATIONS. H. ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM AND IS IN L ARCHITECT SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND THERMOSTAT LOCATIONS. CONFLICT WITH THE NEW LAYOUT SHALL BE RELOCATED AT NO ADDITIONAL COST OVER THE M. COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES WITH LIGHTING PLANS AND ARCHITECTURAL REFLECTED CONTRACT AMOUNT. CEILING PLANS. I. ALL EXISTING DIFFUSERS, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION SHALL N. COORDINATE ALL WALL MOUNTED DEVICE LOCATIONS WITH ARCHITECTURAL INTERIOR ELEVATIONS. REMAIN THE PROPERTY OF THE OWNER AND SHALL BE STORED, REMOVED FROM THE JOB SITE OR DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE 0. DUCT SIZES ARE NET FREE AREA. J• WHERE EXISTING EQUIPMENT IS TO BE RELOCATED, EXTREME CARE SHALL BE TAKEN TO P. PROVIDE ROUND DUCTS TO ALL AIR DEVICES UNLESS NOTED OTHERWISE DUCT SIZE SHALL MATCH AIR DEVICE PREVENT DAMAGE DURING THE REMOVAL AND REINSTALLATION. WHERE DAMAGE OCCURS, NECK SIZE OR THE TABLE IN AIR DEVICE SCHEDULE, WHICHEVER IS LARGER. FLEXIBLE DUCTS SHALL BE SIZED THE EQUIPMENT SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE SIMILARLY. ARCHITECT, AT NO ADDITIONAL COST TO THE OWNER. K or "q ALL EXISTING CMLING DIFFUSERS SHALL BE R U Q. PROVIDE MANUAL VOLUME DAMPER IN EACH AIR DEVICE RUNOUT DUCT AS FAR FROM AIR DEVICE AS POSSIBLE. REMOVED AND STORED OR DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE. L CONTRACTORS SHALL SEAL ALL LEAKS IN EXISTING DUCTWORK AND NEW DUCTWORK. M. EXISTING EQUIPMENT AND DUCTWORK HAS BEEN LIGHTLY DRAWN TO SHOW THE APPROXIMATE LOCATION. NEW EQUIPMENT AND DUCTWORK IS SHOWN BY HEAVY LINES. N. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND /OR DISPOSING OF ALL ITEMS THAT ARE NOT NECESSARY IN THE COMPLETION OF THE PROJECT AND SHALL CLEAN THE AREA OF CONSTRUCTION AFTER THE COMPLETION OF THE PROJECT. 0• THE MECHANICAL CONTRACTOR SHALL ADJUST AND REBALANCE THE AIR CONDITIONING SYSTEM AND EXHAUST SYSTEM TO PROPER DESIGN VOLUME AS SHOWN ON PLAN. P. ANY EXISTING WALLS DAMAGED FROM PIPING OR DUCTWORK THAT WAS REMOVED SHALL BE PATCHED AND SEALED TO MEET THE FULL INTEGRITY OF THE REMAINING WALL COORDINATE WITH ARCHITECTURAL PLANS FOR RATINGS OF WALLS. HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR MO.00 X FIRE DAMPER(S) M2.51 X SMOKE DAMPER(S) M2.71 X FIRE RATED ENCLOSURE M3.00 X FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY M4.00 X FIRE STOPPING M.ICRA X SMOKE CONTROL X v R. INSTALL SPACE THERMOSTAT ADJACENT TO LATCH SIDE OF DOOR IN SPACE INDICATED. U.N.O. INDICATED LOCATIONS ARE APPROXIMATE. AVOID HEAT PRODUCING EQUIPMENT. FINAL SPACE THERMOSTAT /SENSOR LOCATIONS SHALL BE AS DIRECTED BY THE ARCHITECT. S INSTALL TURNING VANES IN ALL 90 DEGREE SQUARE ELLS IN SUPPLY, RETURN, AND EXHAUST DUCTS. (NONE ALLOWED IN COMBUSTION AIR DUCTS). T. LOCATE ISOLATION VALVES FOR EQUIPMENT AS CLOSE TO THE MAIN AS POSSIBLE U. MULTI -BLADE DAMPERS OF ANY TYPE INSTALLED WITHIN 36' OF AN ELL OR OTHER FITTING SHALL BE INSTALLED WITH THE DAMPER BLADE SHAFTS PARALLEL TO THE AIRSTREAM FLOW DIRECTION UPSTREAM OF THE FITTING. V. G.C. TO PROVIDE ACCESS DOORS IF REQUIRED FOR ACCESS TO ANY VALVES THAT ARE NOT ACCESSIBLE VERIFY SIZE AND LOCATIONS WITH MECHANICAL CONTRACTOR. W. FIRE, SMOKE, AND FIRE /SMOKE DAMPERES WILL BE REQUIRED AT ALL DUCT PENETRATIONS THRU RATED WALLS. COORDINATE WITH ARCHITECTURAL DRAWINGS. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PRICING ALL FIRE, SMOKE, AND FIRE /SMOKE DAMPERS REQUIRED BY CODE MECHANICAL CONTRACTOR SHALL REPORT EXISTING FIRE, SMOKE, FIRE /SMOKE DAMPERS TO THE ARCHITECT AND ENGINEER BEFORE PRICING. X. DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL INSTALLED CONTROLS ARE WORKING PROPERLY WITHOUT ERRORS PRIOR TO RELEASING SYSTEM TO OWNER. MECHANICAL SHEET LIST DWG No. DRAWING TITLE SCALE MO.00 LEGEND, NOTES, AND SHEET UST - MECHANICAL NTS M2.51 PARTIAL FIFTH FLOOR PLAN - DEMOLITION & NEW - HVAC 1/4" = 1' -0" M2.71 PARTIAL SEVENTH FLOOR PLAN - DEMOLITION & NEW - HVAC 1/4" = 1' -0" M3.00 MECHANICAL DETAILS AND SCHEDULES NTS M4.00 MECHANICAL SPECIFICATIONS NTS M.ICRA PARTIAL FIFTH & SEVENTH FLOOR PLAN - ICRA 1/4" = 1' -O" Mll= J J 0 Q W ry U W H z ry U Q 0 N M O r Z o M r O 0 m cow t9 0c Q � r- N o m E U cr) co �tirn�F- 8 0 �c� ��NC9 �' W 07 N fD CD O 0 ca "a N d p 2 m N 0 LL o�cVo�coo cu Z C C7 C7 ov mo = J� CYy. coo cn- EU CO LL LL "0a'in�_ o Comm. No: 08061 M 07/07/08 Drawn: Revised: � r 4-1 CIS ' v C O LL w ■E Q ca.}+ Q O Cc 0 .0 0 E m i .— E cis o o cu M i_ cl) c1l) 0 Lo CL p c V0 �/♦> co C.) Comm. No: 08061 Date: 07/07/08 Drawn: Revised: © 2008 HARVARD JOLLY, INC M0.00