08-844-031LOCAIION:
CI /STATE
MIAMI , FLORIDA
,6PRLICA5LE CODES;
BUILDING
2004 FBC
EQUIPMENT
W/ 2005, 2006 REV.
MECHANICAL
2004 FMC W/ REV.
PLUMBING
2004 FPC W /REV.
HOSPITAL AND
2006 AIA
HEALTH CARE GUIDELINES
PARTIAL THIRD FLOOR PLAN MECHANICAL
LATITUDE:
DEG. N. LAT.
25.8
L. i • PLAN--
a MECHANICAL PIPING
PARTIAL ` II FLOOR-
—
LONGITUDE:
MECHANICAL DETAILS
DEG. W. LONG.
80.3
FT. ABOVE SEA LEVEL 13.0
0.4% DB MWB 91/78
U FACTOR —
WALLL
U FACTOR —
DEG. F. DRY BULB 55
I I
AIR
B AL A N
U
EQUIPMENT
SUPPLY AIR
RETURN AIR
MECHANICAL SYMBOLS, LEGEND, AND
-THIRD
EXHAUST AIR OUTSIDE AIR
FROM AHU -1
FLOOR DEMOU11ON `
4650
3515
PARTIAL THIRD FLOOR PLAN MECHANICAL
— 1135
EF -5
L. i • PLAN--
a MECHANICAL PIPING
PARTIAL ` II FLOOR-
—
—
MECHANICAL DETAILS
835 —
EF -6
m=
—
—
MECHANICAL R ; PLAN
300 —
TOTAL
4650
3515
1135 1135
NET PRESSURE = NEUTRAL
EXISTING AHU SCHEDULE
i
ii# •� �# •a 1 �, a # `
OL-ENERALDEMOLITION
MECHAINKAL SHEET LIST
IM
DUCT • DETECTOR
I
FIRE D.
MECHANICAL SYMBOLS, LEGEND, AND
-THIRD
�
SMOKE DAMPER(S)
FLOOR DEMOU11ON `
;
FIRE ., ► ENCLOSURE
PARTIAL THIRD FLOOR PLAN MECHANICAL
FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY
L. i • PLAN--
a MECHANICAL PIPING
PARTIAL ` II FLOOR-
i
FIRE STOPPING
MECHANICAL DETAILS
��IIIs
M
• • * a
m=
EXISTING AHU SCHEDULE
i
ii# •� �# •a 1 �, a # `
OL-ENERALDEMOLITION
MECHAINKAL SHEET LIST
IM
r •
I
r
MECHANICAL SYMBOLS, LEGEND, AND
-THIRD
�
FLOOR DEMOU11ON `
;
PARTIAL THIRD FLOOR PLAN MECHANICAL
L. i • PLAN--
a MECHANICAL PIPING
PARTIAL ` II FLOOR-
i
i
MECHANICAL DETAILS
��IIIs
M
MECHANICAL NOTES
MECHANICAL R ; PLAN
MIAMI' SOUTH
HOSPITAL
L_
REVISIONS:
PROJECT NAME:
SMII- IIIGII RISK A -PAR M UNIT
1 11