08-1330-006DEMOLITION KEY NOTES:
u, REMOVE ALL EXISTING FLOORING, PREPARE FLOOR TO RECEIVE NEW FINISH MATERIAL
FLOOR TO BE LEVELED AND ALL CRACKS AND HIGHSPOTS TO BE REMOVED. FILL FLOOR
PENETRATIONS. COMPLY WITH FLOORING MANUFACTURER RECOMMENDATIONS
FOR FLOOR PREPARATION.
REMOVE EXISTING WALL AND FINISH. PATCH WALLS, FLOOR & STRUCTURE TO MEET & MATCH
EXISTING ADJACENT FINISHES.
3) REMOVE EXISTING CEILING TILES AND GRID. REFER To FINISH SCHEDULE FOR NEW CEILING MATERIAL
H
'I
C OF W
STRUCTul
ApPRC)VEID By'.
jj-TH MIAMI
G [)EPT.
AL SECT10"
CtTY OF SOL
IIUILDIN�3 •
BUILDING
PROJECT NAME:
SOU1711 MIAMI HOSPUAL
m-ml
UUMM. NO.
40053.100
SCALE:
As SHOWN
DATE:
11-18-2008
DRAWN-
JCR
CHECKED:
BNH
CADD FILE-
H:TNSTTTLMoNAL
DRAWING TITLE:
IMO-101:411
t:l SHEET NO.
Amlo"t;